SUB-DIVISIONAL OFFICE
CP-07 1 of 5
Reference Instructions
2.2 Issue top copy of the Meter Change Order and New Consumer's Meter Reading
Card to Lineman (see CP-Code-7/2.4).
Reference Instructions
2.4 Receive the Meter Change Order from the Disconnection and Reconnection Section
Supervisor, (see CP-Code-7/2.2).
2.5 Effect change of meter, complete the Meter Change Form and pass it to the Section
Supervisor (see CP-Code-7/2.6).
CP-07 4 of 5
SUB-DIVISIONAL OFFICE
Reference Instructions
2.6 Receive back from Lineman the top copy of the Meter Change Order duly
completed (see CP-Code-7/2.5). Copy details on to second copy retained in book.
2.8 Detach second copy of Meter Change Order from book and send to Meter Reading
Section Supervisor (see CP-Code-7/2.11).
2.9 Receive second copy of Meter Change Order back from Meter Reading Section
Supervisor (See CP-Code-7/2.13). Check that all numbers are complete. Investigate
and find any missing numbers. File in consumer's individual file.
2.10 Investigate and clear any second copy Meter Change Order which remained for
more than two weeks in book.
CP-07 5 of 5
SUB-DIVISIONAL OFFICE
Reference Instructions
2.11 Receive completed Meter Change Orders from Disconnection and Reconnection
Section Supervisor (see CP-Code-7/2.8).
2.12 Enter details of new meter on Meter Reading Record(CP-Form-11)and also meter
readings of old and new meters.