141268060PMO Project Assurance Plan Template
141268060PMO Project Assurance Plan Template
141268060PMO Project Assurance Plan Template
VERSION HISTORY
[Provide information on how the development and distribution of the Project Assurance
Plan will be controlled and tracked. Use the table below to provide the version number, the
author implementing the version, the date of the version, the name of the person approving the
version, the date that particular version was approved, and a brief description of the reason for
creating the revised version.]
Version Implemented Revision Approved Approval Description of
Number By Date By Date Change
1.0 <Author name> <mm/dd/yy> <name> <mm/dd/yy> <description of change>
TABLE OF CONTENTS
1 INTRODUCTION.....................................................................................................................4
1.1 Purpose of the Project Process Agreement Document...............................................4
2 SUMMARY OF PROJECT TAILORING AND JUSTIFICATION...................................4
3 STAGE GATE CONSOLIDATION/WAIVER REQUEST.................................................4
4 DELIVERABLE CONSOLIDATION/WAIVER REQUEST..............................................6
APPENDIX A: PROJECT PROCESS AGREEMENT APPROVAL.....................................8
APPENDIX B: REFERENCES...................................................................................................9
APPENDIX C: KEY TERMS.....................................................................................................10
1 INTRODUCTION
1.1 PURPOSE OF THE PROJECT ASSURANCE PLAN DOCUMENT
A Project Assurance Plan (PAP) is used to authorize and document the justifications for
using, not using, or combining specific Enterprise Performance Life Cycle (EPLC) Stage
Gate Reviews and the selection of specific deliverables applicable to the
investment/project, including the expected level of detail to be provided. A PAP should
be signed by the project manager and sponsor. Once approved by a governance
committee this document authorizes the project to proceed according to agreed upon
scope, time, costs, and quality including any EPLC related exceptions as outlined within
this document.
General Information
Non-Phase Specific
Independent Verification & Validation
Reports
Integrated Baseline
Documentation
Project Schedule
Periodic Project Status Report
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
APPENDIX B: REFERENCES
[Insert the name, version number, description, and physical location of any
documents referenced in this document. Add rows to the table as necessary.]
The following table summarizes the documents referenced in this document.
Document Name Description Location
<Document Name and <Document description> <URL or Network path where document
Version Number> is located>