The document outlines a project schedule from August 2021 to December 2021. It includes timelines for structural work like excavation and foundation construction in August and September. Services like plumbing, electrical, and HVAC ducting are scheduled between October and mid-November. Interior and exterior finishing such as tiling, painting, glazing, and landscaping will occur from mid-October through late November. The project aims to complete all work by the end of November 2021.
The document outlines a project schedule from August 2021 to December 2021. It includes timelines for structural work like excavation and foundation construction in August and September. Services like plumbing, electrical, and HVAC ducting are scheduled between October and mid-November. Interior and exterior finishing such as tiling, painting, glazing, and landscaping will occur from mid-October through late November. The project aims to complete all work by the end of November 2021.
The document outlines a project schedule from August 2021 to December 2021. It includes timelines for structural work like excavation and foundation construction in August and September. Services like plumbing, electrical, and HVAC ducting are scheduled between October and mid-November. Interior and exterior finishing such as tiling, painting, glazing, and landscaping will occur from mid-October through late November. The project aims to complete all work by the end of November 2021.
STAGE DESCRIPTION OF ITEM PROGRESS START END DAYS S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
Ancillary Rooms MS Structure 16/Aug/21 26/Aug/21 10
Excavation, Levelling and PCC (Base Slab 15/Aug/21 27/Aug/21 12 Casting) Structure and Civil Works
Foundation 24/Aug/21 7/Sep/21 14
Column Casting (from basement slab to first 8/Sep/21 14/Sep/21 6 floor beam bottom) Installation of MS Structure 5/Sep/21 11/Sep/21 6 Ground Floor Brick Work including plastering 12/Sep/21 26/Sep/21 14 & curing (Civil Works)