Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

portfolio

architecture (2018-2021)

YUKTA CHANDAK
My name is Yukta chandak. I am a fourth-year undergraduate student in
architecture. WORKSHOPS

I define myself as creative, artistic, enterprising with a great passion for MASA Convention
architecture. I have a creative mind constantly producing innovative
Sam's drafting board
ideas and design.
Scrap to Sculpture
I can work well individually and as a part of a team.
Besides architecture, I am also interested in animal welfare,
photography, sketching and am always excited to learn something new
EXPERTISE
and different.

HANDS ON
This portfolio contains work I have learnt during the past years. I am
searching for guidance for exploring my hidden capabilities, polishing
Hand Sketching
them and getting an experience, which will lead me further in this field. Water coloring
Drafting
EDUCATION
Model making
YUKTA CHANDAK
OCTOBER 30, 2000 2016 Photography
SSC - GCPS , Pulgaon Design Thinking
CONTACT 2018
Mobile : 7447335478 HSC - R.K Jr. College , Pulgaon
Email : chandak.yukta@gmail.com Architectural College (4th year) SOFTWARE

Address: 102 Shree SaiKrupa Apartment, Smt. Manoramabai Mundle College


Nachangaon Road , Pulgaon. Of Architecture , Nagpur

COMPETITION
AutoCAD Photoshop Revit
S A Deshpande Studio Design Competition.
“THE MOST IMPORTANT THING IS THAT YOU LOVE WHAT
(selection)
YOU ARE DOING, AND THE SECOND THAT YOU ARE NOT
Ar. Sunil Toye Landscape design competition.
AFRAID OF WHERE YOUR NEXT IDEA WILL LEAD.”
(2nd prize)
- CHARLES EAMES Rhino 3D SketchUp Lumion
Rachayata” Young Architects Competitions.

(2nd prize)

Nation level PowerPoint competition

(consolation). Microsoft Microsoft Microsoft
Inside out photography (special mention) Word PowerPoint Excel
Mural Design Competition - Birla group
CONTENTS

PREMIUM HOTEL HOUSING FOR


COMMERCIAL

:
LOCATION GOREWADA , MIGRANTS
NAGPUR /
RESIDENCIAL HOUSING

3RD YEAR STUDIO PROJECT :


LOCATION BORKHEDI

3RD YEAR STUDIO PROJECT

GUEST HOUSE WEEKEND


/
COMMERCIAL RESIDENCIAL

:
LOCATION GOREWADA
HOUSE
, RESIDENTIAL

1
RESCUE CENTER NAGPUR

2 ND YEAR STUDIO PROJECT


ST YEAR STUDIO PROJECT

WORKING BERG THROUGH

DRAWIG MURKY
RESIDENCIAL LOCATION : .
PROF S A DESHPANDE

NAGPUR STUDIO DESIGN COMPETITION

COMPETITION HAND RENDER -


WORK SHEETS
RACHAYATA ” YOUNG

ARCHITECTS COMPETITIONS

.
AR SUNIL TOYE LANDSCAPE

COMPETITION

INTERIOR MISCELLANEOUS

WORK GROUP ( ) MODEL MAKING

SKETCHES

PHOTOGRAPHY
PREMIUM HOTEL

COMMERCIAL

:
LOCATION GOREWADA , NAGPUR

3
RESIDENTIAL
BLOCKS
RD YEAR STUDIO PROJECT

The site is located in gorewada near the Gorewada lake NMC WATER SITE CONTEXT :
LAKE
TRATEMENT PLAN
GOREWAD VIEW FROM SITE

and biodiversity park it is a tourist place so the location of A DAM

hotel with the view of lake and dense vegetation is GUMAN BANQUET &
LAWN
NEAREST TO SITE
ENTRANCE GOREWA
BIODIVERSITY PARK

perfect.
The site area is 3.10 acre's with main highway at one side SITE LOCATION :
Planning is done according to site views , vegetation .
NAGPUR
INDIA MAHARASHTRA
GOREWADA RING ROAD NAGPUR ,
MAHARASHTRA
CONCEPT NEED : For common people of all age group
For 100 to 120 people.
Activites like Accommodation ,eating,
NEED and other activites .
BONFIRE

:
SECTION

FORM
Asymetrical forms.
POOL
S
Different building as a theme.
Using different material , colour, texture.
CONTEXT FORM I
CONTEXT : The site was a bonus as it had an view POOL 6M WIDE
SERVICE ROAD
of the scenic lake and Vegetation .
COURT T
( ):
with countour type topography.
SOLUTION CONCEPT
CABANA
Planning according to views from site. PORCH
E
Use of natural material,elements to connect with nature. RAMP
DROP OFF
Planning according to slope of contour.
Activities for each age groups. RAMP

SOLUTIONS FROM CASE STUDY : 9M WIDE ROAD


ENTRACE
P
BONFIRE POINT

CIRCULATION ZONING: L
ADMINISTRATION &
RESTAURANT+
RECREATIONAL
AREA
RESTAURANT

ROOMS +
A
ACTIVITIES COURTYARD
ROOMS+ (WELCOMR HOUSE)

RESTAURANT +ADMIN,
RECEPTION
ACTIVITIES &
RECREATIONAL
WATER LANDSCAPING
SITE PLAN N
PARKING
PARKING
WELCOME
HOUSE ENTRY
(COURTYARD) PARKING
ENTRY 2
SUITE

ENTRY The welcome house connects all the


All the activities will be connected primary services of the Hotel.
by central courtyard (welcome placement of Accomadation so that
house) and sky bridges on upper maximum good views can be seen.
floors.
VISION

FROM THE SITE : knitting a visual connection


between the outdoor & indoor.
OFF THE SITE : 2ND FLOOR PLAN

( )
DIFFERENTLY ABLED

CIRCULATION

AREA OF ROOMS

DUPLEX ROOM = 32 SQM

SUPER DUPLEX ROOM =39 SQM

DOUBLED BED =33 SQM

SUITE =55.7 SQM

DIFFERENTLY ABLED =30.2 SQM

The central green space as we enter.


Balconies that frame
After that the recreational space
the picturesque
give a counterpoint. NUMBER OF ROOMS

surroundings GROUND FLOOR :13


FIRST FLOOR :13
:12
R
SECOND FLOOR

CREATIVE EXCERSICE THIRD FLOOR :11


TOTAL : 49 ROOMS

O
Making of 3d model according to zoning.
The building is divided into three parts.
M
According to the view from the site the form of building is designed.
S SUPER DUPLEX ROOM DUPLEX ROOM DOUBLE BED ROOM
GROUND FLOOR
ACCOMMODATION 7 8 1.RECEPTION
2.DUPLEX ROOM
STAIRCASE BLOCK +19.7
6
3.SUPER DUPLEX ROOM
PARAPET FLOOR +17.2 4.STAIRCASE AND LIFT
FOURTH FLOOR +16.2
10 5.DOUBLE BED
11 6.DISABLED
THIRD FLOOR +12.45
5 12 7.LAUNDARY
8.CHANGING ROOM
SECOND FLOOR +8.7 4 9.RESTROOM
10.PANTRY
3 11.CONTROL ROOM
FIRST FLOOR +4.95
12.STAIRCASE AND LIFT(STAFF)
+1.2 13.STORAG
PLINTH LVL 1.2
GROUND LVL 0.00

BASEMENT LVL - 2.1


+0.9
FRONT ELEVATION

SECTION BB '
PARAPET FLOOR +17.2
FOURTH FLOOR +16.2
1 ST FLOOR FLOOR
8
7
THIRD FLOOR +12.45 1.RECEPTION
6 9 2.DUPLEX ROOM
10 3.SUPER DUPLEX ROOM
SECOND FLOOR +8.7 11
4.STAIRCASE AND LIFT
12 5.DOUBLE BED
5
FIRST FLOOR +4.95
13 6.DISABLED
4 7.SUITE
PLINTH LVL 1.2
8.CAMERA AND SECURITY
3
GROUND LVL 0.00
9.RESTROOM
1 10.PANTRY
BASEMENT LVL - 2.1 11.CONTROL ROOM

'
RARE ELEVATION
12.STAIRCASE AND LIFT(STAFF)
SECTION AA 13.STORAGE
2

6
7
2 ND FLOOR FLOOR

9
.RECEPTION
10
11 2.DUPLEX ROOM
5 3.SUPER DUPLEX ROOM
4.STAIRCASE AND LIFT
5.DOUBLE BED
8
12 6.DISABLED
7.SUITE
3 8. PASSAGE CONNECTING BLOCK
9.TOILET
10.PANTRY
2 11.CONTROL ROOM
12.STAIRCASE AND LIFT
13.STORAGE

6 9 3
RD FLOOR FLOOR
10
11 1.RECEPTION
12 2.DUPLEX ROOM
5
13 3.SUPER DUPLEX ROOM
8 4.STAIRCASE AND LIFT
4 5.DOUBLE BED
3 6.DISABLED
1
7.SUITE
8. PASSAGE CONNECTING BLOCK
9.TOILET
2 10.PANTRY
11.CONTROL ROOM
12.STAIRCASE AND LIFT
13.STORAGE
6
MAIN BUILDING
12
14 13

5 8
4 10

3 1 9
9 10

1.RECEPTION 2
8 2.WAITING AREA 4
2 3.LOUNGE
4.LUGGAGE ROOM
5.RESTROOM 1.RECEPTION
6.FIRE ESCAPE 2.BOOK SHELFS
7 7.OFFICE 5
3.SEATING AREA
8.PANTRY 3 4.CONFERENCE ROOM
+1.2 1
9.SERVICE STAIRCASE N LIFT 5.MEETING ROOM
10. TOILET 6. RESTROOM
11.LOCKER ROOMS 7. FIRE ESCAPE
12.FIRE CONTROL 8.STAFF KITCHEN N DINING
13.CAMERA ROOM 9.PANTRY
14.ELECTRICAL 10.SERVICE LIFT AND STAIRCASE RARE ELEVATION

GROUND FLOOR FLOOR 1 ST FLOOR FLOOR

FRONT ELEVATION

8
9 3
FIFITH FLOOR +20.95
4
4
7
DINE VIP ROOM
PARAPET +17.2
FOURTH FLOOR +16.2
3 8 BANQUET
7
7
THIRD FLOOR +12.45
5
RESTAURANT
6
1
8 SECOND FLOOR +8.7 FIFITH FLOOR +20.95
1 ROOFTOP BAR
1
SEATING
5 PARAPET +17.2
1.RECEPTION 9 FIRST FLOOR +4.95 BANQUET FOURTH FLOOR +16.2
2.RESTAURANT ELOBBY AND RECEPTION
3.RESTROOM 1.LOBBY 1. LOBBY
4.FIRE ESCAPE 2.BANQUET HALL1 2. MEETING ROOM
5.OFFICE 2 PLINTH LVL 1.2 THIRD FLOOR +12.45
3.BANQUET HALL 2 3. VIP MEETING ROOM
6.PREPARATION AREA 4.CHANGING ROOMS 4. DINE AREA BASEMENT GROUND LVL 0.00 KITCHEN
2 7.STORAGE 2 3 5
5.SATELLITE KITCHEN 5. VIP SUITE 1
8.KITCHEN 6.SEVICE STAIRCASE 6. VIP SUITE 2 BASEMENT LVL - 2.1
9.WASHING AREA SECOND FLOOR +8.7

'
7.TOILET 7. ROOFTOP BAR
8.STORAGE 8. PANTRY KITCHEN STAFF
4 9. STORAGE SECTION BB
6
FIRST FLOOR +4.95
SERVICE AREA

PLINTH LVL 1.2

3
GROUND LVL 0.00

2 4
BASEMENT

'
ND FLOOR FLOOR RD FLOOR FLOOR TH FLOOR FLOOR BASEMENT LVL - 2.1

SECTION AA

GROUND FLOOR FIRE PLAN GROUND FLOOR CIRCULATION GROUND FLOOR SERVICES
3
1

Cantilever
Recreational
1.PLAYING AREA
block 2.SEATING
3. STORAGE

2 ND FLOOR FLOOR

(
RECREATIONAL )

3 3 3

4 1
2

Cantilever
Recreational
1.YOGA HALL
block 2.SEATING
3.SPA ROOMS
4. GYM EQUIPMENT
DROP OFF NIGHT VIEW

3
RD FLOOR FLOOR

(
RECREATIONAL )

RESTROOM
(DRIVERS)

STAIRCASE STAFF DORMITORY


AND
LIFT
STAFF DORMITORY VIEW FOR ROOM

ENTRY

EXIT

3.5 M WIDE RAMP

BASEMENT PLAN
HOUSING FOR MIGRANTS

/
RESIDENCIAL HOUSING

:
LOCATION BORKHEDI

3RD YEAR STUDIO PROJECT

The Design Theme was Atmanirbhar bharat and the project is to


provide Housing for migrants. The village chosen was borkhedi. The
village provides ample scope of development due to a major industrial
belt (MIDC) in the vicinity.
UNIT C
CONCEPT
DETACHED

MODULAR PLANING TYPE

One common unit is repeated in all types . CARPET AREA = 55 SQM


BUILT UP AREA = 63.7 SQM
According to the need area is added to same unit. PLOT AREA = 210 SQM
ADDITION 2

ADDITION 1
ADDITION 1

BASIC PLAN A
BASIC PLAN A BASIC PLAN A

Unit A Addition of area in unit A. Addition of area in unit B


Basic module We get unit b we get unit c

CLUSTER PLANING INCREMENTAL PLANING


UNIT B

Cluster Housing Schemes reflect Space for future expansion. SEMI


the sense of community in a village.
DETACHED
Space for staircase for
TYPE
1st floor expansion.
CARPET AREA = 39.55 SQM
BUILT UP AREA = 40 SQM
Spaces at Individual
units (aangan , small PLOT AREA = 147 SQM
ota seating )
COMMON
OPEN
SPACE
Space for expansion
on ground floor.

ZONING UNIT A

ROW HOUSE

TYPE
CARPET AREA = 30.16 SQM
TYPE A BUILT UP AREA = 34.45 SQM
PLOT AREA = 108 SQM

TYPE B

TYPE C
The total no. of houses are 120 units divided into 3 type A,B,C units.the houses area surrounded by its own indivual spaces and
common receational area . also it has aaganwadi , meditation hall(common hall) small workshops,basic aminities,and park
area with playground and sitting areas, cafe etc.

TYPE A

TYPE B

TYPE C

REVENUE GENERATION R
THREE SMALL SCALE WORKSHOP SPACES .
E
ONE LARGE MEDITATION CENTER Which CAN BE USED
AS COMMUNITY HALL FOR RENTAL PURPOSE. C
BOTH THE AREA WHERE PROVIDED NEAR TO EACH
R
OTHER SO THAt PEOPLE COMING TO MEDITATION
HALL CAN VISIT SMALL WORKSHOP AND SHOPs NEAR E
BY.
A
TYPE C ENTRANCE BLOCK
PARK
GUARD ROOM ,AGANWADI, CAFE T
WITH OPEN SEATING ,SHOPS ETC
I

O
BASIC AMENITIES
BASIC AMENTIES LIKE N
GROCERY , VEGETABLE STORE,
CLINIC,MEDICAL ARE PRESENT A
WITH IT THE SITE. L
ALL THE STORE AT ONE PLACE.

ENTRANCE
SEATING BAR

WALKWAY

POOL

ENTRY/EXIT

ADMINISTRATION

RESTAURANT

DOUBLE BED

VVIP MEDITATION

VIP

GUEST HOUSE

/
COMMERCIAL RESIDENCIAL

:
LOCATION GOREWADA

RESCUE CENTER , NAGPUR

2
ND YEAR STUDIO PROJECT

The site is located in Gorewada Zoo and Wildlife


Rescue Centre it is a tourist place so need of guest
house for officer's is required.
The site area is 2.5 acre's with dense vegetation
near by and wild animals in vicinity.
CARPET AREA = 42 SQM
CONCEPT DOUBLE BED TOTAL NO. OF UNITS = 8

MODULAR PLANING

CREATIVE EXERCISE
Concept from creative exercise making
composition using 2D parts of circle
and square. CLUSTER PLAN 2ND FLOOR FRONT ELEVATION

SLAB LEVEL +3.75


SLAB LEVEL +3.45

PLINTH LVL 0.45


PLAN
GROUND LVL 0.00

CLUSTER PLAN 1ST FLOOR

Using square and


DOUBLE BED
CARPET AREA = 61 SQM SECTION AA '
GUEST HOUSE
quadrant for double VIP TOTAL NO. OF UNITS = 6
bed.
Making module and
assigning spaces.
The module is
repeated to make
super module

SIDE ELEVATION

SLAB LEVEL +3.75


SLAB LEVEL +3.45

VIP GUEST HOUSE

Using 2 squares and


quadrant for VIP guest PLINTH LVL 0.45
GROUND LVL 0.00
house'
Making composition and
assigning spaces.
PLAN
SECTION BB '
Common cluster for all
VIP houses. CARPET AREA = 84 SQM
VVIP TOTAL NO. OF UNITS = 4
Central open dine area .

VVIP GUEST HOUSE

Using 2 squares and


PARAPET LEVEL +6.75
quadrant for VVIP guest FRONT ELEVATION 2ND FLOOR LEVEL +6.75
house'
Making composition and
assigning spaces. 1ST FLOOR LEVEL +3.45

Double storey with large


1ST FLOOR PLAN

courtyard in center of staircase. GROUND LVL 0.00

GROUND FLOOR PLAN


SECTION AA '
RESTAURANT

FRONT ELEVATION

2ND FLOOR LEVEL +9.6

GROUND FLOOR PLAN

Administration and restaurant is


1ST FLOOR LEVEL +3.6 connected through walkway and
pedestrian-bridge.

PLINTH LVL 0.0.6


1ST FLOOR PLAN

SECTION AA '

SIDE ELEVATION

2ND FLOOR LEVEL +9.6

1ST FLOOR LEVEL +3.6


GROUND FLOOR PLAN

PLINTH LVL 0.0.6


1ST FLOOR PLAN

SECTION AA ' ADMINISTRATION


WEEKEND

HOUSE
RESIDENTIAL

1
ST YEAR STUDIO PROJECT

The project was to design a


weekend house and the site , the
FRONT ELEVATION
site should consists of five
elements and weekend house is
design according ones needs.
SITE PLAN

The form of weekend house is The site consists of five elements : bolders ,
derived from interlocking model. water body, hill, trees, meadow.
Five interlocking models where AREA in between 1200-1400 sqm.
made from which one is selected RARE ELEVATION

and according to it internal


planning is done.

INTERLOCKING MODEL
'
SECTION AA

FLOATING

GROUND FLOOR PLAN

On ground floor as we enter


large landscaping court , the
court divide kitchen and hall .
Half house is floating on water
with glass floor cutout in floor.
On 1st floor terrace and playing
1
ST FLOOR PLAN area.
PROPOSED CONST. FOR SINGLE PROPOSED CONST. FOR SINGLE
FAMILY DWELLING UNIT FAMILY DWELLING UNIT
PLOT NO 50, CITY SURVEY NO.30 PLOT NO 50, CITY SURVEY NO.30
GANESH NAGAR, GANESH NAGAR,
17
NEAR GANESH MANDIR , NEAR GANESH MANDIR ,
NAGPUR- 440025 NAGPUR- 440025
B A
B A OWNER : OWNER :
10.58
MR. GAGAN RAJESH MALPANI MR. GAGAN RAJESH MALPANI
3.425 10.58 3 0.23 4.995 0.115 2.205 0.115 2.685 0.23

3
5.148 2.347 2.73
MRS. RANI GAGAN MALPANI MRS. RANI GAGAN MALPANI
0.23 5.253 0.115 4 0.115 0.861 0.115 5 0.115

1 M WIDE BALCONY
PLOT SIZE : 17 X 23 = 391 SQM PLOT SIZE : 17 X 23 = 391 SQM

0.6
W2 W3 W1
V1

0.23

0.23

0.23

0.23

0.23
2.703 1.8 0.75 0.647 1.2 3.13
PROPOSED PLAN : 295 SQ M 0.4 0.9 1.63 1.8 0.465 2.32
PROPOSED PLAN : 295 SQ M
D2
2.685

0.935

0.9

0.9

1.083
1.2
W3

1.45
DRESSING TOILET
UTILITY AREA (2.2X1.95)

2.15
D2

1.95

1.95

1.95
(2.68X1.95)

1.95

1.95
(4X1.95)

2.2
D2 SCHEDULE OF OPENING :-
SCHEDULE OF OPENING :-

0.9

1.05

0.75
D3
KITCHEN TYPE SIZE SILL LVL LINTEL LVL REMARK
(4.1X3.8)

3.565
4.115 TYPE SIZE SILL LVL LINTEL LVL REMARK
D1 1.2 X 2.1 - 2.10 T.W. SINGLE PANEL

0.115

0.115
1.2 X 2.1 - 2.10

0.17
T.W. SINGLE PANEL

0.17
D1
2,5 2.205 D2 0.9 X 2.1 - 2.10 T.W. SINGLE PANEL
0.3 0.9 X 2.1 - 2.10 T.W. SINGLE PANEL

2.585
0.75 X 2.1 - 2.10 T.W. SINGLE PANEL
5.065
D2

5.07
BEDROOM D3
UP (5x5.07)
0.75 X 2.1 - 2.10 T.W. SINGLE PANEL

0.9

0.9
D3 D4 1.8 X 2.1 - 2.10 ALUMINIUM SLIDING
1.8 X 2.1 - 2.10 ALUMINIUM SLIDING

4.28
+ 0.45 1 2 3 4 5 6 7 +1.57
D4 0.6 21 22 23 24 25 26 27 D5 2.7 X 2.1 - 2.10 ALUMINIUM SLIDING
8 -
D5 2.7 X 2.1 2.10 ALUMINIUM SLIDING 28 W2
W1 1.8 X 1.2 0.90 2.10 ALUMINIUM SLIDING
1.8 X 1.2 0.90 2.10

3.115
9 W2
W1 ALUMINIUM SLIDING 29
1.5 X 1.2 0.90 2.10 ALUMINIUM SLIDING
3.13

STAIRCASE AND W2
STAIRCASE AND

3.56
1.36

1.36
1.5 X 1.2 0.90 2.10

3.5

3.5
ALUMINIUM SLIDING

1.4

1.5
1.4
10 LANDSCAPING 10 1.2 X 1.2 0.90 2.10
LANDSCAPING W2
W3 ALUMINIUM SLIDING
0.3

(2.8X3.5) 11 W3 1.2 X 1.2 0.90 2.10 ALUMINIUM SLIDING 2.9


11 W4 3 X 1.2 0.90 2.10 ALUMINIUM SLIDING
DINNING

1.5
STORE POOJA

1.28
1.75 12 W4 3 X 1.2 0.90 2.10 ALUMINIUM SLIDING 12 0.6 X 0.9 1.20 2.10 VENTILATOR WINDOW
0.6

(3.5X3.5)
1.2

(1.93X1.20) (1.8X1.29) W2 V1
+ 3.65
20 19 18 17 16 15 14 13 + 2.53
V1 0.6 X 0.9 1.20 2.10 VENTILATOR WINDOW + 3.6520 19 18 17 16 15 14 13 + 2.53

4.095 0.9
0.3

0.9

0.9
1.8 DOWN DOWN
0.115

0.115
1.8 1 1.8 1
1.8 0.115 2.8 1.8 D2
2.8

0.17

0.17
1.915

0.115

0.115
3.815
C2

TOILET DREESING
1.654

1.663
1.691

1.691
(1.8X2.406) (1.8X2.406)

0.6
1.039
TOILET

0.935
DREESING

2.385
V1
2.406

2.406

V1

2.406
C TOILET (1.8X2.406) LOBBY
2.506

(1.8X2.406)
(2.4X1.8) C TOILET

2.126
1,8

1.8

1.8

1.8
LOBBY (2.4X1.8)

1.076
16.62
D3

0.75

0.75
D3 D3
0.75
0.6

0.6

0.75
V1 V1
2.4 2.4

0.115

0.115
D3
15.5

15,5
0.115

0.115

0.5
D2
3.6
D2
3.615
0.28

D2
2.815 0.904 D2

2.815 0.9

0.939
C1
0.6

0.93
0.6

16.82
23.000

1.564
W3
1.2

W1

W1

1.8
0.6 BEDROOM BEDROOM
3.804

3.844

3.835
(5x3.844) (5x3.844) FAMILY LIVING AND
THEATER

4.554
4.7

4.7
LIVING HALL (5.00x4.7)

1.799

3
(5x4.7)

4.554
W4
2.374

0.465
1.97
2.1 1.8 1.1
0.23

0.23

0.77
W1 1.012 1.8 W1 0.4 1.8 D4 0.23
5.115
1.2 1.008 1.8 0.992 2.7 2.3

0.23

0.23
W1
D5
0.23

ENT. LOBBY (SEMI OPEN SITING)


3.5

PARKING

3
(5.00X2.75)
(5.1x4.7)
3.5

2.75
4.1

2.75

2.75
4.815
4.7

4.7

GROUND FLOOR FIRST FLOOR

4.065
TERRACE
2 3

0.5
+ 0.45

PLAN PLAN
0.6
1.2

1.2

1.2
+- 0.00

UP
B'

0.115
A'
0.23 4.885 0.23 5 0.23
5.115 5.23 N
3.42 10.575 3 0.23 4.885 0.23 5 0.23
4.5

4.5

SCALE : 1:50 10.575 SCALE : 1:50


N B' A'
NOTE : ALL DIMENSION ARE IN METRES. NOTE : ALL DIMENSION ARE IN METRES.

ARCHITECTS NAME: ARCHITECTS NAME:


N N
YUKTA CHANDAK YUKTA CHANDAK

9 M WIDE ROAD ADDRESS : SAI PARK , FC ROAD 9 M WIDE ROAD ADDRESS : SAI PARK , FC ROAD
NAGPUR, MAHARASHTRA NAGPUR, MAHARASHTRA

EMAIL : chandak.yukta@gmail.com EMAIL : chandak.yukta@gmail.com

WORKING DRAWING
RESIDENCIAL
LOCATION: NAGPUR
Proposed const. for Single Family Dwelling Unit
Plot no. 50, city Survey no.30
Ganesh Nagar, near Ganesh Mandir,
Nagpur - 440025

OWNER :
Mr. Gagan Rajesh Malpani
Mrs. Rani Gagan Malpani
MANHOLE MAIN SEWER LINE

PARAPET LVL +10.05 INSPECTION


CHAMER

STAIRCASE + 9.35

PARAPET LVL 1 +7.9 0.6

I.C
I.C
0.23 1.95 0.115 0.23 1.95 0.115 0.23 1.95 0.115
0.675 0.6 0.675 EX5V1
V1 V1

FIRST FLOOR SLAB LVL + 6.85


G A B G A B
G A B
S.S DRAIN 0.075M WIDE
S.S DRAIN 0.075M WIDE AND AND 0.6 M LONG G

1
0.6 M LONG
WET AREA WET AREA CL70 WET AREA

1.185
1.185

1.185
CONCEALED BATH AND -0.036
CONCEALED BATH AND ±0.036 ±0.036
TOWEL HANGER SHOWER SYSTEM HT 1.2 TOWEL HANGER
SHOWER SYSTEM HT 1.2
12MM HOT WATER SUPPLY PIPE

LINTEL LVL 2 + 5.75 WL20


12 MM THICK GLASS PARTITION 0.75 TOILET DROP LINE 0.75 0.75
18MM COLD WATER SUPPLY PIPE(CPVC)

0.45
0.45

0.45
CERAMIC TILES COLOR DESCRIPTION
600X300X10MM DRY AREA CODE
DRY AREA DRY AREA
SOIL PIPE BRICK WALL WALL HUNG EWC -0.018 CONNECTION TO SB
±0.018 ±0.018
100 Ø MM
I.C 575X 360X 360MM CL69

0.45
0.45

0.45
IN SERIES
NAHANI TRAP HEALTH FAUCET
GULLY NAPKIN HOLDER
TRAP
LWM8

0.3
WASTE WATER CL70,EX5,GEYSER POINT,

0.3

0.3
SILL LVL 2 + 4.55 PIPE 50 Ø MM C C C
SB39 LWN8,5 AMP POINT 1.35 M
TABLE TOP BASIN
PILLAR COCK

0.3
0.3

0.3
TABLE TOP BASIN SB38 CL69 1.35 M
D D D SB39
LOVERED CUPBOARD
BELOW BASIN 0.75 D3 MARBEL 0.75 D3 0.75 D3

THRESHOLD
±0.00 ±0.00 ±0.00
1500X300X10MM
GROUND FLOOR SLAB LVL + 3.65
HOT WATER SUPPLY

ELECTRICAL LAYOUT
PLUMBING LAYOUT SANITARY FITTINGS AND
1.8 LEGEND:
FIXTURES & FLOORING LAYOUT
LINTEL LVL + 2.55

1.5
SPACE FOR DRY
LANDSCAPING
SILL LVL + 1.35

1.95 A 2.685 B 1.95 C 2.685 D

PLINTH LVL + 0.45 0.75 0.6 0.6 1.185 1.5 0.75 0.6 0.6 0.3 0.3 0.45 0.45 1.185

GROUND LVL +- 0.00


CONCEALED BATH
AND
VENTILATOR
SHOWER SYSTEM
TOWEL HANGER

FRONT ELEVATION I.C


DOOR

0.6
(SOUTH ELEVATION) I.C
NAPKIN
HOLDER

0.7 FLUSH

2.1
1.518
HEALTH

1.200
FAUCET

0.9

0.9
0.6

0.35
0.5

0.41
-0.036 -0.018 -0.036

LOVERED CUPBOARD WALL HUNG W.C


BELOW BASIN

ELEVATION
PARAPET LVL +10.05

STAIRCASE + 9.35

KITCHEN
GARDEN
SQUAT TOILET
PARAPET LVL 1 +7.9
CONCEALED BATH AND
NAHANI TRAP
18MM COLD WATER SHOWER SYSTEM HT 1.2
SUPPLY PIPE(CPVC) CERAMIC TILES
CISTEN LOVERED CUPBOARD 300X300X10MM
12MM HOT WATER
SUPPLY PIPE SQUAT TOILET SOIL PIPE BELOW BASIN SQUAT TOILET
100 Ø MM SOAP
HOLDER
FIRST FLOOR SLAB LVL + 6.85 0.9 0.6 0.9 0.9 0.6 0.9
STONE BLOCK GULLY
G
WALK PATH 0.6 0.23 0.44 0.23
TRAP
I.C 0.6 0.23 0.44 0.23

0.6

0.6
SPACE V1 V1

MARBEL THRESHOLD
LINTEL LVL 2 + 5.75 FOR WASTE WATER 1500X300X10MM

1,8

1,8
PIPE 50 Ø MM
PLANTS D3 D3

C TOILET C TOILET

0.75

0.75
(2.4X1.8) (2.4X1.8)
G

SILL LVL 2 + 4.55 2.4 2.4


3.6 3.6

1 MANHOLE PLUMBING LAYOUT SANITARY FITTINGS AND


GROUND FLOOR SLAB LVL + 3.65 300MMX300 MM PAVING FIXTURES & FLOORING LAYOUT
GROUND WATER PARKING TILES WELL
RECHAGE TO
KITCHEN GARDEN 0.9 0.6 0.9

LEGEND:
LWM5
LINTEL LVL + 2.55 RAINWATER 0.6 0.225 0.45 0.225 EX3
COLOR DESCRIPTION

0.6
HARVESTING SB23 V1 CODE
CONNECTION TO SB
PIT SB22

1,8
IN SERIES

CL46 CL45
D3

CL45,EX3,GEYSER POINT,LWN5,
C TOILET

0.75
SB22 5 AMP POINT 1.35 M

SILL LVL + 1.35


UNDERGROUND (2.4X1.8)
SB23 CL46 1.35 M
G
WATER
SUMP 2.4
MANHOLE 3.6

0.7
ELECTRICAL LAYOUT
GROUND LVL +- 0.00

NP

SIDE ELEVATION
(EAST ELEVATION)

STAIRCASE SLAB LVL + 9.35

STAIRCASE BLOCK
2.9

PARAPET LVL 1 +7.9


0.45
1.05

1.05
0.9
0.6

1
0.30.1

0.1

FIRST FLOOR SLAB LVL + 6.85


0.3
0.1

TOILET
TOILET

GRASS
3.1

300 300
FAMILY LIVING AND
2.8

2.8

3.4

(TERRACE) THEATER
STONE BLOCKS
SAND BEDDING
0.9

1
COURSE
0.1

GROUND FLOOR SLAB LVL + 3.65


0.05
0.10.3

AGGREGATE
0.1

SUNKEN SLAB LVL + 3.35

SOIL
0.2

0.3

TOILET
0.4

WATER PROOFING GATE LOCKING SET


0.05

LIVING HALL
W/ HANDLE
DETAIL
3.1

ENT. LOBBY 0.3


SLAB
2.8

SOIL
3.1
0.16

0.04 M THK FINISH FLOOR LVL LANDSCAPING CARRIAGE ASSEMBLY DETAIL


PLINTH LVL + 0.45
0.1

0.10.3

0.3

0.1M PPC BED


GROUND LVL +- 0.00
DETAILS OF STAIRCASE LANDSCAPING DETAILS OF STONE PATHWAY (KITCHEN GARDEN) DETAILS OF SLIDING DOOR
BOULDER EARTH FILLING
MUROOM SOLING

SECTION AA'
OUTSIDE WASH
MANHOLE MAIN SEWER LINE AREA
0.23 5.253 0.115 4 0.115 0.861

1.5
0.6
2.000
W2 W3

0.23
P
PURIFER

0.3

0.3
LOFT D2
OPEN CROCKERY UNIT TALL UNIT
SHELF

0.5
SHELF
0.5 1.053 0.6
0.5 BREAKFAST
2 TABLE
M CYLINDERS
DUST BIN,OIL CANS
SHELFS

INSPECTION

1.95
SELF
CABINETS
INSPECTION D2 UTILITY AREA
CHAMER INSPECTION (4X1.95)
CHAMER

PREPARATION
CHAMER KITCHEN

PLATFORM
2
COOKING AREA
SLOPE SLOPE (4.1X3.8)

2.385
I.C

0.9
I.C

5.065
D B
LOFT
C
0.5 0.5
0.65

0.155
SLOPE
GULLY GULLY

0.6
TRAP TRAP LOFT

0.9
FRIDGE

0.25
PURIFER TALL UNIT
SHELF
PASSAGE UTILITY AT GROUND FLOOR STORE POOJA

0.6

0.25
TAP ON TERRACE (1.93X1.20) (1.8X1.29)
/TOILET AT FIRST FLOOR
CROCKERY UNIT

1.2
SLOPE

0.115
OPEN SHELF
KITCHEN
BREAKFAST
TABLE
SLOPE

KITCHEN LAYOUT

0.15
TROLLEYS

0.2
NON RETURN
OVERHEAD VALVE
CABINETS
WATER TANK

0.6
0.55

0.05
OUTSIDE WASH
AREA
DRAIN PIPE

1.5
SLOPE 0.23 5.253 0.115 4 0.115 0.861

ELEVATION A

0.6
2.000

SLOPE
W2 W3
SCALE : 1:50

0.23
GULLY P
CORNER
D2

TRAP

0.5
TOILET OUTLET
UNIT
0.35
CROCKERY UNIT TALL UNIT

0.5 0.5

1
0.5 0.75
GULLY TOILET I.C DUST BIN,OIL CANS M BREAKFAST
CYLINDERS
TRAP SHELFS TABLE

1.95
S TRAY 2 NOS
SOLAR INLET

0.6
D2 UTILITY AREA
I.C PANEL INSPECTION (4X1.95)

0.6

PREPARATION
0.265
CHAMER KITCHEN

PLATFORM
COOKING AREA
(4.1X3.8)
INSPECTION HOOD AND HOB

0.685

0.6
CHAMER PANTRY
CULTLERY TRAY CABINETS
BOWLS 1 NO,PLATES 2 NO ,

0.3
BASKET PLANE 1 NO

5.065
0.5 0.5

0.6
0.65
A
D B
C

0.9
FRIDGE

0.6
STORE POOJA
LOFT
SLOPE (1.93X1.20) (1.8X1.29)

OPEN SHELF

0.115

0.3
TAP IN

0.6
PARKING

0.3
GLASS

CABINET LAYOUT

0.15
TROLLEYS

0.2
SLOPE

7.5
0.4
CABINETS

0.05
PUMP INSPECTION INSPECTION
CHAMER CHAMER
MANHOLE

ELEVATION D
I.C I.C
WELL OUTSIDE WASH SCALE : 1:50
18MM COLD WATER AREA
SUPPLY PIPE(CPVC)
12MM HOT WATER

1.5
0.23 SUPPLY PIPE 5.253 0.115 4 0.115 0.861
RAINWATER 2.000
GULLY GULLY

0.6
HARVESTING TRAP TRAP
W2 W3

PIT

0.23
P
D2

0.5
CROCKERY UNIT TALL UNIT
WASHING
MACHINE
0.5
UNDERGROUND DUST BIN,OIL CANS M CYLINDERS

WATER SHELFS

1.95
UTILITY AREA
SUMP D2

WATER METER MANHOLE (4X1.95)

PREPARATION
KITCHEN

PLATFORM
2
COOKING AREA
DIRECT
(4.1X3.8)

2.385
WATER

0.9
SUPPLY

A
CROCKERY UNIT
5.065

D B 0.5 0.5
C

DIRECT 0.65 CERAMIC TILE


WATER (300 X300 X 8 MM)
SUPPLY
0.9

FRIDGE

GLAZED VITRIFIED
(1200 X 600 X 10MM) GLASS
PARTITION
STORE POOJA
(1.93X1.20) (1.8X1.29)

WATER MAIN
0.115

LEGEND: BREAKFAST
TABLE

COLOR DESCRIPTION DIAMETER


CODE OF PIPES TROLLEYS

0.6
SOIL PIPE/WASTE WATER PIPE 100 MM

2.1
PLUMBING LAYOUT COLD WATER SUPPLY PIPE 75 MM
HANDLELESS

0.9
AND TILE LAYOUT HOT WATER SUPPLY PIPE 50 MM
CABINET

C.I. COVER

CEMENT CONCRETE PACKING


ELEVATION B
GL
SCALE : 1:50

12MM THK. PLASTER

10 CM GRAVEL LAYER 230MM THICK BRICKWALL

OUTSIDE WASH
AREA
10 CM CHARCOAL LAYER 0.23 5.253 0.115 4 0.115 0.861
1.5

100 MM DIA S.W PIPE

150 MM THICK PCC BED (1:4:8) 20MM THICK GRANITE TOP


0.6

2.000
TL3
W2 W3
0.23

25 CM SAND LAYER SECTION AA'


SB16
PURIFER WL7 DB
0.3

0.3

LOFT D2
OPEN CROCKERY UNIT
SHELF
SB17
TALL UNIT
W BP7
0.5

SHELF

0.5 CL41 SB18


BREAKFAST
CL40 2 CL39 BH1
TABLE
M CYLINDERS
DUST BIN,OIL CANS
SHELFS
CL43 CL44
19MM THICK PLYWOOD SHUTTER
1.95

SELF
CABINETS
CF5
SELF CABINETS D2 UTILITY AREA
(4X1.95)
CF4 WL8 WITH 1MM LAMINATE
PREPARATION

KC
25 CM GRAVEL LAYER KITCHEN
PLATFORM

SB19
2

0.525
COOKING AREA

(4.1X3.8)
2.385

CL42
0.9

150 MM THICK PCC BED (1:4:8)

PLYWOOD PARTION
230MM THICK BRICKWALL
CL37
5.065

LOFT CL38 0.5 0.5

DETAIL OF RAINWATER PIT 0.65


SB15
0.155

CHARCOAL FILTER S.W. PIPE 100 MM Ø


TL4 D
A

C
B
0.9

FRIDGE

A A' SS KITCHEN BASKET


STORE POOJA
(1.93X1.20) WL4 WL5(1.8X1.29) LEGEND:
COLOR DESCRIPTION
LWM4 CODE
SKIRTING
0.115

CONNECTION TO SB

IN SERIES

WL5, WL6, CF4,TL4, LMN4,(CL38,CL39),


SB15 5 AMP POINT,15 AMP POINT 1.35 M

PLAN SB16
WL7,(CL40,CL37), CF4, 5 AMP POINT,15
AMP POINT,BP6 1.35M DETAIL OF CABINET
(CL41, CL42),CF5,BH1,5AMP POINT,
SB17 1.05M
15 AMP POINT-2

INSPECTION CHAMBER SB18 BP7,(CL43,CL44), 15 AMP POINT


1.05M

ELECTRICAL LAYOUT SB19 WL8,BP7,TL3,15 AMP POINT,


5 AMP POINT
1.35M
BERG THROUGH MURKY
PROF. S A DESHPANDE STUDIO

DESIGN COMPETITION

A Humans have become EFECTS OF MELTING GLACIERS


GLACIERS MELTING N the dominant geologic
The Polar ice
caps melting as the sea levels T force altering the planet
H and with advanced AFLOAT STRUCTURE
rise, A World of flooded coastal Lands not
hard to visualize.
R technology, INTERIOR
So many species of birds and animals on the
O
P
modenization has taken
shape leading to human
SIGHT VIEWS
endangered list . O distancing themselves The structure will act as a scenic
Designing hopeful antidote to the to the C from nature. point for watching natural scenery.
environment concern of today that is glacier E Nothing not held One can see the panoramic view of
melting. N hostage by the hand of site and marine animals.
E Man. Without distributing the nature and
BUILDING WALLS NEAR SEAFLOOR animals , as it will be enclosed
structure.
TO STOP GLACIERS MELTING.
Despite the massive ice TOUCH
loss, we do still have time CATASTROPHES The structure will be having slightly
to save the glaciers from water waves coming inside to feel
their predicted the surrounding of site.
disappearance. DERANGEMENT One can touch the ice in the
surrounding from inside.
Block warmer water

APOCALYPTIC non human HEARING


voices of nature
Hot water
The sond of flowing water is
pure relaxation and calmness.
Glacier

The structures would not just be aimed at


holding back the melting glaciers, but at
preventing warmer water from reaching the
bases of the glaciers under the sea.
Also help in creating ice sheets artificially. CLIMATE HUMAN-CENTERED

It will act as habitable for marine animals. CHANGE


Scenic point for humans. VIEW TOUCH

MODULE
BERG THROUGH AFLOAT
Prefabricated basic module of three
MURKY The floating structure above
acting as gallery. units.


Repetition of basic module to get
required form and used where melt
rate is more.
SUBMERGED
The extension of floor will be
submerged aimed at holding back
the melting glaciers and
preventing from warmer water.
COOLING SYSTEM
The cooling system will help to
reduce temperature and
making the ice .
It will act as habitat for sea
animals.
Eco wave power technology is FACADE
used to generate electricity
needed to operate the cooling The opposite color of facade gives
system. contradictory feel with respect to site.
This system is Environment The textured facade defines the feel of
Friendly and do not disturb the overall structure.
local marine life. Black color on exterior absorb between
70 to 90% of the sun's energy so all
the heat will be absorbed by structure.
Then absorbed heat will be converted
into electricity.
SITE : The site i have chosen is Antarctica , as Antarctica contains 90% of
the world's glacier ice.
Largest contributor to sea-level rise
COMPETITION

WORK ( GROUP)

AR.SUNIL TOYE LANDSCAPE

COMPETITION

RACHAYATA” YOUNG ARCHITECTS

COMPETITIONS
HAND-RENDER SHEETS
INTERIOR
WORK

COMPETITION)
(

OFFICE DESIGN
Office Layout is
CUBICLES designed to have
interactive spaces.
Biophilic design - A
green workspace
has the power to
boost moods,
performance, and
DISCUSSION AREA OFFICE FOR HIGHER LEVEL EMPLOYEES WAITING AREA wellness.
Activity-Based
Working

CENTRAL CUTOUT

OPEN CUBICLE OPEN WORKSTATION FORMAL DESKS


MURAL DESIGN
Competition by Birla group
The location chosen was Nagpur Airport.
To shows and tempt tourist to try nagpurian
cuisine filled with spices.
The mural has all well known street food of nagpur.

SCRAP TO SCULPTURE MODEL MAKING


Sculpture making from scrap.
PHOTOGRAPHY

SKETCHES
“ONE OF THE GREAT BEAUTIES OF ARCHITECTURE IS THAT EACH
TIME, IT IS LIKE LIFE STARTING ALL OVER AGAIN.”

– RENZO PIANO

YUKTA CHANDAK
7447335478
chandak.yukta@gmail.com

You might also like