Corrigendum dtd. 15.12.

2021 for E-tender 89951 for the job “SUPPLY, INSTALLATION, TESTING &
COMMISSIONING OF 100 KWP SOLAR PV WITH 100 KWH ENERGY STORAGE SOLUTION & DIESEL
GENERATOR AT BPCL LEH DEPOT”

Sr. Clause Tender Bidder’s Query BPCL Reply /


No. No. Requirement Clarification
1 Annexure 1 Integration the The Existing DG set Shall have DEEP The existing DG set
1.Project solar PV+ESS with C/PSO controller inbuilt to may or may not be
Background, the DG sets through communicate with Inverter/DG provided with PSO
Point. 3 solar PV DG Controller. This will be used for DEEP C/PSO controller.
Page No. 1 controller for smooth getting data from DG and putting So there should an
operation. command upon DG controller. arrangement made by
In case functionality of DG controller the EPC contractor so
is inbuilt in PCU then no separate that any DG set can be
product is required. fitted.
2 Annexure -1 PV+DG+ESS As per MNRE certificates upto Bidders should provide
3. Scope of Controller Standard 20KW are required and hence we all the compliance &
Service and for and. shall furnish certificates for smaller certificates as per
specifications, rating rather than 100KW rating. MNRE guidelines No 3-
Distributed Energy:
PCU shall be in compliance with IEEE 2/2015-16 Lab Policy
Balance of IEEE 1547, IEC
system Page 61000, IEEE 519 1547, IEC 61000 & IEEE 519 but for testing,
No. 7 certification shall not be mandatory. Standardization and
However, IEC 62109-1&2 , IEC 62116 Certification for
& IEC 61727 shall be considered for Renewable Sector or
Product safety, Island mode any latest amendment.
operation & utility interface.

3 Annexure Efficiency As per MNRE certificates up to 20KW Bidders should


-1 Environmental are required and hence we shall provide all the
3. Scope of IEC 61683 / IS furnish certificates for smaller rating compliance &
work/ 61683 rather than 100KW rating. certificates as per
Service and IEC 60068-2 (1, 2, MNRE guidelines No
technical 14, 30) 3-2/2015-16 Lab
specification /Equivalent BIS Std Policy for testing,
s Standardization and
Certification for
Renewable Sector or
any latest
amendment.
Balance of Additional Point International reports should not be As per tender terms
Page No. 7 accepted, as most Chinese vendors Test reports/
and some Indian vendors getting certificate from
OEM done in China can easily IEC/NABL accredited
provide the certificates which laboratory to be
ideally have no Credibility in India. mandatorily
However, any Indian SNA/PSU enclosed for relevant
should promote make in India and IEC/equivalent BIS
hence certifications only from Standard issued on or
Indian NABL labs should be after 1 April 2017.
accepted.
4 Annexur In tune with make in This is a good gesture, however In compliance to
e. XII, India (MII) campaign considering the location and MNRE order No
PPLC in oil gas sector, the strategic significance of the area 146/57/2018- P&C -
Policy government has ONLY MADE IN INDIA product Public Procurement
.1.1, decided to should be allowed having service (Preference to make
Page No. 1 incentivize the network in northern part of India. in India) dated
growth in local 11.12.2018 or the
content in goods and latest amendment
services should be followed.

5 Annexure Inverter Make-ABB / We are the largest solar inverter If Bidder meets all the
06- SMA / Schneider / manufacturer in India. We are the required technical
Approved Delta / Sungrow / only company in India offering a criteria it may added to
Makes SIEMENS or approved complete range of solar inverters the approved make
equivalent including Hybrid MPPT PCUs (Storage list.
+ Grid export), SEOG MPPT-based
PCUs. So we request you to consider
our make i.e.
6 Bid All the bidding All the bidding
Qualificatio documents related to documents related to
n Criteria Technical qualification Technical qualification
Pont V- Criteria, Financial
Criteria, Financial
General, Qualification Criteria
as well as MSE Qualification Criteria as
Page No. 4:
certificate and its well as MSE certificate
supporting and its supporting
documents like SC/ST documents like SC/ST
Certificate, Women Certificate, Women
Entrepreneur proof, Entrepreneur proof,
etc. should be self-
etc. should be TPI
certified.
certified.