2.1 ODN
FO distribution core aerial type SM G.652.D-
a
ADSS
24 cores meter
36 cores meter
48 cores meter
Fiber Distribution Terminal (FDT) SC/APC c/w
b Box, matrix terminal, Patchtray, Pigtail, label &
accessories include concrete base
48 cores capacity pole mounted FDT set
72 cores capacity pole mounted FDT set
96 cores capacity pole mounted FDT set
144 cores capacity ground mounted FDT set
288 cores capacity ground mounted FDT set
576 cores capacity ground mounted FDT set
c Optical Splitter (Bracket Mount Type, SC/APC)
Splitter 1:4 unit
Splitter 1:8 unit
d Micro Splitter (PLC Type)
Micro Splitter 1:4 unit
Micro Splitter 1:8 unit
Fiber Access Terminal (FAT) c/w adapter, pigtail
e
SC/APC, label & accessories
Pole mounted outdoor type (16 ports type) unit
f Joint Closure unit
Fiber Optic Joint Closure Type In-line 24 Core unit
Fiber Optic Joint Closure Type In-line 36 Core unit
Fiber Optic Joint Closure Type In-line 48 Core unit
Fiber Optic Joint Closure Type Dome 24 Core unit
Fiber Optic Joint Closure Type Dome 36 Core unit
Fiber Optic Joint Closure Type Dome 48 Core unit
g Splicing core
h Label Cable (on pole, in Handhole) pcs 12,240
i Label FDT pcs 18,360
j Label FAT (include QR Code) pcs 12,240
k Label Pole pcs 7,650
2.2 Pekerjaan OSP termasuk ATP Civil Work
Hand hole include cover, cable hanger and
a set
accessories for FDT
b Precast Hand hole for FDT set
c Public Right of Way (ROW)/Permit Aerial meter
Kementerian Permit - Balai Besar (Balai Nasional) meter
PU Permit meter
Landlord Permit meter
KAI Permit meter
Community Permit meter
Pengelola Tol Permit meter
Pengelola LRT meter
RT/RW Permit meter
Pemerintah Daerah Permit
Instalasi Kabel lintas udara termasuk pondasi,
2.3 bracket, aksesoris, perkuatan tiang termasuk
ATP Civil Work
Pengadaan & pemasangan Tiang 7 meter 5",
a set
STEL L-003 1996
Pengadaan & pemasangan Tiang Tunggal 9
b set
meter 5", STEL L-003 1996
Pengadaan & pemasangan Tiang Tunggal 7
c set
meter 3", STEL L-003 1996
d Perkuatan Tiang
Temberang (perkuatan tiang termasuk sling,
set
anchor dan aksesories)
e Cable loop holder/plat strip/Cable hanger set
f Instalasi strand wire/sling messenger 6 mm meter 12,240
g Pole Accessories detail set
1. Plate belt 20mm pcs
2. Suspension clamp pcs
3. Steel hoop and rubber tape pcs
4. Buldog grip pcs
5. Span wartel 3/8” pcs
6. Steel wire meter
7. Riser pipe 1,5" pcs 135,870
8. Galvanized steel pipe 2" pcs 201,960
9. Steel clamp pcs
10. Pole clamp single pcs
11. Pole clamp 2 cable installation pcs
12. Dead end/clamp buaya pcs
13. Bahan Pondasi tiang pcs 27,540
Pekerjaan Aktivasi, Integrasi, Testing &
2.4
Commissioning
Testing & Commissioning (Testcomm / Uji
Terima) :
a Testcomm OTDR & OPM ODF - FDT core
b Testcomm OTDR & OPM FDT - FAT core
2.5 Documentation
a Survey & Design (Asplan) meter
As Built Drawing A1 (1 set asli + 3 set copy + soft
b set per site
copy), KMZ, BOQ
c Foto Dokumentasi set per site
AERIAL
PriceList Subcont
Service
2,160
2,280
2,400
192,000
192,000
192,000
1,560,000
1,920,000
2,400,000
13,592
13,592
13,592
13,592
61,500
30,000
30,000
30,000
30,000
30,000
30,000
30,000
4,920
6,150
9,225
6,150
984,000
150,675
162,975
138,375
59,963
11,993
3,383
15,375
10,500
10,500
615
780,000
400,000
No. Description UOM
2.1 ODN
36 cores meter
48 cores meter
b Joint Closure
c Splicing core
2,280
2,400
2,700
2,880
49,200
49,200
49,200
49,200
49,200
49,200
30,000
4,920
6,150
59,963
21,525
2,921,250
3,905,250
8,087,250
150,675
162,975
215,250
59,963
199,875
199,875
11,993
12,240 3,383
15,375
135,870
201,960
27,540
153,750
153,750
110,700
215,250
215,250
215,250
215,250
215,250
215,250
215,250
215,250
15,375
15,375
15,375
15,375
15,375
5,228
5,228
5,228
5,228
10,500
615
780,000
400,000
UG
PriceList Subcont
No. Description UOM
Material
24 cores meter
36 cores meter
48 cores meter
Service
2,160
2,280
2,400
192,000
192,000
192,000
1,560,000
1,920,000
2,400,000
13,592
13,592
-
13,592
13,592
-
92,250
-
30,000
30,000
30,000
30,000
30,000
30,000
100,862
30,000
4,920
6,150
9,225
6,150
-
41,820
33,825
39,975
41,820
44,280
64,883
61,193
256,455
227,550
923
431
923
923
2,153
2,153
2,153
2,153
923
923
1,538
1,538
923
923
923
923
923
3,075
3,075
461
461
923
461
4,305
2,460
2,460
923
1,845
1,845
461
1,230
553,500
360,000
215,250
184,500
138,375
138,375
6,000
27,675
-
46,125
15,375
18,450
46,125
36,900
10,500
10,500
615
780,000
400,000
Feeder UG
No. Description UOM PriceList Subcont
Material
ODN, OSP, Aktivasi, Instalasi,
2 termasuk ATP Civil Work, Integrasi,
Testing & Dokumentasi
2.1 ODN
FO feeder core duct type SM G.652.D-
a
ADSS
36 cores
48 cores
144 cores meter
288 cores meter
b Joint Closure
Fiber Optic Joint Closure Type Dome
unit
96 Core
Fiber Optic Joint Closure Type Dome
unit
144 Core
Fiber Optic Joint Closure Type Dome
unit
288 Core
Fiber Optic Joint Closure Type In-line
96 Core
Fiber Optic Joint Closure Type In-line
144 Core
Fiber Optic Joint Closure Type In-line
288 Core
Underground Pedestal SPH920
c Signature Series Type include set
accessories & concrete base
d Splicing core
e Label Cable (in Handhole) pcs 12,240
f Label FDT pcs 18,360
g Label FAT pcs 12,240
h Label Pedestal pcs 12,300
Pekerjaan OSP termasuk ATP Civil
2.2
Work
2,280
2,400
2,700
2,880
-
49,200
49,200
49,200
49,200
49,200
49,200
100,862
30,000
4,920
6,150
9,225
6,150
41,820
33,825
-
39,975
41,820
44,280
64,883
61,193
256,455
227,550
-
923
923
-
2,153
2,153
2,153
2,153
-
923
923
1,538
1,538
-
923
923
923
923
923
3,075
3,075
-
461
461
923
461
4,305
4,305
2,460
2,460
923
1,845
1,845
461
1,230
-
360,000
184,500
138,375
6,000
27,675
-
46,125
15,375
18,450
46,125
36,900
-
-
-
-
-
-
-
-
-
-
153,750
153,750
110,700
215,250
215,250
215,250
215,250
215,250
215,250
215,250
215,250
-
15,375
15,375
15,375
15,375
15,375
-
5,228
5,228
5,228
5,228
-
10,500
-
615
780,000
400,000