Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

PT GEMILANG BINA LINTAS TIRTA

SHIP MANAGEMENT
PRE DEPARTURE CHECKLIST ( BRIDGE )(14.05.2009) D – 03

VESSEL: PORT :
BERTH : DATE :
1. Passage plan prepared, charts and publication corrected Yes / No
2. Radars and plotting aids operative Yes / No
3. Gyro compass and repeaters oriented and aligned Yes / No
4. Magnetic compass checked, gyro azimuth rings available Yes / No
5. Electronic navigation aids position checked, D/F checked (inc. G.P.S. & Satnav) Yes / No
6. AIS (Automatic Identification System) switched on / set to high power and all
Yes / No
necessary information fed in.
7. Course and engine recorders on and aligned Yes / No
8. Chronometer correct, clocks synchronized Yes / No
9. Speed/distance recorder set Yes / No
10. Weather fax/navtex operational Yes / No
11. Communications internal and external tested Yes / No
12. Steering gear and rudder indicators checked Yes / No
13. Bow thruster checked (If applicable) Yes / No / NA
14. Navigation and NUC lights and shapes tested Yes / No
15. Whistle, signaling lamps operative Yes / No
16. Binoculars clean and available Yes / No
17. Latest weather reports and nav. warnings available Yes / No
18. Anchor cleared Yes / No
19. Deck power available Yes / No
20. Crew on board and informed departure time:
Yes / No
Chief Engineer/Engine room informed departure time:
21. Pilot embark/disembarking arrangements satisfactory Yes / No
22. Pilot card (Bridge Procedures Guide Part A Annex 1) Yes / No
23. Deck secure for sea Yes / No
24. Telegraphs/rev counters/main engine controls operative Yes / No
25. Stowaway check Yes / No
MASTER : OOW :

Note: This form to be completed no sooner than 2 hours prior to berthing. An entry is to be made in the
deck log book referring to this form.

Page 1 of 1

You might also like