Download as pdf or txt
Download as pdf or txt
You are on page 1of 54

BREAKDOWN REPO

Breakdow
Sl No LOCATION FA CODE Equipment Details Make/Model
n Date
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021
Transit Mixer
4 Pinan (PKG-V) 2019/TMR052 TATA/2518 24.09.2021
(RJ02GB9238)
5 Pinan (PKG-V) 2018/EXC057 Excavator CAT/323D3 24.09.2021

6 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021

Diesel Tanker
7 Pinan (PKG-V) TATA/407EX2 25.09.2021
(HR32D0231)
Bolero Camper
8 Pinan (PKG-V) 2019/BCR057 Mahindra 27.09.2021
(HR894627)

Bolero Pickup
9 Pinan (PKG-V) 2017/BCR009 Mahindra 27.09.2021
(MP04GA6913)
Ashok
10 Pinan (PKG-V) Trailer(MH40BL1380) 27.09.2021
Leyland/4921
11 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021
12 Pinan (PKG-V) 2018/EXC044 Excavator Kobelco/220 29.09.2021

Transit Mixer
13 Pinan (PKG-V) 2019/TMR056 TATA/2518 30.09.2021
(RJ02GB9515)
14 Pinan (PKG-V) 2011/HYD002 Hydra Escorts 30.09.2021
15 Pinan (PKG-V) 2014/TPR108 Tipper(MP39H0947) AMW/2518 30.09.2021
Transit Mixer
16 Pinan (PKG-V) 2019/TMR051 TATA/2518 30.09.2021
(RJ02GB9508)

17 Pinan (PKG-V) 2020/TPR351 Tipper(RJ29GA8249) TATA/2518 01.10.2021

18 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021

19 Pinan (PKG-V) 2020/VCR044 Tandem Roller Hamm/HD99 01.10.2021

20 Pinan (PKG-V) 2020/TPR423 Tipper(RJ02GC0200) TATA/2518 01.10.2021

21 Pinan (PKG-V) 2018/WHL026 Wheel Loader 432ZX 01.10.2021

NOTE: 1. L&T Komatsu/PC210 Excavators bearing FA Code EXC009 is standing as they require complete overhauling of Engine &
2. All 06 Nos Liugong Wheel Loaders are prepairing for Sale.
3 Excavator EXC012 Control Valve Leakage.
4 MP39H0945 & MP39H0955 sent for denting and painting to OM Motors,Rajgardh.
5 Tipper which has denting work done is running but painting and glass fitting work is pending.
BREAKDOWN REPORT DVRP PKG-5 (01.10.2021)
No of
B/D Nature of failure / Breakdown
Breakdo Action taken Indent No
Hmr/Kmr Details
wn Days
66 91 Engine Failure Sent For Repairing
MNW 49 Denting Work Req. Work Under Progress IMP-5/1003
17029 36 Denting Work Req. Work Under Progress IMP-5/1003
Awaiting for TATA
57201 8 RPM Issue
representative
11797 8 FIP Leakage FIP sent for repairing
Center Pin,Centre Bearing and Awaiting For Spare
10044 7 UJ Cross and Front Loader Pin Parts, Running with IMP-5/01195
Bush Require complain
Material Received,Awaiting For
6497 7 FIP sent for repairing
FIP
Brake Work Require, Due to
Awaiting For Spare
158350 5 payment issue material will not
Parts
purchased.
Brake Work Require, Due to
Awaiting For Spare
33393 5 payment issue material will not
Parts
purchased.
Awaiting For Trailer,
25625 5 Material Received
Trailer Working At Site
90166 5 Battery require
Awaiting For Spare
11907 3 Swing Gear Bearing Damage. IMP-05/1205P
Parts
Awaiting for TATA
52857 2 RPM Issue
Representative
1038 2 Radiator Damage Sent For Core Changing
66580 2 Denting Work Req. Work Under Progress
Mounting Damage,Clutch Plate, Work Under Progress,
60384 2
Pressure Plate Worn Out Today It Will Be Ready

48052 1 Clutch Plate Worn Out Work Under Progress

4476 1 Differential Seal Leakage Work Under Progress

Awaiting For Spare


2119 1 Cooling Fan Damage IMP-5/01219P
Parts,

62849 1 PTO Pump Problem Work Under Progress

9635 1 Brake Cylinder Assy Require Work Under Progress

re complete overhauling of Engine & Hydraulic units.

ork is pending.
Expected Material
Approved indent Purchase
Date of Status Receivin
Date Remarks
Completion g Date
BREAKDOWN REPOR
EQUIPMENT Breakdow B/D
SR. NO. LOCATION FA CODE MAKE/MODEL
DETAILS n Date Hmr/Kmr
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021 66
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021 MNW
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021 17029

Transit Mixer
4 Pinan (PKG-V) 2019/TMR052 TATA/2518 24.09.2021 57201
(RJ02GB9238)

5 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021 10044

Bolero Camper
6 Pinan (PKG-V) 2019/BCR057 Mahindra 27.09.2021 158350
(HR894627)

Bolero Pickup
7 Pinan (PKG-V) 2017/BCR009 Mahindra 27.09.2021 33393
(MP04GA6913)
Ashok
8 Pinan (PKG-V) Trailer(MH40BL1380) 27.09.2021 25625
Leyland/4921
9 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021 90166
10 Pinan (PKG-V) 2018/EXC044 Excavator Kobelco/220 29.09.2021 11907
11 Pinan (PKG-V) 2014/TPR108 Tipper(MP39H0947) AMW/2518 30.09.2021 66580
Transit Mixer
12 Pinan (PKG-V) 2019/TMR051 TATA/2518 30.09.2021 60384
(RJ02GB9508)

13 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021 4476

14 Pinan (PKG-V) 2020/VCR044 Tandem Roller Hamm/HD99 01.10.2021 2119

15 Pinan (PKG-V) 2018/WHL026 Wheel Loader 432ZX 01.10.2021 9635

16 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 02.10.2021 18410

17 Pinan (PKG-V) 2014/TPR109 Tipper(MP39H0953) AMW/2518 02.10.2021

18 Pinan (PKG-V) 2020/TPR406 Tipper(RJ02GC0178) TATA/2518 02.10.2021 56626

19 Pinan (PKG-V) 2019/WHL040 Wheel Loader 432ZX 02.10.2021 5881

Water Tanker
20 Pinan (PKG-V) 2019/WTR/071 TATA/1913 02.10.2021 49192
(RJ02GB9421)

21 Pinan (PKG-V) 2020/TPR428 Tipper(RJ02GC0194) TATA/2518 02.10.2021 64537

NOTE: 1. L&T Komatsu/PC210 Excavators bearing FA Code EXC009 is standing as they require complete overhauling of Engine &
2. All 06 Nos Liugong Wheel Loaders are prepairing for Sale.
3 Excavator EXC012 Control Valve Leakage.
4 MP39H0945 & MP39H0955 sent for denting and painting to OM Motors,Rajgardh.
5 Tipper which has denting work done is running but painting and glass fitting work is pending.
KDOWN REPORT DVRP PKG-5 (02.10.2021)
No of
Nature of failure / Breakdown Approved indent
Breakdo Action taken Indent No
Details Date
wn Days
92 Engine Failure Sent For Repairing
50 Denting Work Req. Work Under Progress IMP-5/1003
37 Denting Work Req. Work Under Progress IMP-5/1003
RPM Issue Solved, But Injector
Injector Sent Along With
9 Cleaning Work Should be
TATA Technician
Require
Center Pin,Centre Bearing and Awaiting For Spare
8 UJ Cross and Front Loader Pin Parts, Running with IMP-5/01195
Bush Require complain
Brake Work Require, Due to
Awaiting For Spare
6 payment issue material will not
Parts
purchased.
Brake Work Require, Due to
Awaiting For Spare
6 payment issue material will not
Parts
purchased.
Fitment Work Under
6 Material Received
Progress
6 Battery require
Materail Received, Work
4 Swing Gear Bearing Damage.
Under Progress
3 Denting Work Req. Work Under Progress
Rest Work is Done, Require Sample Sent To
3
Only Mounting Bracket Purchase Team

2 Differential Seal Leakage Indent Raised By Today IMP-5/1223P

Awaiting For Spare


2 Cooling Fan Damage IMP-5/01219P
Parts,
Awaiting For Spare
2 Brake Cylinder Assy Require
Parts
Awaiting For Spare
1 Steering Box Seal Leakage
Parts

1 Self Stater Problem Work Under Progress

Sent Along With TATA


1 DOSER Unit
Technician for Repairing
Awaiting For Spare
1 Oil Pressure Sensor Required IMP-5/1193P
Parts
Awaiting For TATA
1 RPM ISSUE Represntative With
TATA Engine Laptop
Awaiting For Tata
1 Engine Knocking
Consideration

e overhauling of Engine & Hydraulic units.


Expected Material
Purchase
Date of Status Receivin
Remarks
Completion g Date
BREAKDOWN REPOR
EQUIPMENT Breakdow B/D
SR. NO. LOCATION FA CODE MAKE/MODEL
DETAILS n Date Hmr/Kmr
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021 66
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021 MNW
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021 17029

Transit Mixer
4 Pinan (PKG-V) 2019/TMR052 TATA/2518 24.09.2021 57201
(RJ02GB9238)

5 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021 10044

Bolero Camper
6 Pinan (PKG-V) 2019/BCR057 Mahindra 27.09.2021 158350
(HR894627)

Bolero Pickup
7 Pinan (PKG-V) 2017/BCR009 Mahindra 27.09.2021 33393
(MP04GA6913)
8 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021 90166

9 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021 4476

10 Pinan (PKG-V) 2018/WHL026 Wheel Loader 432ZX 01.10.2021 9635

11 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 02.10.2021 18410

12 Pinan (PKG-V) 2020/TPR406 Tipper(RJ02GC0178) TATA/2518 02.10.2021 56626

13 Pinan (PKG-V) 2019/WHL040 Wheel Loader 432ZX 02.10.2021 5881

Water Tanker
14 Pinan (PKG-V) 2019/WTR/071 TATA/1913 02.10.2021 49192
(RJ02GB9421)

15 Pinan (PKG-V) 2020/TPR428 Tipper(RJ02GC0194) TATA/2518 02.10.2021 64537

16 Pinan (PKG-V) 2018/WHL024 Wheel Loader 432ZX 04.10.2021 7841

17 Pinan (PKG-V) 2017/WHL018 Wheel Loader 432ZX 04.10.2021 7322

18 Pinan (PKG-V) 2017/EXC018 Excavator SK220 04.10.2021 16263

19 Pinan (PKG-V) TPR111 Tipper(MP39H0956) AMW/2518 04.10.2021 269293

20 Pinan (PKG-V) 2019/MGR034 Motor Grader CAT/120K2 04.10.2021 4819

21 Pinan (PKG-V) 2017/TPR192 Tipper(MP04HE4181) Mahindra/Torro 04.10.2021 77122


22 Pinan (PKG-V) Tipper(RJ02GB1646) TATA/2523 04.10.2021 40646
Bolero Camper
23 Pinan (PKG-V) 2019/BCR059 Mahindra 04.10.2021 153451
(HR890595)

NOTE: 1. L&T Komatsu/PC210 Excavators bearing FA Code EXC009 is standing as they require complete overhauling of Engine &
2. All 06 Nos Liugong Wheel Loaders are prepairing for Sale.
3 Excavator EXC012 Control Valve Leakage.
KDOWN REPORT DVRP PKG-5 (04.10.2021)
No of
Nature of failure / Breakdown Approved indent
Breakdo Action taken Indent No
Details Date
wn Days
94 Engine Failure Sent For Repairing
51 Denting Work Req. Work Under Progress IMP-5/1003
38 Denting Work Req. Work Under Progress IMP-5/1003
RPM Issue Solved, But Injector
Injector Sent Along With
11 Cleaning Work Should be
TATA Technician
Require
Center Pin,Centre Bearing and Awaiting For Spare
10 UJ Cross and Front Loader Pin Parts, Running with IMP-5/01195
Bush Require complain
Brake Work Require, Due to
Awaiting For Spare
8 payment issue material will not
Parts
purchased.
Brake Work Require, Due to
Awaiting For Spare
8 payment issue material will not
Parts
purchased.
8 Battery require
Awaiting For Spare
4 Differential Seal Leakage IMP-5/1223P
Parts
Awaiting For Spare
4 Brake Cylinder Assy Require
Parts
Awaiting For Spare
3 Steering Box Seal Leakage IMP-5/973
Parts
Sent Along With TATA
3 DOSER Unit
Technician for Repairing
Oil Pressure Sensor,Timing
Awaiting For Spare IMP-5/1193P,
3 Cover Packing and Seal
Parts IMP-5/1227P
Require
Awaiting For TATA
3 RPM ISSUE Represntative With
TATA Engine Laptop
Awaiting For Tata
3 Engine Knocking
Consideration
Awaiting For Spare
1 Flywheel Ring Damage IMP-5/1225P
Parts
Flywheel Ring Damage,Oil
Awaiting For Spare IMP-5/1225P,
1 Pressure Sensor,Timing Cover
Parts IMP-5/1227
Packing and Seal Require
Awaiting For Spare
1 Self Stater Require IMP-5/1229P
Parts

1 Engine Mounting Damage Work Under Progress

1 Circle Pinion and Shaft Damage Work Under Progress


Gear Oil Leakage From Gear
1 Work Under Progress
Housing
1 King Pin Damage Work Under Progress
Awaiting For Spare,
1 Brake Work Require Sample Sent Purchase
Team

e overhauling of Engine & Hydraulic units.


Expected Material
Purchase
Date of Status Receivin
Remarks
Completion g Date
4 MP39H0945 & MP39H0955 sent for denting and painting to OM Motors,Rajgardh.
5 Tipper which has denting work done is running but painting and glass fitting work is pending.
BREAKDOWN REPOR
EQUIPMENT Breakdow B/D
SR. NO. LOCATION FA CODE MAKE/MODEL
DETAILS n Date Hmr/Kmr
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021 66
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021 MNW
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021 17029

Transit Mixer
4 Pinan (PKG-V) 2019/TMR052 TATA/2518 24.09.2021 57201
(RJ02GB9238)

5 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021 10044

Bolero Camper
6 Pinan (PKG-V) 2019/BCR057 Mahindra 27.09.2021 158350
(HR894627)

Bolero Pickup
7 Pinan (PKG-V) 2017/BCR009 Mahindra 27.09.2021 33393
(MP04GA6913)
8 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021 90166

9 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021 4476

10 Pinan (PKG-V) 2018/WHL026 Wheel Loader 432ZX 01.10.2021 9635

11 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 02.10.2021 18410

12 Pinan (PKG-V) 2020/TPR406 Tipper(RJ02GC0178) TATA/2518 02.10.2021 56626

13 Pinan (PKG-V) 2019/WHL040 Wheel Loader 432ZX 02.10.2021 5881

Water Tanker
14 Pinan (PKG-V) 2019/WTR/071 TATA/1913 02.10.2021 49192
(RJ02GB9421)

15 Pinan (PKG-V) 2020/TPR428 Tipper(RJ02GC0194) TATA/2518 02.10.2021 64537

16 Pinan (PKG-V) 2018/WHL024 Wheel Loader 432ZX 04.10.2021 7841

17 Pinan (PKG-V) 2017/WHL018 Wheel Loader 432ZX 04.10.2021 7322

18 Pinan (PKG-V) 2017/EXC018 Excavator SK220 04.10.2021 16263

19 Pinan (PKG-V) Tipper(RJ02GB1646) TATA/2523 04.10.2021 40646


Bolero Camper
20 Pinan (PKG-V) 2019/BCR059 Mahindra 04.10.2021 153451
(HR890595)
21 Pinan (PKG-V) 2020/TPR432 Tipper(RJ02GC0193) TATA/2518 05.10.2021 58858
22 Pinan (PKG-V) 2020/TPR374 Tipper(RJ29GA8245) TATA/2518 05.10.2021 60550
23 Pinan (PKG-V) 2020/TPR443 Tipper(RJ02GC0179) TATA/2518 05.10.2021 53520
24 Pinan (PKG-V) 2017/TPR188 Tipper(MP04HE4183) Mahindra/Torro 05.10.2021 69136
Diesel Tanker
25 Pinan (PKG-V) TURBO/407EX 05.10.2021 6567
(HR32D0231)

26 Pinan (PKG-V) 2014/MGR009 Motor Grader Cat/120K2 05.10.2021 14738


KDOWN REPORT DVRP PKG-5 (05.10.2021)
No of
Nature of failure / Breakdown Approved indent
Breakdo Action taken Indent No
Details Date
wn Days
95 Engine Failure Sent For Repairing
52 Denting Work Req. Work Under Progress IMP-5/1003
39 Denting Work Req. Work Under Progress IMP-5/1003
RPM Issue Solved, But Injector
Injector Sent Along With
12 Cleaning Work Should be
TATA Technician
Require
Center Pin,Centre Bearing and
Material Received,
11 UJ Cross and Front Loader Pin
Awaiting For Machine
Bush Require
Brake Work Require, Due to
Material Received,
9 payment issue material will not
Awaiting For vehicle.
purchased.
Brake Work Require, Due to
Awaiting For Spare
9 payment issue material will not
Parts
purchased.
9 Battery require
Awaiting For Spare
5 Differential Seal Leakage IMP-5/1223P
Parts
Awaiting For Spare
5 Brake Cylinder Assy Require IMP-5/1235P
Parts
Material Received, Work
4 Steering Box Seal Leakage
Under Progress
Sent Along With TATA
4 DOSER Unit
Technician for Repairing
Oil Pressure Sensor,Timing Material Received,But
4 Cover Packing and Seal FIP Need To Be
Require Overhauling
Awaiting For TATA
4 RPM ISSUE Represntative With
TATA Engine Laptop
Awaiting For Tata
4 Engine Knocking
Consideration
Material Received,
2 Flywheel Ring Damage
Awaiting For Machine
Flywheel Ring Damage,Oil
Material Received,
2 Pressure Sensor,Timing Cover
Awaiting For Machine
Packing and Seal Require
Material Received,
Awaiting for Kobelco
2 Self Stater Require
Representative For
Harness Checking
Work Under Progress,
2 King Pin Damage
Axle I Beam Bend.
Material Received, Work
2 Brake Work Require
Under Progress
1 Self Stater Worn Out Work Under Progress
Breakdown At Site,
1 UJ Cross Damage
Work Under Progress
1 Radiator Leakage Work Under Progress
1 PTO Leakage Work Under Progress
Material Require,
1 Brake Problem Sample Sent To
Purchase Team
1 Tandem Drive Chain Break Work Under Progress
Expected Material
Purchase
Date of Status Receivin
Remarks
Completion g Date
NOTE: 1. L&T Komatsu/PC210 Excavators bearing FA Code EXC009 is standing as they require complete overhauling of Engine &
2 MP39H0945 & MP39H0955 sent for denting and painting to OM Motors,Rajgardh.
3 Tipper which has denting work done is running but painting and glass fitting work is pending.
e overhauling of Engine & Hydraulic units.
BREAKDOWN REPOR
EQUIPMENT Breakdow B/D
SR. NO. LOCATION FA CODE MAKE/MODEL
DETAILS n Date Hmr/Kmr
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021 66
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021 MNW
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021 17029

4 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021 10044

5 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021 90166

6 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021 4476

7 Pinan (PKG-V) 2018/WHL026 Wheel Loader 432ZX 01.10.2021 9635

8 Pinan (PKG-V) 2019/WHL040 Wheel Loader 432ZX 02.10.2021 5881

9 Pinan (PKG-V) 2017/EXC018 Excavator SK220 04.10.2021 16263

10 Pinan (PKG-V) Tipper(RJ02GB1646) TATA/2523 04.10.2021 40646

11 Pinan (PKG-V) 2017/TPR188 Tipper(MP04HE4183) Mahindra/Torro 05.10.2021 69136

Diesel Tanker
12 Pinan (PKG-V) TURBO/407EX 05.10.2021 6567
(HR32D0231)
13 Pinan (PKG-V) 2020/TPR442 Tipper(RJ02GC0182) TATA/2518 06.10.2021 60524
Transit Mixer
14 Pinan (PKG-V) TMR014 AMW/2518 06.10.2021 147403
(MP39H2009)
15 Pinan (PKG-V) 2019/DGS121 DG 160 KVA SUDHIR 06.10.2021 10780

16 Pinan (PKG-V) 2020/TPR403 Tipper(RJ02GC0191) TATA/2518 06.10.2021 61088

17 Pinan (PKG-V) 2009/VSC001 Soil Compactor VOLVO/SD110 06.10.2021

Running With Com


Bolero Pickup
1 Pinan (PKG-V) 2017/BCR009 Mahindra 27.09.2021 33393
(MP04GA6913)

2 Pinan (PKG-V) 2018/WHL024 Wheel Loader 432ZX 04.10.2021 7841

3 Pinan (PKG-V) 2017/WHL018 Wheel Loader 432ZX 04.10.2021 7322

TATA (OEM
Transit Mixer
1 Pinan (PKG-V) 2019/TMR052 TATA/2518 24.09.2021 57201
(RJ02GB9238)

2 Pinan (PKG-V) 2020/TPR406 Tipper(RJ02GC0178) TATA/2518 02.10.2021 56626

Water Tanker
3 Pinan (PKG-V) 2019/WTR/071 TATA/1913 02.10.2021 49192
(RJ02GB9421)
KDOWN REPORT DVRP PKG-5 (06.10.2021)
No of
Nature of failure / Breakdown Approved indent
Breakdo Action taken Indent No
Details Date
wn Days
96 Engine Failure Sent For Repairing
53 Denting Work Req. Work Under Progress IMP-5/1003
40 Denting Work Req. Work Under Progress IMP-5/1003
Center Pin,Centre Bearing and
Material Received,
12 UJ Cross and Front Loader Pin
Awaiting For Machine
Bush Require
10 Battery require
Awaiting For Spare
6 Differential Seal Leakage IMP-5/1223P
Parts
Awaiting For Spare
6 Brake Cylinder Assy Require IMP-5/1235P
Parts
Oil Pressure Sensor,Timing
Material Received,But
5 Cover Packing and Seal
FIP sent for repairing
Require
Material Received,
Awaiting for Kobelco
3 Self Stater Require
Representative For
Harness Checking
Work Under Progress,
3 King Pin Damage
Axle I Beam Bend.
PTO Pump Require,
2 PTO Leakage Awaiting For Spare IMP-5/1247P
Parts
Material Received, Work
2 Brake Problem
Under Progress
1 Gear Box Problem Work Under Progress
1 Accelerator Cable Break Work Under Progress
Awaiting For Service
1 Engine Overheat
Engineer
Wheel Stud and UJ Cross Awaiting For Spare
1 IMP-1238P
Require Parts
Awaiting For Spare
1 Radiator Leakage IMP-5/1244P
Parts
Running With Complaint Plan Machinery
Brake Work Require, Due to
Awaiting For Spare
10 payment issue material will not
Parts
purchased.
Material Received,
3 Flywheel Ring Damage
Awaiting For Machine
Flywheel Ring Damage,Oil
Material Received,
3 Pressure Sensor,Timing Cover
Awaiting For Machine
Packing and Seal Require
TATA (OEM) Related Issues
RPM Issue Solved, But Injector
Injector Sent Along With
13 Cleaning Work Should be
TATA Technician
Require
Sent Along With TATA
Technician for
5 DOSER Unit
Repairing, Today it will
be ready
Awaiting For TATA
5 RPM ISSUE Represntative With
TATA Engine Laptop
Expected Material
Purchase
Date of Status Receivin
Remarks
Completion g Date
4 Pinan (PKG-V) 2020/TPR428 Tipper(RJ02GC0194) TATA/2518 02.10.2021 64537

NOTE: 1. L&T Komatsu/PC210 Excavators bearing FA Code EXC009 is standing as they require complete overhauling of Engine &
2 MP39H0945 & MP39H0955 sent for denting and painting to OM Motors,Rajgardh.
3 Tipper which has denting work done is running but painting and glass fitting work is pending.
Awaiting For Tata
5 Engine Knocking
Consideration

e overhauling of Engine & Hydraulic units.


BREAKDOWN REPO
EQUIPMENT Breakdow B/D
SR. NO. LOCATION FA CODE MAKE/MODEL
DETAILS n Date Hmr/Kmr
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021 66
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021 MNW
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021 17029

4 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021 10044

5 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021 90166

6 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021 4476

7 Pinan (PKG-V) 2018/WHL026 Wheel Loader 455ZX 01.10.2021 9635

8 Pinan (PKG-V) 2019/WHL040 Wheel Loader 432ZX 02.10.2021 5881

9 Pinan (PKG-V) 2017/EXC018 Excavator SK220 04.10.2021 16263

10 Pinan (PKG-V) Tipper(RJ02GB1646) TATA/2523 04.10.2021 40646

11 Pinan (PKG-V) 2017/TPR188 Tipper(MP04HE4183) Mahindra/Torro 05.10.2021 69136

Diesel Tanker
12 Pinan (PKG-V) TURBO/407EX 05.10.2021 6567
(HR32D0231)
13 Pinan (PKG-V) 2020/TPR442 Tipper(RJ02GC0182) TATA/2518 06.10.2021 60524
Transit Mixer
14 Pinan (PKG-V) TMR014 AMW/2518 06.10.2021 147403
(MP39H2009)
15 Pinan (PKG-V) 2019/DGS121 DG 160 KVA SUDHIR 06.10.2021 10780

16 Pinan (PKG-V) 2020/TPR403 Tipper(RJ02GC0191) TATA/2518 06.10.2021 61088

Bolero Pickup
17 Pinan (PKG-V) 2017/BCR009 Mahindra 27.09.2021 33393
(MP04GA6913)

18 Pinan (PKG-V) 2009/VSC001 Soil Compactor VOLVO/SD110 06.10.2021

Running With Com


1 Pinan (PKG-V) 2018/WHL024 Wheel Loader 432ZX 04.10.2021 7841

2 Pinan (PKG-V) 2017/WHL018 Wheel Loader 432ZX 04.10.2021 7322

TATA (OEM
Transit Mixer
1 Pinan (PKG-V) 2019/TMR052 TATA/2518 24.09.2021 57201
(RJ02GB9238)

2 Pinan (PKG-V) 2020/TPR406 Tipper(RJ02GC0178) TATA/2518 02.10.2021 56626

Water Tanker
3 Pinan (PKG-V) 2019/WTR/071 TATA/1913 02.10.2021 49192
(RJ02GB9421)
AKDOWN REPORT DVRP PKG-5 (07.10.2021)
No of
Nature of failure / Breakdown Approved indent
Breakdo Action taken Indent No
Details Date
wn Days
97 Engine Failure Sent For Repairing
54 Denting Work Req. Work Under Progress IMP-5/1003
41 Denting Work Req. Work Under Progress IMP-5/1003
Center Pin,Centre Bearing and
Material Received,
13 UJ Cross and Front Loader Pin
Awaiting For Machine
Bush Require
11 Battery require
Awaiting For Spare
7 Differential Seal Leakage IMP-5/1223P
Parts
Awaiting For Spare
7 Brake Cylinder Assy Require IMP-5/1235P
Parts
Oil Pressure Sensor,Timing
Material Received,But
6 Cover Packing and Seal
FIP sent for repairing
Require
Material Received,
Awaiting for Kobelco
4 Self Stater Require
Representative For
Harness Checking
Work Under Progress,
4 King Pin Damage
Axle I Beam Bend.
PTO Pump Require,
3 PTO Leakage Awaiting For Spare IMP-5/1247P
Parts
Material Received, Work
3 Pinon Damage
Under Progress
Awaiting For Spare
2 Release Bearing Require IMP-5/1146
Parts
Awaiting For Spare
2 Accelerator Cable Break IMP-5/1253P
Parts
Radiator Sent For
2 Engine Overheat
Repairing By Today
Wheel Stud and UJ Cross Awaiting For Spare
2 IMP-1238P
Require Parts
Brake Work Require, Due to
Awaiting For Spare
11 payment issue material will not
Parts
purchased.
Awaiting For Spare
2 Radiator Leakage IMP-5/1244P
Parts
Running With Complaint Plan Machinery
Material Received,
4 Flywheel Ring Damage
Awaiting For Machine
Flywheel Ring Damage,Oil
Material Received,
4 Pressure Sensor,Timing Cover
Awaiting For Machine
Packing and Seal Require
TATA (OEM) Related Issues
RPM Issue Solved, But Injector
Injector Sent Along With
14 Cleaning Work Should be
TATA Technician
Require
Sent Along With TATA
Technician for
6 DOSER Unit
Repairing, Today it will
be ready
Awaiting For TATA
6 RPM ISSUE Represntative With
TATA Engine Laptop
Expected Material
Purchase
Date of Status Receivin
Remarks
Completion g Date
4 Pinan (PKG-V) 2020/TPR428 Tipper(RJ02GC0194) TATA/2518 02.10.2021 64537

NOTE: 1. L&T Komatsu/PC210 Excavators bearing FA Code EXC009 is standing as they require complete overhauling of Engine &
2 MP39H0945 & MP39H0955 sent for denting and painting to OM Motors,Rajgardh.
3 Tipper which has denting work done is running but painting and glass fitting work is pending.
Awaiting For Tata
6 Engine Knocking
Consideration

e overhauling of Engine & Hydraulic units.


BREAKDOWN REPO
EQUIPMENT Breakdow B/D
SR. NO. LOCATION FA CODE MAKE/MODEL
DETAILS n Date Hmr/Kmr
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021 66
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021 MNW
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021 17029

4 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021 10044

5 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021 90166

6 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021 4476

7 Pinan (PKG-V) 2018/WHL026 Wheel Loader 455ZX 01.10.2021 9635

8 Pinan (PKG-V) 2019/WHL040 Wheel Loader 432ZX 02.10.2021 5881

9 Pinan (PKG-V) 2017/EXC018 Excavator SK220 04.10.2021 16263

10 Pinan (PKG-V) Tipper(RJ02GB1646) TATA/2523 04.10.2021 40646

11 Pinan (PKG-V) 2017/TPR188 Tipper(MP04HE4183) Mahindra/Torro 05.10.2021 69136

Diesel Tanker
12 Pinan (PKG-V) TURBO/407EX 05.10.2021 6567
(HR32D0231)

13 Pinan (PKG-V) 2020/TPR442 Tipper(RJ02GC0182) TATA/2518 06.10.2021 60524


Transit Mixer
14 Pinan (PKG-V) TMR014 AMW/2518 06.10.2021 147403
(MP39H2009)
15 Pinan (PKG-V) 2019/DGS121 DG 160 KVA SUDHIR 06.10.2021 10780

16 Pinan (PKG-V) 2020/TPR403 Tipper(RJ02GC0191) TATA/2518 06.10.2021 61088

Bolero Pickup
17 Pinan (PKG-V) 2017/BCR009 Mahindra 27.09.2021 33393
(MP04GA6913)

18 Pinan (PKG-V) 2009/VSC001 Soil Compactor VOLVO/SD110 06.10.2021


19 Pinan (PKG-V) Tipper(RJ29GA9019) TATA/2518 08.10.2021 121009
20 Pinan (PKG-V) TPR100 Tipper(MP39H0943) AMW/2518 08.10.2021 60398
21 Pinan (PKG-V) TPR062 Tipper(MP39H0954) AMW/2518 08.10.2021 243225
22 Pinan (PKG-V) MVC001 Baby Tandem Roller HAMM 08.10.2021 1453
Backhoe Loader
23 Pinan (PKG-V) 2019/BHL041 JCB/3DX 08.10.2021 5372
(RJ02EA1687)
Running With Com
1 Pinan (PKG-V) 2018/WHL024 Wheel Loader 432ZX 04.10.2021 7841

2 Pinan (PKG-V) 2017/WHL018 Wheel Loader 432ZX 04.10.2021 7322

TATA (OEM
AKDOWN REPORT DVRP PKG-5 (08.10.2021)
No of
Nature of failure / Breakdown Approved indent
Breakdo Action taken Indent No
Details Date
wn Days
98 Engine Failure Sent For Repairing
55 Denting Work Req. Work Under Progress IMP-5/1003
42 Denting Work Req. Work Under Progress IMP-5/1003
Center Pin,Centre Bearing and
Material Received,
14 UJ Cross and Front Loader Pin
Awaiting For Machine
Bush Require
12 Battery require
Awaiting For Spare
8 Differential Seal Leakage IMP-5/1223P
Parts
Awaiting For Spare
8 Brake Cylinder Assy Require IMP-5/1235P
Parts
Oil Pressure Sensor,Timing
Material Received,But
7 Cover Packing and Seal
FIP sent for repairing
Require
Kobelco Engineer
inspected the machine.
5 Self Stater Require
Suggested material
require.
Work Under Progress,
5 King Pin Damage
Axle I Beam Bend.
PTO Pump Require,
4 PTO Leakage Awaiting For Spare IMP-5/1247P
Parts
Yesterday Wrong
Material Received,
4 Pinon Damage
Revised Material is
Received Today.
Awaiting For Spare
3 Release Bearing Require IMP-5/1146
Parts
3 Accelerator Cable Break Material Received
Radiator Sent For
3 Engine Overheat
Repairing By Today
Wheel Stud and UJ Cross Awaiting For Spare
3 IMP-1238P
Require Parts
Brake Work Require, Due to
Awaiting For Spare
12 payment issue material will not
Parts
purchased.
Awaiting For Spare
3 Radiator Leakage IMP-5/1244P
Parts
1 Engine Overheat Work Under Progress
1 Water Mix in Engine Oil Work Under Progress
1 Steering Pump Leakage Steering Pump Required IMP-5/1260P
1 Front Drum Seal Leakage Work Under Progress
1 Front Hub Bearing Damage Work Under Progress

Running With Complaint Plan Machinery


Material Received,
5 Flywheel Ring Damage
Awaiting For Machine
Flywheel Ring Damage,Oil
Material Received,
5 Pressure Sensor,Timing Cover
Awaiting For Machine
Packing and Seal Require
TATA (OEM) Related Issues
Expected Material
Purchase
Date of Status Receivin
Remarks
Completion g Date
Transit Mixer
1 Pinan (PKG-V) 2019/TMR052 TATA/2518 24.09.2021 57201
(RJ02GB9238)

2 Pinan (PKG-V) 2020/TPR406 Tipper(RJ02GC0178) TATA/2518 02.10.2021 56626

Water Tanker
3 Pinan (PKG-V) 2019/WTR/071 TATA/1913 02.10.2021 49192
(RJ02GB9421)

4 Pinan (PKG-V) 2020/TPR428 Tipper(RJ02GC0194) TATA/2518 02.10.2021 64537

NOTE: 1 MP39H0945 & MP39H0955 sent for denting and painting to OM Motors,Rajgardh.
2 Tipper which has denting work done is running but painting and glass fitting work is pending.
RPM Issue Solved, But Injector
Injector Sent Along With
15 Cleaning Work Should be
TATA Technician
Require
Sent Along With TATA
Technician for
7 DOSER Unit
Repairing, Today it will
be ready
Awaiting For TATA
7 RPM ISSUE Represntative With
TATA Engine Laptop
Awaiting For Tata
7 Engine Knocking
Consideration
BREAKDOWN REPO
EQUIPMENT Breakdow
SR. NO. LOCATION FA CODE MAKE/MODEL
DETAILS n Date
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021
4 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021

5 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021

6 Pinan (PKG-V) 2018/WHL026 Wheel Loader 455ZX 01.10.2021

7 Pinan (PKG-V) 2019/WHL040 Wheel Loader 432ZX 02.10.2021

8 Pinan (PKG-V) 2017/EXC018 Excavator SK220 04.10.2021

9 Pinan (PKG-V) Tipper(RJ02GB1646) TATA/2523 04.10.2021

10 Pinan (PKG-V) 2017/TPR188 Tipper(MP04HE4183) Mahindra/Torro 05.10.2021


Diesel Tanker
11 Pinan (PKG-V) TURBO/407EX 05.10.2021
(HR32D0231)
12 Pinan (PKG-V) 2020/TPR442 Tipper(RJ02GC0182) TATA/2518 06.10.2021

13 Pinan (PKG-V) 2019/DGS121 DG 160 KVA SUDHIR 06.10.2021

14 Pinan (PKG-V) 2020/TPR403 Tipper(RJ02GC0191) TATA/2518 06.10.2021


Bolero Pickup
15 Pinan (PKG-V) 2017/BCR009 Mahindra 27.09.2021
(MP04GA6913)

16 Pinan (PKG-V) 2009/VSC001 Soil Compactor VOLVO/SD110 06.10.2021


17 Pinan (PKG-V) Tipper(RJ29GA9019) TATA/2518 08.10.2021
18 Pinan (PKG-V) TPR100 Tipper(MP39H0943) AMW/2518 08.10.2021
19 Pinan (PKG-V) TPR062 Tipper(MP39H0954) AMW/2518 08.10.2021

20 Pinan (PKG-V) MVC001 Baby Tandem Roller HAMM 08.10.2021

21 Pinan (PKG-V) 2019/WHL033 Wheel Loader JCB/432ZX 09.10.2021

Running With Co
1 Pinan (PKG-V) 2018/WHL024 Wheel Loader 432ZX 04.10.2021

2 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021

3 Pinan (PKG-V) 2017/WHL018 Wheel Loader 432ZX 04.10.2021

TATA (OE
Transit Mixer
1 Pinan (PKG-V) 2019/TMR052 TATA/2518 24.09.2021
(RJ02GB9238)

2 Pinan (PKG-V) 2020/TPR406 Tipper(RJ02GC0178) TATA/2518 02.10.2021


BREAKDOWN REPORT DVRP PKG-5 (09.10.2021)
No of
B/D Nature of failure / Breakdown
Breakdo Action taken Indent No
Hmr/Kmr Details
wn Days
66 99 Engine Failure Sent For Repairing
MNW 56 Denting Work Req. Work Under Progress IMP-5/1003
17029 43 Denting Work Req. Work Under Progress IMP-5/1003
90166 13 Battery require
Awaiting For Spare
4476 9 Differential Seal Leakage IMP-5/1223P
Parts
Awaiting For Spare
9635 9 Brake Cylinder Assy Require IMP-5/1235P
Parts
Oil Pressure Sensor,Timing
Material Received,But
5881 8 Cover Packing and Seal
FIP sent for repairing
Require
Awaiting For Spare
16263 6 Harness Problem IMP-5/1261P
Parts
Complete Axle Exchange
40646 6 King Pin Damage
with another one
Material Received,
69136 5 PTO Leakage
Today It will Be Ready
6567 4 Pinon Damage Today It Will Be Ready.
Material Received,
60524 4 Release Bearing Require
Today It will Be Ready
Radiator Sent For
10780 4 Engine Overheat Repairing, Today Will
Be Received.
61088 4 Material Received Today It Will Be Ready.
Brake Work Require, Due to Material Partially
33393 13 payment issue material will not Received, Work Under
purchased. Progress
Awaiting For Spare
4 Radiator Leakage IMP-5/1244P
Parts
121009 2 Engine Overheat Work Under Progress
60398 2 Water Mix in Engine Oil Work Under Progress
Material Received, Work
243225 2 Steering Pump Leakage IMP-5/1260P
Under Progress
Travel Motor
1453 2 Front Drum Seal Leakage Dismentalling Under
Progress
Engine RPM not increse over
6118 1 Work Under Progress
1500-1600
Running With Complaint Plan Machinery
Material Received,
7841 6 Flywheel Ring Damage
Awaiting For Machine
Center Pin,Centre Bearing and
Material Received,
10044 15 UJ Cross and Front Loader Pin
Awaiting For Machine
Bush Require
Flywheel Ring Damage,Oil
Material Received,
7322 6 Pressure Sensor,Timing Cover
Awaiting For Machine
Packing and Seal Require
TATA (OEM) Related Issues
RPM Issue Solved, But Injector TATA Technician
57201 16 Cleaning Work Should be Reached at Site. Work
Require under Progress
56626 8 DOSER Unit Work Under Progress
Expected Material
Approved indent Purchase
Date of Status Receivin
Date Remarks
Completion g Date
Water Tanker
3 Pinan (PKG-V) 2019/WTR/071 TATA/1913 02.10.2021
(RJ02GB9421)

4 Pinan (PKG-V) 2020/TPR428 Tipper(RJ02GC0194) TATA/2518 02.10.2021

Tyre Rel
1 Pinan (PKG-V) 2017/TPR238 MH40BG2446 TATA/3118 09.10.2021
2 Pinan (PKG-V) TPR215 MH40BG2452 TATA/3118 09.10.2021
3 Pinan (PKG-V) 2017/TPR237 MH40BG2445 TATA/3118 09.10.2021
4 Pinan (PKG-V) 2017/TPR182 MP04HE4185 MAHINDRA/TORRO 09.10.2021
5 Pinan (PKG-V) 2017/TPR192 MP04HE4181 MAHINDRA/TORRO 09.10.2021

NOTE: 1 MP39H0942 & MP39H0947 sent for denting and painting to OM Motors,Rajgardh.
2 Tipper which has denting work done is running but painting and glass fitting work is pending.
TATA Technician
49192 8 RPM ISSUE Reached at Site. Work
under Progress
TATA Technician
64537 8 Engine Knocking
Reached at site.
Tyre Related Breakdown
14025 1 4 Nos Tyre Removed
176950 1 4 Nos Tyre Removed
14257 1 9 Nos Tyre Removed Awaiting For Tyre
98130 1 10 Nos Tyre Removed
77238 1 10 Nos Tyre Removed

work is pending.
BREAKDOWN REPO
EQUIPMENT Breakdow
SR. NO. LOCATION FA CODE MAKE/MODEL
DETAILS n Date
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021
4 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021

5 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021

6 Pinan (PKG-V) 2018/WHL026 Wheel Loader 455ZX 01.10.2021

7 Pinan (PKG-V) 2017/EXC018 Excavator SK220 04.10.2021

8 Pinan (PKG-V) Tipper(RJ02GB1646) TATA/2523 04.10.2021

9 Pinan (PKG-V) 2009/VSC001 Soil Compactor VOLVO/SD110 06.10.2021

10 Pinan (PKG-V) Tipper(RJ29GA9019) TATA/2518 08.10.2021

11 Pinan (PKG-V) TPR100 Tipper(MP39H0943) AMW/2518 08.10.2021

12 Pinan (PKG-V) 2019/WHL033 Wheel Loader JCB/432ZX 09.10.2021


13 Pinan (PKG-V) 2017/TPR188 Tipper(MP04HE4183) Mahindra/Torro 11.10.2021
Diesel Tanker
14 Pinan (PKG-V) TURBO/407EX 11.10.2021
(HR32D0231)

15 Pinan (PKG-V) 2019/WHL040 Wheel Loader 432ZX 11.10.2021

16 Pinan (PKG-V) 2020/TPR436 Tipper(RJ02GC0189) TATA/2518 11.10.2021


Boom Placer ASHOK
17 Pinan (PKG-V) 2019/BOM003 11.10.2021
(RJ02EA1630) LEYLAND/2518
18 Pinan (PKG-V) 2019/HYD025 Hydra(RJ02EA1682) ACE/14MT 11.10.2021

19 Pinan (PKG-V) 2019/HYD027 Hydra(RJ02EA1683) ACE/14MT 11.10.2021


ASHOK
20 Pinan (PKG-V) Trailer(MH40BL1380) 11.10.2021
LEYLAND/4921

21 Pinan (PKG-V) DGS0180 DG 600KVA CUMMINS 11.10.2021

Running With Co
1 Pinan (PKG-V) 2018/WHL024 Wheel Loader 432ZX 04.10.2021

2 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021

3 Pinan (PKG-V) 2017/WHL018 Wheel Loader 432ZX 04.10.2021

TATA (OE
BREAKDOWN REPORT DVRP PKG-5 (11.10.2021)
No of
B/D Nature of failure / Breakdown
Breakdo Action taken Indent No
Hmr/Kmr Details
wn Days
66 101 Engine Failure Sent For Repairing
MNW 58 Denting Work Req. Work Under Progress IMP-5/1003
17029 44 Denting Work Req. Work Under Progress IMP-5/1003
90166 14 Battery require
Material Received, Axle
4476 11 Differential Seal Leakage Sent to Hydraulic Press
Machine For Fitting
Awaiting For Spare
9635 11 Brake Cylinder Assy Require IMP-5/1235P
Parts
Awaiting For Spare
16263 8 Harness Problem IMP-5/1261P
Parts
Axle Fitted, Rest Work
Under Progress, It will
40646 8 King Pin Damage
be Operational Within 2
Hrs.
Awaiting For Spare
6 Radiator Leakage IMP-5/1244P
Parts
Radiator Sent For
121009 4 Engine Overheat
Repairing
Head and Turbo Sent
60398 4 Water Mix in Engine Oil
For Repairing
Engine RPM not increse over
6118 3 FIP Sent For Repairing
1500-1600
69136 1 Clutch Plate Worn Out Work Under Progress
Engine Didn't Taking
6567 1 FIP Problem Load on Ramp, FIP Sent
Again for Repairing
FIP Fitted Yesterday,
Whole Day Running But
5881 1 FIP Problem Yesterday Evening
Problem Facing Again
Related to FIP
57214 1 PTO Problem Stand at PKG-6
Awaiting For Spare
6157 1 UJ Cross and Flange Damage
Parts
Abnormal Sound Coming From Dismentalling Under
2374 1
Differential Progress
Air Compressor Gear and Dismentalling Under
2129 1
Timming Idler Gear Damage Progress
Timming Oil Seal Leakage, Fan Dismentalling Under
21625 1
Viscous Require Progress
Black Smoke Exhaust High
FIP Sent For Repairing
4161 1 Quantity and Main Oil Seal
with URSS Technician.
Leakage Front
Running With Complaint Plan Machinery
Material Received,
7841 8 Flywheel Ring Damage
Awaiting For Machine
Center Pin,Centre Bearing and
Material Received,
10044 17 UJ Cross and Front Loader Pin
Awaiting For Machine
Bush Require
Flywheel Ring Damage,Oil
Material Received,
7322 8 Pressure Sensor,Timing Cover
Awaiting For Machine
Packing and Seal Require
TATA (OEM) Related Issues
Expected Material
Approved indent Purchase
Date of Status Receivin
Date Remarks
Completion g Date
1 Pinan (PKG-V) 2020/TPR428 Tipper(RJ02GC0194) TATA/2518 02.10.2021

Tyre Rel
1 Pinan (PKG-V) 2017/TPR238 MH40BG2446 TATA/3118 09.10.2021
2 Pinan (PKG-V) TPR215 MH40BG2452 TATA/3118 09.10.2021
3 Pinan (PKG-V) 2017/TPR237 MH40BG2445 TATA/3118 09.10.2021
4 Pinan (PKG-V) 2017/TPR182 MP04HE4185 MAHINDRA/TORRO 09.10.2021
5 Pinan (PKG-V) 2017/TPR192 MP04HE4181 MAHINDRA/TORRO 09.10.2021
Battery R
1 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021
2 Pinan (PKG-V) 2011/TPR050 Tipper(MP39H0285) AMW/2518 11.10.2021
3 Pinan (PKG-V) TPR037 Tipper(MP39H0328) AMW/2518 11.10.2021

1 Pinan (PKG-V) Tipper(HR46C0717) TATA/2518

NOTE: 1 MP39H0942 ,MP39H0947 and MP39H0287 sent for denting and painting to OM Motors,Rajgardh.
2 Tipper which has denting work done is running but painting and glass fitting work is pending.
TATA Technician
64537 8 Engine Knocking
Reached at site.
Tyre Related Breakdown
14025 3 4 Nos Tyre Removed
176950 3 4 Nos Tyre Removed
14257 3 9 Nos Tyre Removed Awaiting For Tyre
98130 3 10 Nos Tyre Removed
77238 3 10 Nos Tyre Removed
Battery Related Breakdown
90166 14 Battery require
18575 1 Battery require Awaiting For Battery
17799 1 Battery require
Scarp

o OM Motors,Rajgardh.
work is pending.
BREAKDOWN RE
EQUIPMENT Breakdow
SR. NO. LOCATION FA CODE MAKE/MODEL
DETAILS n Date
1 Pinan (PKG-V) LTR002 Tower Light ASKA 02.07.2021
2 Pinan (PKG-V) MP39H 0950 Tipper AMW/2518 13.08.2021
3 Pinan (PKG-V) TPR053 Tipper(MP39H0317) AMW/2518 25.08.2021

4 Pinan (PKG-V) 2018/VSC026 Soil Compactor HAMM/311 01.10.2021

5 Pinan (PKG-V) 2018/WHL026 Wheel Loader 455ZX 01.10.2021

6 Pinan (PKG-V) 2017/EXC018 Excavator SK220 04.10.2021


7 Pinan (PKG-V) 2009/VSC001 Soil Compactor VOLVO/SD110 06.10.2021
8 Pinan (PKG-V) Tipper(RJ29GA9019) TATA/2518 08.10.2021
9 Pinan (PKG-V) TPR100 Tipper(MP39H0943) AMW/2518 08.10.2021

10 Pinan (PKG-V) 2019/WHL033 Wheel Loader JCB/432ZX 09.10.2021

11 Pinan (PKG-V) 2017/TPR188 Tipper(MP04HE4183) Mahindra/Torro 11.10.2021

Diesel Tanker
12 Pinan (PKG-V) TURBO/407EX 11.10.2021
(HR32D0231)

13 Pinan (PKG-V) 2019/WHL040 Wheel Loader 432ZX 11.10.2021

14 Pinan (PKG-V) 2020/TPR436 Tipper(RJ02GC0189) TATA/2518 11.10.2021

15 Pinan (PKG-V) 2019/HYD025 Hydra(RJ02EA1682) ACE/14MT 11.10.2021

16 Pinan (PKG-V) 2019/HYD027 Hydra(RJ02EA1683) ACE/14MT 11.10.2021


ASHOK
17 Pinan (PKG-V) Trailer(MH40BL1380) 11.10.2021
LEYLAND/4921

18 Pinan (PKG-V) DGS0180 DG 600KVA CUMMINS 11.10.2021

19 Pinan (PKG-V) 2020/TPR446 Tipper(RJ02GC0161) TATA/2518 12.10.2021


20 Pinan (PKG-V) 2020/TPR422 Tipper(RJ02GC0176) TATA/2518 12.10.2021
21 Pinan (PKG-V) 2020/TPR432 Tipper(RJ02GC0193) TATA/2518 12.10.2021
Transit Mixer
22 Pinan (PKG-V) TMR010 AMW/2518 12.10.2021
(MP39H2004)
Running With
1 Pinan (PKG-V) 2018/WHL024 Wheel Loader 432ZX 04.10.2021

2 Pinan (PKG-V) 2018/WHL028 Wheel Loader 455ZX 25.09.2021

3 Pinan (PKG-V) 2017/WHL018 Wheel Loader 432ZX 04.10.2021


BREAKDOWN REPORT DVRP PKG-5 (12.10.2021)
No of
B/D Nature of failure / Breakdown
Breakdo Action taken Indent No
Hmr/Kmr Details
wn Days
66 102 Engine Failure Sent For Repairing
MNW 59 Denting Work Req. Work Under Progress IMP-5/1003
17029 45 Denting Work Req. Work Under Progress IMP-5/1003
Axle Fitted, Rest Work Under
4476 12 Differential Seal Leakage Progress, It will be Operational
Within 2 Hrs.
9635 12 Brake Cylinder Assy Require Awaiting For Spare Parts IMP-5/1235P

16263 9 Harness Problem Awaiting For Spare Parts IMP-5/1261P


Work Order Sent to Party For
7 Radiator Leakage IMP-5/1244P
Repairing
121009 5 Engine Overheat Radiator Sent For Repairing
Head Sent Yesterday but Turbo
60398 5 Water Mix in Engine Oil
will send by today For Repairing
Engine RPM not increse over
6118 4 FIP Sent For Repairing
1500-1600
Clutch Plate Fitted, Rest Work
69136 2 Clutch Plate Worn Out Under Progress, It will Be
Operational By Today
Engine Didn't Taking Load on
6567 2 FIP Problem Ramp, FIP Sent Again for
Repairing
FIP Fitted Yesterday, Whole Day
Running But Yesterday Evening
Problem Facing Again Related to
5881 2 FIP Problem FIP, JECO(FIP Pump Dealer)
Technician Will Reached at Our
Site Today For Machine
Inspection.
Material Received, Will Sent
57214 2 PTO Problem
Shortly To PKG-6 For Repairing
Abnormal Sound Coming From
2374 2 Dismentalling Under Progress
Differential
Air Compressor Gear and
2129 2 Awaiting For Spare Parts
Timming Idler Gear Damage
Timming Oil Seal Leakage, Fan Material Received,Fitting Under
21625 2
Viscous Require Progress
Black Smoke Exhaust High
FIP Sent For Repairing with URSS
4161 2 Quantity and Front Main Oil
(Cummins) Technician.
Seal Leakage
54326 1 Turbo Failure Dismentalling Under Progress
58245 1 Gear Box Problem Dismentalling Under Progress
59382 1 Air Compressor Failure Work Under Progress
159350 1 Water Pump Leakage Awaiting For Spare Parts

Running With Complaint Plan Machinery


Material Received, Awaiting For
7841 9 Flywheel Ring Damage
Machine
Center Pin,Centre Bearing and
Material Received, Awaiting For
10044 18 UJ Cross and Front Loader Pin
Machine
Bush Require
Flywheel Ring Damage,Oil
Material Received, Awaiting For
7322 9 Pressure Sensor,Timing Cover
Machine
Packing and Seal Require
Expected Material
Approved indent Purchase
Date of Status Receivin
Date Remarks
Completion g Date
TATA (
1 Pinan (PKG-V) 2020/TPR428 Tipper(RJ02GC0194) TATA/2518 02.10.2021
Tyre
1 Pinan (PKG-V) 2017/TPR238 MH40BG2446 TATA/3118 09.10.2021
2 Pinan (PKG-V) TPR215 MH40BG2452 TATA/3118 09.10.2021
3 Pinan (PKG-V) 2017/TPR237 MH40BG2445 TATA/3118 09.10.2021
4 Pinan (PKG-V) 2017/TPR182 MP04HE4185 MAHINDRA/TORRO 09.10.2021
5 Pinan (PKG-V) 2017/TPR192 MP04HE4181 MAHINDRA/TORRO 09.10.2021
Batter
1 Pinan (PKG-V) TPR055 Tipper(MP39H0319) AMW/2518 27.09.2021
2 Pinan (PKG-V) 2011/TPR050 Tipper(MP39H0285) AMW/2518 11.10.2021
3 Pinan (PKG-V) TPR037 Tipper(MP39H0328) AMW/2518 11.10.2021

1 Pinan (PKG-V) Tipper(HR46C0717) TATA/2518

NOTE: 1 MP39H0942 ,MP39H0947 and MP39H0287 sent for denting and painting to OM Motors,Rajgardh.
2 Tipper which has denting work done is running but painting and glass fitting work is pending.
TATA (OEM) Related Issues
64537 9 Engine Knocking TATA Technician Reached at site.
Tyre Related Breakdown
14025 4 4 Nos Tyre Removed
176950 4 4 Nos Tyre Removed Awaiting For Tyre
14257 4 9 Nos Tyre Removed
98130 4 10 Nos Tyre Removed
Will Be Operational By Today
77238 4 10 Nos Tyre Removed
Battery Related Breakdown
90166 15 Battery require
18575 2 Battery require Awaiting For Battery
17799 2 Battery require
Scarp