Project: Bungalow - Welly76**********************7 (11111111)

PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-1

PAD/PILE FOOTING RESULTS

F3
--------------------------------------------------------------------------------
Column: 1C3
bx = 350.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -942.4 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 3000.0 mm Ly = 3000.0 mm
h = 500.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 134.661 kN/m2 S-min = 134.661 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 1000.0 mm2/m
X Dir: Footing Design: M = 118.2 kN.m/m
K/K' = 0.20 < 1.0
As = 1000.0 mm2/m T16-110
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.46 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.32 N/mm2 < vc = 0.49 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 1202.5 kN V-eff = 1202.5 kN
v = 2.85 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 938.5 kN V-eff = 938.5 kN
v = 0.43 N/mm2 < vc = 0.49 N/mm2
Y Dir: Footing Design: M = 132.0 kN.m/m
K/K' = 0.24 < 1.0
As = 1000.0 mm2/m T16-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.50 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.37 N/mm2 < vc = 0.46 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 1202.5 kN V-eff = 1202.5 kN
v = 2.85 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 938.5 kN V-eff = 938.5 kN
v = 0.43 N/mm2 < vc = 0.46 N/mm2

F4
--------------------------------------------------------------------------------
Column: 1C4
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -403.9 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1900.0 mm Ly = 1900.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 139.452 kN/m2 S-min = 139.452 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 50.4 kN.m/m
K/K' = 0.15 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.41 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.27 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 497.8 kN V-eff = 497.8 kN
v = 2.19 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 349.1 kN V-eff = 349.1 kN
v = 0.29 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 50.4 kN.m/m
K/K' = 0.17 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.43 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-2

v = 0.29 N/mm2 < vc = 0.53 N/mm2


Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 497.8 kN V-eff = 497.8 kN
v = 2.19 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 349.1 kN V-eff = 349.1 kN
v = 0.29 N/mm2 < vc = 0.53 N/mm2

F5
--------------------------------------------------------------------------------
Column: 1C5
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 5 ((G+Q)P22 *F)
N = -332.2 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1800.0 mm Ly = 1800.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 130.076 kN/m2 S-min = 130.076 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 41.6 kN.m/m
K/K' = 0.13 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.36 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.23 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 416.2 kN V-eff = 416.2 kN
v = 1.83 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 277.5 kN V-eff = 277.5 kN
v = 0.23 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 41.6 kN.m/m
K/K' = 0.14 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.38 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.25 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 416.2 kN V-eff = 416.2 kN
v = 1.83 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 277.5 kN V-eff = 277.5 kN
v = 0.23 N/mm2 < vc = 0.53 N/mm2

F6
--------------------------------------------------------------------------------
Column: 1C6
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -320.7 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1700.0 mm Ly = 1700.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 138.535 kN/m2 S-min = 138.535 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 39.0 kN.m/m
K/K' = 0.12 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.36 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.22 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 394.8 kN V-eff = 394.8 kN
v = 1.74 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 247.0 kN V-eff = 247.0 kN
v = 0.21 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 39.0 kN.m/m
K/K' = 0.13 < 1.0

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-3

As = 800.0 mm2/m T16-160


Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.38 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.24 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 394.8 kN V-eff = 394.8 kN
v = 1.74 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 247.0 kN V-eff = 247.0 kN
v = 0.21 N/mm2 < vc = 0.53 N/mm2

F7
--------------------------------------------------------------------------------
Column: 1C7
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -405.2 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1900.0 mm Ly = 1900.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 139.809 kN/m2 S-min = 139.809 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 50.5 kN.m/m
K/K' = 0.15 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.41 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.27 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 499.1 kN V-eff = 499.1 kN
v = 2.20 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 350.0 kN V-eff = 350.0 kN
v = 0.29 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 50.5 kN.m/m
K/K' = 0.17 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.43 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.29 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 499.1 kN V-eff = 499.1 kN
v = 2.20 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 350.0 kN V-eff = 350.0 kN
v = 0.29 N/mm2 < vc = 0.53 N/mm2

F8
--------------------------------------------------------------------------------
Column: 1C8
bx = 350.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -717.2 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2600.0 mm Ly = 2600.0 mm
h = 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 134.844 kN/m2 S-min = 134.844 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 900.0 mm2/m
X Dir: Footing Design: M = 85.3 kN.m/m
K/K' = 0.19 < 1.0
As = 900.0 mm2/m T16-130
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.44 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.31 N/mm2 < vc = 0.50 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 902.1 kN V-eff = 902.1 kN
v = 2.46 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-4

Vt = 692.4 kN V-eff = 692.4 kN


v = 0.41 N/mm2 < vc = 0.50 N/mm2
Y Dir: Footing Design: M = 97.1 kN.m/m
K/K' = 0.23 < 1.0
As = 900.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.50 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.36 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 902.1 kN V-eff = 902.1 kN
v = 2.46 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 692.4 kN V-eff = 692.4 kN
v = 0.41 N/mm2 < vc = 0.48 N/mm2

F9
--------------------------------------------------------------------------------
Column: 1C9
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -451.4 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2100.0 mm Ly = 2100.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 129.928 kN/m2 S-min = 129.928 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 58.6 kN.m/m
K/K' = 0.18 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.42 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.29 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 567.8 kN V-eff = 567.8 kN
v = 2.50 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 429.2 kN V-eff = 429.2 kN
v = 0.36 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 58.6 kN.m/m
K/K' = 0.20 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.45 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.32 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 567.8 kN V-eff = 567.8 kN
v = 2.50 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 429.2 kN V-eff = 429.2 kN
v = 0.36 N/mm2 < vc = 0.53 N/mm2

F10
--------------------------------------------------------------------------------
Column: 1C10
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -360.6 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1800.0 mm Ly = 1800.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 138.851 kN/m2 S-min = 138.851 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 44.4 kN.m/m
K/K' = 0.13 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.38 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.24 N/mm2 < vc = 0.48 N/mm2

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-5

Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)


Vt = 444.3 kN V-eff = 444.3 kN
v = 1.96 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 296.2 kN V-eff = 296.2 kN
v = 0.25 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 44.4 kN.m/m
K/K' = 0.15 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.40 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.26 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 444.3 kN V-eff = 444.3 kN
v = 1.96 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 296.2 kN V-eff = 296.2 kN
v = 0.25 N/mm2 < vc = 0.53 N/mm2

F11
--------------------------------------------------------------------------------
Column: 1C11
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -139.7 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 1200.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 124.505 kN/m2 S-min = 124.505 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 15.6 kN.m/m
K/K' = 0.05 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.21 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.09 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 174.3 kN V-eff = 174.3 kN
v = 0.77 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 41.5 kN V-eff = 41.5 kN
v = 0.03 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 15.6 kN.m/m
K/K' = 0.05 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.23 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.10 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 174.3 kN V-eff = 174.3 kN
v = 0.77 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 41.5 kN V-eff = 41.5 kN
v = 0.03 N/mm2 < vc = 0.53 N/mm2

F12
--------------------------------------------------------------------------------
Column: 1C12
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -433.4 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2000.0 mm Ly = 2000.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 135.918 kN/m2 S-min = 135.918 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 55.0 kN.m/m
K/K' = 0.17 < 1.0
As = 800.0 mm2/m T16-200

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-6

Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)


v = 0.42 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.28 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 538.2 kN V-eff = 538.2 kN
v = 2.37 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 393.3 kN V-eff = 393.3 kN
v = 0.33 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 55.0 kN.m/m
K/K' = 0.19 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.44 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.31 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 538.2 kN V-eff = 538.2 kN
v = 2.37 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 393.3 kN V-eff = 393.3 kN
v = 0.33 N/mm2 < vc = 0.53 N/mm2

F13
--------------------------------------------------------------------------------
Column: 1C13
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -545.7 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2300.0 mm Ly = 2300.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 130.722 kN/m2 S-min = 130.722 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 72.1 kN.m/m
K/K' = 0.22 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.47 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.34 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 686.3 kN V-eff = 686.3 kN
v = 3.02 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 546.8 kN V-eff = 546.8 kN
v = 0.46 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 72.1 kN.m/m
K/K' = 0.24 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.50 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.37 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 686.3 kN V-eff = 686.3 kN
v = 3.02 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 546.8 kN V-eff = 546.8 kN
v = 0.46 N/mm2 < vc = 0.53 N/mm2

F16
--------------------------------------------------------------------------------
Column: 1C16
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -506.2 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2200.0 mm Ly = 2200.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 132.149 kN/m2 S-min = 132.149 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-7

As-min (Both Dir's) = 800.0 mm2/m


X Dir: Footing Design: M = 66.1 kN.m/m
K/K' = 0.20 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.45 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.32 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 634.3 kN V-eff = 634.3 kN
v = 2.79 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 493.4 kN V-eff = 493.4 kN
v = 0.41 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 66.1 kN.m/m
K/K' = 0.22 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.48 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.35 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 634.3 kN V-eff = 634.3 kN
v = 2.79 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 493.4 kN V-eff = 493.4 kN
v = 0.41 N/mm2 < vc = 0.53 N/mm2

F17
--------------------------------------------------------------------------------
Column: 1C17
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -541.6 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2200.0 mm Ly = 2200.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 139.468 kN/m2 S-min = 139.468 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 69.7 kN.m/m
K/K' = 0.21 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.48 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.34 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 669.4 kN V-eff = 669.4 kN
v = 2.95 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 520.7 kN V-eff = 520.7 kN
v = 0.44 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 69.7 kN.m/m
K/K' = 0.23 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.51 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.37 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 669.4 kN V-eff = 669.4 kN
v = 2.95 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 520.7 kN V-eff = 520.7 kN
v = 0.44 N/mm2 < vc = 0.53 N/mm2

F20
--------------------------------------------------------------------------------
Column: 1C20
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -90.1 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h = 400.0 mm h-Tap = 0.0 mm

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-8

Soil Stresses:
S-max = 117.506 kN/m2 S-min = 117.506 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 9.4 kN.m/m
K/K' = 0.03 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.16 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.04 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 112.8 kN V-eff = 112.8 kN
v = 0.50 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v = 0.00 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 9.4 kN.m/m
K/K' = 0.03 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.17 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.05 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 112.8 kN V-eff = 112.8 kN
v = 0.50 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v = 0.00 N/mm2 < vc = 0.53 N/mm2

F23
--------------------------------------------------------------------------------
Column: 1C23
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -469.3 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2100.0 mm Ly = 2100.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 133.994 kN/m2 S-min = 133.994 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 60.5 kN.m/m
K/K' = 0.18 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.44 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.30 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 585.6 kN V-eff = 585.6 kN
v = 2.58 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 442.6 kN V-eff = 442.6 kN
v = 0.37 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 60.5 kN.m/m
K/K' = 0.20 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.46 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.33 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 585.6 kN V-eff = 585.6 kN
v = 2.58 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 442.6 kN V-eff = 442.6 kN
v = 0.37 N/mm2 < vc = 0.53 N/mm2

F24
--------------------------------------------------------------------------------
Column: 1C24
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -583.3 kN Mx = 0.0 kN.m

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-9

My = 0.0 kN.m
Footing Dimensions:
Lx = 2300.0 mm Ly = 2300.0 mm
h = 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 139.022 kN/m2 S-min = 139.022 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 900.0 mm2/m
X Dir: Footing Design: M = 76.6 kN.m/m
K/K' = 0.17 < 1.0
As = 900.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.43 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.29 N/mm2 < vc = 0.44 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 729.9 kN V-eff = 729.9 kN
v = 2.73 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 534.6 kN V-eff = 534.6 kN
v = 0.33 N/mm2 < vc = 0.44 N/mm2
Y Dir: Footing Design: M = 76.6 kN.m/m
K/K' = 0.18 < 1.0
As = 900.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.45 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.31 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 729.9 kN V-eff = 729.9 kN
v = 2.73 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 534.6 kN V-eff = 534.6 kN
v = 0.33 N/mm2 < vc = 0.48 N/mm2

F25
--------------------------------------------------------------------------------
Column: 1C25
bx = 250.0 mm by = 250.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -486.3 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2100.0 mm Ly = 2100.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 137.815 kN/m2 S-min = 137.815 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 59.0 kN.m/m
K/K' = 0.18 < 1.0
As = 800.0 mm2/m T16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.44 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.30 N/mm2 < vc = 0.48 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 599.2 kN V-eff = 599.2 kN
v = 2.11 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 440.4 kN V-eff = 440.4 kN
v = 0.35 N/mm2 < vc = 0.48 N/mm2
Y Dir: Footing Design: M = 59.0 kN.m/m
K/K' = 0.20 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.46 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.32 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 599.2 kN V-eff = 599.2 kN
v = 2.11 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 440.4 kN V-eff = 440.4 kN
v = 0.35 N/mm2 < vc = 0.53 N/mm2

F26
--------------------------------------------------------------------------------

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-10

Column: 1C26
bx = 200.0 mm by = 350.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -873.6 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2900.0 mm Ly = 2900.0 mm
h = 500.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 133.829 kN/m2 S-min = 133.829 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 1000.0 mm2/m
X Dir: Footing Design: M = 122.0 kN.m/m
K/K' = 0.20 < 1.0
As = 1000.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.46 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.33 N/mm2 < vc = 0.43 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 1116.1 kN V-eff = 1116.1 kN
v = 2.64 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 853.7 kN V-eff = 853.7 kN
v = 0.39 N/mm2 < vc = 0.43 N/mm2
Y Dir: Footing Design: M = 108.8 kN.m/m
K/K' = 0.20 < 1.0
As = 1000.0 mm2/m T16-90
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.45 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.32 N/mm2 < vc = 0.54 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 1116.1 kN V-eff = 1116.1 kN
v = 2.64 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 853.7 kN V-eff = 853.7 kN
v = 0.39 N/mm2 < vc = 0.54 N/mm2

F28
--------------------------------------------------------------------------------
Column: 2C28
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 2 ((G+Q)P11 *F)
N = -180.3 kN Mx = 7.7 kN.m
My = 6.2 kN.m
Footing Dimensions:
Lx = 1500.0 mm Ly = 1500.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 132.475 kN/m2 S-min = 82.888 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 27.1 kN.m/m
K/K' = 0.08 < 1.0
As = 800.0 mm2/m T16-190
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.29 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.16 N/mm2 < vc = 0.49 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 238.0 kN V-eff = 249.0 kN
v = 1.10 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 123.1 kN V-eff = 134.1 kN
v = 0.11 N/mm2 < vc = 0.49 N/mm2
Y Dir: Footing Design: M = 27.3 kN.m/m
K/K' = 0.09 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.31 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.18 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 238.0 kN V-eff = 249.0 kN
v = 1.10 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 123.1 kN V-eff = 132.0 kN

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-11

v = 0.11 N/mm2 < vc = 0.53 N/mm2

F29
--------------------------------------------------------------------------------
Column: 2C29
bx = 200.0 mm by = 200.0 mm
Effects: Critical Combination = 4 ((G+Q)P21 *F)
N = -57.6 kN Mx = 3.0 kN.m
My = 4.1 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 1200.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 92.237 kN/m2 S-min = 42.724 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 11.2 kN.m/m
K/K' = 0.03 < 1.0
As = 800.0 mm2/m T16-190
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.16 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.07 N/mm2 < vc = 0.49 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 94.5 kN V-eff = 100.4 kN
v = 0.44 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 22.5 kN V-eff = 26.8 kN
v = 0.02 N/mm2 < vc = 0.49 N/mm2
Y Dir: Footing Design: M = 11.0 kN.m/m
K/K' = 0.04 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.17 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.07 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 94.5 kN V-eff = 100.4 kN
v = 0.44 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 22.5 kN V-eff = 28.4 kN
v = 0.02 N/mm2 < vc = 0.53 N/mm2

F19
--------------------------------------------------------------------------------
Columns: 1C22, 1C19
bx = 1195.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -575.4 kN Mx = 67.5 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2595.0 mm Ly = 2595.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 136.086 kN/m2 S-min = 89.748 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 32.3 kN.m/m
K/K' = 0.10 < 1.0
As = 800.0 mm2/m T16-40
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.33 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.19 N/mm2 < vc = 0.82 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 733.4 kN V-eff = 829.6 kN
v = 1.05 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 517.2 kN V-eff = 613.4 kN
v = 0.35 N/mm2 < vc = 0.82 N/mm2
Y Dir: Footing Design: M = 97.6 kN.m/m
K/K' = 0.33 < 1.0
As = 940.8 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.59 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.45 N/mm2 < vc = 0.53 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-12

Vt = 733.4 kN V-eff = 829.6 kN


v = 1.05 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 517.2 kN V-eff = 517.2 kN
v = 0.29 N/mm2 < vc = 0.53 N/mm2

F27
--------------------------------------------------------------------------------
Columns: 1C28, 1C27
bx = 200.0 mm by = 1188.2 mm
Effects: Critical Combination = 2 ((G+Q)P11 *F)
N = -23.8 kN Mx = 0.2 kN.m
My = 2.1 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1788.2 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 44.976 kN/m2 S-min = 35.904 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 3.6 kN.m/m
K/K' = 0.01 < 1.0
As = 800.0 mm2/m T16-50
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.07 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.02 N/mm2 < vc = 0.79 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 62.7 kN V-eff = 65.8 kN
v = 0.08 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v = 0.00 N/mm2 < vc = 0.79 N/mm2
Y Dir: Footing Design: M = 2.0 kN.m/m
K/K' = 0.01 < 1.0
As = 800.0 mm2/m T16-160
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.05 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.00 N/mm2 < vc = 0.52 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 62.7 kN V-eff = 65.8 kN
v = 0.08 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v = 0.00 N/mm2 < vc = 0.52 N/mm2

F1
--------------------------------------------------------------------------------
Columns: 1C2, 1C1
bx = 200.0 mm by = 1250.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -712.6 kN Mx = 0.0 kN.m
My = 173.0 kN.m
Footing Dimensions:
Lx = 3150.0 mm Ly = 3150.0 mm
h = 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 133.703 kN/m2 S-min = 67.292 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 900.0 mm2/m
X Dir: Footing Design: M = 145.4 kN.m/m
K/K' = 0.32 < 1.0
As = 1129.5 mm2/m T16-140
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.58 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.44 N/mm2 < vc = 0.49 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 972.1 kN V-eff = 1187.9 kN
v = 1.23 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 725.1 kN V-eff = 725.2 kN
v = 0.31 N/mm2 < vc = 0.49 N/mm2
Y Dir: Footing Design: M = 57.3 kN.m/m
K/K' = 0.14 < 1.0
As = 900.0 mm2/m T16-220
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-13

v = 0.39 N/mm2 < v-max = 4.00 N/mm2


Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.26 N/mm2 < vc = 0.44 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 972.1 kN V-eff = 1187.9 kN
v = 1.23 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 725.1 kN V-eff = 941.0 kN
v = 0.41 N/mm2 < vc = 0.44 N/mm2

F18
--------------------------------------------------------------------------------
Columns: 1C18, 1C21
bx = 1195.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -281.9 kN Mx = 24.7 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1895.0 mm Ly = 1895.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 127.658 kN/m2 S-min = 84.048 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 7.7 kN.m/m
K/K' = 0.02 < 1.0
As = 800.0 mm2/m T16-250
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.15 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.03 N/mm2 < vc = 0.44 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 354.8 kN V-eff = 390.1 kN
v = 0.49 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 169.1 kN V-eff = 204.4 kN
v = 0.12 N/mm2 < vc = 0.44 N/mm2
Y Dir: Footing Design: M = 45.8 kN.m/m
K/K' = 0.15 < 1.0
As = 800.0 mm2/m T16-250
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.39 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.26 N/mm2 < vc = 0.46 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 354.8 kN V-eff = 390.1 kN
v = 0.49 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 169.1 kN V-eff = 169.1 kN
v = 0.10 N/mm2 < vc = 0.46 N/mm2

F14
--------------------------------------------------------------------------------
Columns: 1C14, 1C15
bx = 2750.0 mm by = 200.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -933.7 kN Mx = 9.9 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 4450.0 mm Ly = 1900.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 139.375 kN/m2 S-min = 136.212 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
140.000 kN/m2
As-min (Both Dir's) = 800.0 mm2/m
X Dir: Footing Design: M = 50.3 kN.m/m
K/K' = 0.15 < 1.0
As = 800.0 mm2/m T16-30
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.41 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.27 N/mm2 < vc = 0.90 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 1089.3 kN V-eff = 1103.4 kN
v = 0.66 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 642.9 kN V-eff = 657.0 kN
v = 0.25 N/mm2 < vc = 0.90 N/mm2

Project: Bungalow
Project: Bungalow - Welly76**********************7 (11111111)
PAD/PILE FOOTING RESULTS Orion Building Design System 15.1 (01.2009) / Page: FTG-14

Y Dir: Footing Design: M = 50.3 kN.m/m


K/K' = 0.17 < 1.0
As = 800.0 mm2/m T16-250
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v = 0.43 N/mm2 < v-max = 4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v = 0.29 N/mm2 < vc = 0.46 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 1089.3 kN V-eff = 1103.4 kN
v = 0.66 N/mm2 < v-max = 4.00 N/mm2
Punching Check (At '1.5d') (BS8110-Cl.3.7.6.4)
Vt = 642.9 kN V-eff = 642.9 kN
v = 0.24 N/mm2 < vc = 0.46 N/mm2

Project: Bungalow