Survey Volume AnsafBP 2021

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

PIT BP

Original Data 2017 : INPUT INPUT INPUT INPUT TC INPUT


Period Keterangan OB CUM SEAM2 SEAM4
No. Month Descriptions Join Survey
Form To Duration OB SEAM 2 OB SEAM 5 OB ALL OB+SIDECAST OB COAL CUM COAL GETTING COAL CUM
TC OB
BCM BCM BCM SIDECAST OB REMOVAL BCM BCM BCM
4 Oct-21 wk1 1-Oct-21 10-Oct-21 10 days 11-Oct-21 1,854,622.25 3,786,659.52 5,641,281.77 132,903.44 - 127,942.44 124,985.00 255,850.03 682.77 3,756.83
wk2 11-Oct-21 17-Oct-21 7 days 18-Oct-21 1,854,622.25 3,895,056.09 5,749,678.34 108,396.57 - 104,051.57 107,120.00 256,229.48 379.45 4,078.59
INPUT INPUT INPUT TC
SEAM4 SEAM5 SEAM ALL DIFFERENT
CO Getting RITASE COAL
COAL GETTING COAL CUM COAL GETTING Adjust COAL % OB %
BCM BCM BCM BCM TON TON TON Ton (TON) (BCM)
558.46 480,809.92 8,612.10 9,853.34 12,809.34 12,809.34 13,869.31 (1,059.97) -7.64% 2,957.44 2.37%
321.75 487,164.11 6,354.19 7,055.40 9,172.02 9,172.02 8,357.63 814.39 9.74% -3,068.43 -2.86%
8-Sep EXCA.KobEXCA-02 RUDI HA NIGHT 11,264.2 11,265.7 1.50 GNR SIDE CAST
9-Sep EXCA.KobEXCA-02 RUDI HA NIGHT 11,266.2 11,267.8 1.60 GNR SIDE CAST
10-Sep EXCA.HitaEXCA-09 RUDI HA NIGHT 10,149.4 10,159.7 10.30 GNR SIDE CAST
11-Sep EXCA.HitaEXCA-09 ARIF SA Day 10,158.5 10,166.5 8.00 GNR SIDE CAST
11-Sep EXCA.KobEXCA-02 RUDI HA NIGHT 11,267.8 11,268.3 0.50 GNR SIDE CAST
11-Sep EXCA.HitaEXCA-09 RUDI HA NIGHT 10,166.5 10,171.7 5.20 GNR SIDE CAST

PC400 3.60 215 1


pc300 23.50 110 1
SIDE CAST
SIDE CAST
SIDE CAST
SIDE CAST
SIDE CAST
SIDE CAST

774.00
2,585.00