Professional Documents
Culture Documents
LiMAR - Shifting Tool
LiMAR - Shifting Tool
Dear Nor,
Please note that we can only accept Purchase Orders which match our supplied quotation. Please ensure the quotation reference number,
invoice address and email (if applicable), shipping address and the LiMAR billing entity are stated on the PO. If there are any variations
please get in touch and we will revise the quotation accordingly.
I trust that you will find everything in order and this meets your requirements but if you have any questions, please do not hesitate to contact
me.
Best regards,
Phil Radcliffe
Technical Sales Engineer - Coiled Tubing
FM-SA-008-R4
SETEGAP VENTURES PETROLEUM SDN BHD
Quotation Ref. LOT20-262-S069-00
ITEM DESCRIPTION PART NUMBER CONNECTION QTY UNIT PRICE EXT PRICE
(USD) (USD)
1 1.687" Flo Activated Shifting Tool 264-1687-003-R0 1" AMMT Box x Pin 2 5,560.00 11,120.00
Consumable Items
Spare Parts
FM-SA-008-R4
GENERAL TERMS & CONDITIONS
1 - LiMAR Oiltools Standard Terms and Conditions apply for all sales unless otherwise stated in the specific quotation.
All prices quoted are exclusive of any government taxes, with-holding tax & import duties. All applicable taxes & duties are to client's account.
3 - DELIVERY / AVAILABILITY
Delivery is quoted ex-works LiMAR nominated facility. INCOTERMS 2010. (please refer to below notes)
"ExW" column on the quotation denotes either:
All sales items shall be packed in accordance with LiMAR Oiltools standards.
Crating & Packing costs are listed in the quotation. This cost is required to be included in the issued Purchase Order.
If applicable, a packing and documentation charge will be listed in the quotation for any shipping of dangerous goods, the cost is required to be
listed & included in the total amount of the issued purchase order.
LiMAR does not cover any shipping costs, all shipments require to be arranged and paid by customer to their own account.
Where LiMAR Oiltools arranges shipping at the request of the client, a separate quotation shall be submitted detailing the shipping & insurance
costs, an additional or revised PO shall be issued from the client to cover.
Should LiMAR Oiltools organise a Certificate of Origin on behalf of the customer, a charge of $150.00 will apply for this service.
5 - DOCUMENTATION
All sales items shall be supplied with a Level of Technical and Certification Package as standard, as per below.
Certification Level 1 - Inclusive of Certificate of Conformity only. This is standard for 3rd party supply items.
Certification Level 2 - Inclusive of Certificate of Conformity, Material Certificate Summary and Test reports, where applicable.
Certification Level 3 - Inclusive of Certificate of Conformity, Material Certificate Summary, Test reports, where applicable and Full Material
Certification Package.
Technical Documentation Package - Inclusive of Operating & Service Manuals and Laminated Drawings as required.
6 - DOCUMENTATION COSTS
If applicable, any discounts offered are based upon receiving payment, on or before, a nominated prompt payment date. Discount at the % stated
in the quotation is NOT deducted from the invoice total.
The PO will be issued at the full amount stated in Total Ex-works on our quotation. The invoice will be issued for 100% of the Total Ex-works value.
The invoice issued will state the Prompt Payment Discount due date. Should payment be made, prior to or upon the due date, the discount shall
be deducted from the transfer amount. If payment is processed after such date, the full invoice total is due.
Should a shortfall in payment be made after the prompt payment deadline, the outstanding amount will remain in the Statement of Accounts until
the payment is received in full.
Title of the goods herein described shall pass to the client upon full payment of said goods and any prior outstanding debt.
Risk of loss passes to the client upon delivery of said goods at LiMAR Oiltools facility.
FM-SA-008-R4