Floor Slab of Basement Foundation Detail
Floor Slab of Basement Foundation Detail
AND NOT TO BE
COPIED OR USED WITHOUT THEIR WRITTEN PERMISSION.
1
KEY PLAN
TO
S
R BL
S
OCK
C6 C14
C15
RESIDENCE
1
BLOCK
BLOCK
C.B.I.
C.B.I.
6M
WID
ER
OA
5330
D
5330
GB ILEY
RO
AD
BA
TO
COURT CAMPUS
D
OA
ER
WID
M
12
C5 C13
R
GB
R
GB
TO BAILEY ROAD
KEY PLAN
C20
AREA CHART
1 1 1 1
5330
5330
GB
GB
b SECOND FLOOR
Q TOTAL AREA ON SECOND FLOOR
c THIRD FLOOR
1426.06 Sqm. A2
C24
F3
G' G' TOTAL COVERED AREA (A1+A2+A3)
FAR ACHIEVED (TOTAL BUILT UP/SITE AREA)
4278.18 Sqm.
5330
COVERED AREA ACHIEVED) 1.29
5330
F'
5
TOTAL BUILT UP AREA 7190.78 Sqm.
F'
5
GB
168
GB
168
FAR CALCULATIONS
3700
NOMEN. NOS METER METER SQM
2600
BUILDING A = 1426.06
350
C3 C11 C18 C23 =
P TOTAL ADDITIONS 1426.06 R1
350
GB
GB
GB
P
GB
DEDUCTIONS
0
C26 C89 =
0
LIFT SHAFT B 1 X 2.275 X 2.465 5.608
479
F5 =
479
LIFT SHAFT C 1 X 2.275 X 2.465 5.608
5330
PL SHAFT 1 F = 7.178
5330
1
C84
D' GB GB
D' PL SHAFT 2
PL SHAFT 3
G
H
=
=
2.920
4.233
TOTAL DEDUCTIONS = 79.386 S1
= 1346.674
7100 C29
GB PROPOSED FAR CALCULATION AT SECOND FLOOR
0
NOMEN. NOS
1
METER METER SQM
353
C25 T=200 T=200 BUILDING A = 1426.06
353
C88 TOTAL ADDITIONS = 1426.06 R1
GB
C17 C22 C79
C28 N
GB
GB
GB
DEDUCTIONS
N C' LIFT SHAFT B 1 X 2.275 X 2.465 = 5.608
C2 C8
C10 F5 C' LIFT SHAFT C 1 X 2.275 X 2.465 = 5.608
2700
5100
GB
C83 C87 STAIRCASE‐2 E 1 X 3.430 X 4.555 = 15.624
350
M GB
PL SHAFT 1 F = 7.178
350
M 1
GB
PL SHAFT 2 G = 2.920
GB
=
C1 C7 C9 C21 C67 C74 PL SHAFT 3 H 0.47
C16 GB
TOTAL DEDUCTIONS = 75.626 S1
1
GB
=
0
1350.434
GB
GB
0
600
GB
600
PROPOSED FAR CALCULATION AT THIRD FLOOR
C45 C53 C78 C82 L NOMEN. NOS
2630
L C37 C54 METER METER SQM
2630
BUILDING A = 1426.06
TOTAL ADDITIONS = 1426.06 R1
GB
F7
GB GB
GB
5600 DEDUCTIONS
LIFT SHAFT B = 5.608
1260 LIFT SHAFT C
1 X
X
2.275 X
X
2.465
= 5.608
C36 K B'
1 2.275 2.465
GB
K B' GB
STAIRCASE‐1 D 1 X 4.765 X 8.020 = 38.215
2250
C73 GB E 1 X 3.430 X 4.555 = 15.624
2250
C77 STAIRCASE‐2
C44 C66
C86 GB GB
PL SHAFT 1 F = 7.178
GB
PL SHAFT 2 G = 2.920
GB
C59 PL SHAFT 3 H = 0.47
10Ø@200
AT TOP TOTAL DEDUCTIONS = 75.626 S1
J GB
0
=
C72 GB 1350.434
GB
J
500
BASEMENT PARKING
500
FLOOR AREA A = 1495.87 A1
C65 BUILT UP
GB
3080
LIFT & STAIRCASE‐
B 1 4.77 X 10.836 = 51.68 A2
10Ø@200
AT BOTTOM
3080
GB 1
DOMESTIC AND
C = 57.00 A3
T=0.30 C81 FIRE TANK
W=1.5
GB
GB
GB
C43 H TOTAL PARKING AREA:‐ A1‐(A2+A3+A4) = 1377.65 Q1
GB
C52
GB
H
GB
STILT PARKING
C85 FLOOR AREA A = 1416.73 B1
C35 GB BUILT UP
TOILETS B = 72.30 B2
C76 STAIRCASE -2 C 1 3.43 X 4.88 = 16.73 B3
ONE WAY RAMP D 1 6.0 X 5.68 = 34.08 B4
T=200 LIFT & STAIRCASE‐ =
GB
E 1 4.77 X 10.83 51.65 B5
1
5330
KIOSK F 23.27 = 23.27 B6
1
5330
X
GB
SERVICES/STORE = B8
C71 GB
H 1 4.77 X 5.09 24.27
0
GB
% OF TOTAL BUILT UP AREA = 33.73
1
T=200
C68 GB
2600
C42 C75 GB
G C51 0 G
GB
GB
GB
GB
260
C34
5330
C64
5330
GB GB
GB
C63 GB
5' 5'
T=200 T=200
F C50 C57 F
GB
GB
GB
GB
C62
C33 C41
4' 4'
4100 350
350
5330
0
5330
0 GB 366
366 GB1 1
1
GB GB
3' 3'
2' 10Ø@200
AT TOP
2'
T=200
C40 C56
E
C49 E 1'
1'
GB
GB
GB
GB
C61
2720
C32
2720
GB1
2600
C60 D
1100
D 1 1 GB GB GB
T=200
2610
1
GB
2610
10Ø@200
AT BOTTOM 1
T=200
C39
GB1
C55
C
C48 C
1
C31
3640
3640
GB1
C47
GB DOMESTIC TANK - 20KL
B B T=200 1 AND
1690
1690
5000 4065 3010 6230 5000 5000 4065 3010 6230 5000
1 2 3 4 5 6 1 2 3 4 5 6 BUILDING CONSTRUCTION
DEPARTMENT, PATNA, BIHAR
PROJECT
500 MULTIPURPOSE BUILDING IN THE
300
NL
200
DATE
450
100
27-12-2021
300
ARCHITECT'S SIGNATURE