STANDARD FIELD OPERATING PROCEDURE

PPGCL Super Thermal Power Plant


3 X 660 MW.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.: 03
Effective Date: Page 1
PMPL/TG/SOP/33 Revision Date: 01/12/2019

FUNCTIONAL CHANGE
OF SAC INTO IAC

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.: 03
Effective Date: Page 2
PMPL/TG/SOP/33 Revision Date: 01/12/2019

INDEX
1. OBJECTIVE
2. SCOPE
3. INTRODUCTION
4. RESPONSIBILITY
5. SAFETY PRECAUTIONS
6. SAFETY PPE’S
7. STEPS FOLLOWED
8. ABBREVIATIONS

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.: 03
Effective Date: Page 3
PMPL/TG/SOP/33 Revision Date: 01/12/2019

1. OBJECTIVE:
Smooth functional change of SAC in IAC.

2. SCOPE:
This SOP is applicable for 4 no. of Service air Compressor.

3. INTRODUCTION:
During the emergency condition when IAC is not available for any
reason we can produce instrument air from service air compressor
using the dryer of IAC and compressor of SAC. Changeover is only
possible in the connected Instrument air compressor and service air
compresssor i.e. between (IAC 1A & SAC 1B), (IAC 2A & SAC 2B), (IAC
3A & SAC 3B) and (IAC 4A & SAC 4B).

4. RESPONSIBILITY:
Unit Control Engineer, Desk Engineer and Field Operator.

5. SAFETY PRECAUTIONS:
Field Operator ensures no permit to work is pending on regarding this
system by checking with CCR.

6. SAFETY PPE’S:
Ear Plugs, Safety Goggles, Hand Gloves, Helmet etc.

7. STEPS FOLLOWED
 STEP 1:- Close SAC 1B service air outlet valve.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.: 03
Effective Date: Page 4
PMPL/TG/SOP/33 Revision Date: 01/12/2019

 STEP 2:- Close IAC 1A compressed air outlet valve.

 STEP 3:- Open Air Dryer air outlet valve of IAC 1A.

 STEP 4 :- Open the valve between the IAC 1A and SAC 2B


(pneumatic valve & MIV)

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.: 03
Effective Date: Page 5
PMPL/TG/SOP/33 Revision Date: 01/12/2019

 STEP 5 :- Open the regeneration valve of SAC 1B & close


regeneration valve of IAC-1A.

 STEP 6 :- Changeover & Switch ON the connection of dryer


motor from SAC 1A control panel.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.: 03
Effective Date: Page 6
PMPL/TG/SOP/33 Revision Date: 01/12/2019

 STEP 7 :- Check the power supply and SAC 1A compressor


cooling water inlet and outlet pressure before starting the
compressor.

 STEP 8 :- Start the compressor by removing the EPB &


switching it ON .

1. Note:- Ensure that the Dryer motor is rotating while the compressor
is on load
8. Abbreviations:-
a. IAC :- Instrument air compressor
b. SAC :- Service Air Compressor

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head