SN DATE DISCOM RSS Incomer


LEVEL

1 01.01.20 HVPNL STLK RSS 66KV

2 01.01.20 HVPNL STLK RSS 66KV

3 12.01.20 UPPCL ATHA RSS 66KV 1&2


4 11.01.20 BRPL PALM 66 KV 2
5 12.01.20 UPPTCL NEC RSS 132 1& 2
6 12.01.20 UPPTCL NEC RSS 132 1& 2

7 13.01.20 HVPNL STLK RSS 66KV 1


8 13.01.20 BRPL RKPM 66 KV 2

9 14.01.20 HVPNL STLK RSS 66KV 2

10 14.12.19 BRPL MUDK 66KV 2

11 15.01.2020 BRPL SN RSS 66 1

12 18.01.20 BYPL VNNR 66KV 2

13 29.01.2020 UPPCL BCGN 132 2


14 30.01.2020 UPPCL BCGN 132 2
15 01.02.20 BYPL VNNR 66KV 2
SINGLE/ Load affected
MULTIPLE FAILED RESUMED
DURATION
RSS FROM AT
FAILURE
TRACTION

15:56:22 16:23:17 0:26:55

SINGLE CHTP SP-HCC DE

15:57:15 16:05:17 0:08:02

16:28:28 16:36:20 0:07:52

SINGLE CHTP SP-HCC DE

16:29:34 16:57:03 0:27:29

SINGLE 7:15 7:42 0:26:52 SHDN SP - NBAA

SINGLE 9:53:00 15:16:00 5:23:00 NA


SINGLE 17:40:05 17:48:15 0:08:10 NIL
SINGLE 17:56:57 18:19:39 0:22:42 NIL

SINGLE 11:35:00 11:36:30 0:01:30 NIL

SINGLE 15:30:00 19:32:48 4:02:48 NA

SINGLE 12:42:30 12:48:30 0:06:00 NIL

SINGLE 10:32:15 12:21:14 1:48:59 NIL

SINGLE 8:41:49 8:52:34 0:10:45 KB SP-UN SP

SINGLE 8:20:48 8:37:32 0:16:44 TKPR-EANR

SINGLE 13:25:00 15:49:00 2:24:00 NIL


SINGLE 12:52:00 15:00:00 2:08:00 NIL
SINGLE 10:00:26 10:07:45 0:07:19 TKPR-EANR
AUXILLIARY
TRACTION SUPPLY
Load affected SUPPLY EXTENDED
EXTENDED FROM
FROM

AUXILLIARY DISCOM RSS DISCOM RSS

SLTP -HCC BRPL CHTP BRPL CHTP

SLTP -HCC BRPL CHTP BRPL CHTP

NBAA-SHDN DTL KG RSS DTL KG RSS


NA NA NA NA NA
NIL NIL NIL NIL NIL
NIL NIL NIL NIL NIL

NIL NIL NIL NIL NIL

NA BRPL PALM NA PALM

NIL NIL NIL NIL NIL

NIL NIL NIL NIL NIL

SN-PN /CKT-1
SN-MDHS/CKT-2 BRPL PALAM RSS BRPL PALAM RSS

TKPR-WC NA YV NA YV

NIL NIL NIL NIL NIL


NIL NIL NIL NIL NIL
TKPR-WC NA YV NA YV
Cause of failure reported by System
control

66 KV I/C - 1 &2 SUPPLY FAILED FROM HVPNL DUE


TO TRIPPING AT THEIR END.

66 KV I/C - 1 & 2 SUPPLY FAILED FROM HVPNL DUE


TO TRIPPING AT THEIR END.

BOTH INCOMER FAILED FROM UPPCL END

PLANNED SHUTDOWNTAKEN BY DTL


400 KV SUPPLY FAILED
400 KV SUPPLY FAILED
66 KV I/C -1 SUPPLY FAILED FROM HVPNL DUE TO
SUPPLY CHANGEOVER AT THEIR END
PLANNED SHUTDOWNTAKEN BY DTL
66 KV I/C -2 SUPPLY FAILED FROM HVPNL DUE TO
SUPPLY CHANGEOVER AT THEIR END
nil

TRIPPING AT DTL END.

DTL END SUPPLY FAILED due to bird electrocuted

SHUT DOWN TAKEN BY UPPCL


SHUT DOWN TAKEN BY UPPCL
DTL END SUPPLY FAILED due to tripping at Maharani
bagh.
CAUSE- STORM, GRID, CABLE JOINT FAILURE, EXTERNAL CABLE
TYPE
FAILURE, OTHERS (SPECIFY)

DUE TO TRIPPING AT HVPNL END 5

DUE TO TRIPPING AT HVPNL END 5

PLANNED SHUTDOWN REQUESTED BY UPPCL. 6


OTHERS 6
OTHERS 5
OTHERS 5

GRID 4

OTHERS 1

DUE TO SUPPLY CHANGEOVER AT THEIR END. 4

N/A 6

OTHERS 4

Problem Upstream to DTL S/S 5

OTHERS 5
OTHERS 5
Problem Upstream to DTL S/S 5
TRAFFIC
REMARKS
REPURCUSSION

I/C -1 ON LOAD
I/C-2 OFF LOAD

NA SUPPLY EXTENDED FROM CHTP RSS.


AUXILIARY SUPPLY EXTENSION DELAYED
DUE TO SCADA COMMUNICATION FAILURE
AT SLTP ASS.

I/C -1 OFF LOAD


NA I/C-2 ON LOAD
SUPPLY EXTENDED FROM CHTP RSS.

NIL NA

NA OFF LOAD
NIL Offload
NIL Offload

NA OFF LOAD

NA ON LOAD INCLUDING INA/RSS

NA OFF LOAD

NIL SAME WAS OFFLOAD.

AT 0914HRS LOAD TAKEN BACK ON SN RSS


NIL AFTER GETTING CLEARANCE FROM DTL/SYSTEM
CONTROLLER.

NA

FEED EXTENDED AT PER FEEDING PLAN


NIL PLANNED SHUT DOWN
NIL PLANNED SHUT DOWN
NA FEED EXTENDED AS PER FEEDING PLAN
SINGLE/
VOLTAGE MULTIPLE
SN DATE DISCOM RSS Incomer
LEVEL RSS
FAILURE

1 01.12.18 UPPCL BCGN 132 1&2 SINGLE

2 01.12.18 HVPNL FBD RSS 66KV 2 SINGLE

3 02.12.18 BRPL DW 66KV 2 SINGLE

4 03.12.18 HVPNL STLK RSS 66KV 1 SINGLE

5 03.12.18 HVPNL STLK RSS 66KV 1 SINGLE

6 06.12.18 HVPNL FBD RSS 66KV 2 SINGLE

7 06.12.18 HVPNL FBD RSS 66KV 1 SINGLE

8 08.12.18 TPDDL RI RSS 66KV 2 SINGLE

9 09.12.18 HVPNL STLK RSS 66KV 1 SINGLE

10 09.12.18 HVPNL STLK RSS 66KV 1 SINGLE

11 11.12.18 HVPNL STLK RSS 66KV 1 SINGLE

12 11.12.18 HVPNL STLK RSS 66KV 1 SINGLE


13 11.12.18 HVPNL STLK RSS 66KV 1 SINGLE

14 11.12.18 HVPNL STLK RSS 66KV 1 SINGLE

15 11.12.18 HVPNL STLK RSS 66KV 1 SINGLE

16 14.12.18 BRPL RKPRM 66 KV 1&2 SINGLE

17 14.12.18 BRPL PALM 66 KV 1 SINGLE

18 14.12.18 HVPNL FBD RSS 66KV 1 SINGLE

19 16.12.18 BRPL MKPR 66 KV 1 SINGLE

20 20.12.18 DTL KG RSS 220KV 1&2 SINGLE

21 20.12.18 DTL KG RSS 220KV 1&2 SINGLE

22 20.12.18 DTL KG RSS 220KV 1 SINGLE

23 21.12.18 HVPNL STLK RSS 66KV 1 SINGLE

24 20.12.18 TPDDL KG RSS 66KV 1&2 SINGLE


25 20.12.18 NDMC PS RSS 66KV 1 SINGLE

26 20.12.18 NDMC PS RSS 66KV 1&2 MULTIPLE

27 22.12.18 HVPNL STLK RSS 66KV 2 SINGLE

28 24.12.18 HVPNL FBD RSS 66KV 1 SINGLE

29 27.12.18 HVPNL STLK RSS 66KV 2 SINGLE

30 27.12.18 HVPNL BGZ 132KV 2 SINGLE

31 28.12.18 HVPNL BGZ 132KV 1 SINGLE

32 28.12.18 HVPNL FBD RSS 66KV 1 SINGLE

33 28.12.18 HVPNL FBD RSS 66KV 1 SINGLE

34 29.12.18 HVPNL FBD RSS 66KV 1 SINGLE

35 31.12.18 HVPNL STLK RSS 66KV 2 SINGLE


36 31.12.18 HVPNL STLK RSS 66KV 1 SINGLE

37 04.01.19 HVPNL FBD RSS 66KV 2 SINGLE

38 05.01.19 TPDDL RI RSS 66KV 1 SINGLE

39 07.01.19 BRPL KJMD 66 KV 2 SINGLE

40 07.01.19 BRPL STVR RSS 66KV 1 SINGLE

41 07.01.19 HVPNL FBD RSS 66KV 2 SINGLE

42 09.01.19 BYPL YV 66 KV 1 SINGLE

43 10.01.19 BRPL RKPRM 66 KV 1&2 SINGLE

44 11.01.19 HVPNL STLK RSS 66KV 1 SINGLE

45 11.01.19 BRPL MKPR 66 KV 1 SINGLE

46 12.01.19 HVPNL FBD RSS 66KV 1 SINGLE

47 13.01.19 BYPL VNNR 66KV 1&2 SINGLE


48 13.01.19 HVPNL STLK RSS 66KV 1 SINGLE

49 14.01.19 HVPNL STLK RSS 66KV 2 SINGLE

50 13.01.19 HVPNL FBD RSS 66KV 1 SINGLE

51 15.01.19 BRPL RKPRM 66 KV 1&2 SINGLE

52 15.01.19 HVPNL FBD RSS 66KV 1 SINGLE

53 16.01.19 HVPNL FBD RSS 66KV 2 SINGLE

54 16.01.19 HVPNL FBD RSS 66KV 2 SINGLE

55 13.01.19 BYPL VNNR 66KV 1&2 SINGLE

56 16.01.19 BYPL VNNR 66KV 2 SINGLE


57 16.01.19 BYPL YV 66 KV 2 SINGLE

58 20.01.19 HVPNL FBD RSS 66KV 1&2 SINGLE

59 24.01.19 HVPNL STLK RSS 66KV 1&2 SINGLE

60 25.01.19 HVPNL STLK RSS 66KV 1 SINGLE

61 24.01.19 BYPL IDPT 66KV 2 SINGLE

62 24.01.19 HVPNL FBD RSS 66KV 2 SINGLE

63 25.01.19 BRPL PALM 66 KV 2 SINGLE

64 25.01.19 BRPL MUDK 66KV 2 SINGLE


65 27.01.19 HVPNL FBD RSS 66KV 2 SINGLE

66 29.01.19 HVPNL STLK RSS 66KV 2 SINGLE

67 29.01.19 HVPNL FBD RSS 66KV 2 SINGLE

68 31.01.19 HVPNL STLK RSS 66KV 2 SINGLE

69 29.01.19 HVPNL FBD RSS 66KV 2 SINGLE

70 01.02.19 HVPNL FBD RSS 66KV 1 SINGLE

71 04.02.19 HVPNL STLK RSS 66KV 2 SINGLE

72 05.02.19 BRPL KJMD 66 KV 2 SINGLE

73 05.02.19 BRPL STVR RSS 66KV 1&2 SINGLE

74 05.02.19 HVPNL BGZ 132KV 1&2 SINGLE

75 06.02.19 HVPNL STLK RSS 66KV 1&2 MULTIPLE

76 08.02.19 HVPNL STLK RSS 66KV 2 SINGLE

77 08.02.19 HVPNL STLK RSS 66KV 1 SINGLE

78 10.02.19 BYPL VNNR 66KV 2 SINGLE

79 12.02.19 HVPNL BGZ 132KV 1 SINGLE


80 15.01.19 BYPL VNNR 66KV 1&2 SINGLE

81 15.02.19 BRPL DKV 66 KV 2 SINGLE

82 15.02.19 NDMC PS RSS 66KV 1&2 MULTIPLE

83 15.02.19 BRPL STVR RSS 66KV 1&2 MULTIPLE

84 16.02.19 HVPNL STLK RSS 66KV 1 SINGLE

85 18.02.19 HVPNL STLK RSS 66KV 1 SINGLE

86 19.02.19 NDMC PS RSS 66KV 2 SINGLE

87 02.02.19 UPPCL ATHA RSS 132 KV 2 SINGLE

88 11.02.19 UPPCL ATHA RSS 132 KV 2 SINGLE

89 11.02.19 UPPCL ATHA RSS 132 KV 2 SINGLE


90 11.02.19 UPPCL ATHA RSS 132 KV 2 SINGLE

91 26.02.19 UPPCL ATHA RSS 132 KV 2 SINGLE

92 20.02.19 UPPCL BCGN 132 1&2 SINGLE

93 22.02.19 HVPNL FBD RSS 66KV 2 SINGLE

94 23.02.19 BYPL VNNR 66KV 1&2 SINGLE

95 24.02.19 BYPL VNNR 66KV 1&2 SINGLE

96 24.02.19 BYPL VNNR 66KV 1&2 SINGLE

97 25.02.19 BYPL VNNR 66KV 1&2 SINGLE

98 27.02.19 HVPNL FBD RSS 66KV 1 SINGLE

99 01.03.19 BYPL ND RSS 66KV 1 SINGLE

100 01.03.19 NDMC PS RSS 66KV 1 SINGLE

101 01.03.19 TPDDL JGPI RSS 220 KV 1 SINGLE

102 01.03.19 TPDDL JGPI RSS 220 KV 2 SINGLE


103 01.03.19 TPDDL JGPI RSS 220 KV 2 SINGLE

104 03.03.19 BRPL RKPRM 66 KV 1&2 MULTIPLE

105 04.03.19 BYPL VNNR 66KV 1&2 SINGLE

106 04.03.19 BRPL DKV 66 KV 2 SINGLE

107 02.03.19 HVPNL FBD RSS 66KV 2 SINGLE

108 11.03.19 BRPL MUDK 66KV 2 SINGLE

NOIDA
109 13.03.19 UPPCL
RSS-62
132 1&2 SINGLE

110 16.03.19 HVPNL FBD RSS 66KV 1& 2 SINGLE

111 17.03.19 HVPNL FBD RSS 66KV 1&2 SINGLE

NOIDA
112 17.03.19 UPPCL
RSS-62
132 1&2 SINGLE

113 18.03.19 HVPNL FBD RSS 66KV 1 SINGLE

114 23.03.19 HVPNL FBD RSS 66KV 1&2 SINGLE

115 24.03.19 BRPL CHTP RSS 66KV 1&2 SINGLE


116 24.03.19 HVPNL FBD RSS 66KV 1&2 SINGLE

117 24.03.19 BRPL MUDK 66KV 2 SINGLE

118 26.03.19 UPPCL ATHA RSS 132 KV 2 SINGLE

119 26.03.19 TPDDL RI RSS 66 KV 2 SINGLE

120 29.03.19 BRPL CHTP RSS 66KV 1&2 SINGLE

121 30.03.19 HVPNL STLK RSS 66KV 1&2 SINGLE

122 30.03.19 HVPNL STLK RSS 66KV 1&2 SINGLE

NOIDA
123 03.04.19 UPPCL
RSS-62
132 1&2 SINGLE

NOIDA
124 04.04.19 UPPCL
RSS-62
132 1&2 SINGLE

125 04.04.19 HVPNL STLK RSS 66KV 2 SINGLE

126 04.04.19 HVPNL BGZ 132KV 1 SINGLE

127 04.04.19 HVPNL BGZ 132KV 2 SINGLE


NOIDA
128 04.04.19 UPPCL
RSS-62
132 1&2 SINGLE

129 06.04.19 BRPL MKPR 66 KV 1 SINGLE

130 06.04.19 BRPL STVR RSS 66KV 1 SINGLE

131 07.04.2019 HVPNL FBD RSS 66KV 1&2 MULTIPLE

132 11.04.19 NDMC PS RSS 66KV 1&2 MULTIPLE

133 12.04.19 BRPL MKPR 66 KV 1 SINGLE

134 16.04.19 HVPNL BGZ 132KV 1&2 SINGLE

135 16.04.19 HVPNL BGZ 132KV 1&2 SINGLE

136 20.04.19 BRPL STVR RSS 66KV 2 SINGLE

NOIDA
137 21.04.19 UPPCL
RSS-62
132 1&2 SINGLE

138 23.03.19 HVPNL FBD RSS 66KV 1&2 SINGLE

139 27.04.19 HVPNL STLK RSS 66KV 1&2 SINGLE

140 27.03.19 UPPCL ATHA RSS 132 KV 2 SINGLE


141 28.04.19 BRPL DKV 66 KV 2 SINGLE

142 30.04.19 HVPNL STLK RSS 66KV 1&2 SINGLE

143 30.04.19 BYPL YV 66 KV 2 SINGLE

144 30.04.19 BYPL IDPT 66KV 1 SINGLE

145 02.05.19 HVPNL STLK RSS 66KV 1&2 SINGLE

146 03.05.19 HVPNL STLK RSS 66KV 1&2 SINGLE

147 02.05.19 HVPNL BGZ 132KV 1 SINGLE

148 03.05.19 BRPL RKPRM 66 KV 1&2 MULTIPLE

149 03.05.19 BRPL DKV 66 KV 2 SINGLE

150 07.05.19 BRPL MKPR 66 KV 1 SINGLE

151 09.05.19 BRPL MKPR 66 KV 1 SINGLE

152 11.05.19 BRPL STVR RSS 66KV 2 SINGLE

153 15.05.19 BRPL CHTP RSS 66KV 1 SINGLE

154 15.05.19 HVPNL BGZ 132KV 2 SINGLE


155 16.05.19 HVPNL FBD RSS 66KV 1&2 SINGLE

156 16.05.19 HVPNL FBD RSS 66KV 1&2 SINGLE

157 17.05.19 BRPL DW 66KV 1&2 SINGLE

158 19.05.19 HVPNL STLK RSS 66KV 1&2 SINGLE

159 20.05.19 HVPNL FBD RSS 66KV 1&2 SINGLE

160 22.05.19 NDMC PS RSS 66KV 1 SINGLE

161 24.05.19 BRPL MKPR 66 KV 1 SINGLE

NOIDA
162 23.05.19 UPPCL
RSS-62
132 1&2 SINGLE

NOIDA
163 24.05.19 UPPCL
RSS-62
132 1&2 SINGLE

164 24.05.19 BRPL MKPR 66 KV 1 SINGLE

NOIDA
165 24.05.19 UPPCL
RSS-62
132 1&2 SINGLE

166 25.05.19 HVPNL STLK RSS 66KV 1&2 SINGLE

167 26.05.19 HVPNL STLK RSS 66KV 2 SINGLE


168 26.05.19 HVPNL STLK RSS 66KV 1 SINGLE

169 26.05.19 HVPNL STLK RSS 66KV 1 SINGLE

170 26.05.19 TPDDL RI RSS 66 KV 1&2 SINGLE

171 26.05.19 NDMC PS RSS 66KV 1 SINGLE

172 26.05.19 BRPL STVR RSS 66KV 1 SINGLE

173 26.05.19 HVPNL FBD RSS 66KV 1&2 SINGLE

174 26.05.19 HVPNL FBD RSS 66KV 1&2 SINGLE

175 28.05.19 TPDDL JGPI RSS 220 KV 1&2 SINGLE

176 28.05.19 UPPCL BCGN 132 1& 2 SINGLE

177 28.05.19 UPPCL BCGN 132 1& 2 SINGLE


178 29.05.19 UPPCL BCGN 132 1& 2 SINGLE

179 30.05.19 HVPNL STLK RSS 66KV 2 SINGLE

180 30.05.19 HVPNL STLK RSS 66KV 2 SINGLE

181 30.05.19 HVPNL STLK RSS 66KV 2 SINGLE

182 30.05.19 HVPNL STLK RSS 66KV 2 SINGLE

183 30.05.19 HVPNL STLK RSS 66KV 2 SINGLE

184 30.05.19 BRPL DW 66KV 1&2 SINGLE

185 01.06.19 BRPL RKPRM 66 KV 1&2 SINGLE

186 31.05.19 HVPNL FBD RSS 66KV 1&2 SINGLE

187 01.06.19 HVPNL FBD RSS 66KV 1&2 SINGLE

NOIDA
188 03.06.19 UPPTCL
RSS-62
132 1&2 SINGLE

189 03.06.19 HVPNL FBD RSS 66KV 1&2 SINGLE

190 03.06.19 HVPNL FBD RSS 66KV 1&2 SINGLE


191 07.06.19 BRPL STVR RSS 66KV 2 SINGLE

192 07.06.19 BRPL MUDK 66KV 2 SINGLE

193 09.06.19 TPDDL JGPI RSS 220 KV 1&2 SINGLE

194 09.06.19 TPDDL MKPR 66 KV 2 SINGLE

195 10.06.19 HVPNL BGZ 132KV 1,2 SINGLE

196 10.06.19 HVPNL BGZ 132KV 1 SINGLE

197 10.06.19 BRPL STVR RSS 66KV 2 SINGLE

198 11.06.19 HVPNL FBD RSS 66KV 1&2 SINGLE

NOIDA
199 12.06.19 UPPTCL
RSS-62
132 1&2 SINGLE

NOIDA
200 12.06.19 UPPTCL
RSS-62
132 1&2 SINGLE

201 14.06.19 TPDDL JGPI RSS 220 KV 1&2 SINGLE

202 14.06.19 TPDDL RI RSS 66 KV 1&2 SINGLE

203 16.06.19 HVPNL BGZ 132KV 2 SINGLE


204 16.06.19 HVPNL FBD RSS 66KV 1&2 SINGLE

205 17.06.19 HVPNL STLK RSS 66KV 1 SINGLE

206 17.06.19 HVPNL STLK RSS 66KV 2 SINGLE

207 17.06.19 HVPNL BGZ 132KV 2 SINGLE

208 17.06.19 BYPL IP RSS 66 2 SINGLE

209 18.06.19 HVPNL STLK RSS 66KV 2 SINGLE

210 19.06.19 HVPNL STLK RSS 66KV 1&2 SINGLE

211 19.06.19 BYPL ND RSS 66KV 1 SINGLE

212 19.06.19 BRPL RKPRM 66 KV 1&2 SINGLE

213 19.06.19 BRPL DKV 66 KV 2 SINGLE

214 19.06.19 BYPL IP RSS 66 2 SINGLE


215 20.06.19 TPDDL JGPI RSS 220 KV 1&2 SINGLE

216 21.06.19 TPDDL JGPI RSS 220 KV 2 SINGLE

217 22.06.19 HVPNL STLK RSS 66KV 1 SINGLE

218 22.06.19 BYPL ND RSS 66KV 1 SINGLE

219 22.06.19 TPDDL MKPR 66 KV 2 SINGLE

220 24.06.19 HVPNL STLK RSS 66KV 1 SINGLE

221 24.06.19 UPPCL BCGN 132 2 SINGLE

222 25.06.19 HVPNL STLK RSS 66KV 1 SINGLE

223 25.06.19 HVPNL STLK RSS 66KV 1 SINGLE

224 27.06.19 HVPNL STLK RSS 66KV 1 SINGLE

225 27.06.19 UPPCL ATHA RSS 132 KV 1&2 SINGLE

226 30.06.19 HVPNL STLK RSS 66KV 1 SINGLE

227 30.06.19 UPPCL ATHA RSS 132 KV 1&2 SINGLE

228 30.06.19 UPPCL ATHA RSS 132 KV 1&2 SINGLE


229 01.07.19 UPPCL ATHA RSS 132 KV 1&2 SINGLE

230 30.06.19 HVPNL BGZ 132KV 1 SINGLE

231 30.06.19 HVPNL BGZ 132KV 2 SINGLE

232 03.07.19 UPPCL ATHA RSS 132 KV 1&2 SINGLE

233 02.07.19 BRPL RKPRM 66 KV 1&2 SINGLE

234 03.07.19 HVPNL STLK RSS 66KV 1 SINGLE

235 03.07.19 HVPNL STLK RSS 66KV 1 SINGLE

236 04.07.19 HVPNL STLK RSS 66KV 1&2 SINGLE

237 04.07.19 HVPNL STLK RSS 66KV 1 SINGLE

238 04.07.19 HVPNL STLK RSS 66KV 2 SINGLE

239 04.07.19 BRPL KJMD 66 KV 1&2 SINGLE

240 04.07.19 BRPL STVR RSS 66KV 1 SINGLE

241 06.07.19 BRPL STVR RSS 66KV 2 SINGLE

242 05.06.19 HVPNL BGZ 132KV 1 SINGLE

243 06.06.19 HVPNL BGZ 132KV 2 SINGLE

244 06.07.19 BRPL STVR RSS 66KV 2 SINGLE


245 12.07.19 HVPNL STLK RSS 66KV 2 SINGLE

246 13.07.19 HVPNL FBD RSS 66KV 1&2 SINGLE

247 17.07.19 HVPNL STLK RSS 66KV 1 SINGLE

248 17.07.19 HVPNL FBD RSS 66KV 1&2 SINGLE

249 18.07.19 HVPNL STLK RSS 66KV 2 SINGLE

250 19.07.19 BYPL ND RSS 66KV 1 SINGLE

251 18.07.19 BYPL IP RSS 66KV 1 SINGLE

252 20.07.19 HVPNL BGZ 132KV 1 SINGLE

253 20.07.19 HVPNL BGZ 132KV 1 SINGLE

254 21.07.19 TPDDL KG RSS 220 KV 1 SINGLE

255 21.07.19 HVPNL BGZ 132KV 2 SINGLE

256 21.07.19 TPDDL KG RSS 220KV 1 SINGLE

257 22.07.19 HVPNL STLK RSS 66KV 1 SINGLE


258 25.07.19 TPDDL RI RSS 66 KV 1&2 SINGLE

259 25.07.19 TPDDL JGPI RSS 220 KV 1&2 SINGLE

260 27.07.19 UPPCL BCGN 132 1 SINGLE

261 29.07.19 HVPNL STLK RSS 66KV 2 SINGLE

262 01.08.19 HVPNL STLK RSS 66KV 2 SINGLE

263 01.08.19 BRPL RKPM 66 KV 1&2 SINGLE

264 02.08.19 BRPL MKPR 66 KV 1 SINGLE

NOIDA
265 06.08.19 UPPTCL 132 1&2 SINGLE
RSS-62

266 09.08.19 BYPL ND RSS 66KV 1 SINGLE

267 09.08.19 BRPL PALM 66 KV 1 SINGLE

268 09.08.19 BYPL IDPT 66KV 2 SINGLE

269 09.08.19 BRPL IDPT 66KV 2 SINGLE

270 10.08.19 BRPL STVR RSS 66KV 2 SINGLE

271 09.08.19 BYPL ND RSS 66KV 1 SINGLE

NOIDA
272 15.08.19 UPPCL 132 1&2 SINGLE
RSS-62
273 15.08.19 BRPL MKPR 66 KV 1 SINGLE

274 15.08.19 BRPL MKPR 66 KV 1 SINGLE

275 18.08.19 UPPCL BCGN 132 1& 2 SINGLE

276 17.08.19 TPDDL KG RSS 66KV 1&2 SINGLE

277 18.08.19 TPDDL KG RSS 220 KV 2 SINGLE

278 18.08.19 UPPCL BCGN 132 1& 2 SINGLE

279 21.08.19 HVPNL FBD RSS 66KV 1&2 SINGLE

280 21.08.19 HVPNL BGZ 132KV 2 SINGLE

281 23.08.19 BYPL ND RSS 66KV 1 SINGLE

282 23.08.19 BRPL MKPR 66 KV 1 SINGLE

283 26.08.19 HVPNL BGZ 132KV 1&2 SINGLE


284 27.08.19 HVPNL BGZ 132KV 1 SINGLE

285 29.08.19 BRPL KJMD 66 KV 2 SINGLE

286 29.08.19 HVPNL BGZ 132KV 1 SINGLE

287 29.08.19 HVPNL BGZ 132KV 1 SINGLE

288 29.08.19 BYPL IDPT 66KV 1 SINGLE

289 31.08.19 HVPNL STLK RSS 66KV 1 SINGLE

290 01.09.19 HVPNL STLK RSS 66KV 2 SINGLE

291 02.09.19 HVPNL STLK RSS 66KV 1 SINGLE

292 02.09.19 HVPNL STLK RSS 66KV 2 SINGLE

293 03.09.19 UPPCL BCGN 132 1& 2 SINGLE

294 04.09.19 HVPNL FBD RSS 66KV 1&2 SINGLE

295 04.09.19 HVPNL FBD RSS 66KV 1&2 SINGLE

296 08.09.19 BRPL CHTP RSS 66KV 1 SINGLE


297 09.09.19 UPPCL BCGN 132 1& 2 SINGLE

298 11.09.19 BRPL MKPR 66 KV 1 SINGLE

299 11.09.19 BRPL DKV 66 KV 2 SINGLE

300 11.09.19 BRPL DKV 66 KV 2 SINGLE

301 11.09.19 BRPL MKPR 66 KV 1 SINGLE

302 13.09.19 TPDDL KG RSS 220 KV 1 SINGLE

303 14.09.19 BRPL MKPR 66 KV 1 SINGLE

304 14.09.19 HVPNL FBD RSS 66KV 1&2 SINGLE

305 15.09.19 HVPNL BGZ 132KV 1, 2 SINGLE

306 15.09.19 BRPL PALM 66 KV 1 SINGLE

307 15.09.19 HVPNL BGZ 132KV 1, 2 SINGLE

308 16.09.19 TPDDL KG RSS 220 KV 1 SINGLE

309 21.09.19 BRPL DKV 66 KV 1&2 SINGLE


MULTIPLE
310 26.09.19 TPDDL JGPI RSS 220 KV 1&2
(RI RSS ALSO)

311 26.09.19 TPDDL RI RSS 66 KV 1&2 SINGLE

312 01.10.19 BRPL MKPR 66 KV 1 SINGLE

313 03.10.19 BRPL MKPR 66 KV 1 SINGLE

314 03.10.19 BRPL MUDK 66KV 2 SINGLE

315 08.10.19 HVPNL FBD RSS 66KV 1&2 SINGLE

316 11.10.19 HVPNL FBD RSS 66KV 2 SINGLE

317 11.10.19 BYPL ND RSS 66KV 1 SINGLE

318 11.10.19 HVPNL FBD RSS 66KV 2 SINGLE

319 11.10.19 BRPL STVR RSS 66KV 2 SINGLE

320 12.10.19 HVPNL FBD RSS 66KV 1 SINGLE

321 18.10.19 BRPL DKV 66 KV 1&2 SINGLE

322 18.10.19 HVPNL FBD RSS 66KV 1 SINGLE

323 18.10.19 HVPNL FBD RSS 66KV 1&2 SINGLE

324 20.10.19 UPPCL ATHA RSS 132 KV 1&2 SINGLE

325 20.10.19 BRPL MKPR 66 KV 1 SINGLE


326 21.10.19 BRPL PALM 66 KV 1&2 MULTIPLE

327 21.10.19 BRPL MKPR 66 KV 1 SINGLE

328 21.10.19 BRPL SN 66KV 1&2 SINGLE

329 22.10.19 HVPNL FBD RSS 66KV 1 SINGLE

330 24.10.19 HVPNL STLK RSS 66KV 2 SINGLE

1
MULTIPLE
331 06.11.19 TPDDL JGPI RSS 220 KV &
(RI RSS ALSO)
2

1
MULTIPLE
332 06.11.19 TPDDL JGPI RSS 220 KV &
(RI RSS ALSO)
2

1
MULTIPLE
333 06.11.19 TPDDL JGPI RSS 220 KV &
(RI RSS ALSO)
2
1
MULTIPLE
334 06.11.19 TPDDL JGPI RSS 220 KV &
(RI RSS ALSO)
2

335 08.11.19 HVPNL STLK RSS 66KV 1 SINGLE

336 08.11.19 HVPNL STLK RSS 66KV 1 SINGLE

337 09.11.19 HVPNL STLK RSS 66KV 2 SINGLE

338 09.11.19 BRPL PALM 66 KV 2 SINGLE

339 13.11.19 UPPTCL NEC RSS 132 1& 2 SINGLE

340 14.11.19 HVPNL FBD RSS 66KV 2 SINGLE


341 14.11.19 DTL ROHINI RI RSS 66 KV 1 SINGLE

342 15.11.19 HVPNL FBD RSS 66KV 1 SINGLE

343 15.11.19 HVPNL FBD RSS 66KV 2 SINGLE

344 16.11.19 HVPNL FBD RSS 66KV 1&2 SINGLE

345 16.11.19 TPDDL JGPI RSS 220 KV 2 MULTIPLE


(RI RSS ALSO)

346 17.11.19 HVPNL MUDK RSS 66KV 1 SINGLE

347 18.11.19 TPDDL JGPI RSS 220 KV 1&2 MULTIPLE


(RI RSS ALSO)

348 18.11.19 TPDDL RI RSS 66 KV 1&2 SINGLE

349 18.11.19 TPDDL JGPI RSS 220 KV 1&2 MULTIPLE


(RI RSS ALSO)

350 18.11.19 TPDDL JGPI RSS 220 KV 1&2 MULTIPLE


(RI RSS ALSO)

351 19.11.19 HVPNL FBD RSS 66KV 1&2 SINGLE

352 19.11.19 HVPNL FBD RSS 66KV 1&2 SINGLE

MULTIPLE
353 21.11.19 TPDDL JGPI RSS 220 KV 2 (RI RSS ALSO)

354 21.11.19 TPDDL RI RSS 66KV 1&2 SINGLE


355 23.11.19 TPDDL JGPI RSS 220 KV 2 MULTIPLE
(RI RSS ALSO)

MULTIPLE
356 23.11.19 TPDDL JGPI RSS 220 KV 1
(RI RSS ALSO)

MULTIPLE
357 23.11.19 TPDDL JGPI RSS 220 KV 2
(RI RSS ALSO)

MULTIPLE
358 23.11.19 TPDDL JGPI RSS 220 KV 1 (RI RSS ALSO)

359 23.11.19 TPDDL RI RSS 66KV 2 MULTIPLE

360 23.11.19 TPDDL RI RSS 66KV 1 MULTIPLE

361 23.11.19 TPDDL RI RSS 66KV 1&2 MULTIPLE

362 26.11.19 UPPCL ATHA RSS 66KV 1&2 SINGLE

363 27.11.19 HVPNL FBD RSS 66KV 1&2 SINGLE

364 28.11.19 BRPL MKPR 66 KV 1 SINGLE

365 30.11.19 BRPL PALM 66 KV 2 SINGLE

366 30.11.19 BRPL PALM 66 KV 2 SINGLE

367 30.11.19 BRPL SN 66KV 1 SINGLE


368 01.12.19 HVPNL FBD RSS 66KV 1&2 SINGLE

01.12.19 UPPCL ATHA RSS 66KV 1&2 SINGLE


369

370 01.12.19 HVPNL FBD RSS 66KV 1&2 SINGLE

371 03.12.19 BRPL DKV 66 KV 1 SINGLE

372 01.12.19 HVPNL FBD RSS 66KV 1&2 SINGLE

373 04.12.19 HVPNL BGZ 132KV 2 SINGLE

374 12.12.19 BRPL DKV 66 KV 1&2 SINGLE

375 12.12.19 BYPL VNNR 66KV 2 SINGLE

376 12.12.19 HVPNL FBD RSS 66KV 1 SINGLE

377 12.12.19 HVPNL FBD RSS 66KV 2 SINGLE

378 12.12.19 HVPNL FBD RSS 66KV 2 SINGLE

379 13.12.19 HVPNL FBD RSS 66KV 1 SINGLE

380 13.12.19 HVPNL FBD RSS 66KV 1 SINGLE

381 14.12.19 BRPL KJMD 66 KV 2 SINGLE

382 16.12.19 UPPTCL NEC RSS 132 1& 2 SINGLE

383 17.12.19 HVPNL FBD RSS 66KV 1&2 SINGLE


384 19.12.19 BRPL MKPR 66 KV 2 SINGLE

385 18.12.19 UPPTCL NEC RSS 132 1& 2 SINGLE

386 20.12.19 BRPL CHTP RSS 66KV 1&2 SINGLE

387 22.12.19 UPPCL BCGN 132 1& 2 SINGLE


388 26.12.19 HVPNL STLK RSS 66KV 1 SINGLE
389 26.12.19 HVPNL STLK RSS 66KV 1 SINGLE

390 29.12.19 BRPL CHTP RSS 66KV 2 SINGLE

683 30.12.19 BYPL ND RSS 66KV 1 SINGLE

684 28.12.19 HVPNL STLK RSS 66KV 1 SINGLE

684 30.12.19 HVPNL STLK RSS 66KV 1 SINGLE

685 30.12.19 BYPL VNNR 66KV 1&2 SINGLE

686 30.12.19 BYPL IDPT 66KV 1 SINGLE

687 30.12.19 UPPTCL NEC RSS 132 1& 2 SINGLE

688 08.12.19 BRPL MUDK 66KV 2 SINGLE


689 14.12.19 BRPL MUDK 66KV 2 SINGLE

690 29.01.20 BYPL YV 66 KV 1&2 SINGLE

356 29.01.20 HVPNL FBD RSS 66KV 1 SINGLE


Load affected
FAILED
RESUMED AT DURATION
FROM
TRACTION AUXILLIARY

15.29.20h 15.46.16h 17 min MVPE-NCC NSFT-NCC

11:06:17 14:53:13 3:46:56 NA NA

9:20:21 12:15:12 2:54:51 NIL NIL

12:12:27 12:16:26 0:03:59 NIL NIL

16:14:30 16:16:30 0:02:00 NIL NIL

13:06:42 14:19:36 1:12:54 SARAI-ECMJ BAPB-ECMJ

13:10:35 13:13:37 0:03:02 SARAI-ECMJ BAPB-ECMJ

0:01:33 0:36:36 0:35:03 KN SP-RI KN-RI

9:01:23 9:10:24 0:09:01 NIL NIL

14:18:50 14:50:00 0:31:10 NIL NIL

13:15:01 13:25:12 0:10:11 NIL NIL

22:21:56 22:23:43 0:01:47 NIL NIL


22:23:56 22:28:06 0:04:10 NIL NIL

22:28:16 22:31:17 0:03:01 NIL NIL

22:31:27 22:32:57 0:01:30 NIL NIL

JPW-KJMD
9:25:15 9:37:23 0:12:08 SABR-CDLI
CKT-2
15.12.18
23:21:18 #VALUE! NA NA
05:11:29

11:47:02 11:58:16 0:11:14 NA NA

14:24:14 16:05:00 1:40:46 NA NA

DSG-ILOK
SPBI-MDTW
9:15:28 9:46:19 0:30:51 KN SP-SHDN SP
GTB-SAKET
(SOUTH RING)

DSG-ILOK
SPBI-MDTW
10:44:34 10:44:49 0:00:15 KN SP-SHDN SP
GTB-SAKET
(SOUTH RING)

13:48:03 13:50:21 0:02:18 NIL NIL

0:45:14 0:48:00 0:02:46 NIL NIL

9:15:28 9:46:19 0:30:51 CTST SP-KG SSP CKT 2 KG -JGPA


KG-JGPA (CKT1)
14:07:33 14:09:59 0:02:26 CTST SP-MLCD SP NDRU-DSTO
(CKT-2)

KG-JGPA
(CKT.2)
14:07:33 14:09:59 0:02:26 CTST SP-MLCD SP
NDRU-
DWD(CKT-2)

11:41:13 13:12:00 1:30:47 NIL NIL

16:45:49 17:31:42 0:45:53 NA NA

10:45:39 10:53:50 0:08:11 NIL NIL

10:27:20 11:17:38 0:50:18 NIL NIL

11:20:00 12:21:00 1:01:00 NIL NIL

11:32:26 11:50:25 0:17:59 NA NA

16:23:30 16:48:08 0:24:38 NA NA

9:57:51 10:32:59 0:35:08 NA NA

10:11:00 10:13:00 0:02:00 NIL NIL


19:20:00 PM 33 HR
10:11:00
01.01.2019 NIL NIL
09 MIN

8:43:56 8:52:38 0:08:42 NA NA

10:22:37 17:40:15 7:17:38 NA NA

OKNS-OBC
BOTH CKT &
3:33:59 5:03:00 1:29:01 BCGN-CDLI SP
CDLI-KJMD
CKT-1
TKBD-LJPN
3:35:45 5:00:43 1:24:58 MLCD SP- SRAI SP
BOTH CKT

9:39:51 10:04:22 0:24:31 NA NA

15:10:00 19:12:00 4:02:00 EANR SP-SVVR JFRB-SVVR

10.01.19 JPW-KJMD CKT-


12:35:46 0:27:36 SABR-CDLI
13:02:10 2

11:47:25 11:49:25 0:02:00 NIL NIL

MKPR-NAVR
(CKT-1),
16:15:14 17:37:00 1:21:46 MKPR-PBGW SP
MKPRD-MJPK
(CKT-2)

10:20:09 10:30:46 0:10:37 NA NA

17:10:03 18:00:03 0:50:00 EANR SP-TKPR TKPR-WC


10:52:33 10:54:44 0:02:11 CHTP SP-HCC SLTP-HCC

0:57:19 1:30:37 0:33:18 CHTP SP-HCC SLTP-HCC

12:11:42 12:21:28 0:09:46 NA NA

JPW-KJMD CKT-
10:59:17 11:23:30 0:24:13 SABR-CDLI
2

18:02:55 18:11:14 0:08:19 NA NA

9:08:41 9:15:11 0:06:30 NA NA

10:13:16 10:31:31 0:18:15 NA NA

17:10:03 18:00:03 0:50:00 EANR SP-TKPR TKPR-WC

9:10:00 17:46:03 8:36:03 NA NA


15:10:00 15:52:00 0:42:00 NA NA

10:29:17 NA #VALUE! SARAI-ECMJ BAPB-ECMJ

22:24:42H I/C-1 &


21:56:21 CHTP SP-HCC CHTP-HCC
22:28:21 I/C-2
11:26:00 11:28:00 0:00:00 CHTP SP-HCC CHTP-HCC

13:10:53 13:12:45 0:01:52 NIL NIL

12:35:23 13:00:38 0:25:15 NA NA

25.01.19
22:56:00 #VALUE! NA NA
05:09:42

8:15:38 8:38:10 0:22:32 NIL NIL


7:59:46 8:04:16 0:04:30 NA NA

00.25.30 7:13:30 6:49:00 CHTP SP-HCC QUM-HCC

11:14:39 12:50:13 1:35:34 NA NA

10:45:34 10:53:45 0:08:19 CHTP SP-HCC QUM-HCC

11:14:39 12:50:13 1:35:34 NA NA

1:18:37 1:24:17 0:05:40 NA NA

15:02:15 15:04:55 0:02:40 CHTP SP-HCC QUM-HCC

OKNS-OBC
BOTH CKT &
11:55:28 12:10:36 0:15:08 BCGN-CDLI SP
CDLI-KJMD
CKT-1

11:57:34 12:13:44 0:16:10 LJPN-BAPB LJPN-TKBD

15:52:50 16:21:17 0:28:27 NIL NIL

7:03:00 7:04:30 0:01:30 CHTP SP-HCC QUM-HCC

10:19:58 10:30:30 0:10:32 CHTP SP-HCC QUM-HCC

19:16:42 19:34:03 0:17:21 CHTP SP-HCC QUM-HCC

17:29:13 18:37:40 1:08:27 NA NA

10:13:00 10:20:00 0:07:00 NIL NIL


5:20:25 5:23:04 0:02:39 VNND TKPR-WC

DLIC-
MVPO(CKT-1),
4:20:20 4:42:00 0:21:40 NA
SAKP-SVMB
(CKT-2)

KG-JGPA
(CKT.2)
4:22:43 4:25:23 0:02:40 CTST SP-MLCD SP
NDRU-
DWD(CKT-2)

4:22:43 4:25:23 0:02:40 LJPN-BAPB LJPN-TKBD

14:29:42 14:31:12 0:01:30 NIL NIL

10:25:52 10:40:53 0:15:01 NIL NIL

KG - JGPA CKT
1
19:46:52 0:00:00 4:13:08 CTST SP- MLCD SP
DSTO-NDRU
LOOP 1

7:39:15 7:48:33 0:09:18 SHDN SP - NBAA NIL

11:24:27 11:51:34 0:27:07 SHDN SP - NBAA NIL

14:25:27 14:30:00 0:04:33 SHDN SP - NBAA NIL


14:39:41 15:08:16 0:28:35 SHDN SP - NBAA NIL

12:47:14 12:59:17 0:12:03 SHDN SP - NBAA NIL

23:39:17 23:40:18 0:01:01 MVPE-NCC NSFT-NCC

7:30:06 7:47:27 0:17:21 NA NA

16:52:16 16:58:39 0:06:23 TKPR-EANR TKPR-WC

0:05:08 0:09:55 0:04:47 TKPR-EANR TKPR-WC

0:10:03 0:11:12 0:01:09 TKPR-EANR TKPR-WC

0:08:45 0:10:42 0:01:57 TKPR-EANR TKPR-WC

1:35:19 1:44:17 0:08:58 NA NA

1:44:21 1:50:11 0:05:50 NIL NIL

KG-JGPA
(CKT.2)
0:34:00 1:54:00 1:20:00 CTST SP-MLCD SP
NDRU-
DWD(CKT-2)

SPBI-MDTW
10:25:21 10:28:12 0:02:51 SPBI-AZU SP
BOTH RING

10:25:25 10:28:16 0:02:51 NIL NIL


16:48:41 16:52:31 0:03:50 NIL NIL

JPW-KJMD CKT-
3:58:21 4:51:48 0:53:27 SABR-CDLI
2

3:57:25 6:25:00 2:27:35 TKPR-EANR TKPR-WC

AZU-LJPN(CKT-
3:57:25 4:18:00 0:20:35 PBGW SP-DDSC 1), DLIC-LJPN
(CKT-2)

12:43:33 12:52:54 0:09:21 SARAI-ECMJ BAPB-ECMJ

14:50:23 14:51:13 0:00:50 NIL NIL

NOIDA -61 TO
7:53:06 8:22:34 0:29:28 NIL
NEC

5:03:05 NA #VALUE! SARAI-BVHM BAPB-BVHM

4:58:18 NA #VALUE! SARAI-BVHM BAPB-BVHM

12:39:36 12:43:43 0:04:07 NIL NIL

8:50:46 13:19:26 4:28:40 SARAI-BVHM BAPB-BVHM

5:21:32 17:57:58 12:36:26 SARAI-BVHM BAPB-BVHM

UDB-SAKT
3:15:00 4:12:00 0:57:00 SLTPD
NORTH RING
6:59:29 18:35:21 11:35:52 SARAI-BVHM BAPB-BVHM

22:13:10 22:15:03 0:01:53 NIL NIL

12:09:24 12:17:56 0:08:32 NIL NBAA-SHDN

14:37:12 14:39:13 0:02:01 KN SP - RI KN -RI

UDB-CHTP
15:14:00 15:35:00 0:21:00 UDB-CHTP SP
NORTH RING

HKS-SAKT CKT
0:38:01 1:35:00 0:56:59 CHTP SP-HCC II AND SLTP-
HCC

HKS-SAKT CKT
2:15:23 2:15:33 0:00:10 NIL II AND SLTP-
HCC

13:02:00 13:19:00 0:17:00 NIL NIL

6:07:55 6:16:28 0:08:33 NIL NIL

21:02:30 22:35:30 1:33:00 CHTP SP-HCC HKS-HCC

6:01:00 9:33:45 3:32:45 CIPK-GHEM MIE-CIPK

6:01:00 9:33:45 13:16:15 NIL NIL


6:07:55 6:16:28 0:08:33 NIL NIL

MKPR-NAVR
(CKT-1),
20:38:47 20:41:09 0:02:22 MKPR-PBGW SP
MKPRD-MJPK
(CKT-2)

10:14:51 15:55:26 5:40:35 NA NA

20:03:53 20:22:21 0:18:28 SARAI-BVHM BAPB-BVHM

KG-JGPA
(CKT.2)
0:52:54 6:09:05 5:16:11 CTST SP-MLCD SP
NDRU-
DWD(CKT-2)

MKPR-NAVR
(CKT-1),
13:07:32 13:10:35 0:03:03 MKPR-PBGW SP
MKPRD-MJPK
(CKT-2)

0:23:51 0:57:04 0:33:13 CIPK-GHEM NIL

0:23:51 0:57:04 0:33:13 CIPK-GHEM NIL

5:49:15 11:21:00 5:31:45 NA NA

5:35:04 5:45:00 0:09:56 NIL NIL

12:27:05 13:27:21 1:00:16 SARAI-BVHM BAPB-BVHM

HKS-SAKT CKT I
1:42:10 1:46:08 0:03:58 NIL
AND SLTP-HCC

11:43:07 13:49:09 2:06:02 SHDN SP - NBAA NBAA-SHDN


7:12:00 18:45:44 11:33:44 NA NA

HKS-SAKT CKT I
12:57:18 1:48:56 0:51:38 NIL
AND -HCC

10:17:57 10:48:00 0:30:03 NA NA

13:14:53 15:06:45 1:51:52 NIL NIL

HKS-SAKT CKT
16:21:40 17:10:04 0:48:24 CHTP SP-HCC
2 AND QM -HCC

JB-HCC CKT 2
4:18:00 4:23:00 0:05:00 CHTP SP-HCC AND SLTP -HCC
CKT 1

18:03:05 18:05:08 0:02:03 CIPK-GHEM NIL

JPW-KJMD CKT-
18:35:00 22:00:00 3:25:00 SABR-CDLI
2

19:19:00 19:06:00 23:54:00 NA NA

MKPR-MVPO
(CKT-1),
1:06:00 13:50:00 12:44:00 MKPR-SVMB SP
MKPRD-NSHP
(CKT-2)
MKPR-MVPO 1
(CKT-1),
12:17:42 12:25:04 0:07:22 NA
MKPRD-
SVMB(CKT-2)

5:41:00 10:58:02 5:17:02 NA NA

UDB-SAKT
9:31:04 15:38:30 6:07:26 CHTP SP-UDB
NORTH RING

10:28:20 11:15:12 0:46:52 NIL NIL


1:40:25 1:51:41 0:11:16 AJD BAPB-BVHM

10:15:30 10:28:33 0:13:03 SARAI-BVHM BAPB-BVHM

16:28:00 16:32:00 0:04:00 DWTO-UN SP DWTO-TN

HKS-HCC CKT 2
1:08:13 1:15:43 0:07:30 CHTP SP-HCC AND SLTP -HCC
CKT 1

9:44:30 10:21:58 0:37:28 SARAI-BVHM BAPB-BVHM

1:32:00 7:12:44 5:40:44 NIL NIL

MKPR-NAVR
(CKT-1),
1:52:54 -1:52:54 MKPR-PBGW SP
MKPRD-MJPK
(CKT-2)

23:11:38 23:30:58 0:19:20 NIL NIL

0:45:19 0:48:16 0:02:57 NIL NIL

MKPR-NAVR
(CKT-1),
1:52:54 11:59:00 10:06:06 MKPR-PBGW SP
MKPRD-MJPK
(CKT-2)

0:45:19 0:48:16 0:02:57 NIL NIL

HKS-HCC CKT 2
12:58:40 13:20:10 0:21:30 CHTP SP-HCC AND SLTP -HCC
CKT 1

8:37:00 8:39:30 0:02:30 NA NA


HKS-HCC CKT 2
8:46:00 9:13:30 0:27:30 CHTP SP-HCC AND SLTP -HCC
CKT 1

16:41:37 16:43:37 0:02:00 NA NA

13:14:11 13:20:51 0:06:40 KN SP - RI KN -RI

13:30:00 17:25:00 3:55:00 NIL NIL

4:46:25 12:36:56 7:50:31 NA NA

9:52:14 10:09:36 0:17:22 SARAI-BVHM BAPB-BVHM

10:55:10 11:05:28 0:10:18 SARAI-BVHM BAPB-BVHM

(SPBI TO
MDTW) AND
18:19:12 18:26:11 0:06:59 SPBI-AZU SP
(GTBR TO
CWBR) SOUTH

13:20:43 13:21:30 0:00:47 MVPE-NECC NSFT-SFTN

13:20:43 13:21:30 0:00:47 MVPE-NECC NSFT-SFTN


18:33:17 18:34:38 0:01:21 MVPE-NECC NSFT-SFTN

HKS-HCC CKT 2
11:25:30 12:26:30 1:01:00 CHTP SP-HCC AND SLTP -HCC
CKT 1

13:09:30 13:16:30 0:07:00 NIL NIL

13:53:35 14:02:12 0:08:37 NIL NIL

14:03:31 14:07:52 0:04:21 NIL NIL

16:19:14 16:25:56 0:06:42 NIL NIL

11:08:14 11:18:35 0:10:21 DWTO-UN SP DWTO-TN

JPW-KJMD CKT-
1:30:00 -1:30:00 SABR-CDLI
2

23:53:32 0:26:11 0:33:49 SARAI-BVHM BAPB-BVHM

19:38:10 23:16:00 3:37:50 SARAI-BVHM BAPB-BVHM

6:11:17 7:46:49 1:35:32 NIL NIL

1:38:30 2:21:43 0:43:13 SARAI-BVHM BAPB-BVHM

4:44:00 4:51:02 0:07:02 SARAI-BVHM BAPB-BVHM


5:41:35 9:17:00 3:35:25 NA NA

11:36:00 16:14:14 4:38:14 GHEM-KNR/ILOK TKBR-KNR/ILOK

SPBI-MDTW
BOTH RING
21:29:48 21:37:30 0:07:42 SPBI-AZU SP
AND GTB-CWBR
N RING

21:29:23 -21:29:23 MKPR-SVMB SP NIL

11:58:56 12:16:11 0:17:15 CIPK-GHEM MIE-CIPK

13:36:47 13:52:59 0:16:12 NIL NIL

16:56:59 17:12:00 0:15:01 NA NA

13:10:59 13:14:52 0:03:53 SARAI-BVHM BAPB-BVHM

14:43:55 15:08:40 0:24:45 NIL NCC -NEC

15:36:27 15:36:31 0:00:04 NIL NCC -NEC

SPBI-MDTW
BOTH RING
13:24:19 13:31:12 0:06:53 SPBI-AZU SP
AND GTB-CWBR
N RING

13:25:36 13:33:03 0:07:27 KN SP - RI KN-RI

12:42:47 14:26:55 1:44:08 CIPK-GHEM MIE-CIPK


9:30:41 9:59:00 0:28:19 SARAI-BVHM BAPB-BVHM

HKS-HCC CKT1
17:13:49 18:57:35 1:43:46 CHTP SP-HCC AND SLTP -HCC
CKT 2

17:13:49 18:39:36 1:25:47 NIL NIL

9:42:25 11:14:48 1:32:23 NIL NIL

21:09:00 0:21:00 0:03:12 KB SP -MVE SP /VASI PN-VASI/NAGR

7:09:00 7:38:00 0:29:00 NIL NIL

HKS-HCC CKT1
17:41:14 17:43:05 0:01:51 CHTP SP-HCC AND SLTP -HCC
CKT 2

NDI - GNPK
18:03:32 18:08:46 0:05:14 AZU SP -UDB SP
NORTH

MIRK-KJMD
12:02:00 12:38:00 0:36:00 SABR-CDLI
CKT-1

SAKP-MVPO
11:56:54 12:12:51 0:15:57 PBGW SP-SVMB SP
(CKT-1)

18:03:26 18:08:03 0:04:37 KB SP -MVE SP /VASI PN-VASI/NAGR


SPBI-MDTW
BOTH RING AND
11:20:17 11:22:08 0:01:51 SPBI-AZU SP
GTB-CWBR N
RING

SPBI-GTB BOTH
17:27:08 17:50:11 0:23:03 SPBI-AZU SP RING AND VW-
CWBR N RING

10:53:56 10:56:07 0:02:11 NIL NIL

NDI - GNPK
11:22:06 14:07:04 2:44:58 AZU SP -UDB SP
NORTH

1:33:50 -1:33:50 NIL NIL

18:11:10 18:15:22 0:04:12 NIL NIL

10:49:50 13:31:10 2:41:20 NA NA

15:14:46 15:18:59 0:04:13 NIL NIL

16:54:20 16:56:41 0:02:21 NIL NIL

6:07:28 6:26:30 0:19:02 NIL NIL

11:54:24 11:59:27 0:05:03 SHDN SP - NBAA SHDN - NBAA

8:29:03 8:35:36 0:06:33 NIL NIL

5:09:11 6:04:02 0:54:51 SHDN SP - NBAA SHDN - NBAA

21:49:41 22:02:19 0:12:38 SHDN SP - NBAA SHDN - NBAA


5:09:11 6:04:02 0:54:51 SHDN SP - NBAA SHDN - NBAA

21:43:06 22:22:03 0:38:57 CIPK-GHEM CIPK-MIE

21:43:06 22:25:52 0:42:46 NIL NIL

4:47:14 5:56:32 1:09:18 SHDN SP - NBAA SHDN - NBAA

JPW-KJMD CKT-
2:30:00 4:30:00 2:00:00 SABR-CDLI
2

19:41:30 19:42:30 0:01:00 NIL NIL

19:43:30 19:44:30 0:01:00 NIL NIL

07:11:30 I/C-1
7:03:20 07:08:00 I/C-2 #VALUE! NIL NIL

HKS-CHTP CKT-
17:40:59 17:46:02 0:05:03 CHTP SP-HCC AND SLTP-HCC
BOTH

17:41:30 17:43:01 0:01:31 NIL NIL

OKNS-OBC
BOTH CKT &
17:55:00 18:24:00 0:29:00 BCGN-CDLI SP
CDLI-KJMD
CKT-1

17:55:50 18:17:46 0:21:56 BAPB-LJPN NA

5:42:16 NA #VALUE! NA NA

14:38:22 14:50:29 0:12:07 CIPK-GHEM CIPK-MIE

8:41:52 9:39:21 0:57:29 NIL NIL

5:42:16 8:48:00 3:05:44 NA NA


HKS-SAKT CKT1
7:57:00 8:07:30 0:10:30 CHTP SP-HCC
AND SLTP -HCC

9:43:00 17:19:22 7:36:22 NA NA

HKS-CHTP CKT-
3:49:30 4:35:00 0:45:30 NIL AND SLTP-HCC
BOTH

6:06:57 7:50:10 1:43:13 SARAI-BVHM BAPB-BVHM

HKS-CHTP CKT-
16:27:14 16:31:06 0:03:52 NIL AND SLTP-HCC
BOTH

23:41:02 1:55:33 2:14:31 AZU SP -UDB SP NDI - CTST S

22:53:00 1:26:31 2:32:29 KB SP -MVE SP /VASI RP-VASI/NAGR

7:53:33 7:57:08 0:03:35 NIL NIL

10:19:08 10:21:34 0:02:26 NIL NIL

15:36:14 17:36:33 2:00:19 SHDN SP-KN SP DSG-ILOK

8:08:18 8:08:26 0:00:08 NIL NIL

15:36:14 17:36:37 2:00:23 CTST SP-KG SSP CKT 2 KG -JGPA

18:50:17 18:52:01 0:01:44 NIL NIL


10:58:19 11:55:00 0:56:41 KN SP - RI KN-RI

SPBI-MDTW
BOTH RING AND
10:57:41 11:12:36 0:14:55 SPBI-AZU SP
GTBR-CWBR S
RING

11:26:00 12:35:00 1:09:00 NIL NIL

7:15:01 7:19:30 0:04:29 NIL NIL

17:28:21 17:41:35 0:13:14 NIL NIL

SABR-GKEI
11:25:22 11:29:31 0:04:09 SABR-CDLI
CKT-2
MKPR-MVPO
(CKT-1),
11:19:23 11:20:09 0:00:46 MKPR-SVMB SP
MKPRD-NSHP
(CKT-2)

16:30:36 16:58:21 0:27:45 NIL NCC -NEC

11:16H #VALUE! AZU SP -UDB SP RCKN-JB

13:56:17 14:06:18 0:10:01 JPW-SABR JPW-KJMD

12:49:22 14:06:48 1:17:26 KB-VASI/MVP1 RP-VASI/NAGR

13:56:21 13:57:24 0:01:03 UNSP-VASI/MVPE SP SN-VASI/NAGR

5:35:00 -5:35:00 NA NA

11:16H 23:50:00
(09.08.19) (12.08.19) 84:34:00 AZU SP -UDB SP RCKN-JB

17:21:10 17:34:39 0:13:29 NIL NCC -NEC


MKPR-SVMB
(CKT-2),
11:54:13 11:57:02 0:02:49 MKPR-PBGW SP
MKPRD-SAKP
CKT-1)
MKPR-SVMB
(CKT-2),
18:54:13 18:55:02 0:00:49 MKPR-PBGW SP
MKPRD-SAKP
CKT-1)

1:14:47 1:23:02 0:08:15 NIL NIL

9:51:30 10:25:14 0:33:44 CTST SP-KG SSP NA

11:30:59 11:31:25 0:00:26 NIL NIL

1:14:47 1:23:02 0:08:15 NIL NIL

16:21:00 16:34:00 0:13:00 SARAI-BVHM BAPB-BVHM

9:21:28 13:40:47 4:19:19 NIL NIL

NDI NORTH-CTST
3:42:00 AZU SP -UDB SP
NORTH

MKPR-
NSHP(CKT-2),
17:30:54 17:32:45 0:01:51 MKPR-PBGW SP
MKPRD-DLIC
CKT-1)

13:33:00 17:30:35 3:57:35 CIPK-GHEM CIPK-MIE


15:02:33 15:47:12 0:44:39 CIPK-GHEM CIPK-MIE

OKNS-OBC
BOTH CKT &
23:18:49 BCGN-CDLI SP
CDLI-KJMD
CKT-1

12:21:16 12:59:01 0:37:45 NIL NIL

13:38:25 14:00:25 0:22:00 NIL NIL

22:39:00 1:26:00 2:47:00 KB-VASI/MVP1 RP-VASI/NAGR

23:06:44 23:08:35 0:01:51 NIL NIL

6:22:11 12:55:31 6:33:20 NIL NIL

2:25:30 2:27:30 0:02:00 NIL QM-HCC

11:57:39 13:40:38 1:42:59 NIL NIL

10:30:36 10:36:00 0:05:24 MVPE SP - NECC NIL

6:05:06 7:05:28 1:00:22 SARAI-BVHM BAPB-BVHM

8:40:37 8:42:36 0:01:59 SARAI-BVHM BAPB-BVHM

10:34:02 13:22:54 2:48:52 NIL NIL


13:50:01 13:52:52 0:02:51 MVPE SP - NECC NIL

MKPR-
NSHP(CKT-2),
5:47:00 12:01:00 6:14:00 MKPR-PBGW SP
MKPRD-DLIC
CKT-1)
SAKP-MVPO
8:00:00 8:07:00 0:07:00 PBGW SP-SVMB SP
(CKT-1)
SAKP-MVPO
8:34:00 8:39:00 0:05:00 PBGW SP-SVMB SP
(CKT-1)
MKPR-
NSHP(CKT-2),
9:30:00 MKPR-PBGW SP
MKPRD-DLIC
CKT-1)

23:09:40 5:19:27 6:09:47 SHDN SP-KN SP DSG-ILOK

MKPR-
NSHP(CKT-2),
14:48:02 15:25:25 0:37:23 MKPR-PBGW SP
MKPRD-DLIC
CKT-1)

1:30:58 1:33:14 0:02:16 SARAI-BVHM BAPB-BVHM

7:16:00 8:14:46 0:58:46 NIL NIL

9:39:17 10:00:18 0:21:01 JPW-SABR JPW-PSPK CKT 1

7:16:00 8:14:46 0:58:46 NIL NIL

10:05:00 13:06:54 3:00:00 SHDN SP-KN SP DSG-ILOK

DLIC-MVPO-1
(CKT-1)
7:02:00 7:44:00 0:42:00 PBGW SP-SVMB SP
AZU-SVMB
(CKT-2)
SPBI-MDTW
BOTH RING AND
14:16:17 14:19:35 0:03:18 SPBI-AZU SP
GTBR-CWBR N
RING

14:16:51 14:24:00 0:07:09 KN SP - RI KN-RI

MKPR(CKT-2),
11:52:11 12:13:10 0:20:59 MKPR-PBGW SP MKPRD-NAVR
CKT-1)
MKPR(CKT-2),
20:51:11 20:54:10 0:02:59 MKPR-PBGW SP MKPRD-NAVR
CKT-1)
13:23:40 13:29:02 0:05:22 NIL NIL

18:46:31 20:15:49 1:29:18 SARAI-BVHM BAPB-BVHM

6:53:55 7:28:23 0:34:28 nil NIL

NDI SOUTH-CTST
23:58:00 4:33:30 4 HR 35 MIN AZU SP -UDB SP
SOUTH

6:53:55 7:28:23 0:34:28 nil NIL

TKBD-JGPA
15:41:00 16:09:54 0:28:54 MLCD SP- SRAI SP BOTH CKT+
CTST-JLN CKT2

10:11:27 19:37:06 9:25:39 NIL NIL

DLIC-MVPO-1
(CKT-1)
21:34:20 21:37:48 0:03:28 PBGW SP-SVMB SP
AZU-SVMB
(CKT-2)

11:17:00 18:16:27 6:59:27 NIL NIL

19:10:06 20:07:29 0:57:23 SARAI-BVHM BAPB-BVHM

6:10:28 6:10:41 0:00:13 SHDN SP - NBAA SHDN - NBAA


MKPR(CKT-2),
17:55:57 17:57:35 0:01:38 MKPR-PBGW SP MKPRD-NAVR
CKT-1)
18:00:52 18:03:32 0:02:40 JPW-SABR JPW-PSPK CKT 1

MKPR(CKT-2),
12:47:57 12:54:35 0:06:38 MKPR-PBGW SP MKPRD-NAVR
CKT-1)

18:00:56 18:03:35 0:02:39 UNSP-KB SP SN-MDHS S

14:29:49 19:16:28 4:46:39 NIL NIL

10:09:00 10:10:30 0:01:30 NIL NIL

SPBI-MDTW
03:12:36 03:26:58 00:14:22
BOTH RING AND
SPBI-AZU SP
GTBR-CWBR N
03:12:38 03:21:18 00:08:40
RING

SPBI-MDTW
03:27:29 03:33:49 00:06:20
BOTH RING AND
SPBI-AZU SP
GTBR-CWBR N
03:27:31 03:33:51 00:06:20
RING

SPBI-MDTW
03:35:00 03:48:25 00:13:25
BOTH RING AND
SPBI-AZU SP
GTBR-CWBR N
03:35:02 03:48:27 00:13:25
RING
SPBI-MDTW
03:54:57 03:56:38 00:01:41
BOTH RING AND
SPBI-AZU SP
GTBR-CWBR N
03:54:59 03:56:41 00:01:41
RING
8:43:07 8:52:29 0:09:22 NIL NIL

14:13:50 14:15:50 0:02:00 NIL NIL

8:53:49 9:03:23 0:09:34 NIL NIL

8:38:44 14:01:42 5:22:58 NA NA

16:45:29 16:50:28 0:04:59 NIL SSON-NECC

1:41:28 1:46:42 0:05:14 SARAI-BVHM BAPB-BVHM


6:48:21 7:06:46 13:55:07 KN SP - RI KN-RI

3:45:34 AJD BAPB-BVHM

3:45:34 5:30:00 1:44:26 AJD BAPB-BVHM

1:31:24 1:34:19 0:02:55 AJD BAPB-BVHM

SPBI-MDTW
14:17:00 14:21:00 0:04:00 SPBI-AZU SP BOTH RING AND
GTBR-CWBR N
RING
12:07:00
8:20:00 3:47:00 NIL NIL
(17.11.19)
SPBI-MDTW
6:40:36 6:52:08 0:11:32 SPBI-AZU SP BOTH RING AND
GTBR-CWBR N
RING

6:41:38 8:35:20 1:53:42 KN SP - RI KN-RI

NIL
6:53:08 7:24:58 0:31:50 SPBI-AZU SP (LOAD ALREADY
SHIFTED DURING
SPBI-MDTW
FIRST FAILURE)
7:25:20 8:32:28 1:07:08 SPBI-AZU SP BOTH RING AND
GTBR-CWBR N
RING
1:08:33 1:12:42 0:04:09 AJD BAPB-BVHM

1:08:33 1:12:42 0:04:09 AJD BAPB-BVHM

3:36:30 3:43:09 0:06:39 NIL NIL

3:36:19 3:43:11 0:06:52 NA KN-RI


18:04:31 18:21:03 0:16:32 NA NA

SPBI-MDTW
BOTH RING AND
18:12:10 18:19:24 0:07:14 SPBI-AZU SP
GTBR-VS SOUTH
RING

SPBI-MDTW
BOTH RING AND
20:55:04 20:55:54 0:00:50 SPBI-AZU SP
GTBR-VS SOUTH
RING

SPBI-MDTW
BOTH RING AND
20:55:06 20:55:46 0:00:40 SPBI-AZU SP GTBR-VS SOUTH
RING

18:12:20 18:19:57 0:07:37 KN SP - RI KN-RI

18:13:47 18:14:53 0:01:06 NA NA

20:55:56 20:56:25 0:00:29 KN SP - RI KN-RI

8:10 8:13 0:02:24 SHDN SP - NBAA NBAA-SHDN

22:46:16 23:13:30 0:27:14 AJD BAPB-BVHM

MKPR(CKT-2),
0:48:57 NA #VALUE! MKPR-PBGW SP MKPRD-NAVR
CKT-1)
JPW-PSPK CKT
6:43:17 7:55:44 1:12:27 JPW-SABR
1
JPW-PSPK CKT
6:43:17 7:55:44 1:12:27 JPW-SABR
1

6:42:00 9:39:00 2:57:00 UNSP-kb SP SN-PN/MDHS


1:24:42 1:30:12 0:05:30 AJD BAPB-BVHM

SHDN SP - NBAA NBAA-SHDN


8:07:21 18:13:00 10:06:21

1:24:42 1:30:12 0:05:30 AJD BAPB-BVHM

DLIC-SOEN-1
(CKT-1)
23:17:00 1:36:00 -21:41:00 PBGW SP-SVMB SP
AZU-SOJI (CKT-
2)

1:24:42 1:30:12 0:05:30 AJD BAPB-BVHM

7:33:19 7:53:00 0:20:00 NIL NIL

DLIC-MVPO-1
(CKT-1)
21:29:12 22:04:38 0:35:26 PBGW SP-SVMB SP
AZU-SVMB
(CKT-2)

21:22:44 21:30:12 0:07:28 TKPR-EANR TKPR-WC

19:49:22 20:29:05 0:39:43 SARAI-BVHM BAPB-BVHM

19:49:22 20:29:27 0:40:05 SARAI-BVHM BAPB-BVHM

22:20:24 1:39:36 SARAI-BVHM BAPB-BVHM

2:25:13 3:00:25 0:35:12 SARAI-BVHM BAPB-BVHM

2:25:13 3:00:25 0:35:12 SARAI-BVHM BAPB-BVHM

12:42:04 14:42:42 2:00:38 NA NA

22:47:21 22:51:21 0:04:00 NIL NIL

1:40:50 1:50:21 0:09:31 SARAI-BVHM BAPB-BVHM


MKPR(CKT-2),
4:59:00 8:45:00 3:46:00 MKPR-PBGW SP MKPRD-NAVR
CKT-1)

12:58:57 13:12:21 0:13:24 NIL NIL

12:46:45 12:53:48 0:07:03 UDB-CHTP SP UDB -QUM


SOUTH

9:46:27 9:46:49 0:00:22 MVPE SP - NECC NSFT-NECC


10:28:06 10:35:27 0:07:21 NIL NIL
13:49:30 13:51:00 0:01:30 NIL NIL

18:17:12 18:19:12 0:02:00 NIL NIL

NDI SOUTH-CTST
5:40:10 5:47:00 06:50:00 AZU SP -UDB SP SOUTH

10:25:26 10:26:30 0:01:04 NIL NIL

14:45:30 14:47:00 0:01:30 NIL NIL

12:28:44 12:48:04 0:20:04 TKPR-EANR TKPR-WC

5:40:08 6:08:53 0:28:45 KB-VASI/MVP1 RP-VASI/NAGR

6:13:24 6:54:28 0:41:04 NIL NIL

21:59:00 0:43:00 2:44:00 NIL NIL


10:32:15 12:21:14 1:48:59 NIL NIL

11:03:03 11:21:49 0:18:46 EANR SP- SVVR WC-SVVR

12:13:05 12:18:29 0:05:24 NIL NIL


TRACTION SUPPLY AUXILLIARY SUPPLY
EXTENDED FROM EXTENDED FROM

DISCOM RSS DISCOM RSS

NIL NIL NIL NIL

NA NA NA NA

NIL NIL NIL NIL

NIL NIL NIL NIL

NIL NIL NIL NIL

NA NA BYPL STVR RSS

DTL STVR RSS DTL STVR RSS

DTL RI DTL RI

NIL NIL NIL NIL

NIL NIL NIL NIL

NIL NIL NIL NIL

NIL NIL NIL NIL


NIL NIL NIL NIL

NIL NIL NIL NIL

NIL NIL NIL NIL

BRPL PALM BRPL PALM

NA NA NA NA

NA NA NA NA

NA
NA NA NA

NA RI RSS NA RI RSS

NA NA NA NA

NA NA NA NA

NIL NIL NIL NIL

NDMC PS RSS BYPL STVR RSS


TPDDL TPDDL KG RSS
KG RSS
BRPL AP RSS

TPDDL KG
TPDDL KG
BRPL AP RSS

NIL NIL NIL NIL

NA NA NA NA

NIL NIL NIL NIL

NIL NIL NIL NIL

NIL NIL NIL NIL

NA NA NA NA

NA NA NA NA

NA NA NA NA

NIL NIL NIL NIL


NIL NIL NIL NIL

NA NA NA NA

NA NA NA NA

25 KV CKT BCGN 33 KV CKT BCGN

BRPL STVR BRPL STVR

NA NA NA NA

BYPL YV BYPL YV

BRPL PALM NA NA

NIL NIL NIL NIL

TPDDL JGPI TPDDL JGPI

NA NA NA NA

BYPL YV TPDDL KG
HVPNL STLK RSS HVPNL STLK RSS

HVPNL STLK RSS HVPNL STLK RSS

NA NA NA NA

BRPL PALM NA NA

NA NA NA NA

NA NA NA NA

NA NA NA NA

BYPL YV TPDDL KG

NA NA TPDDL KG
NA NA BYPL YV

DTL STVR RSS DTL STVR RSS

DTL CHTP RSS DTL CHTP RSS

DTL CHTP RSS DTL CHTP RSS

BYPL SN TSS NIL NIL

NA NA NA NA

NA NA NA NA

BRPL MUDK RSS BRPL MUDK RSS


NA NA NA NA

HVPNL STLK RSS HVPNL STLK RSS

NA NA NA NA

HVPNL STLK RSS HVPNL STLK RSS

NA NA NA NA

HVPNL FBD RSS HVPNL FBD RSS

HVPNL STLK RSS HVPNL STLK RSS

66 KV CKT-1 KJMD 66 KV CKT-1 KJMD

NDMC PS RSS DTL KG RSS

NIL NIL NIL NIL

DTL CHTP DTL CHTP

HVPNL STLK RSS HVPNL STLK RSS

HVPNL STLK RSS HVPNL STLK RSS

NA NA NA NA

NIL NIL NIL NIL


NA NA NA NA

NA NA NA INA

TPDDL KG RSS
TPDDL KG
BRPL AP RSS

NA NA NA NA

NIL NIL NIL NIL

NIL NIL NIL NIL

NA NA NA NA

DTL KG RSS NA NA

DTL KG RSS NA NA

DTL KG RSS NA NA
DTL KG RSS NA NA

DTL KG RSS NA NA

NIL NIL NIL NIL

HVPNL FBD RSS HVPNL FBD RSS

NA YV NA YV

NA YV NA YV

NA YV NA YV

NA YV NA YV

HVPNL FBD RSS HVPNL FBD RSS

NIL NIL NIL NIL

TPDDL KG RSS
TPDDL KG
BRPL AP RSS

BYPL ND RSS BYPL ND RSS

NIL NIL NIL NIL


NIL NIL NIL NIL

NA NA BRPL PALM

BYPL YV BYPL YV

BRPL NA BRPL MKPR

HVPNL FBD RSS DTL STVR RSS

BRPL MUDK RSS BRPL MUDK RSS

NIL NIL NIL NIL

DTL STVR RSS DTL STVR RSS

DTL STVR RSS DTL STVR RSS

NIL NIL NIL NIL

DTL STVR RSS DTL STVR RSS

DTL STVR RSS DTL STVR RSS

NIL NIL NIL KG RSS


DTL STVR RSS DTL STVR RSS

BRPL MUDK RSS BRPL MUDK RSS

DTL NIL NIL NIL

DTL KG NIL NIL

HVPNL HCC RSS TPDDL KG RSS

DTL CHTP DTL CHTP

NA NA NA NA

NIL NIL UPPCL BCGN RSS

NIL NIL NIL NIL

HVPNL STLK RSS HVPNL STLK RSS

BRPL MUDK RSS BRPL MUDK RSS

BRPL MUDK RSS BRPL MUDK RSS


NIL NIL NIL NIL

BRPL MKPR BRPL MKPR

NA NA NA NA

DTL STVR RSS DTL STVR RSS

TPDDL KG
TPDDL KG
BRPL AP RSS

BRPL MKPR BRPL MKPR

BRPL MUDK RSS NIL NIL

BRPL MUDK RSS NIL NIL

NA NA NA NA

NIL NIL NIL NIL

DTL STVR RSS DTL STVR RSS

NA NA NA NA

DTL KG DTL KG
TPDDL NA BRPL MKPR

NA NA DTL CHTP

NA NA BYPL YV

BYPL SN TSS NIL NIL

DTL CHTP DTL CHTP

DTL CHTP DTL CHTP

BRPL MUDK RSS NIL NIL

NA NA BRPL PALM

TPDDL NA BRPL MKPR

BRPL MKPR BRPL MKPR

NA NA BRPL MKPR

NA NA NA NA

DTL CHTP DTL CHTP

NIL NIL NIL NIL


NA NA DTL STVR RSS

STVR
DTL DTL STVR RSS
RSS

BRPL SN RSS NIL NIL

NA NA DTL CHTP

STVR
DTL DTL STVR RSS
RSS

NDMC PS NDMC PS

BRPL MKPR BRPL MKPR

NIL NIL NIL NIL

NIL NIL NIL NIL

BRPL MKPR BRPL MKPR

NIL NIL NIL NIL

BRPL CHTP BRPL CHTP

NA NA DTL CHTP
NA NA NA NA

NA NA NA NA

DTL KG DTL KG

NDMC PS NDMC PS

NA NA NA NA

STVR
DTL DTL STVR RSS
RSS

STVR
DTL DTL STVR RSS
RSS

BYPL NDI TPDDL KG

BYPL IDPT NIL NIL

BYPL IDPT NIL NIL


BYPL IDPT NIL NIL

NA NA DTL CHTP

NA NA NIL NIL

NA NA NIL NIL

NA NA NIL NIL

NA NA NIL NIL

BRPL SN RSS BRPL SN RSS

BRPL PLM BRPL KJMD

STVR
DTL DTL STVR RSS
RSS

STVR
DTL DTL STVR RSS
RSS

NIL NIL UPPCL BCGN RSS

STVR
DTL DTL STVR RSS
RSS

NA NA NA NA
NA NA NA NA

BRPL MUDK RSS BRPL MUDK RSS

KG
BYPL ND RSS TPDDL

BRPL MKPR TPDDL MKPR

BRPL MUDK RSS NIL NIL

NIL NIL NIL NIL

NA NA NA NA

STVR
DTL DTL STVR RSS
RSS

NIL NIL UPPCL BCGN RSS

NIL NIL NIL NIL

KG
BYPL ND RSS TPDDL

DTL KG DTL KG

BRPL BGZ I/C-1 BRPL BGZ I/C-1


STVR
DTL DTL STVR RSS
RSS

BRPL CHTP BRPL CHTP

NIL NIL NIL NIL

NIL NIL NIL NIL

BRPL SN RSS BRPL SN RSS

NA NA NIL NIL

BRPL CHTP BRPL CHTP

TPDDL JGPI RSS TPDDL JGPI RSS

BRPL PLM BRPL KJMD

TPDDL NA BRPL MKPR

BRPL SN RSS NIL NIL


BYPL ND RSS BYPL ND RSS

TPDDL JGPI RSS TPDDL KG

NA NA NIL NIL

TPDDL JGPI RSS TPDDL KG RSS

BRPL MKPR TPDDL MKPR

NA NA NIL NIL

NA NA NIL NIL

NA NA NIL NIL

NA NA NIL NIL

NA NA NIL NIL

DTL KG RSS DTL KG RSS

NA NA NIL NIL

DTL KG RSS DTL KG RSS

DTL KG RSS DTL KG RSS


DTL KG RSS DTL KG RSS

BRPL MUDK RSS BRPL MUDK RSS

NIL NIL NIL NIL

DTL KG RSS DTL KG RSS

NA NA NA NA

NA NA NIL NIL

NA NA NIL NIL

BRPL STLK RSS BRPL STLK AMS

BRPL CHTP BRPL CHTP

NA NA NIL NIL

BRPL RKPM BRPL RKPM

NA NA NA NA

NA NA NA NA

BRPL BGZ I/C-2 BRPL BGZ I/C-2

NIL NIL NIL NIL

NA NA NA NA
HVPNL STLK RSS HVPNL STLK AMS

NA NA NA NA

BRPL CHTP BRPL CHTP

BRPL STVR RSS BRPL STVR RSS

HVPNL STLK RSS HVPNL STLK AMS

TPDDL JGPI RSS TPDDL JGPI RSS

UPPCL BCGN RSS BRPL SN RSS

NIL NIL NIL NIL

NIL NIL NIL NIL

TPDDL KG RSS TPDDL KG RSS

NIL NIL NIL NIL

KR RSS
NDMC NA NA
I/C-2

NA NA NA NA
DTL KG DTL KG

BYPL ND RSS TPDDL KG

NIL NIL NIL NIL

NA NA NA NA

NA NA NA NA

BRPL PALM BRPL PALM

BRPL MKPR BRPL MKPR

NIL NIL UPPCL BCGN RSS

TPDDL JGPI RSS TPDDL JGPI RSS

NA NA NA NA

BRPL SN RSS BRPL SN AMS

BRPL SN RSS BRPL SN AMS

NA NA NA NA

TPDDL JGPI RSS TPDDL JGPI RSS

NIL NIL UPPCL BCGN RSS


BRPL MKPR BRPL MKPR

BRPL MKPR BRPL MKPR

NIL NIL NIL NIL

NDMC PS RSS NA NA

NIL NIL NIL NIL

NIL NIL NIL NIL

BRPL STVR RSS BRPL STVR RSS

NIL NIL NIL NIL

TPDDL JGPI RSS TPDDL JGPI RSS

BRPL MKPR BRPL MKPR

BRPL MUDK RSS BRPL MUDK RSS


BRPL MUDK RSS BRPL MUDK RSS

66 KV CKT-1 KJMD 66 KV CKT-1 KJMD

NIL NIL NIL NIL

NIL NIL NIL NIL

BRPL SN RSS BRPL SN AMS

NIL NIL NIL NIL

NIL NIL NIL NIL

NIL NIL HVPNL STLK RSS

NIL NIL NIL NIL

BYPL IP RSS NIL NIL

BRPL STVR RSS BRPL STVR RSS

BRPL STVR RSS NA NA

NIL NIL NIL NIL


BYPL IP RSS NIL NIL

BRPL MKPR BRPL MKPR

BRPL MKPR BRPL INA

BRPL MKPR BRPL INA

BRPL MKPR BRPL MKPR

TPDDL KG RSS TPDDL KG RSS

BRPL DKV BRPL DKV

nil nil NA NA

NIL NIL NIL NIL

NA NA NA NA

NIL NIL NIL NIL

TPDDL KG RSS TPDDL KG RSS

BRPL MKPR BRPL MKPR,INA


BYPL ND RSS BYPL ND RSS

DTL KG DTL KG

BRPL MKPR BRPL MKPR

BRPL MKPR BRPL MKPR

NIL NIL NIL NIL

BRPL STVR RSS BRPL STVR RSS

NA NA NA NA

TPDDL JGPI RSS TPDDL JGPI RSS

NA NA NA NA

NDMC PS RSS NDMC PS RSS

NA NA NA NA

BRPL MKPR BRPL INA

NA NA NA NA

BRPL STVR RSS BRPL STVR RSS

DTL KG RSS DTL KG RSS

BRPL DKV BRPL MKPR


BRPL RKPM BRPL KJMD

BRPL DKV BRPL MKPR

BRPL DW RSS NIL NIL

NA NA NA NA

NIL NIL NIL NIL

BYPL ND RSS BYPL ND RSS

BYPL ND RSS BYPL ND RSS

BYPL ND RSS BYPL ND RSS

BYPL ND RSS BYPL ND RSS

NIL NIL HVPNL STLK RSS

NIL NIL HVPNL STLK RSS

NIL NIL HVPNL STLK RSS

NA NA NA NA

NIL NIL UPPCL BCGN

NA NA NA NA
DTL KG KG RSS NA NA

BRPL STVR RSS BRPL STVR RSS

BRPL STVR RSS BRPL STVR RSS

NA NA NA NA

TPDDL JGPI RSS TPDDL JGPI RSS

NIL NIL NIL NIL

TPDDL NDI RSS TPDDL KG RSS

DTL KG RSS DTL KG RSS

TPDDL NDI RSS TPDDL KG RSS

TPDDL NDI RSS TPDDL KG RSS

NA NA NA NA

NA NA NA NA

NA NA NA NA

NA NA NA NA
NA NA NA NA

TPDDL NDI RSS TPDDL KG RSS

TPDDL NDI RSS NA NA

TPDDL NDI RSS NA NA

DTL KG RSS DTL KG RSS

NA NA NA NA

DTL KG RSS NA NA

DTL KG RSS DTL KG RSS

BRPL STVR RSS BRPL STVR RSS

BRPL DKV BRPL MKPR

NA NA NA NA

NA NA NA NA

BRPL SN RSS BRPL SN AMS


BRPL STVR RSS BRPL STVR RSS

DTL KG RSS DTL KG RSS

BRPL STVR RSS BRPL STVR RSS

BRPL DKV I/C-2 BRPL DKV I/C-2

BRPL STVR RSS BRPL STVR RSS

NIL NIL NIL NIL

TDPL MKPR TDPL NA

NA YV NA YV

BRPL STVR RSS BRPL STVR RSS

BRPL STVR RSS BRPL STVR RSS

BRPL STVR RSS BRPL STVR RSS

BRPL STVR RSS BRPL STVR RSS

BRPL STVR RSS BRPL STVR RSS

NA NA NA NA

NIL NIL NIL NIL

BRPL STVR RSS BRPL STVR RSS


TPDPL(JGPI) MKPR (JGPI )TPDPL MKPR

NIL NIL NIL NIL

HVPNL HCC RSS TPDDL ND RSS

NIL NIL NIL NIL


NIL NIL HVPNL STLK RSS
NIL NIL HVPNL STLK RSS

NIL NIL NIL NIL

TPDDL JGPI RSS TPDDL JGPI RSS

NIL NIL NIL NIL

NIL NIL NIL NIL

NA YV NA YV

BRPL SN RSS UPPCL BCGN RSS

NIL NIL NIL NIL

NIL NIL NIL NIL


NIL NIL NIL NIL

BYPL VNNR BYPL VNNR

NA NA NA NA
CAUSE- STORM, GRID,
CABLE JOINT FAILURE,
Cause of failure reported by
EXTERNAL CABLE TYPE
System control
FAILURE, OTHERS
(SPECIFY)
220 KV SUPPLY FAILED OTHERS 5
PLANNED SHUT DOWN taken by
NA 6
HVPNL staff.

PLANNED SHUTDOWN BY DTL OTHERS 6

OFF LOAD 66 KV I/C-1FAILED


NA 4
FROM HVPNL

CHANGEOVER THEIR END NA 6

BOTH I/C FAILED FROM 220KV


PALLA END DUE TO SPRAKING NA 5
AT 220KV PALLA HVPNL SIDE.

BOTH I/C FAILED FROM 220KV


PALLA END DUE TO SPRAKING NA 5
AT 220KV PALLA HVPNL SIDE.

TRIPPING AT ROHINI
NA 5
SUBSTATION

OFF LOAD 66 KV I/C-1FAILED


FROM HVPNL. CHANGEOVER NA 4
AT THEIR END

OFF LOAD 66 KV I/C-1FAILED


FROM HVPNL. CHANGEOVER NA 4
AT THEIR END

OFF LOAD 66 KV I/C-1FAILED


FROM HVPNL. CHANGEOVER NA 4
AT THEIR END

OFF LOAD 66 KV I/C-1FAILED


FROM HVPNL. CHANGEOVER NA 4
AT THEIR END
OFF LOAD 66 KV I/C-1FAILED
FROM HVPNL. CHANGEOVER NA 4
AT THEIR END

OFF LOAD 66 KV I/C-1FAILED


FROM HVPNL. CHANGEOVER NA 4
AT THEIR END

OFF LOAD 66 KV I/C-1FAILED


FROM HVPNL. CHANGEOVER NA 4
AT THEIR END

TRIPPING OCCURS AT DTL END OTHERS 5

PLANNED SHUTDOWN OTHERS 6

I/C-1 FAILED FROM 220KV


PALLA END DUE TO SPRAKING NA 5
AT 220KV PALLA HVPNL SIDE.

SHUT DOWN TAKEN BY DTL


GOPALPUR FOR FOR OIL TOP OTHERS 6
UP IN 66 KV TRANSFORMER

TRIPPING AT DTL WAZIRABAD


OTHERS 4
DUE TO BIRD ELECTROCUTION

LOAD CHANGE OVER AT DTL


OTHERS 4
END.

TRIPPING AT DTL WAZIRABAD OTHERS 4

OFF LOAD 66 KV I/C-1FAILED


FROM HVPNL DUE TO NA 4
CHANGEOVER AT THEIR END

TRIPPING AT GRID END NA 5


TRIPPING AT 220 KV DTL SYSTEM NA 4

TRIPPING AT DTL END NA 4

POWER BLOCK TAKEN ON OFF


LOAD 66 KV I/C-2 FROM HVPNL
NA 4
DUE TO MAINTENANCE WORK AT
THEIR END

I/C-1 FAILED FROM 220KV PALLA


NA 5
END

OFF LOAD 66 KV I/C-2 FAILED


FROM HVPNL. CHANGEOVER AT NA 4
THEIR END
MAINTENANCE AT NOONA MAJRA,
N/A 6
HVPNL END.
MAINTENANCE AT NOONA MAJRA,
N/A 6
HVPNL END.

I/C-1 FAILED due to supply failure at


NA 5
palla

I/C-1 FAILED due to supply failure at


NA 5
palla

I/C-1 FAILED due to supply failure at


NA 5
palla

As per HVPNL tripping occured on


DMRC 66KV Ckt-1 on DPR ( zone-1 )
NA 4
MTR operated. ASE/PSI asked for
check same.
abnormality noted in tripping current
and also pre fault parameters and fault
parameters.

IR test carried out of 66KV cable after


the isolation PT primary side result
found satisfactory.

R-E- more than 18G ohms


Y-E- more than 20G ohms
B-E- more than 18G ohms NA 4

As meggering result satisfactory, it is


suspected that relay is
malfunctioning.Also it is suspected that
tripping occured due to
changeover/fluctuation at hvpnl end.
Relay team informed to check relay on
priority.DMRC HCC 66KV I/C-1
OFF LOAD I/C-2 FAILED due to
charged successfully at 19:20Hrs after NA 5
changeover at palla
the replacing faulty HMI of RED670
relay & testing of relay by relay team
at HVPNL.

PLANNED SHUTDOWN BY DTL NA 6

OTHERS
FIR ON 20 MVA 66KV TR AT STVR
FIR ON 20 MVA 66KV TR AT 4
DTL
STVR DTL

FIRE REPORTED AT STVR DTL


NA 4
SUBSTATION.

OFF LOAD I/C-2 FAILED due to


tripping of 100kva transformer tripping NA 5
at pali.now load on palla transformer.

DMRC BREAKER TRIPED ON MTR


OTHERS 6
AT DTL END

TRIPPING OCCURS AT DTL END OTHERS 5

OFF LOAD 66 KV I/C-1 FAILED


FROM HVPNL. CHANGEOVER AT NA 4
THEIR END

DMRC BREAKER TRIPED ON AT


DTL END WITHOUT ANY OTHERS 7
INDICATION.

I/C-1 FAILED due to CHANGEOVER


OF SUPPLY OF INCOMER1 FROM NA 5
PALLA TO PALI.

66 kv incomer CT blast in DTL sub-statio at Problem insise DTL S/S 4


Ghazipur
ON LOAD 66 KV I/C-1 FAILED FROM
CT BURST 4
HVPNL. DUE TO LOAD CHANGING.

ON LOAD 66 KV I/C-2 FAILED FROM


HVPNL. DUE TO CT BURSTING AT CT BURST 4
THEIR END.

I/C-1 FAILED due to CHANGEOVER


OF SUPPLY OF INCOMER1 AT PALI NA 5
END.

TRIPPING OCCURS AT DTL END OTHERS 5

OFF LOAD I/C-1 FAILED due


NA 5
tochangeover at pali

OFF LOAD I/C-2 FAILED due to


NA 5
changeover at palla

OFF LOAD I/C-2 FAILED due to


NA 5
OVERLOADING at palla

66 kv incomer CT blast in DTL sub-statio at Problem insise DTL S/S 4


Ghazipur
NA Problem insise DTL S/S 6

NA Problem insise DTL S/S 6


PLANNED SHUTDOWN AT HVPNL
DUE TREE TRIMMING AT HVPNL NA 6
END

NA NA 6

DUE TO CHANGE OVER NA 6

TRIPPING AT GTPS END OF 220KV OTHERS 4

OFF LOAD I/C-2 FAILED due to


NA 5
OVERLOADING at palla

PLANNED SHUTDOWNTAKEN BY
OTHERS 6
PSI STAFF/L8 FOR MNT.

FAILED AT DTL END N/A 4


OFF LOAD I/C-2 FAILED due to
NA 5
OVERLOADING at palla

ON LOAD 66 KV I/C-2 TRIPPED


NA
FROM HVPNL
OFF LOAD I/C-2 FAILED due to DC
NA 4
failure at SEC-46/HVPNL end.
OFF LOAD 66 KV I/C-2 FAILED
NA
FROM HVPNL

OFF LOAD I/C-2 FAILED due to DC


NA 4
failure at SEC-46/HVPNL end.

ON LOAD I/C-1 FAILED DUE TO


TRANSFORMER TRIPPING AT NA 4
PALLA SIDE.

ON LOAD 66 KV I/C-2 FAILED FROM


NA
HVPNL. LOAD SHIFTED TO I/C-1.

TRIPPED FROM DTL END others 4

BOTH 66KV INCOMER AT STVR


RSS FAILED DUE TO ONE BIRD NA 4
ELECTROCUTED AT DTL END.

DUE TO 220KV POWER SUPPLY


FAILURE AT NOONA MAJRA, HVPNL N/A 4
END.

66 KV I/C- 1 & 2 FAILED FROM


HVPNL DUE TO SUPPLY FAILURE NA 4
FROM SECTOR 72.

ON LOAD 66 KV I/C-2 FAILED FROM


HVPNL DUE TO SUPPLY FAILURE
NA
FROM SECTOR 56. LOAD SHIFTED
TO I/C-1.
ON LOAD 66 KV I/C-1 FAILED FROM
HVPNL DUE TO SUPPLY FAILURE
NA
FROM SECTOR 56. LOAD SHIFTED
TO I/C-2.

Problem insise DTL S/S 4


NA
Planned Shutdown FROM HVPNL
N/A 6
END.
DTL UP STREAM 400KV SUPPLY DADRI-
Problem Upstream to DTL S/S 5
MAHARANI BAGH FAILED.

DTL UP STREAM 400KV SUPPLY DADRI-


MAHARANI BAGH FAILED.
Problem Upstream to DTL S/S 5

TRIPPING AT DTL END NA 4

BOTH 66KV INCOMER AT STVR


RSS FAILED DUE TO ONE BIRD NA 5
ELECTROCUTED AT DTL END.

OFF LOAD 66 KV I/C-1 FAILED


FROM HVPNL DUE TO NA
CHANGEOVER

OFF LOAD 66 KV I/C-1 FAILED


FROM HVPNL DUE TO NA
CHANGEOVER

DTL I/C-2 INCOMER FAILED AT


DTL END ON DIFFERENTIAL
NA 3
PROTECTION . OPERATED AT PS
RSS END.

BOTH INCOMER FAILED FROM


NA 3
UPPCL END

BOTH INCOMER FAILED FROM


NA 3
UPPCL END

BOTH INCOMER FAILED FROM


NA 3
UPPCL END
BOTH INCOMER FAILED FROM
NA 3
UPPCL END

BOTH INCOMER FAILED FROM


NA 3
UPPCL END

220 KV SUPPLY FAILED OTHERS 5

CHANGEOVER AT PALLA END DUE


NA 6
TO PLANNED SHUTDOWN
DTL UP STREAM 220KV SUPPLY
Problem Upstream to DTL S/S 5
PATPARGANJ FAILED.
DTL UP STREAM 220KV SUPPLY
Problem Upstream to DTL S/S 5
PATPARGANJ FAILED.
DTL UP STREAM 220KV SUPPLY
Problem Upstream to DTL S/S 5
PATPARGANJ FAILED.
TRIPPING ON OVERVOLTAGE AT DTL
TRIPPING AT DTL S/S 4
GHAZIPUR

PLANNED CHANGEOVER BY
NA 6
HVPNL.

AS PER GTPS DUE TO JERK IN 220


NA 4
KV I/C

TRIPPING AT DTL END DUE TO


INRUSH CURRENT AT THE TIME OF NA 1
CHARGING AT A-2 AT PS RSS.

220KV I/C-1 & 2 SUPPLY FAILED TRIPPING AT DTL SHALIMAR


4
FROM DTL END. END

220KV I/C-1 & 2 SUPPLY FAILED TRIPPING AT DTL SHALIMAR


4
FROM DTL END. END
220KV I/C-1 & 2 SUPPLY FAILED TRIPPING AT DTL SHALIMAR
4
FROM DTL END. END

TRIPPING OCCURS AT DTL END OTHERS 5

TRIPPING ON OVERVOLTAGE AT DTL


TRIPPING AT DTL S/S 4
GHAZIPUR

ITRIPPING ON OVERVOLTAGE AT
OTHERS 6
DTL

SUPPLY FAILED FROM PALI END NA 5

FAILED AT DTL END N/A 4

SUPPLY FAILED FROM UPPCL


OTHERS 5
END.

PLANNED SHUTDOWN OF HVPNL NA 6

PLANNED SHUTDOWN OF HVPNL NA 6

SUPPLY FAILED FROM UPPCL


OTHERS 5
END.

PLANNED SHUTDOWN AT SEC-46/


HVPNL END FOR RELAY TESTING NA 6
BY DMRC STAFF.

PLANNED SHUTDOWN OF HVPNL NA 6

66 KV I/C- 1 & 2 FAILED FROM DTL


AS TRIPPING OCCURRED AT THEIR EXTERNAL 4
END ( IN YARD ON E/F).
PLANNED SHUTDOWN OF HVPNL NA 6

FAILED AT DTL END N/A 4

BOTH INCOMER FAILED FROM


NA 3
UPPCL END

INCOMER 2 FAILED FROM TPDDL DUE TRIPPING AT BAWANA


3
END. GRID

66 KV I/C- 1 & 2 FAILED FROM DTL TRIPPING AT DTL SHALIMAR


5
AS CT BLAST AT THEIR END END

66 KV I/C- 1 & 2 FAILED FROM


HVPNL DUE TO SUPPLY FAILURE NA 5
FROM SECTOR 72.

66 KV I/C- 1 & 2 FAILED FROM


HVPNL DUE TO SUPPLY NA 5
FLUCTUATION FROM SECTOR 72.

SUPPLY FAILED FROM UPPCL


OTHERS 5
END.

SUPPLY FAILED FROM UPPCL


OTHERS 5
END.

ON LOAD 66 KV I/C-2 FAILED FROM


HVPNL DUE TO SUPPLY FAILURE
NA
FROM SECTOR 56. LOAD SHIFTED
TO I/C-1.
DUE TO 220KV POWER SUPPLY
DC SUPPLY TRIPPED AT
FAILURE AT NOONA MAJRA, HVPNL 6
HVPNL END.
END.
DUE TO 220KV POWER SUPPLY
DC SUPPLY TRIPPED AT
FAILURE AT NOONA MAJRA, HVPNL 6
HVPNL END.
END.
SUPPLY FAILED FROM UPPCL
OTHERS 5
END.

SUPPLY TRIPPED FROM MANDOLA


OTHERS 5
220KV.

PLANNED SHUTDOWN WAS


NA 6
REQUESTED BY DTL

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to power failure from NA 6
HVPNL edn

Planned shutdown by DTL NA 6

SUPPLY TRIPPED FROM MANDOLA


OTHERS 5
220KV.

DUE TO DC SUPPLY tripped at DC SUPPLY TRIPPED AT


4
HVPNL END. HVPNL END.

DUE TO DC SUPPLY tripped at DC SUPPLY TRIPPED AT


4
HVPNL END. HVPNL END.

PLANNED SHUTDOWN WAS


NA 6
REQUESTED BY DTL

SUPPLY FAILED FROM UPPCL


OTHERS 5
END.

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to power failure from NA 6
HVPNL edn

66 KV I/C- 1 & 2 FAILED FROM


HVPNL DUE TO CHANGEOVER NA 4
THEIR END

BOTH INCOMER FAILED FROM


NA 3
UPPCL END
TRIPPING ON OVERVOLTAGE AT
OTHERS 6
DTL
66 KV I/C- 1 & 2 FAILED FROM
HVPNL DUE TO SUPPLY FALURE
NA 4
OF 220KV I/C FROM SECTOR-52
THEIR END
TRIPPING AT DTL HARSH VIHAR
Problem insise DTL S/S 4
S/S

Planned shutdown by DTL end OTHERS 6

66 KV I/C - 1 & 2 SUPPLY FAILED


FROM HVPNL.220KV ALSO FAILED NA 4
FROM THEIR END.

66 KV I/C - 1 & 2 SUPPLY FAILED


FROM HVPNL.SUPPLY
NA 4
RESTORATION AS PER SCHEDULE
DUE TO FAILURE OF DAY TIME.

220KV INCOMER SUPPLY FAILED


DUE OTHER 132KV PARALLEL N/A 3
LINE'S CABLE FAULTY.

TRIPPING OCCURS AT DTL END OTHERS 5

PLANNED SHUTDOWN OTHERS 6

PT OIL LEAKEGING AT DTL END. OTHERS 4

SUPPLY TRIPPED FROM MANDOLA


OTHERS 5
220KV.

PLANNED SHUTDOWN WAS


NA 6
REQUESTED BY DTL

CHATTERING REPORTED BY DTL


NA 4
ON ISOLATOR AT DTL END.

DUE TO MAINTENANCE WORK AT


NIL 6
NOONA MAJRA, HVPNL END.
BOTH 66 Kv I/C -1& 2 AT FBD RSS
FAILED DUE TO CHANGEOVER AT
PALLA/HVPNL END FOR URGENT NA 7
MAINTENANCE AT PALLA/HVPNL
END.

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to power failure from NA 7
HVPNL edn

BAMNAULI- PPANKALAN CKT


TRIPPING AT UPSTREAM 5
TRIPPED

66 KV I/C - 1 & 2 SUPPLY FAILED


NA 4
FROM HVPNL.

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to power failure from NA 5
HVPNL end at Palla.

66 KV CKT-1(APL) TRIPPED FROM


DTL END DUE TO EARTH FAULT ON NA 7
CHARGING OF AT A1

TRIPPING OF DMRC FEEDER AT


OTHERS 3
DTL GOPALPURI.

SUPPLY FAILED FROM UPPCTL


OTHERS 5
END.

SUPPLY FAILED FROM UPPCTL


OTHERS 4
END DUE TO CHANGEOVER DONE.

TRIPPING OF DMRC FEEDER AT


OTHERS 3
DTL GOPALPURI.

SUPPLY FAILED FROM UPPCTL


OTHERS 4
END DUE TO CHANGEOVER DONE.

66 KV I/C - 1 & 2 SUPPLY FAILED


NA 4
FROM HVPNL.

OFF LOAD 66 KV I/C - 2 SUPPLY


NA 4
FAILED FROM HVPNL.
66 KV I/C - 1 SUPPLY FAILED FROM
NA 4
HVPNL.

66 KV I/C - 1 SUPPLY FAILED FROM


NA 4
HVPNL.

BOTH INCOMER FAILED FROM


TPDDL END DUE TO TRIPPING
GRID 5
UPSTREAM FROM 220KV BAWANA
GSS

66 KV CKT-1(APL) TRIPPED FROM


DTL END FOR GENERAL MTC AND NA 6
PAINTING AT PARK STREET.

PLANNED SHUTDOWN WAS


NA 6
REQUESTED BY DTL

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to power failure from NA 5
HVPNL end at Palla.

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to power failure from NA 5
HVPNL end at Palla.

220KV I/C-1 & 2 SUPPLY FAILED TRIPPING AT DTL SHALIMAR


4
FROM DTL END. END

220 KV SUPPLY FAILED OTHERS 5

220 KV SUPPLY FAILED OTHERS 5


220 KV SUPPLY FAILED OTHERS 5

66 KV I/C - 2 SUPPLY FAILED FROM


I/C TRIPPED AT HVPNL END. 4
HVPNL.

66 KV I/C - 2 SUPPLY FAILED FROM


I/C TRIPPED AT HVPNL END. 4
HVPNL.

66 KV I/C - 2 SUPPLY FAILED FROM


I/C TRIPPED AT HVPNL END. 4
HVPNL.

66 KV I/C - 2 SUPPLY FAILED FROM


I/C TRIPPED AT HVPNL END. 4
HVPNL.

66 KV I/C - 2 SUPPLY FAILED FROM


I/C TRIPPED AT HVPNL END. 4
HVPNL.

TRIPPING AT DTL END. PPANKALAN CKT TRIPPED 4

PLANNED SHUTDOWN BY DTL OTHERS 6

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to power failure from NA 5
HVPNL end at Palla.

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to power failure from NA 5
HVPNL end at Palla.

SUPPLY FAILED FROM UPPCTL


END DUE TO SPARKING IN OTHERS 4
ISOLATOR AT UPPTCL END

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to CT burst at 220 kv pala NA 5
substation .

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to changeover from HVPNL NA 4
end .
PLANNED SHUTDOWN WAS
TAKEN BY DTL TO ATTEND HOT NA 4
SPOT.
DTL EMERGENCY SHUTDOWN TO
N/A 4
ATTEND HOT SPOT

MULTIPLE BREAKDOWN
REPORTED AT DTL SHALIMAR BAG NA 4
END

SUPPLY TRIPPED FROM DTL END


OTHERS 4
AT JGPI RSS

DUE TO BURNING OF CLAMP &


N/A 7
EARTH FAULT

DUE TO LOAD CHANGEOVER N/A 7

Due to sparking at Transformer at DTL


NA 4
end.

Both 66 Kv I/C -1& 2 at FBD RSS


failed due to DC fluctuation at HVPNL NA 4
end .

SUPPLY FAILED FROM UPPCTL


END DUE TO 220KV SUPPLY OTHERS 4
FAILED

SUPPLY FAILED FROM UPPCTL


OTHERS 4
END DUE TO CHANGEOVER DONE.

SUPPLY TRIPPED AT DTL END. NA 4

BOTH INCOMER FAILED FROM


TPDDL END DUE TO TRIPPING AT GRID 4
220KV BAWANA GSS

DUE TO EARTHFAULT N/A 2


Both 66 Kv I/C -1& 2 at FBD RSS
NA 4
failed at HVPNL end .

66 KV I/C - 1 & 2 SUPPLY FAILED


NA 4
FROM HVPNL.

66 KV I/C - 1 & 2 SUPPLY FAILED


NA 4
FROM HVPNL.

DUE TO fault investigation AT


N/A 5
NOONA MAJRA, HVPNL END.

HOT SPOT OBSERVED ON DMRC


EMERGENCY SHUTDOWN BY DTL 4
CKT-2/GTPS END

OFFLOAD 66 KV I/C - 2 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END

66 KV I/C - 1 & 2 SUPPLY FAILED


FROM HVPNL DUE TO
NA 4
UNINFORMED CHANGEOVER AT
THEIR END.

66 KV I/C-1 SUPPLY FAILED FROM


GTPS DUE TO PROBLEM AT THEIR NA 4
END.

TRIPPING OCCURS AT DTL END AT


OTHERS 1
220KV VASANT KUNJ MEHARAULI

FIRE AT DTL END OTHERS 6

220 KV SUPPLY FAILED 220 KV SUPPLY FAILED 5


SUPPLY FAILED AT 220KV SHALIMAR
GRID 4
BAGH GSS FROM BAWANA GSS

SUPPLY FAILED AT 220KV SHALIMAR


GRID 4
BAGH FROM BAWANA CKT-2

OFFLOAD 66 KV I/C - 1 SUPPLY


I/C TRIPPED AT SECTOR 72 END. 4
FAILED FROM HVPNL.

DUE TO HOTSPOT AT GTPS END DTL


REQUESTED TO REMOVE LOAD FROM NA 4
66 KV I/C-1.

SUPPLY TRIPPED FROM JGPI RSS OTHERS 7

OFFLOAD 66 KV I/C - 1 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END

PLANNED SHUTDOWN TO ATTEND HOT SPOT AT SEC-45/UPPCL


6
HOT SPOT AT SEC-45/NOIDA END

OFFLOAD 66 KV I/C - 1 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END

OFFLOAD 66 KV I/C - 1 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END

OFFLOAD 66 KV I/C - 1 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END

BOTH INCOMER FAILED FROM


TRIPPING AT UPPCL END 4
UPPCL END

OFFLOAD 66 KV I/C - 2 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END
BOTH INCOMER FAILED FROM PLANNED SHUTDOWN
6
UPPCL END REQUESTED BY UPPCL.
BOTH INCOMER FAILED FROM
TRIPPING AT UPPCL END 4
UPPCL END
BOTH INCOMER FAILED FROM PLANNED SHUTDOWN
6
UPPCL END REQUESTED BY UPPCL.
Due to Substation DC Supply failure N/A 4

Due to Substation DC Supply failure NIL 4

BOTH INCOMER FAILED FROM PLANNED SHUTDOWN


6
UPPCL END REQUESTED BY UPPCL.

TRIPPING OCCURS AT DTL END AT


OTHERS 1
220KV VASANT KUNJ MEHARAULI

OFFLOAD 66 KV I/C - 1 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END
OFFLOAD 66 KV I/C - 1 SUPPLY SUPPLY CHANGEOVER AT HVPNL
4
FAILED FROM HVPNL. END

BOTH 66 KV I/C -1 & I/C-2 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END

BOTH 66 KV I/C -1 & I/C-2 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END

OTHERS
FIRE ON 20 MVA 66KV TR AT STVR
FIRE ON 20 MVA 66KV TR AT 4
DTL
STVR DTL

STVR RSS I/C -1 FAILED DUE TO


NA 4
FIRE ACCIDENT AT DTL END

PLANNED SHUTDOWN IS TAKEN


NA 6
BY DTL

Due to two I/C tripped from HVPNL


N/A 4
side

Due to Planned Shutdown from


NIL 6
HVPNL side
PLANNED SHUTDOWN IS TAKEN
NA 6
BY DTL
66 KV I/C - 2 SUPPLY FAILED FROM
HVPNL DUE TO TRIPPING AT THEIR TRIPPING AT THEIR END. 4
END.

PLANNED SHUTDOWN IS TAKEN


NA 6
BY HVPNL

66 KV I/C -1 SUPPLY FAILED FROM


TRIPPING OCCURRED OF 220 KV
HVPNL DUE TO TRIPPING OCCURRED 4
AT THEIR END.
OF 220 KV AT THEIR END.

Both 66 Kv I/C -1& 2 at FBD RSS


NA 5
failed at HVPNL end .

ON LOAD 66 KV I/C -2 SUPPLY FAILED


TRIPPING OCCURRED AT THEIR
FROM HVPNL DUE TO TRIPPING AT 5
END.
THEIR END.
66 KV I/C-1 SUPPLY FAILED FROM HOT SPOT OBSERVED ON DMRC
GTPS DUE TO HOT SPOT PROBLEM CKT-1/GTPS END 4
AT THEIR END.

EMERGENCY SHUTDOWN BY DTL HOT SPOT OBSERVED ON DMRC 4


CKT-2/GTPS END

DUE TO LOAD CHANGEOVER AT


N/A 4
HVPNL END

DUE TO LOAD CHANGEOVER AT


N/A 4
HVPNL END

ON LOAD INCOMER-1 FAILED


FROM TPDDL END DUE TO
GRID 4
BUSBAR PROTECTION OPERATED
AT 220KV DTL KASHMERE GATE

132 KV I/C at discom end tripped N/A 4

TRIPPING AT GRID END NA 5

OFFLOAD 66 KV I/C - 1 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END
BOTH INCOMER FAILED FROM
TPDDL END DUE TO TRIPPING
GRID 5
UPSTREAM FROM 220KV BAWANA
GSS

SUPPLY FAILED AT 220KV SHALIMAR


GRID 4
BAGH FROM BAWANA CKT-2

FOR REPLACE JUMPER BY UPPCL


OTHERS 4
AT THEIR END

OFFLOAD 66 KV I/C - 2 SUPPLY SUPPLY CHANGEOVER AT HVPNL


4
FAILED FROM HVPNL. END
OFFLOAD 66 KV I/C - 2 SUPPLY SUPPLY CHANGEOVER AT HVPNL
4
FAILED FROM HVPNL. END
TRIPPING OCCURS AT DTL END AT Interupption in which DTL system
1
66 KV CKT tripped

220KV TRIPPING FROM DTL. OTHERS 5

SUPPLY FAILED FROM UPPCTL


OTHERS 4
END DUE TO CHANGEOVER DONE.

PLANT SHUT DOWN DUE TO SOME


CONDUCTOR STRANDS FOUND CUT IN SUPPLY WITHDRAW FROM GTPS 4
YARD OF GTPS.
TRIPPING OCCURS AT DTL END OTHERS 5

JUPMER FALLEN ON BUS BAR


DURING FAILURE RECTIFICATION OTHERS 4
AT THEIR END BY DTL.

SUPPLY FAIL FROM PALAM RSS


AT THAT TIME LOAD ON PALAM OTHERS 4
INCOMER

PLANNED SHUTDOWN WAS


NA 6
TAKEN BY DTL

PLANT SHUT DOWN DUE TO SOME


CONDUCTOR STRANDS FOUND CUT IN SUPPLY WITHDRAW FROM GTPS 4
YARD OF GTPS.

SUPPLY FAILED FROM UPPCTL


END DUE TO 220KV FEEDER OTHERS 4
TRIPPED
220KV TRIPPING FROM DTL. OTHERS

220KV TRIPPING FROM DTL. OTHERS

220 KV SUPPLY FAILED OTHERS 5

TRIPPING AT GRID END NA 5

OFFLOAD INCOMER-2 FAILED


FROM TPDDL END DUE TO
TRIPPING OF 220 CIRCUIT-2
GRID 4
BETWEEN WAZIRABAD GSS AND
KASHMERE GATE GSS ON
DISTANCE PROTECTION

220 KV SUPPLY FAILED OTHERS 5

Both 66 Kv I/C -1& 2 at FBD RSS


NA 5
failed at HVPNL end .

Due to Planned Shutdown from


N/A 6
HVPNL side

AS PER DTL, PROBLEM IN CB AT GTPS


CB TO BE ATTANDED BY
END. CB DID NOT OPEN. DTL DENIED 1
PROTECTION TEAM OF DTL.
TO TAKE LOAD ON ND RSS.

220KV TRIPPING FROM DTL. OTHERS 5

DUE TO 220KV POWER SUPPLY


FAILURE AT NOONA MAJRA, HVPNL
N/A 5
END DUE TO INCOMMER SUPPLY
FAIL OF NUNAMAJRA
LA BURST AT NOONA MAJRA,
N/A 4
HVPNL END.

66 KV B1-PHASE DISTANCE
PROTECTION OPTD, FAULT
others 3
CURRENT 12.5 KA & DISTANCE 3.8
KM.
132KV OFFLOAD INCOMER FAILED
DUE TO LA BURST AT NOONA N/A 4
MAJRA , HVPNL END.
132KV OFFLOAD INCOMER FAILED
DUE TO LA BURST AT NOONA N/A 4
MAJRA , HVPNL END.

ATTENDED Hot spot of 66KV ckt-2 of


OTHERS 4
IP RSS attended at GTPS

66 KV I/C -1 SUPPLY FAILED FROM CHANGEOVER DONE AT HVPNL


4
HVPNL. END.
66 KV I/C -2 SUPPLY FAILED FROM
Maintenance done at HVPNL end. 4
HVPNL.
66 KV I/C -1 SUPPLY FAILED FROM CHANGEOVER DONE AT HVPNL
4
HVPNL. END.

66 KV I/C -2 SUPPLY FAILED FROM


Maintenance done at HVPNL end. 4
HVPNL.

220 KV SUPPLY FAILED OTHERS 5

Both 66 Kv I/C -1& 2 at FBD RSS


NA 5
failed at HVPNL end .

Both 66 Kv I/C -1& 2 at FBD RSS


failed at HVPNL end DUE TO NA 5
CHANGEOVER

66 KV I/C- 1 FAILED FROM DTL DUE TO


SCHEDULED MAINTENANCE ON
SCHEDULED MAINTENANCE ON THEIR 6
DTL END
END
220 KV SUPPLY FAILED OTHERS 5

220KV TRIPPING FROM DTL. problem inside DTL S/S 4

220KV TRIPPING FROM DTL. OTHERS 5

220KV TRIPPING FROM DTL. OTHERS 5

220KV TRIPPING FROM DTL. problem inside DTL S/S 4

ON LOAD INCOMER-1 FAILED


FROM TPDDL END DUE TO
DIFFERENTIAL BUSBAR ,EARTH
OTHERS 7
FAULT AND DISTANCE
PROTECTION OPERATED AT
220KV DTL KASHMERE GATE

220KV TRIPPING FROM DTL. problem inside DTL S/S 4

Both 66 Kv I/C -1& 2 at FBD RSS


failed at HVPNL end DUE TO NA 5
CHANGEOVER

Due to Complete shut down of 220kV


Nuna Majra is planned for taking new
N/A 6
battery charger and battery bank into
circuit at HVPNL end.

TRIPPING OCCURS AT DTL END OTHERS 5

Due to Complete shut down of 220kV


Nuna Majra is planned for taking new
N/A 6
battery charger and battery bank into
circuit at HVPNL end.

SAME CHECKED FY DTL &


TRIPPED ON E/F, WIRIG PROBLEM RELAY TEAM, FOUND EIRING
7
IN DTL END. PROBLEM, SAME ATTENDED
& RECTIFIED.

TRIPPING AT 220KV DTL S/S OTHERS 4


SUPPLY FAILED AT 220KV SHALIMAR BUSBAR PROTECTION
4
BAGH FROM BAWANA CKT OPERATED AT DTL BAWANA.

BOTH INCOMERS FAILED FROM


TPDDL END DUE TO TRIPPING
GRID 5
UPSTREAM FROM 220KV BAWANA
GSS

220KV TRIPPING FROM DTL. problem inside DTL S/S 4

220KV TRIPPING FROM DTL. problem inside DTL S/S 4

nil N/A 7

Both 66 Kv I/C -1& 2 at FBD RSS


failed at HVPNL end due to
NA 4
transformer tripping at
HVPNL/SEC-46.
ATTENDING HOT SPOT AT
NA 4
SEC46/HVPNL END

PLANNED SHUTDOWN TO ATTAND


HOT SPOT AT GTPS END ON BUS
HOT SPOT AT GTPS END, ON BUS 6
BAR-1 R-PHASE ISOLATOR
BAR-1 R-PHASE ISOLATOR

ATTENDING HOT SPOT AT


NA 4
SEC46/HVPNL END

ON LOAD INCOMER 2 SUPPLY


FAILED AT STVR RSS AS CB AT
DTL END TRIPPED , IMMEDIATELY NA 4
LOAD IS TAKEN ON INCOMER 1 AT
STVR RSS.

shutdown was sought from HVPNL


NA 6
END.

CHANGEOVER AT DTL RIDGE


OTHERS 4
VALLEY.

PLANNED SHUTDOWN IS TAKEN


BY HVPNL
NA 6
Both 66 Kv I/C -1& 2 at FBD RSS
failed at HVPNL end due to
NA 4
transformer tripping at
HVPNL/SEC-46.
BOTH INCOMER FAILED FROM
Transient fault 6
UPPCL END

220KV TRIPPING FROM DTL. Problem Upstream to DTL S/S 5


TRIPPING OCCURS AT BAMNOLI OTHERS 5

220KV TRIPPING FROM DTL. Problem Upstream to DTL S/S 5

Supply fail from Bamnoali ( DTL) end. OTHERS 5

PLANNED SHUTDOWN IS TAKEN


BY HVPNL for Relay testing work.
NA 6

66 KV I/C -2 SUPPLY FAILED FROM


PLANED CHANGEOVER. 4
HVPNL.

SUPPLY FAILED AT 220KV SHALIMAR BUSBAR PROTECTION


4
BAGH FROM BAWANA CKT OPERATED AT DTL BAWANA.

SUPPLY FAILED AT 220KV SHALIMAR BUSBAR PROTECTION


4
BAGH FROM BAWANA CKT OPERATED AT DTL BAWANA.

SUPPLY FAILED AT 220KV SHALIMAR BUSBAR PROTECTION


4
BAGH FROM BAWANA CKT OPERATED AT DTL BAWANA.

SUPPLY FAILED AT 220KV SHALIMAR BUSBAR PROTECTION


4
BAGH FROM BAWANA CKT OPERATED AT DTL BAWANA.

66 KV I/C -1 SUPPLY FAILED FROM CHANGEOVER DONE AT HVPNL


4
HVPNL. END.

66 KV I/C -1 SUPPLY FAILED FROM CHANGEOVER DONE AT HVPNL


4
HVPNL. END.
66 KV I/C -2 SUPPLY FAILED FROM CHANGEOVER DONE AT HVPNL
4
HVPNL. END.

PLANNED SHUTDOWNTAKEN BY
OTHERS 6
DTL

220 KV SUPPLY FAILED OTHERS 5

PLANNED SHUTDOWN IS TAKEN


BY HVPNL for CHANGEOVER
NA 4
66 KV ON LOAD INCOMMER-1
FAILED FROM DTL END.
TRIPPING AT DTL YARD. 4

Both 66 Kv I/C -1& 2 at FBD RSS


failed at HVPNL end due to main
NA 4
breaker tripping on overvltage at
HVPNL/SEC-46.
Both 66 Kv I/C -1& 2 at FBD RSS
failed at HVPNL end due to main
NA 4
breaker tripping on overvltage at
HVPNL/SEC-46.
Both 66 Kv I/C -1& 2 at FBD RSS
failed at HVPNL end due to NA 4
changeover at Sec-46/HVPNL

SUPPLY FAILED AT 220KV SHALIMAR TRIPPING AT DTL END. 4


BAGH FROM BAWANA CKT

Planned shutdown REQUESTED


N/A 6
FROM DISCOM END

BOTH I/C SUPPLY FAILED AT 220KV TRIPPING AT DTL END. 4


SHALIMAR BAGH FROM BAWANA CKT

BOTH INCOMERS FAILED FROM


TPDDL END DUE TO BUSBAR
PROTECTION OPERATED GRID 5
UPSTREAM FROM 220KV BAWANA
GSS

BOTH I/C SUPPLY FAILED AT 220KV TRIPPING AT DTL END. 4


SHALIMAR BAGH FROM BAWANA CKT
BOTH I/C SUPPLY FAILED AT 220KV TRIPPING AT DTL END. 4
SHALIMAR BAGH FROM BAWANA CKT
Both 66 Kv I/C -1& 2 at FBD RSS
failed at HVPNL end due to NA 4
changeover at Sec-46/HVPNL
Both 66 Kv I/C -1& 2 at FBD RSS
failed at HVPNL end due to NA 4
changeover at Sec-46/HVPNL

OFFLOAD I/C SUPPLY FAILED AT 220KV


SHALIMAR BAGH. TRIPPING AT DTL END. 4

BOTH INCOMERS FAILED FROM


TPDDL END DUE TO TRIPPING.
GRID 5
OFF LOAD 220KV I/C-2 SUPPLY FAILED TRIPPING OF 220KV CKT-1 &2 4
FROM 220KV DTL SHALIMAR BAGH. FROM BAWANA.

ON LOAD 220KV I/C-1 SUPPLY FAILED TRIPPING OF 220KV CKT-1 &2


4
FROM 220KV DTL SHALIMAR BAGH. FROM BAWANA.

ON LOAD 220KV I/C-1 SUPPLY FAILED TRIPPING OF 220KV CKT-1 &2


4
FROM 220KV DTL SHALIMAR BAGH. FROM BAWANA.

ON LOAD 220KV I/C-1 SUPPLY FAILED TRIPPING OF 220KV CKT-1 &2


FROM 220KV DTL SHALIMAR BAGH. FROM BAWANA. 4

66KV ONLOAD INCOMER-2 FAILED


FROM TPDDL END DUE TO GRID 4
TRIPPING AT 220KV BAWANA GSS

66KV OFFOAD INCOMER-1 FAILED


FROM TPDDL END DUE TO GRID 4
TRIPPING AT 220KV BAWANA GSS

BOTH INCOMERS FAILED FROM


TPDDL END DUE TO TRIPPING AT GRID 4
220KV BAWANA GSS

BOTH INCOMER FAILED FROM PLANNED SHUTDOWN


UPPCL END REQUESTED BY UPPCL.
6
Both 66 Kv I/C -1& 2 at FBD RSS
failed at HVPNL end due to Their NA 4
extranal cable failure
C PHASE TRIPPED ON EARTH
Problem IN 66 KV CABLE 5
FAULT AT DTL END
TRIPPING OCCURS AT UPSTREAM
OTHERS 5
OF DTL END
TRIPPING OCCURS AT UPSTREAM
OTHERS 5
OF DTL END

220kv circuit tripped at bamnauli OTHERS 5


Both 66 Kv I/C -1& 2 at FBD RSS
failed at HVPNL end due to supply NA 4
change over.
BOTH INCOMER FAILED FROM PLANNED SHUTDOWN
UPPCL END REQUESTED BY UPPCL.
6

Both 66 Kv I/C -1& 2 at FBD RSS


failed at HVPNL end due to supply NA 4
change over.

CHANGEOVER AT DTL RIDGE


problem inside DTL S/S 4
VALLEY.

Both 66 Kv I/C -1& 2 at FBD RSS


failed at HVPNL end due to supply NA 4
change over.
DUE TO TRIPPING AT HVPNL END. N/A 6

DTL END SUPPLY FAILED OTHERS 4

DTL UP STREAM 220KV SUPPLY


Problem Upstream to DTL S/S 5
PATPARGANJ FAILED.
Both 66 Kv I/C -1& 2 at FBD RSS
failed at HVPNL end due to Their NA 4
Transformer tripping.
Both 66 Kv I/C -1& 2 at FBD RSS
failed at HVPNL end due to Their NA 4
Transformer tripping.
66 Kv I/C - 2 at FBD RSS failed at
HVPNL end due to Their NA 4
Transformer tripping.
66 Kv I/C - 1 at FBD RSS failed at
HVPNL end due to Their NA 4
Transformer tripping.
66 Kv I/C - 1 at FBD RSS failed at
HVPNL end due to Their NA 4
Transformer tripping.

PLANNED SHUTDOWNTAKEN BY
DTL END FOR MULTI FUNCTION OTHERS 6
METER INSTALLATION

220 KV SUPPLY FAILED OTHERS 5

PLANNED SHUTDOWN IS TAKEN


BY HVPNL
NA 4
66 KV I/C2 TRIPPED ON OSRFROM
7
JGPI RSS

220 KV SUPPLY FAILED OTHERS 5

FEEDER CB TRIPPED IN PALAM ON E/F TRIPPING OCCURRED IN 66 KV 4


FEEDER IN PALAM.

220 KV SUPPLY FAILED OTHERS 5


66 KV I/C -1 SUPPLY FAILED FROM MAINTENANCE AT HVPNL END. 4
HVPNL.
66 KV I/C -1 SUPPLY FAILED FROM
MAINTENANCE AT HVPNL END. 4
HVPNL.
PROBLEM INSIDE DTL S/S GRID 4

RESTORATION OF TRACTION
66 KV i/c -1 SUPPLY FAILED FROM
GTPS DUE TO TRIPPING OF INCOMERS POWER SUPPLY CARRIED OUT BY
STAFF MANUALLY AT 0546H.
FROM MANDOLA AND ISOLATION OF AUXILIARY LOAD ND ASS-S TO 6
RUNNING UNITS AT GTPS
CTST ASS-S SUPPLY RESTORED AT
SIMULTANEOUSLY. 0556H.

66 KV I/C -1 SUPPLY FAILED FROM


CHANGEOVER AT HVPNL END. 4
HVPNL.
66 KV I/C -1 SUPPLY FAILED FROM CHANGEOVER AT HVPNL END. 4
HVPNL.

DTL END SUPPLY FAILED Problem Upstream to DTL S/S 5

ATTENDED Hot spot of 66KV ckt-2 of


OTHERS 5
IP RSS attended at GTPS

220 KV SUPPLY FAILED OTHERS 5

nil N/A 6
nil N/A 6

BOTH 66 KV CKT FAILED FROM DTL END Problem Upstream to DTL S/S 5
TRACTION AND AUXILIARY LOAD TAKEN
ON VNNR RSS IMMIDIETLY

I/C-1 FAILED DUE TO TESTING AT


HVPNL END
NA 4
TRAFFIC
REMARKS
REPURCUSSION
BOTH TRACTION AND AUXILIARY
LOAD OF BCGN ZONE WAS TAKEN
NIL ON IP RSS.
after restoration of supply, Tr and Aux
NIL OFF
load LOAD
normalised.

NIL Planned shutdown from DTL end

NA NO REPURCUSSION. OFF LOAD I/C.

NA NO REPURCUSSION. OFF LOAD I/C.

NIL NA

NIL NA

BOTH TRACTION AND AUX LOAD


NIL
TAKEN ON INCOMER 1

NA NO REPURCUSSION. OFF LOAD I/C.

NA NO REPURCUSSION. OFF LOAD I/C.

NA NO REPURCUSSION. OFF LOAD I/C.

NA NO REPURCUSSION. OFF LOAD I/C.


NA NO REPURCUSSION. OFF LOAD I/C.

NA NO REPURCUSSION. OFF LOAD I/C.

NA NO REPURCUSSION. OFF LOAD I/C.

NA ON LOAD INCLUDING INA/RSS

NA OFF LOAD

NIL OFF LOAD

NA OFF LOAD

LINE-1 AUX LOAD TAKEN ON RI RSS &


LINE-2 AUX LOAD TAEN AT ND RSS.
NIL LINE-1 TRACTION LOAD TAKEN ON RI
RSS AND LATER TRACTION LOAD
TAKEN BACK ON KG RSS.

NIL NA

NIL OFF LOAD

NA NO REPURCUSSION. OFF LOAD I/C.

TRACTION LOAD TAKEN ON PS TSS &


NIL AUXILLARY LOAD OF 33Kv CKT-2(KG-JGPA
) PUT ON STVR AMS
AUX LOAD (KG ASS- JGPA ASS ) LOAD
NIL
TAKEN ON STVR RSS.

LOAD WAS FROM I/C-2 & I/C-1 WAS IN OFF


LOAD CONDITION.L-6 LOAD & APL
NIL AUXILIARY LOAD WAS FROM I/C-2
(DTL OPERATOR NOT INFORMED EXACT
REASON OF TRIPPING)

NA NO REPURCUSSION. OFF LOAD I/C.

NIL OFF LOAD

NA NO REPURCUSSION. OFF LOAD I/C.

NIL NIL

NIL OFFLOAD

NIL OFF LOAD

NIL OFF LOAD

NIL OFF LOAD

TRACTION LOAD ( CHTP SP-HCC ) + AUX


LOAD ( SLTP-HCC ) TAKEN AT CHTP RSS.
NA AFTER SUPPLY NORMALISATION OF I/C-2
TRACTION + AUX. LOAD TAKEN BACK AT
HCC RSS.
TRACTION LOAD ( CHTP SP-HCC ) + AUX
LOAD ( SLTP-HCC ) TAKEN AT CHTP RSS.
NA AFTER SUPPLY NORMALISATION OF I/C-2
TRACTION + AUX. LOAD TAKEN BACK AT
HCC RSS.

NIL off load

NIL OFF LOAD INCOMER

NA ON LOAD

NIL OFF LOAD

NIL off load

NA OFF LOAD

NA ON LOAD INCLUDING INA/RSS

NA NO REPURCUSSION. OFF LOAD I/C.

NA OFF LOAD

NIL OFF LOAD

NA
FEED EXTENDED AT PER FEEDING PLAN
NA NO REPURCUSSION.

NA NO REPURCUSSION.

NIL OFF LOAD

NA ON LOAD INCLUDING INA/RSS

NIL off load

NIL off load

NIL off load

NA
FEED EXTENDED AT PER FEEDING PLAN
NA OFFLOAD
NA OFF LOAD

NIL off load

NIL ON LOAD & OFF LOAD.

NIL ON LOAD & OFF LOAD.


TRACTION LOAD TAKEN ON SN RSS.
AFTER NORMALIZATION OF INCOMER
NIL TRACTION LOAD TAKEN BACK ON IDPT
RSS.

NIL off load

NA OFF LOAD

NIL OFFLOAD
NIL off load

NA NO REPURCUSSION.

NIL off load

FAILED AFTER INFORMING, NO


NA
REPURCUSSION.

NIL off load

LOAD TAKEN ON HEALTHY 66Kv INCOMER


NIL -2/FBD RSS. THEN AGAIN TAKEN BACK ON
I/C-01.

NA NO REPURCUSSION.

NA ON LOAD

TRACTION LOAD TAKEN ON PS TSS AND


NIL
33KV LOAD ON KG AMS.

TRACTION LOAD TAKEN ON MUDK RSS &


NIL AUXILLARY LOAD WAS ALREADY AT MUDK
RSS

LOAD SHIFTED BACK ON STLK RSS AFTER


NA
CLEARANCE FROM HVPNL.

NA NO REPURCUSSION.

NA NO REPURCUSSION.

NA
Bird electrocuted at DTL Ghazipur
NIL OFF LOAD INCOMER-1 FAIL FROM HVPNL
POWER BLOCK ON MAIN LINE. ONLY VNND OHE
NA
CHARGED.

AUX LOAD TAKEN ON INAR RSS.


NA TRACTION LOAD NOT SHIFTED DUE TO
P/B ON MAIN LINE.

LOAD WAS FROM I/C-2 & I/C-1 WAS IN OFF


LOAD CONDITION.L-6 LOAD & APL
NIL AUXILIARY LOAD WAS FROM I/C-2
(DUE TO 440KV TRIPPING AT DADRI VIA
MAHARANIBAG & BALLABH GARH)

400 KV CIRCUIT TRIPPED DUE OVER


NIL VOLTAGE FROM DADARI TO MAHARANI
AND MAHARANI TO BALLABHGARH

NA NO REPURCUSSION.

NA NO REPURCUSSION.

LOAD TAKEN ON HEALTHY 66Kv INCOMER


NIL
-1.

NIL NA

NIL NA

NIL NA
NIL NA

TRACTION SUPPLY EXTENDED THROUGH


NIL
SHDN SP FROM KG RSS.

NIL after restoration of supply, Tr and Aux load


normalised.

NIL OFFLOAD INCOMER

NA
FEED EXTENDED AT PER FEEDING PLAN
NA
FEED EXTENDED AT PER FEEDING PLAN
NA
FEED EXTENDED AT PER FEEDING PLAN
NA
FEED EXTENDED AT PER FEEDING PLAN

LOAD TAKEN ON HEALTHY 66Kv INCOMER


NIL
-2.

SAME TIME P/B OF AZU SP TO UDB SP


TAKEN BY HM/OHE & AUXILIARY LOAD
FROM GTBR NORTH ASS TO GNPK NORTH
ASS WAS OFF DUE TO DG MOCK-DRILL .
NA
AFTER RESTORATION OF SUPPLY AND
CLEARANCE FROM GTPS LOAD TAKEN
BACK AT ND RSS
NO REPURCUSSION.

I/C-1 WAS IN ON LOAD CONDITION.L-6


NIL LOAD & APL AUXILIARY LOAD SHIFTED TO
KG RSS & AP RSS.

NIL TRACTION LOAD FROM SPBI-AZU SP


TAKEN AT ND RSS. AUX. LOAD FROM
SPBI-MDTW TAKEN AT ND RSS. AFTER
RESUMPTION OF I/C-1 & 02 TRACTION
LOAD & AUX. LOAD TAKEN BACK AT 1043H
NIL & 1108H ON JGPI RSS.
TRACTION LOAD FROM SPBI-AZU SP
TAKEN AT ND RSS. AUX. LOAD FROM
SPBI-MDTW TAKEN AT KG RSS. AFTER
NIL
RESUMPTION OF I/C-1 & 02 TRACTION
LOAD & AUX. LOAD TAKEN BACK AT 1655H
& 1659H ON JGPI RSS.

NA ON LOAD INCLUDING INA/RSS

NA
FEED EXTENDED AT PER FEEDING PLAN

AUX LOAD TAKEN ON MKPR


NA RSS.TRACTION LOAD NOT SHIFTED DUE
TO P/B ON MAIN LINE.

NIL ON LOAD INCOMER

NIL OFFLOAD

NIL After restoration of supply, Aux load


normalised.

NIL NIL

NIL NIL

NIL NIL

NIL NIL

NIL NIL

AFTER RESUMPTION OF SUPPLY AUX.


NA
LOAD TAKEN BACK AT CHTP RSS.
NIL NIL

NIL OFFLOAD

NIL NIL

NIL NIL

AFTER RESUMPTION OF SUPPLY AUX.


NA
LOAD TAKEN BACK AT CHTP RSS.

LOAD SHIFTED BACK ON STLK RSS AFTER


NA
CLEARANCE FROM HVPNL.

LOAD SHIFTED BACK ON STLK RSS AFTER


NA
CLEARANCE FROM HVPNL.

AUXILIARY SUPPLY FROM NECC ASS TO


NIL
NS-61 EXTENDED FROM BCGN AMS.

NIL OFFLOAD

NA

NIL ON LOAD

NIL OFF LOAD


NIL OFFLOAD

TRACTION AND AUX LOAD TAKEN ON I/C-2


NA
(FROM JGPI RSS)

NIL OFF LOAD

NIL NIL

LOAD WAS FROM I/C-2 & I/C-1 WAS IN OFF


NIL LOAD CONDITION.L-6 LOAD & APL
AUXILIARY LOAD WAS FROM I/C-2

TRACTION AND AUX LOAD TAKEN ON I/C-2


NA
(FROM JGPI RSS)

TRACTION LOAD TAKEN ON MUDK RSS &


NIL AUXILLARY LOAD WAS ALREADY AT MUDK
RSS
TRACTION LOAD TAKEN ON MUDK RSS &
NIL AUXILLARY LOAD WAS ALREADY AT MUDK
RSS

NIL OFF LOAD

NIL OFFLOAD

NIL TRACTION LOAD TAKEN BAK AT 13:29HR

LOAD SHIFTED BACK ON STLK RSS AFTER


NA
CLEARANCE FROM HVPNL.

TRACTION LOAD AND AUX LOAD SHIFTED


NIL
TO KG RSS BEFORE SUPPLY FAILURE.
DKV RSS ALREADY SHUT DOWN FOR
NA
SCADA TESTING UP TO 48 HRS,

LOAD SHIFTED BACK ON STLK RSS AFTER


NA
CLEARANCE FROM HVPNL.

NA OFF LOAD
TRACTION LOAD TAKEN ON SN RSS.
NIL AFTER NORMALIZATION OF INCOMER
TRACTION LOAD TAKEN BACK ON IDPT
RSS.

LOAD SHIFTED BACK ON STLK RSS AFTER


NA
CLEARANCE FROM HVPNL.

LOAD SHIFTED BACK ON STLK RSS AFTER


NA
CLEARANCE FROM HVPNL.

TRACTION LOAD TAKEN ON BGZ RSS


NIL INCOMER2 & AUXILLARY LOAD WAS
ALREADY AT MUDK RSS

NA ON LOAD INCLUDING INA/RSS

DKV RSS ALREADY SHUT DOWN FOR


NA
SCADA TESTING UP TO 48 HRS,

TRACTION AND AUX LOAD TAKEN ON I/C-2


NA
(FROM JGPI RSS)

TRACTION AND AUX LOAD TAKEN ON I/C-2


NA
(FROM JGPI RSS)

NIL OFF LOAD

LOAD CHANGEOVER DONE FROM I/C-1 TO


NA I/C-2 DUE TO CHATTERING ON ISOLATOR
AT DTL END.

NIL OFF LOAD


AUXILLARY LOAD TAKEN ON STVR RSS &
NIL TAKEN BACK ON FBD RSS AS SUPPLY
RESUMED FROM HVPNL END.

AUXILLARY AND TRACTION LOAD TAKEN


NIL ON STVR RSS & TAKEN BACK ON FBD RSS
AS SUPPLY RESUMED FROM HVPNL END.
TRACTION LOAD TAKEN ON SN RSS.
AFTER NORMALIZATION OF INCOMER
NIL
TRACTION LOAD TAKEN BACK ON DW
RSS.

LOAD SHIFTED BACK ON STLK RSS AFTER


NA
CLEARANCE FROM HVPNL.

AUXILLARY AND TRACTION LOAD TAKEN


NIL ON STVR RSS & TAKEN BACK ON FBD RSS
AS SUPPLY RESUMED FROM HVPNL END.

66 KV CKT-1(APL) WAS ON LOAD


NIL

TRACTION AND AUX LOAD TAKEN ON I/C-2


NA
(FROM JGPI RSS)

NIL OFFLOAD

NIL OFFLOAD

TRACTION AND AUX LOAD TAKEN ON I/C-2


NA
(FROM JGPI RSS)

NIL OFFLOAD

LOAD SHIFTED BACK ON STLK RSS AFTER


NA
CLEARANCE FROM HVPNL.

NA OFF LOAD
IMMEDIATELY LOAD SHIFTED ON I/C 2 ,
NA TRIPPING OCCURRED DUT TO TRIPPING
AT THEIR END.

NA OFF LOAD

NIL NIL

66 KV CKT-1(APL) WAS Off LOAD


NIL

NIL OFF LOAD

AUXILLARY AND TRACTION LOAD TAKEN


NIL ON STVR RSS & TAKEN BACK ON FBD RSS
AS SUPPLY RESUMED FROM HVPNL END.

AUXILLARY AND TRACTION LOAD TAKEN


NIL ON STVR RSS & TAKEN BACK ON FBD RSS
AS SUPPLY RESUMED FROM HVPNL END.

TRACTION LOAD FROM SPBI-AZU SP


TAKEN AT ND RSS. AUX. LOAD FROM
SPBI-MDTW AND GTBR TO CWBR SOUTH
NIL
TAKEN AT KG RSS. AFTER RESUMPTION
OF I/C-1 & 02 TRACTION LOAD & AUX.
LOAD TAKEN BACK AT ON JGPI RSS.

TRACTION LOAD OF BCGN ZONE WAS


SHIFTED ON IP TSS IMMEDIATELY. AND
NIL
AUXILIRY LOAD IS TAKEN ON BCGN AMS
AS SUUPLY RESUMED
TRACTION LOAD OF BCGN ZONE WAS
SHIFTED ON IP TSS IMMEDIATELY. AND
NIL
AUXILIRY LOAD IS TAKEN ON BCGN AMS
AS SUUPLY RESUMED
TRACTION LOAD OF BCGN ZONE WAS
SHIFTED ON IP TSS IMMEDIATELY. AND
NIL
AUXILIRY LOAD IS TAKEN ON BCGN AMS
AS SUUPLY RESUMED

IMMEDIATELY LOAD SHIFTED ON I/C 1 ,


NA TRIPPING OCCURRED DUT TO TRIPPING
AT THEIR END.

NA OFF LOAD

NA OFF LOAD

NA OFF LOAD

NA OFF LOAD

NIL TRIPPING AT PPK-2/DTL END

NA ON LOAD INCLUDING INA/RSS

AUXILLARY AND TRACTION LOAD TAKEN


NIL ON STVR RSS & TAKEN BACK ON FBD RSS
AS SUPPLY RESUMED FROM HVPNL END.

AUXILLARY AND TRACTION LOAD TAKEN


NIL ON STVR RSS & TAKEN BACK ON FBD RSS
AS SUPPLY RESUMED FROM HVPNL END.

33KV SUPPLY FROM NCC-NECC


INTERRUPTED; SAME WAS TAKEN ON
NIL
BCGN AMS. AFTER NORMALISATION LOAD
WAS TAKEN BACK ON NS-62 RSS.

AUXILLARY AND TRACTION LOAD TAKEN


NIL ON STVR RSS & TAKEN BACK ON FBD RSS
AS SUPPLY RESUMED FROM HVPNL END.

NIL
DURING POWER BLOCK OF TRACTION
NIL OFF LOAD

NIL ON LOAD

TRACTION LOAD FROM SPBI-AZU SP


TAKEN AT ND RSS. AUX. LOAD FROM
SPBI-MDTW AND GTBR TO CWBR SOUTH
TAKEN AT KG RSS. AFTER RESUMPTION
NIL
OF I/C-1 & 02 CLEARANCE FROM DTL
SOUGHT FOR TAKING LOAD. BUT DTL
REQUESTED TO KEEP JGPI RSS OFFLOAD
TILL 1000H OF 10.06.19

TRACTION AND AUX LOAD ALREADY


NA
TAKEN ON I/C-1 (FROM GOPLAPUR DTL)

NIL ON LOAD

NIL OFF LOAD

NIL OFF LOAD

NIL
BM 616 of METE FP became faulty.

33KV SUPPLY FROM NCC-NECC


INTERRUPTED; SAME WAS TAKEN ON
NIL
BCGN AMS. AFTER NORMALISATION LOAD
WAS TAKEN BACK ON NS-62 RSS.

AFTER NORMALISATION LOAD WAS


NIL
TAKEN ON NS-62 RSS.

TRACTION LOAD FROM SPBI-AZU SP


TAKEN AT ND RSS. AUX. LOAD FROM
SPBI-MDTW AND GTBR TO CWBR SOUTH
NIL TAKEN AT KG RSS. AFTER RESUMPTION
OF I/C-1 & 02 CLEARANCE FROM DTL
BOTH AUX. & TRACTION LOAD TAKEN
BACK AS PREVIOUS.

NIL NIL

NIL ON LOAD
HVPNL SEC-46 DID NOT ALLOWED TO
TAKE LOAD EVEN AFTER RESUMING
SUPPLY. AT 1234HRS ONLY AUXILLARY
LOAD TAKEN BACK ON FBD RSS AFTER
CONFIRMATION OF HVPNL SEC-46.,
NIL
TRACTION LOAD NOT TAKEN AS
COMPLETE SHUTDOWN (PLANNED)WAS
GOING ON AT FBD TSS FOR PSI/RELAY
WORK, TRACTION LOAD TAKEN BACK ON
FBD RSS ON 0447HRS /17.06.19
LOAD SHIFTED BACK ON STLK RSS I/C-2
NA
AFTER CLEARANCE FROM HVPNL.

LOAD SHIFTED BACK ON STLK RSS I/C-2


NA
AFTER CLEARANCE FROM HVPNL.

NIL OFF LOAD

NIL TRACTION & AUXILLARY LOAD TAKEN ON IP RSS


AFTER SUPPLY RESUMING.

NA OFF LOAD

LOAD SHIFTED BACK ON STLK RSS I/C-2


NA
AFTER CLEARANCE FROM HVPNL.

TRACTION LOAD FROM AZU SP TO UDB


SP TAKEN ON JGPI RSS & AUXILIARY
LOAD FROM NDI-N TO GNPK NORTH
TAKEN ON JGPI RSS.
NA AT 1808H NDI RSS I/C-1 NORMALISED BY
GTPS BUT CLEARANCE FOR TAKING LOAD
GIVEN ON 1830H.
TR AND AUX LOAD TAKEN BACK ON NDI
RSS.

NA ON LOAD INCLUDING INA/RSS

NA

ONE ROUND TRIP DELAY


TRACTION & AUXILLARY LOAD TAKEN ON IP RSS
AFTER SUPPLY RESUMING.
TRACTION LOAD FROM SPBI-AZU SP TAKEN
AT ND RSS. AUX. LOAD FROM SPBI-MDTW
AND GTBR TO CWBR NORTH TAKEN AT ND
NIL
RSS. AFTER RESUMPTION OF I/C-1 & 02
CLEARANCE FROM DTL BOTH AUX. &
TRACTION LOAD TAKEN BACK AS PREVIOUS.

Load shifted to IC-1. SO TRACTION SUPPLY


RESUMED. AT THE SAME TIME SCADA
NIL
COMMUNICATION OF JGPI RSS FAILED LOCAL
AND REMOTE. LSO Aux load shifted to kg rss.

NA OFF LOAD

TRACTION LOAD FROM AZU SP TO UDB SP


TAKEN ON JGPI RSS & AUXILIARY LOAD FROM
NDI-N TO GNPK NORTH TAKEN ON KG RSS.
NA
AT 1407H NDI RSS I/C-1 NORMALISED BY
GTPS.
TR AND AUX LOAD TAKEN BACK ON NDI RSS.

TRACTION AND AUX LOAD ALREADY


NA
TAKEN ON I/C-1 (FROM GOPLAPUR DTL)

NA OFF LOAD

NIL OFF LOAD

NA OFF LOAD

NA OFF LOAD

NA OFF LOAD

NIL NA

NA OFF LOAD

NIL NA

NIL NA
NIL NA
TRACTION LOAD & AUXILLARY
NIL
LOADEXTEND THROUGH GHEM SP
NIL OFF LOAD

NIL NA

NA ON LOAD INCLUDING INA/RSS

NA OFF LOAD

NA OFF LOAD

I/C -1 ON LOAD
NA
I/C-2 OFF LOAD

I/C -1 ON LOAD
NA
I/C-2 OFF LOAD

NA ON LOAD

The failed I/C was feeding traction load from


NIL BAPB-LJPN while the Auxiliary load was being
fed through the other? I/C

NIL OFF LOAD

NIL ON LOAD

NIL OFF LOAD

NIL OFF LOAD


NA LOAD TAKEN ON HEALTHY 66KV I/C-1

NIL OFF LOAD

NA LOAD TAKEN ON HEALTHY 66KV I/C-2

TRACTION & AUXILLARY LOAD OF FBD


ZONE PUT ON STVR RSS, AT 0725 HRS
AUXILLARY LOAD OF LJPN-JLA PUT ON PS
NIL AMS TO REDUCE THE LOAD OF STVR RSS.
AFTER RESUMING SUPPLY AT FBD RSS
,SUPPLY MADE NORMAL AS PER FEEDING
PLAN.

NA LOAD TAKEN ON HEALTHY 66KV I/C-2

NA LOAD TAKEN ON JGPI RSS

NIL TRACTION & AUXILLARY LOAD TAKEN ON IP RSS


AFTER SUPPLY RESUMING.

NIL OFF LOAD

NIL OFF LOAD

TRACTION AND AUXILIARY LOAD


NIL IMMEDIATELY TAKEN ON HEALTHY
INCOMER-2

NIL OFF LOAD

TRACTION LOAD TAKEN ON KG RSS I/C -


NIL
2.

NA OFF LOAD
TRACTION AND AUXILIARY LOAD
NIL
IMMEDIATELY TAKEN ON KG RSS.

BOTH INCOMERS FAILED AT JGPI RSS. SLDC


SYSTEM CONTROLLER SH BHARAT, ASKED
NOT TO PUT NORMAL LOAD AT JGPI RSS
NIL UNTIL CLEARANCE GIVEN.AT 1216H
CLEARANCE GIVEN BY SLDC AND TRACTION &
AUX. LOAD SHIFTED BACK TO JGPI RSS AT
1219H AND 1223H, RESPECTIVELY.

NIL SAME WAS OFFLOAD

NA OFF LOAD

NA OFF LOAD

NA ON LOAD INCLUDING INA/RSS

NA incommer restored with 1 min.

AFTER NORMALISATION LOAD WAS


NIL
TAKEN ON NS-62 RSS.

BOTH TRACTION AND AUXILIARY LOAD OF ND


NA
RSS TAKEN ON JGPI RSS.

NA LOAD TAKEN ON PAPPANKALAN -1

NIL LOAD TAKEN ON SN RSSS.

DURING INCOMER FAILURE LOAD ON


PALAM INCOMER SO LOAD SHIFTED ON
INCOMER 1 AT SN RSS. DURING THIS
NIL
TIME IP RSS ALSO IN FAILED CONDITION.
SO LOAD OF IP RSS ZONE WAS ON SN
RSS.

NIL OFF LOAD

BOTH TRACTION AND AUXILIARY LOAD OF ND


NA
RSS TAKEN ON JGPI RSS.

AFTER NORMALISATION LOAD WAS


NIL
TAKEN ON NS-62 RSS.
NIL NIL

NIL TRACTION LOAD TAKEN ON PS RSS .

NIL OFF LOAD INCOMER

NIL NIL

TRACTION & AUXILLARY LOAD OF FBD


ZONE PUT ON STVR RSS, AT 1622 HRS
AUXILLARY LOAD OF SRAI - BVHM PUT
NIL
ON STVR AMS . AFTER RESUMING
SUPPLY AT FBD RSS ,SUPPLY MADE
NORMAL AS PER FEEDING PLAN.

NIL OFF LOAD

CABLE CHARGED UPTO DMRC END. BUT DTL


DENIED TO TAKE LOAD ON ND RSS. BOTH
NA
EFFECTED TRACTION AND AUXILLIARY LOAD
TAKEN ON JGPI RSS.

NA LOAD TAKEN AGAIN AT MKPR.

NIL ON LOAD
ONLOAD I/C FAILED. LOAD TAKEN ON
NIL HEALHY I/C-2 SUBSEQUENTLY TO
NORMALIZE THE SYSTM

NA ON LOAD

NIL SAME WAS OFFLOAD.

NIL SAME WAS OFFLOAD.

NIL LOAD TAKEN ON SN RSS.

NA I/C -1 OFF LOAD.

NA I/C -2 OFF LOAD.

NA LOAD TAKEN ON HEALTHY I/C-2

NA I/C -2 OFF LOAD.

NIL NIL

BOTH TRACTION & AUXILLARY LOAD


NIL
OF FBD ZONE PUT ON STVR RSS.

TRACTION OF FBD ZONE PUT ON


NIL
STVR RSS.

NA I/C-1 OFF LOAD


NIL OFFLOAD.

NA 160MVA T/F TRIPPED AT O/C,E/F.

NA

NA

NA

CHARGED AFTER CARRYING OUT


NIL
MEGGERING OF CABLES.

NA

NIL nil

NIL

NA LOAD TAKEN ON PAPPANKALAN -1

NIL

NIL

DLIC-MVPO-1 (CKT-1)-MKPR
NA
MYPI-SVMB (CKT-2)-INA
NIL ON LOAD

NIL NIL

NA

NA

NIL SAME WAS OFFLOAD.

Traction & Auxillary load both put on STVR


NIL
RSS during failure..

NIL OFF LOAD

BOTH AFFECTED TRACTION AND AUXILLIARY


LOAD TAKEN ON JGPI RSS. WHEN SUPPLY
NA
RESUMED, BOTH LOAD ( TR. & AUX. ) TAKEN
BACK AT ND RSS.

NIL OFF LOAD

NIL LOAD PUT ON IC/-1 (HEALTHY INCOMER) .

NIL OFF LOAD

NA

NIL OFF LOAD


Traction & Auxillary load both put on STVR
NIL
RSS during failure..
NIL NA

NA
NA

NA

NIL nil

NIL OFF LOAD

NA I/C -2 OFF LOAD.

NIL ON LOAD

NIL ON LOAD

NIL ON LOAD

NIL ON LOAD

NA OFF LOAD

NA OFF LOAD

NA OFF LOAD

NA OFF LOAD

NIL NIL

NIL ON LOAD
NIL ON LOAD

Traction & Auxillary load both put on STVR


NIL
RSS during failure..

Traction & Auxillary load both put on STVR


NIL
RSS during failure..

Main line OHE was already dead .Traction


NIL of AJD & Auxillary load both normalised
after resuming supply.

NIL ON LOAD. TR.+ AUX. TAKEN ON HEALTHY


220KV I/C-1

NIL On load I/c, load taken on i/C-1

NIL ON LOAD. TR.+ AUX. TAKEN ON NDI & KG RSS

DUE TO SCADA
COMM. FAILURE IN
SHD-RI SECTION, IT
TOOK 6 MINUTES TO
Traction and auxiliary load put on KG RSS
MANUALLY GET THE
KN/SP BYPASSED

NIL NIL
TR.+ AUX. TAKEN TAKEN BACK ON JGPI RSS
NIL AFTER CLEARANCE FROM DTL AT 0839H &
0845H RESPECTIVELY.
Main line OHE was already dead .Traction
NIL of AJD & Auxillary load both normalised
after resuming supply.
Main line OHE was already dead .Traction
NIL of AJD & Auxillary load both normalised
after resuming supply.

NIL NIL

NIL
NIL NIL

ON LOAD. AFFECTED TR.+ AUX. TAKEN ON NDI


& KG RSS RESPECTIVELY. AFTER RESUMPTION
NIL
OF 22KV I/C-1 SUPPLY TRACTION & AUX. LOAD
TAKEN BACK AT JGPI RSS AT 1831H & 1836H.

ON LOAD. AFFECTED TR.+ AUX. TAKEN ON


NDI .AFTER RESUMPTION OF 22KV I/C-1
NIL
SUPPLY TRACTION & AUX. LOAD TAKEN BACK
AT JGPI RSS AT 0030H.

ON LOAD. AFFECTED TR.+ AUX. TAKEN ON


NDI .AFTER RESUMPTION OF 22KV I/C-1
NIL SUPPLY TRACTION & AUX. LOAD TAKEN BACK
AT JGPI RSS AT 0030H.

DUE TO SCADA
PROBLEM AT RI ON LOAD. AFFECTED TR.+ AUX. TAKEN ON KG
RSS, IT TOOK 3.5 RSS. AFTER RESUMPTION OF SUPPLY
MINUTES TO TRACTION & AUX. LOAD TAKEN BACK AT RI
CHARGE THE RSS
SECTION

NIL OFF LOAD INCOMER

ON LOAD. AFFECTED TR.LOAD. TAKEN


ON KG RSS. AFTER RESUMPTION OF
NIL
SUPPLY TRACTION TAKEN BACK AT RI
RSS

NIL NA

Traction & Auxillary load both put on STVR


NIL
RSS during failure..

NA LOAD IS ON I/C-2

NA LOAD TAKEN ON PAPPANKALAN -1

NA LOAD TAKEN ON PAPPANKALAN -1

DURING INCOMER FAILURE LOAD ON


PALAM INCOMER SO LOAD SHIFTED ON
INCOMER 1 AT SN RSS. DURING THIS
NIL
TIME IP RSS ALSO IN FAILED CONDITION.
SO LOAD OF IP RSS ZONE WAS ON SN
RSS.
Traction & Auxillary load both put on STVR
NIL
RSS during failure..

NIL NA

Traction & Auxillary load both put on STVR


NIL
RSS during failure..

AUXILIARY LOAD NOT TAKEN ON DKV


NA
RSS I/C-2

Traction & Auxillary load both put on STVR


NIL
RSS during failure..

NIL OFFLOAD

NA LOAD ON MKPR RSS

NA
1/C-2 WAS ON LOAD

Traction & Auxillary load both put on STVR


NIL
RSS during failure..

Traction & Auxillary load both put on STVR


NIL
RSS during failure..

Traction & Auxillary load both put on 66kv


NIL
I/C -1.

66kv I/C -1. already failed from 2220h of


NIL 12.12.19 . Auxillary load taken on STVR
AMS.
66kv I/C -1. already failed from 2220h of
NIL 12.12.19 . Auxillary load taken on STVR
AMS.

NA OFF LOAD

NIL NIL

Auxillary load both put on 66kv I/C -1


NIL
during shutdown.
NA LOAD IS ON I/C-2

NIL NIL
WHEN SUPPLY FAIL OF BOTH I/C AT CHTP
NA RSS,TRACTION LOAD TAKEN ON HCC TSS, AND
AUX LOAD TAKEN ON ND RSS OF UDB - QUM
SOUTH
NIL NIL
NA OFF LOAD
NA OFF LOAD

NA OFF LOAD

BOTH AFFECTED TRACTION AND AUXILLIARY


LOAD TAKEN ON JGPI RSS. WHEN SUPPLY
RESUMED, BOTH LOAD ( TR. & AUX. ) TAKEN
BACK AT ND RSS AT 0713H.
REPERCUSSION:- One Dn trip delayed between
NA SPBI-HCC.
NOTE: As status of 25kv incomer CB not
available to TPC & ND RSS operator, so CB
manually operated by RSS operator. after that
supply extended from JGPI RSS.

NA OFF LOAD

NA OFF LOAD

NA
FEED EXTENDED AT PER FEEDING PLAN

TRACTION LOAD TAKEN ON BCGN RSS.&


NIL
AUXILIARY LOAD TAKEN ON SN RSS

NIL NIL

NIL SAME WAS OFFLOAD.


NIL SAME WAS OFFLOAD.

NA ON LOAD I/C FAILED

NIL I/C-1 was already in open condition