MERCOSUL GUARANI - Owner Representative CE Report 3
MERCOSUL GUARANI - Owner Representative CE Report 3
Main Engine
Main Engine general condition is very bad. There are a lot of leakages (Oil, Fuel & Water)
Starting air distributor fault (From time to time ME not started from the bridge).
SI Response: Vessel was requested for more information, they were not sure if this was due to the distributor or
some other part. Also PO 013-21-0133 was issued with recommended parts after the Technical stop in January;
there are parts for the distributor in it. Well Noted.
Fuel Oil / Cylinder Lube Oil calculation as per V2PS not matched real consumption (ME Torque/shaft Meter, ME
fuel oil flowmeter not available) fuel oil calculation is carried out based on table “handmade “.
SI Response: PO 013-21-0317 was issued for ME flow meter. Well Noted.
ME unit 4 recently was overhauled (Liner, Piston, Piston skirt & Piston rings) by a service engineer. Unit now
running on Running In mode. After ME performance was taken, was observed that Pc is lower than other units
(Exhaust valve timing to be checked).
SI Response: Now pending evaluation of Wartsila, follow up to be done. Note that the timing was done by
Wartsila in January. Appreciate if the same will be forwarded to the ship
Electronic Speed Governor to be checked (VIT positioning failure).
SI Response: This was already checked by previous attendance Wartsila. PO 013-21-0333 was issued for a new
positioning unit. Well Noted.
Fuel Oil injectors spare parts are not available (Nozzles, springs & washer disk).
SI Response: PO 013-21-0283 was issued for spares. Well Noted.
Fuel Oil high-pressure pipes spare parts are not available “behind pump”.
SI Response: Well noted, I will request the vessel to make a REQ. Appreciate if you could please ask the CE to
raise a REQ.
Exhaust valve spares are not available (valve spindle, v/v seat).
SI Response: Well noted, I will request the vessel to make a REQ. Appreciate if you could please ask the CE to
raise a REQ.
A lot of O-Rings are not available (Liner, exhaust valve & Gland Box).
SI Response: Well noted, I will request the vessel to make a REQ. Appreciate if you could please ask the CE to
raise a REQ.
Some of the jobs were implemented to TOUCH with wrong figures like overhaul data & running hours (Unit 4,5
& 7).
SI Response: I will check this. Well Noted.
T/C manometer gauges not working properly.
SI Response: Noted, I will request vessel to fix. Well Noted.
T/C U Tubes to be replaced.
SI Response: Noted, I will request vessel to fix. Well Noted.
Pressure air transmitter not working properly.
SI Response: Noted, I will request vessel to fix. Well Noted.
Oil mist detector spare parts are not available.
SI Response: OMD model Mark5 is obsolete and there are no more spares available. PO 013-21-0131 was
issued for a retrofit to Mark7. Well Noted.
ME lube oil auto filter not working properly, spare parts not available(candle).
FLEET MANUAL
Version 01 2021-05-28 Page 2 of 9
Mentor C/E report form
SI Response: Well noted, I will request the vessel to make a REQ. Appreciate if you could please ask the CE to
raise a REQ.
ME lube oil strainer (Continuous Auto Backwashing) running but the Ratchet Mechanical / Handle to be
checked
SI Response: Well noted, I will request the vessel to make a REQ. Appreciate if you could please ask the CE to
raise a REQ.
Auxiliary Engines
Doctor is out of order (Portable cylinder pressure analyzer), AE’s performance is taken with a Peak
pressure indicator.
SI Response: The Doctor should be ok, it should be a matter of configuration. I have sent the manual to
the vessel with the instructions but yet to date no feedback. Well Noted.
Fuel Oil injectors spare parts are not available (Nozzles, springs & washer disk).
SI Response: Well noted, I will request the vessel to make a REQ. Appreciate if you could please ask the CE to
raise a REQ.
Spare cyl head complete not available
SI Response: There should be the spares from the Swing set available, for Aux. No.2. I will ask the CEO
about this.
Lube Oil Filter (Candles) spares are not available.
SI Response: Last ones were used for emergency Aux. No.1. Vessel will receive more for guarantee
from Wartsila. Also PO 013-21-0426 was issued. Well Noted.
Fuel Oil high-pressure pipes spare are not available.
SI Response: Well noted, I will request the vessel to make a REQ. Appreciate if you could please ask the CE to
raise a REQ.
Roto-cap/Springs is not available.
SI Response: Well noted, I will request the vessel to make a REQ. Appreciate if you could please ask the CE to
raise a REQ.
ΩM meter tester for 220/440 not working as well as 220 for EDG.
SI Response: Well noted, I will request the vessel to make a REQ for a new unit. Appreciate if you could please
ask the CE to raise a REQ.
Bow Thruster
Out of order due to defective solenoid valve (valve is fixed but the crew still not able to start BT, some of relay
and contactors to be checked).
SI Response: I have reached out to maker Kawasaki to attend the vessel. The BT was flooded in March this year
and there are still some issues to resolve. Well Noted.
Boiler
BLR in normal running condition.
Burner condition is very bad due to soot leakages (Swivel flange to be replaced with the new one as
soon as possible otherwise it’ll be led to fire).
Aux. Boiler washing is to be performed routinely (water, brush), not once in a year to i mprove boiler
FLEET MANUAL
Version 01 2021-05-28 Page 3 of 9
Mentor C/E report form
efficiency.
The water level switch sensor not working properly.
Fuel Oil Temperature controller not working properly.
The pressure gauge in ECR not working.
Boiler common alarm panel fixing with many jumpers (if an alarm occurs, they will have only visual
alarm without sound).
The cascade tank is not equipped with a salino-meter & Oil Detection unit.
SI Response: I will discuss this with CEO. Water washing is a big job because access is welded and after
cleaning the refractory needs to be build again. Boiler was washed in July during a short stop in Suape
but needed 3-4 days. Well Noted.
Purifiers
ME Lube Oil Purifier is Out of order, ME running for a long time without LO purifier (waiting for spare parts).
SI Response: Pending quotation from GEA. Well Noted.
AEs Lube Oil Purifiers in running condition (for last week never started and AEs are running without
purification.
SI Response: I will discuss this with CEO, they already received instructions before to run only with purifiers.
Now running
Fuel Oil purifiers in running condition.
SI Response: Noted.
OWS was OPERATED & about 20 m3 of Oily water was discharged overboard despite our recommendation, as I
understood previous CE not handed over to current CE.
ICCP/MGPS
ICCP AFT out of order/ MGPS working
SI Response: A new ICCP module was received previously but was defective, a new module was sent by supplier
under warranty. Well Noted.
Pumps
All pumps are in normal condition except ME TC lube oil pump 2 not running (No spare for coupling).
SI Response: 2 new couplings will be delivered Santos 30/Nov. Delivered
Mechanical seal spare part not available
SI Response: Well noted, I will request the vessel to make a REQ. Appreciate if you could please ask the CE to
raise a REQ.
EDG
EDG running (planning to test & take on load mode “LOAD TEST 80-85%)
SI Response: Noted.
Provision plants
Running, there is a Freon leakage for both compressors from the shaft side (the system is topped up twice on
weekly basis)
SI Response: PO 013-21-0428 was issued for overhaul. Well Noted.
Air condition
FLEET MANUAL
Version 01 2021-05-28 Page 4 of 9
Mentor C/E report form
Running. AC 2 running, max load 63%
SI Response: Noted. Please to be checked & there is a needed of spare parts to be raised.
Air compressors
Running. I observe that almost of time are running and they don’t cope-up (Leaking Internal Gaskets, Worn Out
Intake Valve, Faulty Pressure Switch Pressure or Relief Valve to be checked)
spare part not available.
SI Response: We are currently in dialogue with maker to have a maintenance contract in place. PO 013-21-0490
was issued for spares and service. As soon as spares are received on board we can arrange attendance. Well
Noted.
sewage treatment
Not running. The black water does not pass from the Aeration tank to the settling/clarifier tank.
SI Response: Vessel to issue a DR and investigate. Appreciate if you could please ask the CE to raise a REQ.
Ballast valves
Almost of valves are not working remotely only manually.
SI Response: System to be renewed during Drydock. Well Noted.
Emergency Fire p/p Filter heavily rusted and isolation valve out of order.
Bunker Line Pressure test to be carried out & certificate to be issued by chief engineer. RA to be
raised
OIL RECORD BOOK correct entries in the Oil Record Book ( Code C 11, C 12 & D) Training carried out with Chief Eng., 2nd
Eng, 3rd Eng & 4th Eng.
IV. Collection of oil residue (sludge) from tank not listed under item 3.1 in the Supplement to the IOPP certificate
(draining aux. engine sump to a sludge tank).
Collection of oil residues (sludge). Usage of code C.12
I. Disposal of oil residue (sludge) via shore connection.
II. Draining of water (disposal) from a oil residue (sludge) tank (item 3.1) to a bilge tank (item 3.3).
III. Transfer from one oil residue (sludge) tank to another oil residue (sludge) tank (both listed under item 3.1 in
the Supplement to the IOPP certificate.
IV. Disposal (transfer) of oil residues from a oil residue (sludge) tank (item 3.1) to a tank not listed under item 3.1
but mentioned under item 3.2 as means of disposal.
V. Evaporation of water (disposal) from an oil residue (sludge) tank (item 3.1).
VI. Regeneration of Fuel from oil residue (sludge).
VII. Non-automatic disposal of engine room bilge water.
VIII. Pumping of bilge water from engine room bilge holding tank overboard.
IX. Disposal of bilge water from engine room bilge wells or engine room bilge holding tank (item 3.3) to shore
reception facility.
X. Pumping of bilge water from engine room bilge wells or engine room bilge holding tank (item 3.3). Also
includes transfer between tanks listed in item 3.3.
TOUCH Training ( How to prepare DryDock list, TABULAR) carried out with Chief Eng, 2nd Eng, 3rd Eng & 4th Eng.
TOUCH Training (LPSQ, ) carried out with Chief Eng, 2nd Eng, 3rd Eng & 4th Eng.
Engineer’s responsibility on board Ch Eng, 2nd Eng, 3rd Eng & 4th Eng
Bunkering Specific Procedures.
Oily water source on board Chief Eng, 2nd Eng, 3rd Eng & 4th Eng.
Main Engine
FLEET MANUAL
Version 01 2021-05-28 Page 7 of 9
Mentor C/E report form
Auxiliary Engine
FLEET MANUAL
Version 01 2021-05-28 Page 8 of 9
Mentor C/E report form
Auxiliary Boiler
Note: Mentor C/E Report is done to highlight any impact on machinery operations safety. This is not a replacement of
reporting in TOUCH.
Reference to TOUCH ID to be mentioned where relevant.
Note: There is nothing wrong in leaving fields empty. Human resources matters to be reported separately to dedicated
persons if relevant.
Completed