Saudi Aramco Typical Inspection Plan: Cement Lining of Pipes & Fittings SATIP-H-002-01 Mechanical
Saudi Aramco Typical Inspection Plan: Cement Lining of Pipes & Fittings SATIP-H-002-01 Mechanical
00 30-Nov-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Cement Lining of Pipes & Fittings SATIP-H-002-01 27-Jan-19 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
APPLICATION &
3.0
ACCEPTANCE
3.2 Welding (if required) See remarks See remarks Refer to SATIP-W-011-001
3.4 In-Process Inspection of Cement Lining SAIC-H-2006 SAIC-H-2006 W S Notify SA before the start of work
GENERAL NOTES
1 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
2
representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
3
attendance.
4 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
###
###