DAFTAR HARGA SEWA ALAT BERAT

TAHUN 2021

HARGA
NO NAMA BARANG SATUAN
Rp
1 2 3 4

1 Asphalt Mixing Plant Jam 5,146,022.47


2 Asphalt Finisher Jam 507,700.00
3 Asphalt Sprayer Jam 115,346.00
4 Bulldozer 100-150 HP Jam 435,566.00
5 Compressor 4000-6500 L\M Jam 170,800.00
6 Concrete Mixer 0.3-0.6 M3 Jam 85,573.00
7 Mixer Kyukuto Hino Kapasitas 7 m3 / 25 hari 95,000,000.00
kerja / 200
jam
8 Mixer Kyukuto Hino Kapasitas 2,5 m3 / 25 hari 62,500,000.00
kerja / 200
jam
9 Crane 10-15 TON Jam 521,072.00
10 Dump Truck 3-4 M3 Jam 249,651.00
11 Dump Truck Jam 387,651.00
12 Excavator 80-140 HP Jam 470,000.00
13 Flat Bed Truck 3-4 M3 Jam 373,577.00
14 Generator Set Jam 419,800.00
15 Motor Grader >100 HP Jam 455,299.00
16 Track Loader 75-100 HP Jam 378,324.00
17 Wheel Loader 1.0-1.6 M3 Jam 335,000.00
18 Loader WA 200-1 / 25 hari
kerja / 200
jam
19 Sift Loader dengan Crane / Hiap Crane 8 ton / 8 jam 4,500,000.00
20 Sift Loader dengan Crane / Hiap Crane 5 ton / 8 jam 3,880,000.00
21 Dolly Scania 18 ton / 8 jam 3,885,000.00
22 Three Wheel Roller 6-8 T Jam 302,037.00
23 Tandem Roller 6-8 T. Jam 320,300.00
24 Tire Roller 8-10 T. Jam 298,200.00
25 Vibratory Roller 5-8 T. Jam 497,000.00
26 Concrete Vibrator Jam 50,200.00
27 Stone Crusher Jam 735,332.00
28 Water Pump 70-100 mm Jam 46,600.00
29 Water Tanker 3000-4500 L. Jam 253,386.00
30 Pedestrian Roller Jam 74,338.00
31 Tamper Jam 58,096.00
32 Jack Hammer Jam 78,800.00
33 Fulvi Mixer Jam 148,400.00
34 Concrete Pump Jam 308,178.00
35 Concrate Pump Standart IHI IPF 8E 21, 21 m / 25 hari 65,000,000.00
kerja / 200
jam
36 Concrate Pump Long Boom IHI IPF 8 N 29, 29 m / 25 hari
kerja / 200 60,000,000.00
jam
37 Concrate Pump Mini IHI IPN4N17, 17 m / 25 hari
kerja / 200 50,000,000.00
jam
38 Trailer 20 TON Jam 285,292.00
39 Pile Driver + Hammer Jam 193,967.00
40 Crane on Track 35 TON Jam 399,665.00
41 Welding Set Jam 165,293.00
42 Bore Pile Machine Jam 993,707.00
43 Asphalt Liquid Mixer Jam 85,865.00
44 Trailer Jam 355,050.00
45 Cold Milling Jam 493,500.00
46 Rock Drill Breaker Jam 60,810.00
47 Alat Stressing Jam 13,500.00
48 Alat Grouting Jam 18,000.00
49 Baro Mixer Jam 65,000.00
50 Bole Mixer Jam 65,000.00
51 Prenater Jam 65,000.00
52 Asphalt Cutter Jam 62,111.00
53 Concrete Pan Mixer Jam 456,635.00
54 Truck Mixer Jam 546,182.00
55 Blending Equipment Jam 192,768.87
56 Asphalt Distributor Jam 348,305.00
57 Crane Tadano Bulan 115,000,000.00
58 Crane Tadano Bulan 97,000,000.00
59 Crane Tadano Bulan 90,000,000.00
60 Crane Tadano Bulan 85,000,000.00
61 Crane Tadano Bulan 60,000,000.00
62 Crane Tadano Hari 15,000,000.00
63 Crane Tadano Hari Bidang Penataan Bangunan
10,000,000.00
Bidang Penataan Ruang dan Pengembangan
64 Crane Tadano Hari 9,500,000.00Kawasan Permukiman
65 Crane Tadano Hari 8,500,000.00
66 Crane Tadano Hari 7,000,000.00
I Gede Cipta Sudewa Atmaja, ST., MT. Agus Sudarmo, ST.
67 Excavator
NIP.PC.200-8 / MO
19690426 199803 1 012 Jam 570,000.00
NIP. 19700907 199903 1
68 Excavator PC.200-8 / MO Jam 500,000.00 006
69 Mobilisasi Excavator
Bidang PC.200-8
Air Minum Dan(Denpasar,
PLP Kuta, Nusa Dua) LS Sumber Daya
Bidang 4,000,000.00
Air
70 Excavator PC.78 UU (breaker) Jam 450,000.00
71 Excavator PC.78 UU (bucket) Jam 390,000.00
72 MobilisasiIExcavator PC.78
Ketut Dirga, ST.,UU (Denpasar, Kuta, Nusa Dua)
M.Si. I Gst. LS
Ngurah Putra Sanjaya, ST.
2,500,000.00
73 Sewa TCNIP. 19670820
Potain MC 205B 199103
made1in007
Prancis, jib length 60 m NIP. 19660316
Bulan 199703 1 003
120,000,000.00
kapasitas 2,4 ton
Bidang
74 Jaminan Angkur TCBina Marga
Potain MC 205B Bidang JasaSet
Konstruksi dan60,000,000.00
Bina Program
75 Pasang Angkur TC Potain MC 205B Set 6,500,000.00
76 Erexsion TC Potain MC 205B Set 50,000,000.00
I Wayan Dirgayasa, ST. Ir. I Gde Made Bhaju Pravita, MM.
NIP. 19680314 199703 1 005 NIP. 19681114 199803 1 003
Bidang Bina Marga Bidang Jasa Konstruksi dan Bina Program

I Wayan
77 Dismantling Dirgayasa,
Normal TC PotainST.
MC 205B Ir. I GdeSet
Made Bhaju Pravita, MM.
50,000,000.00
NIP. 19680314 199703 1 005 NIP. 19681114 199803 1 003
78 Mob-Demob TC Potain MC 205B wilayah Bali Set 95,000,000.00
79 Gaji Operator TC Potain MC 205B / bulan 3,500,000.00
80 Sewa Mesin Bor Jam 65,000.00
81 Alat Bantu Pekerjaan Pengeboran Bored Pile LS 4,500,000.00
82 Batching Plant (di luar genset, listrik dan loader) / 1 bulan / 30 115,000,000.00
Hari

Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi /
penyesuaian

Denpasar,

Mengetahui,
PLT. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar

Ir. Nym. Ngurah Jimmy Sidharta W, MT.


Pembina Utama Muda
NIP. 19640913 199303 1 006
DAFTAR HARGA SEWA
SCAFOLDING
KOTA DENPASAR TAHUN 2021

HARGA
NO NAMA BAHAN SAT
(RP) KET
1 2 3 4
1 Main Frame m3 7,500.00 265,000.00 - 257,500.00 102,500.00 360,000.00 367,500
2 Cross brace 220 m3 4,500.00 285,000.00 - 280,500.00 14,250.00 294,750.00 299,250
3 End Frame m3 5,500.00 290,250.00 - 284,750.00 24,750.00 309,500.00 315,000
4 Join Pen m3 1,500.00 294,500.00 - 293,000.00 14,500.00 307,500.00 309,000
5 U-Head m3 4,500.00 205,500.00 - 201,000.00 10,275.00 211,275.00 215,775
6 Jack Base m3 4,500.00 294,500.00 - 290,000.00 14,725.00 304,725.00 309,225

Denpasar,
Bidang Penataan Ruang
Bidang Penataan Ruang dan Bangkim

I Gede Cipta Sudewa Atmaja, ST., MT.


NIP. 19690426 199803 1 012 Agus Sudarmo, ST.
NIP. 19700907 199903 1 006

Bidang Air Minum Dan PLP Bidang Sumber Daya Air

I Ketut Dirga, ST., M.Si. I Gst. Ngurah Putra Sanjaya, ST.


NIP. 19670820 199103 1 007 NIP. 19660316 199703 1 003

Bidang Bina Marga


Bidang Jasa Konstruksi dan Bina Program

I Wayan Dirgayasa, ST.


NIP. 19680314 199703 1 005 Ir. I Gde Made Bhaju Pravita, MM.
NIP. 19681114 199803 1 003

Mengetahui,
PLT. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar

Ir. Nym. Ngurah Jimmy Sidharta W, MT.


Pembina Utama Muda
NIP. 19640913 199303 1 006
DAFTAR HARGA BAHAN TAMBAHAN
PADA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA DENPASAR TAHUN 2021

HARGA SATUAN
NO NAMA BARANG SAT.
2019 (Rp)

1 2 3 4

BIDANG UMUM
1 Jaring Sungar m2 170,000.00
2 Tali Seling m' 9,500.00
3 Tali m' 5,600.00
4 Sekop Datar bh 165,000.00
5 Selang Air m' 8,000.00
6 Terpal m2 9,500.00

BIDANG BINA MARGA


1 Uditch 1000 x 1000 x 1200 K 350 unit 1,950,000.00
2 Uditch 1200 x 1200 x 1200 K 350 unit 2,950,000.00
3 Plat Penutup 400 x 1200 K 350 unit 450,000.00
4 Plat Penutup 1200 x 1200 x 1200 K 350 unit 1,250,000.00
5 Frame Manhole 1200 x 1200 unit 450,000.00
6 Cover Manhole 1200 x 1200 unit 650,000.00
7 Abu Batu m3

BAHAN K3
A Alat Pelindung Diri
1 Topi Pelindung (safety Helmet) bh 55,000.00
2 Pelindung Mata (Goggles, Spectacles) bh 95,000.00
3 Tameng Mata (face Shield) bh 215,000.00
4 Masker Selam (Breathing Apparatus) bh 350,000.00
5 Pelindung Telinga (Ear Plug, Ear Muff) bh 250,000.00
6 Pelindung Pernafasan dan Mulut (Masker) bh 45,000.00
7 Sarung Tangan (Safety Gloves) bh 40,000.00
8 Penunjang Seluruh Tubuh (Full Body Harness) bh 130,000.00
9 Jaket Pelampung (Life Vest) bh 150,000.00
10 Celemek (Apron/Coverralls) bh 90,000.00
11 Pelindung Jatuh (Fall Arrester) bh 990,000.00

B Rambu-Rambu K3 bh 150,000.00
1 Rambu Petunjuk bh 150,000.00
2 Rambu Larangan bh 150,000.00
3 Rambu Peringatan bh 150,000.00
4 Rambu Kewajiban bh 150,000.00
5 Rambu Informasi bh 150,000.00
6 Rambu Pekerjaan Sementara bh 150,000.00
7 Tongkat Pengatur Lalu Lintas (Warning Light Stck) bh 60,000.00
8 Kerucut Lalu Lintas (Traffic Cone) bh 125,000.00
9 Lampu Putar (Rotary Lamp) bh 97,000.00
10 Lampu Selang Lalu Lintas bh
C Pengendaliang Resiko K3
1 Alat Pemadam Api Ringan (APAR) bh 550,000.00
2 Sirine bh 450,000.00
3 Bendera K3 bh
4 Lampu Darurat (Emergency Lamp) bh 170,000.00

BAHAN TAMBAHAN
1 List Gypsum Profil 5 cm m' 11,500.00
2 Bubungan Genteng glazur bh 44,651.10
3 Tempat Sabun bh 149,800.00
4 Kusen Aluminum m' 110,000.00
5 Rangka Jendela Aluminium m' 115,500.00
6 Rangka Pintu Aliminium m' 121,000.00
7 Door Stoper bh 210,000.00
8 Door Closer bh 380,000.00
9 Kusen dan Pintu PVC Toilet unit 800,000.00
10 Genteng Keramik ex Jatiwangi bh 7,500.00
11 Genteng Keramik Glazur ex KANMURI bh 22,500.00
12 Nok Genteng Keramik EX Jatiwangi bh 42,000.00
13 Nok Genteng Keramik Ex Kanmuri bh 47,000.00
14 Kran Zink bh 485,000.00
15 Kran Dinding bh 240,000.00
16 Kitchen Zink bh 850,000.00
17 Floor Drain bh 110,000.00
18 Bak Air Fibergles bh 395,000.00
19 Klep Diameter 3/4" bh 112,000.00
20 Tangkin Air 1000 Liter bh 1,850,000.00
21 Tangki Air 500 Liter bh 845,000.00
22 Pelampung Otomatis bh 170,000.00
23 Roof Drain Metal bh 97,000.00
24 Mesin Jet Pump kap 250 watt ex Grounfos bh 5,600,000.00
25 Mesin Pompa Tekan kap. 150 watt ex Grounfos bh 3,450,000.00
26 Box Panel PVC isi 4 MCB ex Legran bh 210,000.00
27 MCB 6 A ex Legran bh 52,000.00
28 MCB 4 A ex Legran bh 48,000.00
29 Kabel telephone 4 x 0.5 mm m' 22,000.00
30 Oulet TV Broco bh 220,000.00
31 Outlet Telephone bh 230,000.00
32 Dowlight/PLC 13 W bh 62,000.00
-
1 1 M2 PEMASANGAN MEMBRAN BAKAR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.500 115,000.00 57,500.00
Kepala Tukang OH 0.050 120,000.00 6,000.00
Mandor OH 0.013 130,000.00 1,625.00
JUMLAH TENAGA KERJA 93,125.00
B. BAHAN
Material Primer Prime Coat kg 0.300 13,000.00 3,900.00
Waterproofing Membrance Bakar Plan 3mm m2 1.050 88,000.00 92,400.00
JUMLAH HARGA BAHAN 96,300.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 189,425.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 189,425.00
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN TAMBAHAN
TAHUN 2021

NO URAIAN PEKERJAAN HARGA

1 2 3

1 1 M2 PEMBUATAN STEGGER DENGAN SCAFHOLDING 120 x 180 h 190 (Sewa) Rp 268,674.00


2 PEMBESIAN 10 KG DENGAN BESI POLOS Rp 124,950.00
3 PEMBESIAN 1 KG DENGAN BESI POLOS Rp 12,495.00
4 PEMBESIAN 10 KG DENGAN BESI ULIR Rp 153,300.00
5 PEMBESIAN 1 KG DENGAN BESI ULIR Rp 15,330.00
6 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU Rp 101,366.25

XVI PEKERJAAN STYLE BALI


1 1 M2 PASANGAN BATA GOSOK 2 MUKA Rp 302,584.00
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA Rp 4,543,084.00
3 1 M2 PASANGAN BATA PRESS 1 MUKA Rp 271,292.00
4 1 M2 PASANGAN PARAS 1 MUKA Rp 6,035,292.00
5 1 M2 PASANGAN BATU PALIMANAN TEBAL 3 CM Rp 453,208.67
6 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA Rp 2,042,331.67
7 1 M2 PASANGAN BATA GOSOK DIUKIR Rp 965,292.00
8 1 M2 PASANGAN BATU TABAS KARANGASEM DIUKIR Rp 490,092.00
9 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Rp 2,122,331.67
10 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP IJUK Rp 3,954,900.00
11 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP GENTENG Rp 3,313,760.00
12 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP IJUK Rp 4,623,642.75
13 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP GENTENG Rp 3,832,760.06
14 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP IJUK 190cmX190cm Rp 8,309,650.00
15 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP GENTENG 190cmx190cm Rp 8,309,650.00
16 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP IJUK 190cmx190cm Rp 6,153,400.00
17 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP GENTENG 190cmx190cm Rp 8,912,939.78
18 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP IJUK 200CMX200CM Rp 15,307,600.00
19 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP GENTENG 200CMX200CM Rp 13,876,300.00
20 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP IJUK 200CMX200CM Rp 16,610,199.64
21 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP GENTENG 200CMX200CM Rp 13,628,899.64
22 1 UNIT SANGGAH TAKSU BATU HITAM ATAP IJUK 40cmx40cm Rp 2,713,050.00
23 1 UNIT SANGGAH TAKSU BATU HITAM ATAP GENTENG 40cmx40cm Rp 2,787,610.00
24 1 UNIT SANGGAH TAKSU PARAS BATA ATAP IJUK 40cmx40cm Rp 3,122,582.07
25 1 UNIT SANGGAH TAKSU PARAS BATA ATAP GENTENG 40cmx40cm Rp 3,125,157.07

XVII PEKERJAAN HARDDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 Rp. 177,250.00
2 1 M2 PASANGAN Paving 10 x 20 cm tebal 6 cm K350 Rp. 202,450.00
3 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K225 Rp. 172,000.00
4 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K350 Rp. 212,950.00
5 1 M2 PASANGAN Paving 20 x 20 cm tebal 6 cm K350 Rp. 219,250.00
6 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K225 Rp. 195,100.00
7 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K350 Rp. 229,750.00
8 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 pc Rp. 189,640.00
9 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 merah Rp. 198,250.00
10 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 hitam Rp. 212,950.00
11 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 pc Rp. 203,500.00
12 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah Rp. 198,250.00
13 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 hitam Rp. 241,300.00
14 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 pc Rp. 251,800.00
15 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 merah Rp. 253,900.00
16 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 hitam Rp. 256,000.00
17 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 pc Rp. 274,900.00
18 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 merah Rp. 261,250.00
19 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 hitam Rp. 256,000.00
20 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 pc Rp. 256,000.00
21 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 merah Rp. 271,750.00
22 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 hitam Rp. 282,250.00
23 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 pc Rp. 303,250.00
24 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 merah Rp. 308,500.00
25 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 hitam Rp. 313,750.00
26 1 M2 PASANGAN Paving Tiga Berlian tebal 6 cm K225 pc Rp. 177,250.00
27 1 M2 PASANGAN GRASS BLOCK Rp. 170,000.00
28 1 M2 PASANGAN KORAL SIKAT Rp. 116,692.80
29 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp. 201,551.00
30 Kanstein Jumbo (P:50,L:15,T:30 cm K225) Rp. 276,551.00
31 Kanstein kotak (P:50,t.20,La.10,Lb.16cm) K225 Rp. 228,551.00
32 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) Rp. 247,551.00
33 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) Rp. 257,551.00
34 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) Rp. 250,551.00
35 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) Rp. 230,951.00
36 1 Buah Pasangan Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Rp. 217,551.00
37 1 M2 PENGECATAN KANSTEIN Rp. 40,771.50
38 PASANGAN BUIS BETON DIAMETER 80 CM Rp. 193,970.00
39 PASANGAN Buis Beton Diameter 50 x 75 Rp. 238,470.00
40 PASANGAN BUIS BETON DIAMETER 25 CM Rp. 122,470.00
41 1 M2 BONGKARAN PAVING LAMA Rp. 11,850.00
42 1 M3 PENGURUGAN DENGAN LIMESTONE Rp. 253,250.00
43 PASANGAN BUIS BETON DIAMETER 100 CM Rp. 287,470.00
44 1 M' PASANGAN BUIS BETON DIAMETER 100 CM Rp 574,940.00
45 PASANGAN BUIS BETON DIAMETER 80 CM Rp. 193,970.00
46 1 M' PASANGAN BUIS BETON DIAMETER 80 CM Rp. 387,940.00
47 PASANGAN BUIS BETON DIAMETER 50 CM Rp. 130,070.00
48 1 M' PASANGAN BUIS BETON DIAMETER 50 CM Rp 172,993.10
49 PASANGAN BUIS BETON DIAMETER 25 CM Rp. 122,470.00
50 1 M' PASANGAN BUIS BETON DIAMETER 25 CM Rp 162,885.10
51 1 M' PASANGAN1/2 BUIS BETON DIAMETER 25 CM Rp. 61,235.00
52 1 M' KANSTEIN SEGI LIMA (P:50:15,T:20)K-225 Rp 250,551.00
53 1 M' KANSTEIN KURSI K-225 Rp 247,551.00

Ditetapkan di Denpasar
pada tanggal
 
Plt. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar
 
 
 
Ir. Nyoman Ngurah Jimmy Sidharta W.MT
Pembina Utama Muda
Nip. 19640913 199303 1 006
 
DAFTAR HARGA BAHAN
PADA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA DENPASAR TAHUN 2021

HARGA
NO NAMA BAHAN SAT
(RP) KET
1 2 3 4
BATU KALI DAN BATU ALAM HARGA 2018 2018 - 2017 Harga walikota - 2017 Harga walikota - kesepakatan Harga Walikota 2018
1 Batu Kali/batu bulat 15-30 cm m3 305,000.00 265,000.00 40,000.00 102,500.00 62,500.00 367,500
2 Batu Belah 1.0-5.0 cm m3 345,000.00 285,000.00 60,000.00 14,250.00 - 45,750.00 299,250
3 Batu Pecah Besar 15/30 cm m3 205,000.00 290,250.00 - 85,250.00 24,750.00 110,000.00 315,000
4 Batu Pecah 5/7 cm m3 310,000.00 294,500.00 15,500.00 14,500.00 - 1,000.00 309,000
5 Batu Pecah 3/5 cm m3 316,000.00 205,500.00 110,500.00 10,275.00 - 100,225.00 215,775
6 Batu Pecah 3-4 cm m3 335,000.00 294,500.00 40,500.00 14,725.00 - 25,775.00 309,225
7 Batu Pecah 2/3 cm m3 396,000.00 253,066.67 142,933.33 61,933.33 - 81,000.00 315,000
8 Batu Pecah Mesin 1 - 2 cm m3 475,000.00 290,400.00 184,600.00 24,600.00 - 160,000.00 315,000
9 Batu Pecah 2-3 cm m3 450,000.00 155,000.00 295,000.00 - 137,491.00 - 432,491.00 17,509
10 Batu Pecah 1 - 2 cm m3 550,000.00 167,900.00 382,100.00 8,395.00 - 373,705.00 176,295
11 Batu Pecah 0,5 - 1 Cm m3 385,000.00 115,000.00 270,000.00 5,750.00 - 264,250.00 120,750
13 Batu Alam Andesit Alur m2 120,000.00 105,600.00 14,400.00 5,280.00 - 9,120.00 110,880
14 Batu Alam Live Grendia m2 119,000.00 156,000.00 - 37,000.00 7,800.00 44,800.00 163,800
15 Batu Candi m2 125,000.00 228,000.00 - 103,000.00 11,400.00 114,400.00 239,400
16 Batu Candi Hitam (Ukuran 30 x 30 x 2 Cm) Cirebon m2 112,000.00 90,000.00 22,000.00 4,500.00 - 17,500.00 94,500
17 Batu Candi Hitam (Ukuran 30 x 30 x 3 Cm) Cirebon m2 162,000.00 216,000.00 - 54,000.00 10,800.00 64,800.00 226,800
18 Batu Candi Hitam (Ukuran 30 x 30 x 5 Cm) Cirebon m2 238,000.00 96,000.00 142,000.00 4,800.00 - 137,200.00 100,800
19 Batu Candi Hitam (Ukuran 20 x 20 x 2 Cm) Cirebon m2 99,500.00 138,000.00 - 38,500.00 6,900.00 45,400.00 144,900
20 Batu Candi Hitam (Ukuran 20 x 30 x 5 Cm) Cirebon m2 218,000.00 204,000.00 14,000.00 10,200.00 - 3,800.00 214,200
21 Batu Putih Jogya / Palimanan (30 x 30 x 2 Cm) m2 107,000.00 115,000.00 - 8,000.00 5,750.00 13,750.00 120,750
22 Batu Putih Jogya / Palimanan (30 x 30 x 3 Cm) m2 148,000.00 83,600.00 64,400.00 4,180.00 - 60,220.00 87,780
23 Batu Putih Jogya / Palimanan (30 x 30 x 5 Cm) m2 214,000.00 89,100.00 124,900.00 4,455.00 - 120,445.00 93,555
24 Batu Alam Palimanan Putih Super m2 118,000.00 83,600.00 34,400.00 4,180.00 - 30,220.00 87,780
25 Batu hitam Jember 5 x 20 halus m2 89,500.00 83,600.00 5,900.00 4,180.00 - 1,720.00 87,780
26 Batu hitam Jember 20 x 40 halus m2 94,500.00 89,100.00 5,400.00 4,455.00 - 945.00 93,555
27 Batu hitam Jember 15 x 30 halus m2 88,500.00 99,000.00 - 10,500.00 4,950.00 15,450.00 103,950
28 Batu hitam Singaraja 15 x 30 halus m2 95,000.00 25,000.00 70,000.00 1,250.00 - 68,750.00 26,250
29 Batu hitam Singaraja 20 x 40 halus m2 90,000.00 33,000.00 57,000.00 1,650.00 - 55,350.00 34,650
30 Batu hitam karangasem/Batu Tabas (20 x 40 x 3) m2 160,000.00 93,500.00 66,500.00 90,250.00 23,750.00 183,750
31 Paras Silakarang Tipis (Ukuran 15 x 30 x 5 Cm) m2 318,000.00 13,750.00 304,250.00 688.00 - 303,562.00 14,438
32 Paras Silakarang Tebal (Ukuran 15 x 30 x 8 Cm) m2 348,500.00 89,100.00 259,400.00 4,455.00 - 254,945.00 93,555
33 Batu Paras Bali/Pawon (Abu - Abu Terang) m2 274,000.00 83,600.00 190,400.00 4,180.00 - 186,220.00 87,780
34 Paras Kelating / Kerobokan (Ukuran 3 x 20 x 40 Cm) bh 10,000.00 264,000.00 - 254,000.00 24,750.00 278,750.00 288,750
35 Batu pilah m2 125,000.00 285,000.00 - 160,000.00 30,000.00 190,000.00 315,000
36 Batu pilah Singaraja 30 x 30 m2 130,000.00 298,000.00 - 168,000.00 14,900.00 182,900.00 312,900
37 Batu pilah Singaraja 20 x 20 m2 117,000.00 103,500.00 13,500.00 5,175.00 - 8,325.00 108,675
38 Split Kasar m3 320,000.00 25,300.00 294,700.00 1,265.00 - 293,435.00 26,565
39 Split Halus m3 312,000.00 40,250.00 271,750.00 2,013.00 - 269,737.00 42,263
40 Koral Beton diameter 1 - 2 cm m3 412,000.00 45,000.00 367,000.00 2,250.00 - 364,750.00 47,250
41 Batu Sikat Hitam Lokal Super kampil 95,000.00 267,000.00 - 172,000.00 13,350.00 185,350.00 280,350
42 Batu Sikat Akik Merah kampil 25,000.00 230,000.00 - 205,000.00 32,500.00 237,500.00 262,500
43 Batu Sikat Putih Salju kampil 35,000.00 210,000.00 - 175,000.00 52,500.00 227,500.00 262,500
44 Koral Sikat (Lokal) sak 55,000.00 183,750.00 - 128,750.00 26,250.00 155,000.00 210,000
45 Kerikil m3 410,000.00 140,000.00 270,000.00 43,750.00 - 226,250.00 183,750
46 Kerikil Beton m3 500,000.00 80,000.00 420,000.00 4,000.00 - 416,000.00 84,000
47 Kerikil Halus m3 420,000.00 123,750.00 296,250.00 33,750.00 - 262,500.00 157,500
48 Pasir Halus m3 258,000.00 179,000.00 79,000.00 31,000.00 - 48,000.00 210,000
49 Pasir Pasang m3 215,000.00 158,000.00 57,000.00 25,750.00 - 31,250.00 183,750
50 Pasir Beton m3 195,000.00 2,050.00 192,950.00 1,100.00 - 191,850.00 3,150
51 Pasir Urug m3 195,000.00 2,250.00 192,750.00 690.00 - 192,060.00 2,940
52 Tanah Urug m3 149,000.00 2,200.00 146,800.00 110.00 - 146,690.00 2,310
53 Tanah Urug Pilihan m4 125,000.00 935,000.00 - 810,000.00 46,750.00 856,750.00 981,750
54 Tanah Lempung m3 118,000.00 935,000.00 - 817,000.00 46,750.00 863,750.00 981,750
55 Sirtu m3 248,000.00 935,000.00 - 687,000.00 46,750.00 733,750.00 981,750
56 Batu Karang Bukit m3 318,000.00 935,000.00 - 617,000.00 46,750.00 663,750.00 981,750
57 Limestone m3 185,000.00 2,500.00 182,500.00 1,700.00 - 180,800.00 4,200
58 Abu Bata 450,000.00 2,150.00 447,850.00 1,525.00 - 446,325.00 3,675
59 Batako Lubang bh 2,700.00 1,450.00 1,250.00 1,175.00 - 75.00 2,625
60 Batako Buntu bh 2,800.00 5,850.00 - 3,050.00 293.00 3,343.00 6,143
61 Batu Bata bh 1,200.00 3,250.00 - 2,050.00 - 108.00 1,942.00 3,142
62 Bata Ringan setara falcon uk. 75 x 200 x 500 mm m3 785,000.00 3,120.00 781,880.00 156.00 - 781,724.00 3,276
63 Bata Ringan setara falcon uk. 100 x 200 x 600 mm m3 785,000.00 8,000.00 777,000.00 400.00 - 776,600.00 8,400
64 Bata Ringan setara falcon uk. 125 x 200 x 600 mm m3 795,000.00
65 Bata Ringan setara falcon uk. 150 x 200 x 600 mm m3 950,000.00
66 Bata Merah Klas I bh 2,800.00
67 Bata Merah Klas II bh 2,900.00
68 Bata Merah Klas III bh 2,950.00
69 Bata Merah Super (Pripian) ex tulikup bh 6,500.00
70 Bata Pres 22x10x6cm bh 3,400.00
71 Bata Pres 22x10x5cm bh 4,000.00 16,500.00 - 12,500.00 4,500.00 17,000.00 21,000
72 Batu Gosok bh 11,000.00 175,000.00 - 164,000.00 8,750.00 172,750.00 183,750
73 Filler kg 40,000.00 74,750.00 - 34,750.00 3,738.00 38,488.00 78,488
74 Additive liter 18,000.00 25,300.00 - 7,300.00 1,265.00 8,565.00 26,565
75 Agregat m3 300,000.00 51,750.00 248,250.00 2,588.00 - 245,662.00 54,338
76 Closeter bh 100,000.00 51,750.00 48,250.00 2,588.00 - 45,662.00 54,338
77 Lis Batu Alam L=7, T=40 bh 5,500.00
78 Lem Batu Alam kaleng 55,000.00
79 Coating (CP.27) kaleng 73,000.00
- - -
SEMEN - - -
80 PC. Tiga Roda 50 Kg sak 75,000.00 71,250.00 3,750.00 3,563.00 - 187.00 74,813
81 PC Tiga Roda 40 Kg sak 50,000.00
82 PC. Tonasa 50 Kg / Busoa 50 Kg sak 47,000.00 57,000.00 - 10,000.00 2,850.00 12,850.00 59,850
83 PC. Gresik 40 Kg sak 50,000.00 58,000.00 - 8,000.00 2,900.00 10,900.00 60,900
84 PC. Gresik 50 Kg sak 63,000.00 72,500.00 - 9,500.00 3,625.00 13,125.00 76,125
85 PC Rajawali 40 Kg sak 46,500.00 49,000.00 - 2,500.00 2,450.00 4,950.00 51,450
86 PC Holcim 40 Kg sak 45,000.00 1,450.00 43,550.00 72.00 - 43,478.00 1,522
87 PC Conch 40 Kg sak 43,500.00 1,425.00 42,075.00 71.00 - 42,004.00 1,496
88 Semen Gresik kg 1,250.00 1,375.00 - 125.00 69.00 194.00 1,444
89 Semen Tiga Roda kg 1,250.00 1,375.00 - 125.00 69.00 194.00 1,444
90 Semen Tonasa kg 1,000.00 25,620.00 - 24,620.00 1,281.00 25,901.00 26,901
91 Semen Bosowa kg 1,150.00 2,250.00 - 1,100.00 113.00 1,213.00 2,363
92 Semen Holcim kg 1,150.00 1,591.67 - 441.67 79.33 521.00 1,671
93 Semen Conch kg 1,150.00
94 Semen Warna MU 408/ Nat kg 14,000.00
95 Semen Tipe V kg 3,000.00
96 Semen Portland kg 2,300.00

Mortar Utama - - -
97 ThinBedMAX/Perekat Bata Ringan (MU 380) @40 Kg sak 128,000.00 128,100.00 - 100.00 6,405.00 6,505.00 134,505
98 PlasterPlus/Pas. Bata & Plester (MU-301) @40 kg sak 86,200.00 86,520.00 - 320.00 4,326.00 4,646.00 90,846
99 Plester premium (MU-100)@ 40 kg sak 91,000.00 91,350.00 - 350.00 4,568.00 4,918.00 95,918
100 Finish Plesteran/ Render (MU 290)@ 40 kg sak 159,500.00 160,230.00 - 730.00 8,012.00 8,742.00 168,242
101 SkimWall/Acian Plesteran & Beton (Skimcoat) 20 kg (MU-200) sak 72,000.00 72,187.50 - 187.50 3,609.50 3,797.00 75,797
102 SkimWall/Acian Plesteran & Beton (Skimcoat) 40 kg (MU-200) sak 136,500.00 137,130.00 - 630.00 6,857.00 7,487.00 143,987
103 Acian Putih (MU-270)@25 kg sak 152,000.00 152,460.00 - 460.00 7,623.00 8,083.00 160,083
104 Perata Lantai (MU-440)@40kg sak 90,000.00 87,360.00 2,640.00 4,368.00 1,728.00 91,728
105 Perata Lantai Expose (MU 445) 40 kg sak 171,000.00 169,890.00 1,110.00 8,495.00 7,385.00 178,385
106 Self Leveling Floor /Underlayment (MU-410) @25kg sak 146,000.00 270,900.00 - 124,900.00 13,545.00 138,445.00 284,445
107 Primer Self Leveling Floor (MU-L410) @ 5lt Set 75,000.00 302,925.00 - 227,925.00 15,146.00 243,071.00 318,071
108 Floor Hardener (MU 700) 25 kg sak 140,000.00 138,180.00 1,820.00 6,909.00 5,089.00 145,089
109 Granitfix/Perekat Granite Tile & Batu Alam (MU-400) @25kg sak 117,000.00 117,442.50 - 442.50 5,872.50 6,315.00 123,315
110 Cerafix/Perekat Keramik (MU-420)@25 kg sak 82,000.00 82,162.50 - 162.50 4,108.50 4,271.00 86,271
111 Poolfix White/Perekat keramik area terendam (MU-460)@25 kg sak 385,000.00 392,070.00 - 7,070.00 19,604.00 26,674.00 411,674
112 Renofix/Perekat keramik diatas keramik (MU-480)@25 kg sak 231,000.00 235,095.00 - 4,095.00 11,755.00 15,850.00 246,850
113 Powerfix Flex/Perekat keramik serba guna (MU-485)@25 kg sak 298,000.00 299,250.00 - 1,250.00 14,963.00 16,213.00 314,213
114 Rapidfix Flex/Perekat keramik Fast Setting (MU-490)@25 kg sak 300,000.00 324,660.00 - 24,660.00 16,233.00 40,893.00 340,893
115 Colorfill/ Pengisi nat interior & eksterior (MU-408C) kg 9,200.00 11,340.00 - 2,140.00 567.00 2,707.00 11,907
116 ColorPlus/Pengisi nat interior,eksterior,area basah(MU-408P) kg 16,000.00 16,800.00 - 800.00 840.00 1,640.00 17,640
117 Glliter/Pengisi nat dengan efek Glliter (MU-408G)@ 2kg set 30,000.00 154,875.00 - 124,875.00 7,744.00 132,619.00 162,619
118 PowerPool/Pengisi nat area terendam(MU-408PP)@2kg set 87,000.00 82,950.00 4,050.00 4,147.00 97.00 87,097
119 FixGrout/Perbaikan struktur beton (MU-800)@20kg sak 79,500.00 77,490.00 2,010.00 3,875.00 1,865.00 81,365
120 PatchCrete/Perbaikan permukaan beton(MU-830)@40kg sak 248,000.00 249,270.00 - 1,270.00 12,464.00 13,734.00 261,734
121 SkimRep/Perbaikan permukaan acian(MU-840)@25kg sak 231,000.00 308,910.00 - 77,910.00 15,446.00 93,356.00 324,356
122 DryShield/Pelapis kedap air (MU-600)@3kg set 101,000.00 101,535.00 - 535.00 5,077.00 5,612.00 106,612
123 ArcyBond/Perekat Mortar & Beton akrilik (MU-L500)@900ml set 40,000.00 31,500.00 8,500.00 1,575.00 - 6,925.00 33,075
- - -
Uzin - - -
124 Beton Instan (UZ K300) 50 kg sak 110,000.00 78,750.00 31,250.00 3,938.00 - 27,312.00 82,688
125 Plester dinding instan (UZ Plester) 50 Kg sak 80,000.00 78,750.00 1,250.00 3,938.00 2,688.00 82,688
126 Plester Finish tanpa Aci (UZ Render) 50 kg sak 120,000.00 99,750.00 20,250.00 4,988.00 - 15,262.00 104,738
127 Acian diatas beton (UZ SC100) 40 kg sak 101,000.00 111,300.00 - 10,300.00 5,565.00 15,865.00 116,865
128 Acian dinding instan interior (UZ SC 50) 40 kg sak 118,000.00 102,900.00 15,100.00 5,145.00 - 9,955.00 108,045
129 Acian dinding instan eksterior (UZ SC 75) 40 kg sak 120,500.00 105,000.00 15,500.00 5,250.00 - 10,250.00 110,250
130 Perekat Bata Ringan (UZ TB20) 50 kg sak 98,000.00 112,875.00 - 14,875.00 5,644.00 20,519.00 118,519
- - -
Bostik - - -
Perekat Keramik & Batu Alam - - -
131 Fix Crete 25kg sak 75,000.00 133,185.15 - 58,185.15 6,658.85 64,844.00 139,844
132 Fix all 20kg sak 85,000.00 149,694.30 - 64,694.30 7,484.70 72,179.00 157,179
133 Super Fix all 20kg sak 65,000.00 213,064.95 - 148,064.95 10,653.05 158,718.00 223,718
134 Super Fix all trade/white 20kg sak 265,000.00 258,667.50 6,332.50 12,933.50 6,601.00 271,601
135 Asaflex 45 kg (15lt +30 kgp) set 1,350,000.00 1,292,834.55 57,165.45 64,641.45 7,476.00 1,357,476
136 Mortar Fix 100kg set 151,000.00 1,431,696.00 - 1,280,696.00 71,593.00 1,352,289.00 1,503,289
137 Mortar Fix 50 kg set 860,000.00 829,256.40 30,743.60 41,462.60 10,719.00 870,719
138 Mortar Fix 5 kg set 90,000.00 87,445.05 2,554.95 4,371.95 1,817.00 91,817
139 Renofix 25 kg Zak 350,000.00 386,742.30 - 36,742.30 19,336.70 56,079.00 406,079
140 Grout ( Semen Nat) 20 kg sak 340,000.00 16,420.95 323,579.05 821.05 - 322,758.00 17,242
141 Grout ( Semen Nat) 1 kg sak 17,000.00 931,728.00 - 914,728.00 46,586.00 961,314.00 978,314
142 Liquid Grout Adictive (LGA) 20 Lt pail 951,000.00 931,728.00 19,272.00 46,586.00 27,314.00 978,314
143 Mega Lastic Acrilic Base 20Lt pail 951,000.00
- - -
Wall System - - -
144 Skim Plas 25 Kg sak 70,000.00 111,612.90 - 41,612.90 5,581.10 47,194.00 117,194
145 Skim Crete 25 Kg sak 78,000.00 145,828.20 - 67,828.20 7,291.80 75,120.00 153,120
146 Fix. Plas 40 kg sak 65,000.00 100,101.75 - 35,101.75 5,005.25 40,107.00 105,107
147 Fix T. 40 kg sak 70,000.00 147,909.30 - 77,909.30 7,395.70 85,305.00 155,305
- - -
Waterproofing - - -
148 Ultra Coat RC2 20 Lt pail 850,000.00 1,179,487.05 - 329,487.05 58,973.95 388,461.00 1,238,461
149 Boscosem Slury 33 Kg set 520,000.00 494,182.50 25,817.50 24,709.50 - 1,108.00 518,892
150 Damplix 2 20 kg set 355,000.00 1,541,675.10 - 1,186,675.10 77,083.90 1,263,759.00 1,618,759
151 Damplix 3 45 kg set 2,175,000.00 2,045,376.90 129,623.10 102,269.10 - 27,354.00 2,147,646
152 Damplix 3E 35 kg set 1,285,000.00 1,133,574.75 151,425.25 56,678.25 - 94,747.00 1,190,253
153 Boscoseal Tom (Wp membran Bakar) Uk. 1m x 10 m rol 950,000.00 897,871.80 52,128.20 44,893.20 - 7,235.00 942,765
154 Indo primer ( lapisan primer WP membran) 20 Lt pail 810,000.00 734,801.55 75,198.45 36,740.45 - 38,458.00 771,542
155 Integral Kristalisasi (Waterproofing kristal) 20 kg pail 1,625,000.00 1,577,668.05 47,331.95 78,882.95 31,551.00 1,656,551
156 Sika Top Seal Set 20 kg + cairan set 345,000.00
- - -
Sealent - - -
156 No More Nail (320 GR) bh 80,600.00 71,695.05 8,904.95 3,584.95 - 5,320.00 75,280
157 Seal n Flex 1 (600 ML) bh 110,000.00 111,692.70 - 1,692.70 5,584.30 7,277.00 117,277
158 Boscosil 313 (300 ML) bh 60,000.00 57,016.05 2,983.95 2,850.95 - 133.00 59,867
159 Boscosil 616 (300 ML) bh 62,000.00 57,862.35 4,137.65 2,892.65 - 1,245.00 60,755
160 Fil A Gap (300 ML) bh 40,000.00 37,076.55 2,923.45 1,853.45 - 1,070.00 38,930
161 Boscosil Mastic (300 ML) khusus R. Pendingin bh 50,800.00 48,769.35 2,030.65 2,438.65 408.00 51,208
162 Bostik Z Bond 6S (300 ML) bh 145,000.00 139,258.35 5,741.65 6,962.65 1,221.00 146,221
163 Bostik Z PU Contrcuction (600 ML) bh 128,000.00 121,796.85 6,203.15 6,090.15 - 113.00 127,887
164 Quelyd Super Express (250 GR) bh 40,000.00 35,833.35 4,166.65 1,791.65 - 2,375.00 37,625
165 Expanda Foam (340 GR) bh 185,000.00 171,652.95 13,347.05 8,583.05 - 4,764.00 180,236
166 Barel Gun bh 540,000.00 523,805.10 16,194.90 26,189.90 9,995.00 549,995
167 Flash Band rol 188,000.00 164,872.05 23,127.95 8,243.95 - 14,884.00 173,116
- - -
BAMBU - - -
168 Bambu Ukuran 8"- 10" panjang 4 m btg 15,000.00 10,500.00 4,500.00 525.00 - 3,975.00 11,025
169 Bambu Ukuran 3"-6" panjang 4 m btg 8,500.00 9,450.00 - 950.00 472.00 1,422.00 9,922
170 Gedeg kulit kelas I m2 15,000.00 36,750.00 - 21,750.00 1,838.00 23,588.00 38,588
171 Gedeg kulit kelas II m2 10,000.00 34,125.00 - 24,125.00 1,706.00 25,831.00 35,831
172 Gedeg Biasa m2 9,000.00 35,000.00 - 26,000.00 1,750.00 27,750.00 36,750
- - -
KAYU - - -
173 Kayu jati Balok Ex Bojonegoro m3 9,500,000.00 31,500,000.00 ### 1,575,000.00 23,575,000.00 33,075,000
174 Kayu jati papan ex Bojonegoro m3 12,000,000.00 36,750,000.00 ### 1,837,500.00 26,587,500.00 38,587,500
175 Kayu jati Usuk m3 7,500,000.00 14,500,000.00 - 7,000,000.00 725,000.00 7,725,000.00 15,225,000
176 Kayu jati Reng m3 8,750,000.00 14,500,000.00 - 5,750,000.00 725,000.00 6,475,000.00 15,225,000
177 Kayu merbau Balok m3 18,500,000.00 16,800,000.00 1,700,000.00 840,000.00 - 860,000.00 17,640,000
178 Kayu merbau papan m3 8,900,000.00 17,850,000.00 - 8,950,000.00 892,500.00 9,842,500.00 18,742,500
179 Kayu kamper balok m3 8,850,000.00 8,925,000.00 - 75,000.00 446,250.00 521,250.00 9,371,250
180 Kayu kamper usuk/reng m3 9,500,000.00 7,875,000.00 1,625,000.00 393,750.00 - 1,231,250.00 8,268,750
181 Kayu kamper papan m3 9,500,000.00 9,975,000.00 - 475,000.00 462,750.00 937,750.00 10,437,750
182 Kayu Profil 4/5 kamper m' 9,500,000.00 37,800.00 9,462,200.00 1,890.00 - 9,460,310.00 39,690
183 List Kayu m' 48,500.00 33,000.00 15,500.00 1,650.00 - 13,850.00 34,650
184 List profil 2/4 kamper m' 48,800.00 30,450.00 18,350.00 3,150.00 - 15,200.00 33,600
185 Kayu kruing balok m3 6,750,000.00 6,300,000.00 450,000.00 525,000.00 75,000.00 6,825,000
186 Kayu kruing papan m3 7,450,000.00 7,875,000.00 - 425,000.00 - 425,000.00 7,875,000
187 Kayu Usuk Kruing m3 7,450,000.00 6,300,000.00 1,150,000.00 - - 1,150,000.00 6,300,000
188 Kayu Reng Kruing m3 7,450,000.00 6,300,000.00 1,150,000.00 - - 1,150,000.00 6,300,000
189 Kayu Papan Meranti m3 6,715,000.00 6,930,000.00 - 215,000.00 - 105,000.00 110,000.00 6,825,000
190 Kayu Balok Meranti m3 6,816,000.00 6,300,000.00 516,000.00 - - 516,000.00 6,300,000
191 Kayu Usuk Meranti m3 6,800,000.00 6,300,000.00 500,000.00 - - 500,000.00 6,300,000
192 Kayu Reng Meranti m3 6,500,000.00 6,300,000.00 200,000.00 - - 200,000.00 6,300,000
193 Kayu Bangkirai Papan m3 11,600,000.00 13,650,000.00 - 2,050,000.00 4,200,000.00 6,250,000.00 17,850,000
194 Kayu Bangkirai Balok m3 11,100,000.00 11,340,000.00 - 240,000.00 4,410,000.00 4,650,000.00 15,750,000
195 Kayu Begisting 5/7 m3 2,500,000.00 2,985,675.00 - 485,675.00 149,284.00 634,959.00 3,134,959
196 Kayu Seseh Balok m3 4,150,000.00 171,465.00 3,978,535.00 8,573.00 - 3,969,962.00 180,038
197 Kayu Dolken / Skapolding m3 8,000.00 99,750.00 - 91,750.00 4,988.00 96,738.00 104,738
198 Kayu Seseh Dolken D 20 Panjang 3 m btg 240,000.00
199 Kayu Seseh Dolken D 8-10 Panjang 4m btg 12,000.00 52,500.00 - 40,500.00 2,625.00 43,125.00 55,125
200 Kayu Usuk Albesia 5/7 Panjang 4 m btg 65,000.00 4,510,000.00 - 4,445,000.00 225,500.00 4,670,500.00 4,735,500
201 Kayu Reng mekanis Uk 2 x 3 x 400 cm m3 4,500,000.00 4,510,000.00 - 10,000.00 225,500.00 235,500.00 4,735,500
202 Kayu Reng mekanis Uk 3 x 5 x 400 cm m3 5,650,000.00 4,510,000.00 1,140,000.00 225,500.00 - 914,500.00 4,735,500
203 Kayu Usuk mekanis Uk 4 x 6 x 400 cm m3 5,650,000.00 4,510,000.00 1,140,000.00 225,500.00 - 914,500.00 4,735,500
204 Kayu Usuk mekanis Uk 5 x 7 x 400 cm m3 6,700,000.00 5,390,000.00 1,310,000.00 269,500.00 - 1,040,500.00 5,659,500
205 Kayu Balok mekanis Uk. 6 x 12 x 400 cm m3 6,700,000.00 5,500,000.00 1,200,000.00 275,000.00 - 925,000.00 5,775,000
206 Kayu Balok mekanis Uk. 6 x 15 x 400 cm m3 6,700,000.00 5,500,000.00 1,200,000.00 275,000.00 - 925,000.00 5,775,000
207 Kayu Balok mekanis Uk. 6 x 20 x 400 cm m3 6,700,000.00 2,843,000.00 3,857,000.00 144,250.00 - 3,712,750.00 2,987,250
208 Kayu Kelas III lokal m3 2,000,000.00 2,860,000.00 - 860,000.00 143,000.00 1,003,000.00 3,003,000
209 Kayu 7/7, Kelas III m3 3,500,000.00 700,000.00 2,800,000.00 35,000.00 - 2,765,000.00 735,000
210 Kayu Cempaka lokal m3 2,995,000.00 3,306,000.00 - 311,000.00 169,500.00 480,500.00 3,475,500
211 Kayu Bakar m3 850,000.00 15,000,000.00 ### 750,000.00 14,900,000.00 15,750,000
212 Papan Bakesting m3 1,450,000.00 15,000,000.00 ### 750,000.00 14,300,000.00 15,750,000
213 Papan Kayu Ulin m3 5,300,000.00 53,000.00 5,247,000.00 10,000.00 - 5,237,000.00 63,000
214 Papan Kayu, Kelas II m3 13,500,000.00 18,900.00 13,481,100.00 2,100.00 - 13,479,000.00 21,000
215 Balok Kayu Ulin m3 5,300,000.00 44,265.10 5,255,734.90 - 4,024.10 - 5,259,759.00 40,241
216 Lem Aica Aibond kg 60,000.00 60,000.00 -
217 Lem Kayu setara Fox ltr 16,000.00 16,000.00 -
218 Minyak bekisting setara Calform NX*R ltr 45,000.00
219 Jaro bubut bh 30,000.00
220 Kayu Perancah m3 48,000.00

Flooring/ Lantai - -
221 Parket Jati lokal Uk. 1,2 x 5 x 20 cm m2 255,000.00 220,000.00 35,000.00 11,000.00 - 24,000.00 231,000
222 Parket Jati lokal Uk. 1,2 x 5 x 25 cm m2 275,000.00 230,000.00 45,000.00 11,500.00 - 33,500.00 241,500
223 Parket Jati lokal Uk. 1,2 x 5 x 30 cm m2 310,000.00 250,000.00 60,000.00 12,500.00 - 47,500.00 262,500
224 Jati Eksport Uk. 1,2 x 5 x 20 cm m2 380,000.00 240,000.00 140,000.00 12,000.00 - 128,000.00 252,000
225 Jati Eksport Uk. 1,2 x 5 x 25 cm m2 395,000.00 265,000.00 130,000.00 13,250.00 - 116,750.00 278,250
226 Jati Eksport Uk. 1,2 x 5 x 30 cm m2 410,000.00 290,000.00 120,000.00 14,500.00 - 105,500.00 304,500
227 Jati Eksport Uk. 1,5 x 9 x 30 - 120 cm m2 510,000.00 460,000.00 50,000.00 23,000.00 - 27,000.00 483,000
228 Jati Eksport Uk. 1,5 x 12 x 30 - 120 cm m2 535,000.00 625,000.00 - 90,000.00 31,250.00 121,250.00 656,250
229 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 20 cm m2 340,000.00 190,000.00 150,000.00 9,500.00 - 140,500.00 199,500
230 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 30 cm m2 345,000.00 220,000.00 125,000.00 11,000.00 - 114,000.00 231,000
231 Parket Kayu Merbau Kelas I Uk. 1 x 9 x 30 - 120 cm m2 518,000.00 450,000.00 68,000.00 22,500.00 - 45,500.00 472,500
232 Parket Kayu Merbau Export Uk. 1 x 9 x 30 - 120 cm m2 540,000.00 490,000.00 50,000.00 24,500.00 - 25,500.00 514,500
233 Parket Kayu Merbau Export Uk. 1 x 9 x 60 - 120 cm m2 516,000.00 475,000.00 41,000.00 23,750.00 - 17,250.00 498,750
234 Decking Bangkirai Uk. 1,9 x 9 x 180 - 390 cm m2 548,000.00 440,000.00 108,000.00 22,000.00 - 86,000.00 462,000
235 Decking Krewing Uk. 1,9 x 9 x 180 - 400 cm m2 415,000.00 450,000.00 - 35,000.00 22,500.00 57,500.00 472,500
236 Decking Merbau Uk. 1,9 x 9 x 180 - 400 cm m2 445,000.00 520,000.00 - 75,000.00 26,000.00 101,000.00 546,000
237 Decking Ulin Sulawesi Uk. 1,9 x 9 x 200 cm m2 685,000.00 690,000.00 - 5,000.00 34,500.00 39,500.00 724,500
- - -
Lambersering - - -
238 Lambersering Bangkirai Uk. 1 x 9 x 200 cm m2 469,000.00 420,000.00 49,000.00 21,000.00 - 28,000.00 441,000
239 Lambersering Kruing Uk. 2 x 9 x 200 cm m2 385,000.00 320,000.00 65,000.00 16,000.00 - 49,000.00 336,000
- - -
Lis Kayu - - -
240 Lis plapond kayu mekanis Uk. 1 x 5 x 400 cm btg 26,000.00 15,000.00 11,000.00 750.00 - 10,250.00 15,750
241 Lis Plapond dobel kayu mekanis Uk. 1 x 5 x 400 cm btg 28,000.00 16,000.00 12,000.00 800.00 - 11,200.00 16,800
242 Lis Plapond Uk. 0,8 x 5 x 400 cm btg 21,000.00 13,000.00 8,000.00 650.00 - 7,350.00 13,650
243 Lis Plapond Uk.1 x 3 x 400 cm btg 19,500.00 11,000.00 8,500.00 550.00 - 7,950.00 11,550
244 Lis Plapond tanpa profil Uk. 1 x 5 x 400 cm btg 32,000.00 14,000.00 18,000.00 700.00 - 17,300.00 14,700
245 Lisplang kayu mekanis Uk. 2 x 6 x 400 cm btg 51,000.00 35,500.00 15,500.00 1,775.00 - 13,725.00 37,275
246 Lisplang kayu mekanis Uk. 2 x 7 x 400 cm btg 57,000.00 40,000.00 17,000.00 2,000.00 - 15,000.00 42,000
247 Lisplang kayu mekanis Uk. 2 x 8 x 400 cm btg 65,000.00 44,000.00 21,000.00 2,200.00 - 18,800.00 46,200
248 Lisplang kayu mekanis Uk. 2 x 10 x 400 cm btg 81,000.00 51,500.00 29,500.00 2,575.00 - 26,925.00 54,075
249 Lisplang kayu mekanis Uk. 2 x 12 x 400 cm btg 101,000.00 63,000.00 38,000.00 3,150.00 - 34,850.00 66,150
250 Lisplang kayu mekanis Uk. 2 x 15 x 400 cm btg 122,000.00 79,000.00 43,000.00 3,950.00 - 39,050.00 82,950
251 Lisplang kayu mekanis Uk. 2 x 20 x 400 cm btg 122,500.00 115,000.00 7,500.00 5,750.00 - 1,750.00 120,750
252 Lis Kaca Uk. 1,5 x 3 cm m' 16,500.00 6,500.00 10,000.00 325.00 - 9,675.00 6,825
253 Lis Dowel Kecil Uk. 1 x 2 cm m' 6,000.00 3,200.00 2,800.00 160.00 - 2,640.00 3,360
254 Lis Dowel Besar Uk. 1,3 x 3 cm m' 6,500.00 4,000.00 2,500.00 200.00 - 2,300.00 4,200
255 Lis Kusen m' 6,200.00 3,300.00 2,900.00 165.00 - 2,735.00 3,465
- - -
CONWOOD - - -
Flooring/Deck Application - - -
256 Conwood Deck 4" ( 102 x 3050 x 14 mm) Pcs 81,500.00 67,100.00 14,400.00 3,355.00 - 11,045.00 70,455
257 Conwood Deck 6" ( 152 x 3050 x 14 mm) Pcs 138,000.00 105,400.00 32,600.00 5,270.00 - 27,330.00 110,670
258 Conwood Deck 8" ( 203 x 3050 x 14 mm) Pcs 168,000.00 140,500.00 27,500.00 7,025.00 - 20,475.00 147,525
259 Conwood Deck 4" ( 102 x 3050 x 25 mm) Pcs 168,000.00 140,900.00 27,100.00 7,045.00 - 20,055.00 147,945
260 Conwood Deck 6" ( 152 x 3050 x 25 mm) Pcs 250,500.00 211,400.00 39,100.00 10,570.00 - 28,530.00 221,970
261 Conwood Deck 8" ( 203 x 3050 x 25 mm) Pcs 325,000.00 281,700.00 43,300.00 14,085.00 - 29,215.00 295,785
262 Conwood Deck 12"( 300 x 3050 x 25 mm) Pcs 475,000.00 414,700.00 60,300.00 20,735.00 - 39,565.00 435,435
- - -
Decorative Stair - - -
263 Conwood Stair 8" (Vertical) (200 x 1200 x 16 mm) Pcs 91,000.00 74,500.00 16,500.00 3,725.00 - 12,775.00 78,225
264 Conwood Stair 12" (Horisontal) (300 x 1200 x 25 mm) Pcs 189,800.00 163,200.00 26,600.00 8,160.00 - 18,440.00 171,360
265 Conwood Handrail (85 x 3050 x 30 mm) Pcs 148,500.00 130,200.00 18,300.00 6,510.00 - 11,790.00 136,710
- - -
Ceiling Application - - -
266 Celling Border (50 X 3050 X 11 mm) Pcs 40,000.00 33,100.00 6,900.00 1,655.00 - 5,245.00 34,755
267 Conwood Lath 3" Cut (76 x 3050 x 11 mm) Pcs 61,000.00 49,900.00 11,100.00 2,495.00 - 8,605.00 52,395
268 Conwood Lath 4" Cut (100 x 3050 x 11 mm) Pcs 75,000.00 61,100.00 13,900.00 3,055.00 - 10,845.00 64,155
269 Conwood Lath 3"(UG)(600 x 1200 x 8 mm) Pcs 125,000.00 105,300.00 19,700.00 5,265.00 - 14,435.00 110,565
270 Conwood Lath 3"(UG)(1200 x 2400 x 8 mm) Pcs 515,000.00 447,700.00 67,300.00 22,385.00 - 44,915.00 470,085
- - -
Eave/lisplank - - -
271 Conwood Eave 2 IN 1 (235 x 3050 x 16 mm) Pcs 178,000.00 149,200.00 28,800.00 7,460.00 - 21,340.00 156,660
- - -
Wall Application - - -
272 Conwood Lap Siding 6" BG (152 x 3050 x 11mm) Pcs 85,000.00 63,900.00 21,100.00 3,195.00 - 17,905.00 67,095
273 Conwood Lap Siding 8" GO (200 x 3050 x 11mm) Pcs 98,000.00 83,300.00 14,700.00 4,165.00 - 10,535.00 87,465
274 Conwood Decorative Panel (600 x 1200 x 11mm) Pcs 180,000.00 151,600.00 28,400.00 7,580.00 - 20,820.00 159,180
275 Conwood Decorative Panel " V-Groove" (305 x 3050 x 14mm) Pcs 215,000.00 185,400.00 29,600.00 9,270.00 - 20,330.00 194,670
- - -
Moulding Application - - -
276 Conwood Floor Mould 4" (Louis) (102 x 3050 x 11mm) Pcs 125,000.00 46,900.00 78,100.00 2,345.00 - 75,755.00 49,245
277 Conwood Floor Mould 4" (Louis) (102 x 3050 x 14mm) Pcs 41,000.00 55,500.00 - 14,500.00 2,775.00 17,275.00 58,275
278 Conwood Floor Mould 4" (Classic) (102 x 3050 x 11mm) Pcs 65,000.00 46,900.00 18,100.00 2,345.00 - 15,755.00 49,245
279 Conwood Floor Mould 4" (Classic) (102 x 3050 x 14mm) Pcs 60,000.00 55,500.00 4,500.00 2,775.00 - 1,725.00 58,275
- - -
Decorative Application - - -
280 Conwood Plank 1" (100 x 3050 x 25 mm) Pcs 110,000.00 90,300.00 19,700.00 4,515.00 - 15,185.00 94,815
281 Conwood Plank 2" (50 x 3050 x 16 mm) Pcs 45,000.00 34,200.00 10,800.00 1,710.00 - 9,090.00 35,910
282 Conwood Plank 2" (50 x 3050 x 25 mm) Pcs 65,000.00 53,000.00 12,000.00 2,650.00 - 9,350.00 55,650
283 Conwood Sun Shade 3" (76 x 3050 x 14 mm) Pcs 53,000.00 45,300.00 7,700.00 2,265.00 - 5,435.00 47,565
284 Conwood Fence 4" Arrow - 1M (100x 1000 x 16 mm) Pcs 40,000.00 28,500.00 11,500.00 1,425.00 - 10,075.00 29,925
285 Conwood Fence 4" Arrow - 1,5M (100x 1500 x 16 mm) Pcs 52,000.00 42,800.00 9,200.00 2,140.00 - 7,060.00 44,940
286 Conwood Fence 4" Botany - 1M (100x 1000 x 16 mm) Pcs 38,000.00 28,500.00 9,500.00 1,425.00 - 8,075.00 29,925
287 Conwood Fence 4" Botany - 1,5M (100x 1500 x 16 mm) Pcs 53,000.00 42,800.00 10,200.00 2,140.00 - 8,060.00 44,940
288 Conwood Fence 4" Classic - 1,5M (100x 1500 x 16 mm) Pcs 55,000.00 44,600.00 10,400.00 2,230.00 - 8,170.00 46,830
289 Conwood Fence 4" Branch - 1M (100x 1000 x 16 mm) Pcs 40,000.00 29,500.00 10,500.00 1,475.00 - 9,025.00 30,975
- - -
Planks - - -
290 Conwood Plank 8" Textured (200 x 3050 x 8 mm) Pcs 94,000.00 47,000.00 47,000.00 2,350.00 - 44,650.00 49,350
291 Conwood Plank 8" Plain (200 x 3050 x 8 mm) Pcs 91,000.00 47,000.00 44,000.00 2,350.00 - 41,650.00 49,350
- - -
- - -
BESI - - -
292 Mour + Bout bh 2,950.00 7,550.00 - 4,600.00 755.00 5,355.00 8,305
293 Besi strip kg 13,000.00 11,960.00 1,040.00 3,265.00 2,225.00 15,225
294 Besi strip 30x3 mm m' 18,000.00 20,000.00 - 2,000.00 2,000.00 4,000.00 22,000
295 Baja Strip (0,2 x 2) cm / Plat Strip Kg 15,833.33 16,500.00 - 666.67 1,650.00 2,316.67 18,150
296 Besi Beton U24 (Polos) Kg 9,800.00 8,750.00 1,050.00 4,900.00 3,850.00 13,650
297 Besi Beton Ulir U 32 Kg 12,500.00 9,375.00 3,125.00 4,800.00 1,675.00 14,175
298 Besi Ulir 13,0x 12 sni (Ts-40) Kg 12,000.00 12,000.00 -
299 Besi Ulir 16,0x 12 sni (Ts-40) kg 11,000.00 11,000.00 -
300 Besi Ø5 (3,8 x 6,0) btg 4,950.00 4,200.00 750.00 420.00 - 330.00 4,620
301 Besi Ø6 (5,0 x 12) btg 18,200.00 11,850.00 6,350.00 1,185.00 - 5,165.00 13,035
302 Besi Ø6 (5,2 x 12) btg 21,000.00 12,450.00 8,550.00 1,245.00 - 7,305.00 13,695
303 Besi Ø6 (5,7 x 12) btg 27,400.00 2.66 10,300.75 14,750.00 12,650.00 1,475.00 - 11,175.00 16,225
304 Besi Ø8 (6,5 x 12) btg 29,100.00 19,550.00 9,550.00 1,955.00 - 7,595.00 21,505
305 Besi Ø8 (6,7 x 12) btg 30,400.00 20,700.00 9,700.00 2,070.00 - 7,630.00 22,770
306 Besi Ø8 (6,9 x 12) SNI btg 31,800.00 23,900.00 7,900.00 2,390.00 - 5,510.00 26,290
307 Besi Ø8 (7,1 x 12) SNI btg 36,100.00 24,700.00 11,400.00 2,470.00 - 8,930.00 27,170
308 Besi Ø8 (7,4 x 12) SNI btg 38,200.00 26,500.00 11,700.00 2,650.00 - 9,050.00 29,150
309 Besi Ø8 (7,6 x 12) SNI btg 39,100.00 27,200.00 11,900.00 2,720.00 - 9,180.00 29,920
310 Besi Ø8 (7,7 x 12) SNI btg 40,100.00 27,700.00 12,400.00 2,770.00 - 9,630.00 30,470
311 Besi Ø8 (7,8 x 12) SNI btg 42,000.00 4.74 8,860.76 28,400.00 13,600.00 2,840.00 - 10,760.00 31,240
312 Besi Ø8 SNI U 24 btg 39,600.00 28,900.00 10,700.00 3,070.00 - 7,630.00 31,970
313 Besi Ø10 (8,4 x 12) SNI btg 46,900.00 33,600.00 13,300.00 3,360.00 - 9,940.00 36,960
314 Besi Ø10 (8,6 x 12) SNI btg 50,200.00 34,800.00 15,400.00 3,480.00 - 11,920.00 38,280
315 Besi Ø10 (8,9 x 12) SNI btg 52,200.00 37,500.00 14,700.00 3,750.00 - 10,950.00 41,250
316 Besi Ø10 (9,2 x 12) SNI btg 54,750.00 39,400.00 15,350.00 3,940.00 - 11,410.00 43,340
317 Besi Ø10 (9,4 x 12) SNI btg 58,500.00 41,500.00 17,000.00 4,150.00 - 12,850.00 45,650
318 Besi Ø10 (9,6 x 12) SNI btg 61,050.00 43,200.00 17,850.00 4,320.00 - 13,530.00 47,520
319 Besi Ø10 (9,8 x 12) SNI btg 63,500.00 44,400.00 19,100.00 4,440.00 - 14,660.00 48,840
320 Besi Ø10 SNI U 24 btg 64,000.00 7.4 8,648.65 45,500.00 18,500.00 4,550.00 - 13,950.00 50,050
321 Besi Ø10 Ulir (9,5 x 12) SNI btg 58,500.00 42,700.00 15,800.00 4,270.00 - 11,530.00 46,970
322 Besi Ø10 Ulir (9,7 x 12) SNI btg 56,000.00 44,400.00 11,600.00 4,440.00 - 7,160.00 48,840
323 Besi Ø12 (11,5 x 12) SNI btg 84,500.00 27,810.16 62,700.00 21,800.00 6,270.00 - 15,530.00 68,970
324 Besi Ø13 Ulir (11,5 x 12) SNI btg 80,500.00 9,270.05 64,300.00 16,200.00 6,430.00 - 9,770.00 70,730
325 Besi Ø13 Ulir (11,7 x 12) SNI btg 93,000.00 66,000.00 27,000.00 6,600.00 - 20,400.00 72,600
326 Besi Ø13 Ulir (12,0 x 12) SNI btg 96,500.00 10.7 9,018.69 69,200.00 27,300.00 6,920.00 - 20,380.00 76,120
327 Besi Ø13 Ulir (12,5 x 12) SNI btg 101,000.00 74,300.00 26,700.00 7,430.00 - 19,270.00 81,730
328 Besi Ø13 Ulir (12,7 x 12) SNI btg 101,000.00 76,800.00 24,200.00 8,040.00 - 16,160.00 84,840
329 Besi Ø16 Ulir (14 x 12) SNI btg 130,000.00 94,400.00 35,600.00 9,440.00 - 26,160.00 103,840
330 Besi Ø16 Ulir (14,5 x 12) SNI btg 132,000.00 101,200.00 30,800.00 10,120.00 - 20,680.00 111,320
331 Besi Ø16 Ulir (15,0 x 12) SNI btg 140,000.00 108,000.00 32,000.00 10,800.00 - 21,200.00 118,800
332 Besi Ø16 Ulir (15,5 x 12) SNI btg 150,500.00 115,300.00 35,200.00 11,530.00 - 23,670.00 126,830
333 Besi Ø16 Ulir (15,7 x 12) SNI btg 154,800.00 19 8,147.37 117,500.00 37,300.00 11,750.00 - 25,550.00 129,250
334 Wiremesh M6@50m rol 2,300,500.00 2,028,000.00 272,500.00 202,800.00 - 69,700.00 2,230,800
335 Wiremesh M7 (D6,5mm) Uk. 2,1 x 5,4 m lbr 450,000.00 308,000.00 142,000.00 30,800.00 - 111,200.00 338,800
336 Wiremesh M8 (D7,5mm) Uk. 2,1 x 5,4 m lbr 695,000.00 424,600.00 270,400.00 42,460.00 - 227,940.00 467,060
337 Wermes Diameter 8 (U 50) lbr 3,011,000.00 489,900.00 2,521,100.00 48,990.00 - 2,472,110.00 538,890
338 Beugel Besi O8 kg 20,000.00 12,100.00 7,900.00 1,210.00 - 6,690.00 13,310
339 Beugel penguat /plaat kg 18,000.00 70,950.00 - 52,950.00 7,095.00 60,045.00 78,045
340 Kawat Beton RRT kg 32,000.00 15,400.00 16,600.00 2,450.00 - 14,150.00 17,850
341 Kawat berduri kg 120,000.00 99,000.00 21,000.00 9,900.00 - 11,100.00 108,900
342 Kawat Ayak / Kuasa 5 X 5 cm m2 65,000.00 14,000.00 51,000.00 1,400.00 - 49,600.00 15,400
343 Kawat Harmonika 3 X 3 cm m2 62,000.00 33,000.00 29,000.00 3,300.00 - 25,700.00 36,300
344 Kawat Nyamuk m2 48,000.00 24,200.00 23,800.00 2,420.00 - 21,380.00 26,620
345 Kawat Jaring m2 49,500.00 25,000.00 24,500.00 2,500.00 - 22,000.00 27,500
346 Kawat Bronjong kg 50,000.00 44,000.00 6,000.00 4,400.00 - 1,600.00 48,400
347 Besi / Baja profil kg 15,000.00 10,450.00 4,550.00 18,950.00 14,400.00 29,400
348 Besi Baja L60 X 60 X 6 / L50 x 50 x 5 kg 18,500.00 13,200.00 5,300.00 1,320.00 - 3,980.00 14,520
349 Baja WF (150 x 12 GG) btg 1,950,000.00 1,512,000.00 438,000.00 151,200.00 - 286,800.00 1,663,200
350 Baja WF (200 x 12 GG) btg 2,500,000.00 2,304,000.00 196,000.00 230,400.00 34,400.00 2,534,400
351 Besi Baja WF 200 x 100 x 4,5 x 7 kg 15,000.00 11,500.00 3,500.00 1,150.00 - 2,350.00 12,650
352 Besi Baja WF 200 x 100 x 5,5x8 kg 14,500.00 14,500.00 -
353 Besi Baja WF 250 x 125 x 5 x 7 kg 16,000.00 11,500.00 4,500.00 1,150.00 - 3,350.00 12,650
354 Besi Baja C 100 x 50 x 3,2 kg 14,000.00 11,500.00 2,500.00 1,150.00 - 1,350.00 12,650
355 Baja Ringan Type C- 75, 0.8 m' 19,800.00 15,950.00 3,850.00 1,595.00 - 2,255.00 17,545
356 Baja Ringan Type C- 75, 0.6 m' 14,000.00 13,750.00 250.00 1,375.00 1,125.00 15,125
357 Reng Baja m' 11,250.00 7,700.00 3,550.00 770.00 - 2,780.00 8,470
358 Profil Canal "C" Tipe C71.075 btg 85,000.00 16,280.00 68,720.00 1,628.00 - 67,092.00 17,908
359 Profil Canal "C" Tipe C81.075 btg 96,000.00 94,380.00 1,620.00 9,438.00 7,818.00 103,818
360 Profil Canal "C" Tipe C81.065 btg 90,000.00 90,750.00 - 750.00 9,075.00 9,825.00 99,825
361 Profil "Omega / reng Tipe AA btg 45,000.00 52,800.00 - 7,800.00 5,280.00 13,080.00 58,080
362 Profil "Omega / reng Tipe A btg 55,000.00 49,500.00 5,500.00 4,950.00 - 550.00 54,450
363 Profil "Omega / reng Tipe AB btg 65,000.00 46,200.00 18,800.00 4,620.00 - 14,180.00 50,820
364 Profil Aluminium Kaca 3/4 m' 18,000.00 9,900.00 8,100.00 990.00 - 7,110.00 10,890
365 Profil Aluminium L 3 cm lis Kaca m' 18,000.00 12,650.00 5,350.00 1,265.00 - 4,085.00 13,915
366 Profil Aluminium 4" m' 22,000.00 66,000.00 - 44,000.00 6,600.00 50,600.00 72,600
367 Besi Plat kg 23,000.00 24,860.00 - 1,860.00 2,486.00 4,346.00 27,346
368 Besi plat 3 X 6 tebal 1,2 mm btg 90,000.00 215,600.00 - 125,600.00 21,560.00 147,160.00 237,160
369 Besi plat 4 X 8 tebal 1,8 mm btg 22,000.00 486,200.00 - 464,200.00 48,620.00 512,820.00 534,820
370 Baja Plat Hitam L = 10 lbr 285,000.00 1,805,000.00 - 1,520,000.00 180,500.00 1,700,500.00 1,985,500
371 Baja Plat Hitam L = 8 lbr 510,000.00 1,449,000.00 - 939,000.00 144,900.00 1,083,900.00 1,593,900
372 Baut Galvanis 3/4 x 2 " bh 9,500.00 6,775.00 2,725.00 678.00 - 2,047.00 7,453
373 Baut Galvanis 3/4 x 2 1/2 " bh 10,000.00 7,790.00 2,210.00 779.00 - 1,431.00 8,569
374 Baut Galvanis 3/4 x 3 " bh 12,000.00 8,475.00 3,525.00 848.00 - 2,677.00 9,323
375 Baut Galvanis 3/4 x 3 1/2 " bh 12,000.00 9,475.00 2,525.00 947.00 - 1,578.00 10,422
376 Baut Galvanis 3/4 x 4 " bh 13,500.00 10,125.00 3,375.00 1,013.00 - 2,362.00 11,138
377 Baut Galvanis 3/4 x 4 1/2 " bh 15,000.00 11,100.00 3,900.00 1,110.00 - 2,790.00 12,210
378 Baut Galvanis 3/4 x 5 " bh 17,000.00 11,800.00 5,200.00 1,180.00 - 4,020.00 12,980
379 Baut Galvanis 3/4 x 5 1/2 " bh 9,500.00 7,031.25 2,468.75 702.75 - 1,766.00 7,734
380 Baut Galvanis 3/4 x 6 " bh 17,000.00 13,800.00 3,200.00 1,380.00 - 1,820.00 15,180
381 Plat Siku Panjang 30 cm bh 21,000.00 24,000.00 - 3,000.00 2,400.00 5,400.00 26,400
382 Plat Siku Panjang 40 cm bh 28,000.00 26,000.00 2,000.00 2,600.00 600.00 28,600
383 Plat Siku Panjang 50 cm bh 15,000.00 30,000.00 - 15,000.00 3,000.00 18,000.00 33,000
384 Plat Siku Panjang 60 cm bh 18,500.00 35,000.00 - 16,500.00 3,500.00 20,000.00 38,500
385 Plat Aluminium 2mm m2 30,500.00 275,000.00 - 244,500.00 27,500.00 272,000.00 302,500
386 Besi siku / engsel m' 38,500.00 38,500.00 -
387 Besi Siku L.30.30.3 mm btg 34,500.00 74,033.33 - 39,533.33 7,403.67 46,937.00 81,437
388 Baut UNC 5/8 x 2" bh 3,500.00 3,000.00 500.00 300.00 - 200.00 3,300
389 Baut UNC 5/8 x 2 1/2" bh 4,250.00 3,200.00 1,050.00 320.00 - 730.00 3,520
390 Baut UNC 5/8 x 3" bh 2,100.00 3,650.00 - 1,550.00 365.00 1,915.00 4,015
391 Baut UNC 5/8 x 3 1/2" bh 2,800.00 3,900.00 - 1,100.00 390.00 1,490.00 4,290
392 Baut UNC 5/8 x 4" bh 3,100.00 4,350.00 - 1,250.00 435.00 1,685.00 4,785
393 Baut UNC 5/8 x 4 1/2" bh 3,800.00 4,700.00 - 900.00 470.00 1,370.00 5,170
394 Baut UNC 5/8 x 5" bh 4,100.00 5,075.00 - 975.00 508.00 1,483.00 5,583
395 Baut UNC 5/8 x 5 1/2" bh 4,300.00 5,440.00 - 1,140.00 544.00 1,684.00 5,984
396 Baut UNC 5/8 x 6" bh 4,500.00 5,800.00 - 1,300.00 580.00 1,880.00 6,380
397 Baut UNC 3/4 x 2" bh 4,600.00 5,300.00 - 700.00 530.00 1,230.00 5,830
398 Baut UNC 3/4 x 2 1/2" bh 4,900.00 5,750.00 - 850.00 575.00 1,425.00 6,325
399 Baut UNC 3/4 x 3" bh 8,900.00 6,300.00 2,600.00 630.00 - 1,970.00 6,930
400 Baut UNC 3/4 x 3 1/2" bh 10,000.00 6,900.00 3,100.00 690.00 - 2,410.00 7,590
401 Baut UNC 3/4 x 4" bh 11,000.00 7,450.00 3,550.00 745.00 - 2,805.00 8,195
402 Baut UNC 3/4 x 4 1/2" bh 11,500.00 8,000.00 3,500.00 800.00 - 2,700.00 8,800
403 Baut UNC 3/4 x 5" bh 12,000.00 8,650.00 3,350.00 865.00 - 2,485.00 9,515
404 Baut UNC 3/4 x 5 1/2" bh 13,000.00 9,200.00 3,800.00 920.00 - 2,880.00 10,120
405 Baut UNC 3/4 x 6" bh 5,000.00 9,800.00 - 4,800.00 980.00 5,780.00 10,780
406 Baut CB 3/8 x 5" bh 2,500.00 1,600.00 900.00 160.00 - 740.00 1,760
407 Baut CB 3/8 x 3" bh 1,200.00 1,100.00 100.00 110.00 10.00 1,210
408 Baut CB 3/8 x 2" bh 1,345.00 900.00 445.00 90.00 - 355.00 990
409 Behel 7/8 bh 5,100.00 119,000.00 - 113,900.00 11,900.00 125,800.00 130,900
410 Baut Baja A325 16 x 50 bh 8,500.00 6,000.00 2,500.00 600.00 - 1,900.00 6,600
411 Baut Baja A325 16 x 60 bh 9,500.00 6,700.00 2,800.00 670.00 - 2,130.00 7,370
412 Baut Baja A325 16 x 70 bh 10,000.00 7,000.00 3,000.00 700.00 - 2,300.00 7,700
413 Baut Baja A325 16 x 80 bh 11,500.00 8,000.00 3,500.00 800.00 - 2,700.00 8,800
414 Baut Baja A325 16 x 90 bh 12,350.00 8,750.00 3,600.00 875.00 - 2,725.00 9,625
415 Baut Baja A325 16 x 100 bh 13,500.00 9,550.00 3,950.00 955.00 - 2,995.00 10,505
416 Baut Baja A325 16 x 110 bh 15,500.00 11,000.00 4,500.00 1,100.00 - 3,400.00 12,100
417 Baut Baja A325 16 x 120 bh 17,000.00 12,000.00 5,000.00 1,200.00 - 3,800.00 13,200
418 Baut Baja A325 16 x 130 bh 18,000.00 13,000.00 5,000.00 1,300.00 - 3,700.00 14,300
419 Baut Baja A325 16 x 140 bh 20,300.00 14,000.00 6,300.00 1,400.00 - 4,900.00 15,400
420 Baut Baja A325 16 x 150 bh 20,500.00 14,500.00 6,000.00 1,450.00 - 4,550.00 15,950
421 Baut Baja A325 19 x 50 bh 13,500.00 9,600.00 3,900.00 960.00 - 2,940.00 10,560
422 Baut Baja A325 19 x 60 bh 15,000.00 10,550.00 4,450.00 1,055.00 - 3,395.00 11,605
423 Baut Baja A325 19 x 70 bh 16,500.00 11,425.00 5,075.00 1,143.00 - 3,932.00 12,568
424 Baut Baja A325 19 x 80 bh 17,325.00 12,000.00 5,325.00 1,200.00 - 4,125.00 13,200
425 Baut Baja A325 19 x 90 bh 19,500.00 13,850.00 5,650.00 1,385.00 - 4,265.00 15,235
426 Baut Baja A325 19 x 100 bh 21,000.00 14,700.00 6,300.00 1,470.00 - 4,830.00 16,170
427 Baut Baja A325 19 x 110 bh 21,000.00 16,000.00 5,000.00 1,600.00 - 3,400.00 17,600
428 Baut Baja A325 19 x 120 bh 24,000.00 17,000.00 7,000.00 1,700.00 - 5,300.00 18,700
429 Baut Baja A325 19 x 130 bh 25,000.00 18,850.00 6,150.00 1,885.00 - 4,265.00 20,735
430 Baut Baja A325 19 x 140 bh 27,200.00 18,800.00 8,400.00 1,880.00 - 6,520.00 20,680
431 Baut Baja A325 19 x 150 bh 28,000.00 20,000.00 8,000.00 2,000.00 - 6,000.00 22,000
432 Baut Galvanis 3/8 x 2 " bh 2,000.00 1,300.00 700.00 130.00 - 570.00 1,430
433 Baut Galvanis 3/8 x 2 1/2 " bh 2,100.00 1,400.00 700.00 140.00 - 560.00 1,540
434 Baut Galvanis 3/8 x 3 " bh 2,250.00 1,550.00 700.00 155.00 - 545.00 1,705
435 Baut Galvanis 3/8 x 3 1/2 " bh 2,700.00 1,695.00 1,005.00 170.00 - 835.00 1,865
436 Baut Galvanis 3/8 x 4 " bh 2,800.00 1,840.00 960.00 184.00 - 776.00 2,024
437 Baut Galvanis 3/8 x 4 1/2 " bh 2,900.00 2,045.00 855.00 205.00 - 650.00 2,250
438 Baut Galvanis 3/8 x 5 " bh 3,000.00 2,150.00 850.00 215.00 - 635.00 2,365
439 Baut Galvanis 3/8 x 5 1/2 " bh 3,200.00 2,400.00 800.00 240.00 - 560.00 2,640
440 Baut Galvanis 3/8 x 6 " bh 3,800.00 2,500.00 1,300.00 250.00 - 1,050.00 2,750
441 Baut Galvanis 5/8 x 2 " bh 5,100.00 3,550.00 1,550.00 355.00 - 1,195.00 3,905
442 Baut Galvanis 5/8 x 2 1/2 " bh 5,740.00 4,025.00 1,715.00 403.00 - 1,312.00 4,428
443 Baut Galvanis 5/8 x 3 " bh 6,200.00 4,375.00 1,825.00 438.00 - 1,387.00 4,813
444 Baut Galvanis 5/8 x 3 1/2 " bh 7,000.00 4,900.00 2,100.00 490.00 - 1,610.00 5,390
445 Baut Galvanis 5/8 x 4 " bh 7,600.00 5,250.00 2,350.00 525.00 - 1,825.00 5,775
446 Baut Galvanis 5/8 x 4 1/2 " bh 8,200.00 5,650.00 2,550.00 565.00 - 1,985.00 6,215
447 Baut Galvanis 5/8 x 5 " bh 8,650.00 5,980.00 2,670.00 598.00 - 2,072.00 6,578
448 Baut Galvanis 5/8 x 5 1/2 " bh 9,850.00 6,750.00 3,100.00 675.00 - 2,425.00 7,425
449 Baut Galvanis 5/8 x 6 " bh 10,100.00 7,100.00 3,000.00 710.00 - 2,290.00 7,810
450 Besi Pipa Galvanis lonjor 120,500.00 770,000.00 - 649,500.00 77,000.00 726,500.00 847,000
451 besi tangga D 19, enamel cat bh 85,500.00 85,500.00 -
452 Handle Besi Ø 12, enamel cat bh 95,800.00 95,800.00 -
453 Angker diameter 12mm bh 21,000.00 14,800.00 6,200.00 1,480.00 - 4,720.00 16,280
454 Skruf Fixer 5 cm bh 1,000.00 550.00 450.00 55.00 - 395.00 605
455 Dynabolt bh 4,500.00 3,675.00 825.00 368.00 - 457.00 4,043
456 Rapidrant gln 98,500.00 98,500.00 -
457 Sealant tube 40,000.00 36,300.00 3,700.00 1,815.00 - 1,885.00 38,115
458 Silicon kg 43,500.00 73,700.00 - 30,200.00 3,685.00 33,885.00 77,385
459 Elektrode 0,6 % bh 118,500.00 137,500.00 - 19,000.00 6,875.00 25,875.00 144,375
460 Elektrode 2 % bh 315,000.00 203,500.00 111,500.00 10,175.00 - 101,325.00 213,675
- - -
BESI PAGAR - - -
461 Pagar Setara BRC T.90 diameter 6mm m' 245,000.00 245,000.00 -
462 Pagar Setara BRC T.120 diameter 6mm m' 289,000.00 289,000.00 -
463 Pagar Setara BRC T.150 diameter 6mm m' 289,000.00 289,000.00 -
464 Pagar Setara BRC T.175 diameter 7mm m' 485,000.00 485,000.00 -
465 Pagar Setara BRC T.190 diameter 7mm m' 685,000.00 685,000.00 -
466 Pagar HotDip Galvanized T.90 diameter 6mm m' 234,000.00 234,000.00 -
467 Pagar HotDip Galvanized T.120 diameter 6mm m' 250,000.00 250,000.00 -
468 Pagar HotDip Galvanized T.150 diameter 7mm m' 285,000.00 285,000.00 -
469 Pagar HotDip Galvanized T.175 diameter 7mm m' 309,000.00 309,000.00 -
470 Pagar HotDip Galvanized T.190 diameter 7mm m' 248,000.00 248,000.00 -
- - -
CAT - - -
471 Cat Marka Jalan Kg 61,000.00 43,890.00 17,110.00 2,195.00 - 14,915.00 46,085
472 Glas Bit Kg 38,000.00 27,500.00 10,500.00 1,375.00 - 9,125.00 28,875
473 Cat besi kg 57,000.00 93,170.00 - 36,170.00 4,112.00 40,282.00 97,282
474 Cat Menie besi Kg 40,000.00 49,500.00 - 9,500.00 3,000.00 12,500.00 52,500
475 Cat menie Kayu kg 30,000.00 49,500.00 - 19,500.00 2,475.00 21,975.00 51,975
476 Cat Dasar Tembok Setara Emco Kg 65,000.00 59,400.00 5,600.00 2,970.00 - 2,630.00 62,370
477 Cat Setara weldon biasa Kg 33,000.00 33,000.00 -
478 Cat Setara weldon warna Kg 35,000.00 35,000.00 -
479 Cat Setara weldon warna tua Kg 38,000.00 38,000.00 -
480 Cat Setara emco Lux Biasa kg 33,000.00 59,400.00 - 26,400.00 3,600.00 30,000.00 63,000
481 Cat Setara emco Lux Warna kg 35,000.00 64,460.00 - 29,460.00 4,840.00 34,300.00 69,300
482 Cat Setara emco Lux Warna Tua kg 40,000.00 72,930.00 - 32,930.00 7,920.00 40,850.00 80,850
483 Cat tembok Setara Decolith kg 38,000.00 39,930.00 - 1,930.00 1,997.00 3,927.00 41,927
484 Cat tembok Setara Dulux Exterior kg 145,000.00 126,500.00 18,500.00 6,325.00 - 12,175.00 132,825
485 Cat tembok Setara Dulux Interior kg 110,000.00 93,500.00 16,500.00 4,675.00 - 11,825.00 98,175
486 Cat tembok Setara Vinilex kg 26,500.00 39,930.00 - 13,430.00 1,997.00 15,427.00 41,927
487 Cat Galvanis kg 55,000.00 87,780.00 - 32,780.00 4,389.00 37,169.00 92,169
488 Cat Kayu Emco kg 65,000.00 63,800.00 1,200.00 3,190.00 1,990.00 66,990
489 Cat Baja Chromate (anti karat) Kg 57,000.00 110,000.00 - 53,000.00 5,500.00 58,500.00 115,500
490 Cat Kansteen Kg 82,000.00 57,875.00 24,125.00 3,025.00 - 21,100.00 60,900
491 Kalkarium Kg 110,500.00 110,500.00 -
492 Kapur sirih Kg 15,000.00 15,000.00 -
493 Amplas lbr 5,000.00 6,600.00 - 1,600.00 330.00 1,930.00 6,930
494 Kuas Bh 12,000.00 13,200.00 - 1,200.00 2,550.00 3,750.00 15,750
- - -
Cat KCA - - -
495 Cat Natural@25 kg Pail 890,000.00 399,000.00 491,000.00 19,950.00 - 471,050.00 418,950
496 Cat Flakes@25 kg Pail 985,000.00 683,000.00 302,000.00 34,150.00 - 267,850.00 717,150
497 Cat Genteng @25kg Pail 288,000.00 519,000.00 - 231,000.00 25,950.00 256,950.00 544,950
- - -
Stone Coating - - -
498 Clear gloss air kg 75,000.00 48,000.00 27,000.00 2,400.00 - 24,600.00 50,400
499 Black gloss air kg 88,000.00 46,000.00 42,000.00 2,300.00 - 39,700.00 48,300
500 Clear gloss solvent kg 79,500.00 50,500.00 29,000.00 2,525.00 - 26,475.00 53,025
501 Black gloss solvent kg 89,000.00 54,000.00 35,000.00 2,700.00 - 32,300.00 56,700
502 Clear doft solvent kg 89,500.00 53,000.00 36,500.00 2,650.00 - 33,850.00 55,650
503 Black doft solvent kg 89,800.00 54,000.00 35,800.00 2,700.00 - 33,100.00 56,700
504 Dempul / Plamir ltr 45,000.00 52,800.00 - 7,800.00 2,640.00 10,440.00 55,440
505 Dempul / Plamir Altik ltr 42,500.00 46,530.00 - 4,030.00 2,327.00 6,357.00 48,857
506 Dempul Impra Kayu ltr 40,000.00 49,500.00 - 9,500.00 2,475.00 11,975.00 51,975
507 Kuas untuk mengecat bh 8,000.00 13,200.00 - 5,200.00 660.00 5,860.00 13,860
508 Lem Fox (Rajawali Kuning) Gln 135,000.00 159,500.00 - 24,500.00 7,975.00 32,475.00 167,475
509 Lem Wall Paper Kg 80,000.00 27,500.00 52,500.00 1,375.00 - 51,125.00 28,875
510 Mild zak 10,000.00 13,200.00 - 3,200.00 660.00 3,860.00 13,860
511 Minyak cat ltr 28,000.00 46,530.00 - 18,530.00 2,327.00 20,857.00 48,857
512 Melamine Lack / Imfra ltr 89,500.00 77,000.00 12,500.00 3,850.00 - 8,650.00 80,850
513 Okear / Veap Kg 25,000.00 82,500.00 - 57,500.00 4,125.00 61,625.00 86,625
514 Plamir kayu kg 28,000.00 49,500.00 - 21,500.00 2,475.00 23,975.00 51,975
515 Plamir tembok setara wall Putty kg 32,000.00 159,500.00 - 127,500.00 7,975.00 135,475.00 167,475
516 Politur ultra ltr 65,000.00 75,130.00 - 10,130.00 3,756.00 13,886.00 78,886
517 Politur Jadi ltr 70,000.00 75,900.00 - 5,900.00 3,795.00 9,695.00 79,695
518 vernis ltr 40,000.00 60,500.00 - 20,500.00 3,025.00 23,525.00 63,525
519 Residu / Teer Ltr 45,000.00 27,500.00 17,500.00 1,375.00 - 16,125.00 28,875
520 Roll Buah 28,500.00 38,500.00 - 10,000.00 1,925.00 11,925.00 40,425
521 Sending Seaker ltr 89,500.00 61,050.00 28,450.00 3,053.00 - 25,397.00 64,103
522 Soda Api Kg 11,000.00 24,200.00 - 13,200.00 1,210.00 14,410.00 25,410
523 Thiner A Spesial ltr 28,500.00 27,500.00 1,000.00 1,375.00 375.00 28,875
524 Thiner B ltr 30,000.00 27,500.00 2,500.00 1,375.00 - 1,125.00 28,875
525 Teack Oil ltr 65,000.00 66,550.00 - 1,550.00 3,328.00 4,878.00 69,878
526 Wall Paper Setara Silk House m2 775,000.00 660,000.00 115,000.00 33,000.00 - 82,000.00 693,000
527 Wood Filler ltr 45,000.00 60,500.00 - 15,500.00 3,025.00 18,525.00 63,525
528 Cat Scotlight Ltr 195,000.00 166,100.00 28,900.00 8,305.00 - 20,595.00 174,405
529 Mowilex Kg 78,000.00 78,000.00 -
- - -
KACA - - -
530 Bingkai Nako Silver daun 47,500.00 38,500.00 9,000.00 1,925.00 - 7,075.00 40,425
531 Bingkai Nako Coklat daun 49,500.00 33,000.00 16,500.00 2,700.00 - 13,800.00 35,700
532 Glass Block bh 28,500.00 40,700.00 - 12,200.00 2,035.00 14,235.00 42,735
533 Kaca 2 mm bening m2 106,000.00 77,000.00 29,000.00 3,850.00 - 25,150.00 80,850
534 Kaca 3 mm bening m2 130,000.00 82,500.00 47,500.00 5,700.00 - 41,800.00 88,200
535 Kaca 5 mm bening m2 110,000.00 143,000.00 - 33,000.00 7,150.00 40,150.00 150,150
536 Kaca 6 mm bening m2 259,000.00 187,000.00 72,000.00 9,350.00 - 62,650.00 196,350
537 Kaca 8 mm bening m2 315,000.00 317,900.00 - 2,900.00 15,895.00 18,795.00 333,795
538 Kaca 10 mm bening m2 341,000.00 385,000.00 - 44,000.00 19,250.00 63,250.00 404,250
539 Kaca 12 mm bening m2 585,000.00 495,000.00 90,000.00 24,750.00 - 65,250.00 519,750
540 Kaca Cermin 3 mm m2 198,000.00 165,000.00 33,000.00 8,250.00 - 24,750.00 173,250
541 Kaca Cermin 5 mm m2 365,000.00 308,000.00 57,000.00 15,400.00 - 41,600.00 323,400
542 Kaca Es/Kapur 3 mm m2 231,000.00 198,000.00 33,000.00 9,900.00 - 23,100.00 207,900
543 Kaca Es/Kapur 5 mm m2 235,000.00 253,000.00 - 18,000.00 12,650.00 30,650.00 265,650
544 Kaca Nako Bening m2 137,000.00 99,000.00 38,000.00 4,950.00 - 33,050.00 103,950
545 Kaca Nako Rayben m2 182,500.00 132,000.00 50,500.00 6,600.00 - 43,900.00 138,600
546 Kaca ryben 3 mm m2 118,000.00 99,000.00 19,000.00 6,000.00 - 13,000.00 105,000
547 Kaca ryben 5 mm m2 185,000.00 154,000.00 31,000.00 7,700.00 - 23,300.00 161,700
548 Kaca asahi tebal 3 mm polos clear m2 101,000.00 63,000.00 38,000.00 3,150.00 - 34,850.00 66,150
549 Kaca asahi tebal 3 mm ryben dark grey m2 115,000.00 89,000.00 26,000.00 4,450.00 - 21,550.00 93,450
550 Kaca asahi tebal 3 mm cermin mirror m2 180,000.00 140,000.00 40,000.00 7,000.00 - 33,000.00 147,000
551 Kaca asahi tebal 3 mm es mislet m2 195,000.00 145,500.00 49,500.00 7,275.00 - 42,225.00 152,775
552 Kaca asahi tebal 3 mm biru dark blue m2 285,000.00 235,500.00 49,500.00 11,775.00 - 37,725.00 247,275
553 Kaca asahi tebal 3 mm one way m2 415,000.00 350,000.00 65,000.00 17,500.00 - 47,500.00 367,500
554 Kaca asahi tebal 5 mm polos clear m2 118,000.00 92,500.00 25,500.00 4,625.00 - 20,875.00 97,125
555 Kaca asahi tebal 5 mm ryben dark grey m2 145,000.00 113,500.00 31,500.00 5,675.00 - 25,825.00 119,175
556 Kaca asahi tebal 5 mm cermin mirror m2 255,000.00 200,000.00 55,000.00 10,000.00 - 45,000.00 210,000
557 Kaca asahi tebal 5 mm es mislet m2 263,000.00 190,000.00 73,000.00 9,500.00 - 63,500.00 199,500
558 Kaca asahi tebal 6 mm polos clear m2 185,000.00 145,000.00 40,000.00 7,250.00 - 32,750.00 152,250
559 Kaca asahi tebal 8 mm polos clear m2 365,000.00 289,000.00 76,000.00 14,450.00 - 61,550.00 303,450
560 Kaca asahi tebal 10 mm polos clear m2 415,000.00 350,000.00 65,000.00 17,500.00 - 47,500.00 367,500
561 Kaca asahi tebal 12 mm polos clear m2 430,000.00 362,500.00 67,500.00 18,125.00 - 49,375.00 380,625
562 Kaca tempered asahimas tebal 3mm polos clear m2 245,000.00 203,500.00 41,500.00 10,175.00 - 31,325.00 213,675
563 Kaca tempered asahimas tebal 3mm ryben dark grey m2 275,000.00 242,000.00 33,000.00 12,100.00 - 20,900.00 254,100
564 Kaca tempered asahimas tebal 3mm sanergy clear m2 310,000.00 604,000.00 - 294,000.00 30,200.00 324,200.00 634,200
565 Kaca tempered asahimas tebal 4mm polos clear m2 245,000.00 200,500.00 44,500.00 10,025.00 - 34,475.00 210,525
566 Kaca tempered asahimas tebal 4mm sanergy clear m2 798,000.00 692,000.00 106,000.00 34,600.00 - 71,400.00 726,600
567 Kaca tempered asahimas tebal 5mm polos clear m2 265,000.00 224,500.00 40,500.00 11,225.00 - 29,275.00 235,725
568 Kaca tempered asahimas tebal 5mm ryben dark grey m2 269,000.00 278,000.00 - 9,000.00 13,900.00 22,900.00 291,900
569 Kaca tempered asahimas tebal 5mm stopsol m2 518,000.00 436,000.00 82,000.00 21,800.00 - 60,200.00 457,800
570 Kaca tempered asahimas tebal 5mm warna m2 445,000.00 372,000.00 73,000.00 18,600.00 - 54,400.00 390,600
571 Kaca tempered asahimas tebal 5mm sanergy clear m2 950,000.00 812,000.00 138,000.00 40,600.00 - 97,400.00 852,600
572 Kaca tempered asahimas tebal 6mm polos clear m2 370,000.00 299,500.00 70,500.00 14,975.00 - 55,525.00 314,475
573 Kaca tempered asahimas tebal 6mm ryben dark grey m2 475,000.00 406,000.00 69,000.00 20,300.00 - 48,700.00 426,300
574 Kaca tempered asahimas tebal 6mm stopsol m2 575,000.00 825,000.00 - 250,000.00 41,250.00 291,250.00 866,250
575 Kaca tempered asahimas tebal 6mm warna m2 540,000.00 466,500.00 73,500.00 23,325.00 - 50,175.00 489,825
576 Kaca tempered asahimas tebal 6mm diamon m2 735,000.00 621,500.00 113,500.00 31,075.00 - 82,425.00 652,575
577 Kaca tempered asahimas tebal 6mm sanergy clear m2 1,235,000.00 1,001,000.00 234,000.00 50,050.00 - 183,950.00 1,051,050
578 Kaca tempered asahimas tebal 8mm polos clear m2 495,000.00 391,500.00 103,500.00 19,575.00 - 83,925.00 411,075
579 Kaca tempered asahimas tebal 8mm stopsol m2 1,345,000.00 1,132,000.00 213,000.00 56,600.00 - 156,400.00 1,188,600
580 Kaca tempered asahimas tebal 8mm warna m2 910,000.00 731,500.00 178,500.00 36,575.00 - 141,925.00 768,075
581 Kaca tempered asahimas tebal 8mm diamon m2 1,250,000.00 1,078,000.00 172,000.00 53,900.00 - 118,100.00 1,131,900
582 Kaca tempered asahimas tebal 8mm sanergy clear m2 1,610,000.00 1,375,000.00 235,000.00 68,750.00 - 166,250.00 1,443,750
583 Kaca tempered asahimas tebal 10mm polos clear m2 610,000.00 482,000.00 128,000.00 5,324,100.00 5,196,100.00 5,806,100
584 Kaca tempered asahimas tebal 10mm diamon m2 1,810,000.00 1,540,000.00 270,000.00 77,000.00 - 193,000.00 1,617,000
585 Kaca tempered asahimas tebal 12mm polos clear m2 685,000.00 565,000.00 120,000.00 28,250.00 - 91,750.00 593,250
586 Kaca tempered asahimas tebal 12mm diamon m2 2,310,000.00 1,962,500.00 347,500.00 98,125.00 - 249,375.00 2,060,625
587 Kaca tempered asahimas tebal 15mm polos clear m2 5,410,000.00 4,616,500.00 793,500.00 230,825.00 - 562,675.00 4,847,325
588 Kaca tempered asahimas tebal 15mm diamon m2 6,918,000.00 6,000,000.00 918,000.00 300,000.00 - 618,000.00 6,300,000
589 Kaca tempered asahimas tebal 19mm polos clear m2 6,210,000.00 5,313,000.00 897,000.00 265,650.00 - 631,350.00 5,578,650
590 Kaca tempered asahimas tebal 19mm diamon m2 9,500,000.00 7,309,500.00 2,190,500.00 365,475.00 - 1,825,025.00 7,674,975
591 Kaca tebal 3+3 mm laminet biasa m2 418,000.00 345,000.00 73,000.00 17,250.00 - 55,750.00 362,250
592 Kaca tebal 4+4 mm laminet biasa m2 510,000.00 422,000.00 88,000.00 21,100.00 - 66,900.00 443,100
593 Kaca tebal 5+5 mm laminet biasa m2 565,000.00 475,000.00 90,000.00 23,750.00 - 66,250.00 498,750
594 Kaca tebal 6+6 mm laminet biasa m2 700,000.00 566,000.00 134,000.00 28,300.00 - 105,700.00 594,300
595 Kaca tebal 8+8 mm laminet biasa m2 910,000.00 846,000.00 64,000.00 42,300.00 - 21,700.00 888,300
596 Kaca tebal 10+10 mm laminet biasa m2 1,215,000.00 1,041,000.00 174,000.00 52,050.00 - 121,950.00 1,093,050
597 Kaca tebal 12+12 mm laminet biasa m2 1,110,000.00 1,184,000.00 - 74,000.00 59,200.00 133,200.00 1,243,200
598 Kaca tebal 3+3 mm laminet tempered m2 1,410,000.00 957,000.00 453,000.00 47,850.00 - 405,150.00 1,004,850
599 Kaca tebal 4+4 mm laminet tempered m2 1,420,000.00 1,056,000.00 364,000.00 52,800.00 - 311,200.00 1,108,800
600 Kaca tebal 5+5 mm laminet tempered m2 1,430,000.00 1,083,000.00 347,000.00 54,150.00 - 292,850.00 1,137,150
601 Kaca tebal 6+6 mm laminet tempered m2 1,850,000.00 1,375,000.00 475,000.00 68,750.00 - 406,250.00 1,443,750
602 Kaca tebal 8+8 mm laminet tempered m2 1,950,000.00 1,670,000.00 280,000.00 83,500.00 - 196,500.00 1,753,500
603 Kaca tebal 10+10 mm laminet tempered m2 2,350,000.00 1,938,000.00 412,000.00 96,900.00 - 315,100.00 2,034,900
604 Kaca tebal 12+12 mm laminet tempered m2 2,960,000.00 2,134,000.00 826,000.00 106,700.00 - 719,300.00 2,240,700
605 Ongkos polin kaca tempered tebal 5mm m' 28,500.00 15,000.00 13,500.00 750.00 - 12,750.00 15,750
606 Ongkos polin kaca tempered tebal 6mm m' 30,000.00 15,000.00 15,000.00 750.00 - 14,250.00 15,750
607 Ongkos polin kaca tempered tebal 8mm m' 41,000.00 25,000.00 16,000.00 1,250.00 - 14,750.00 26,250
608 Ongkos polin kaca tempered tebal 10mm m' 40,000.00 25,000.00 15,000.00 1,250.00 - 13,750.00 26,250
609 Ongkos polin kaca tempered tebal 12mm m' 30,000.00 27,500.00 2,500.00 1,375.00 - 1,125.00 28,875
610 Ongkos polin kaca tempered tebal 19mm m' 65,000.00 90,000.00 - 25,000.00 4,500.00 29,500.00 94,500
- - -
PIPA - - -
611 Pipa Galvanis 1" m' 70,000.00 55,650.00 14,350.00 - 217.00 - 14,567.00 55,433
612 Pipa Galvanis 1,5 BSA m' 91,000.00 84,000.00 7,000.00 4,200.00 - 2,800.00 88,200
613 Pipa Galvanis 2" m' 121,000.00 118,000.00 3,000.00 5,900.00 2,900.00 123,900
614 Pipa Galvanis 3" m' 178,500.00 181,000.00 - 2,500.00 9,050.00 11,550.00 190,050
615 Pipa Maspion AW 1/2 m' 7,510.00 7,560.00 - 50.00 378.00 428.00 7,938
616 Pipa Maspion AW 3/4 m' 9,160.00 10,000.00 - 840.00 500.00 1,340.00 10,500
617 Pipa Maspion AW 1 m' 11,530.00 11,550.00 - 20.00 578.00 598.00 12,128
618 Pipa Maspion AW 1-1/2 m' 21,250.00 22,000.00 - 750.00 1,100.00 1,850.00 23,100
619 Pipa Maspion AW 1-1/4 m' 16,325.00 17,000.00 - 675.00 850.00 1,525.00 17,850
620 Pipa Maspion AW 2 m' 31,550.00 32,000.00 - 450.00 1,600.00 2,050.00 33,600
621 Pipa Maspion AW 2-1/2 m' 41,075.00 41,000.00 75.00 2,050.00 1,975.00 43,050
622 Pipa Maspion AW 3 m' 60,250.00 58,275.00 1,975.00 2,914.00 939.00 61,189
623 Pipa Maspion AW 4 m' 85,250.00 85,000.00 250.00 4,250.00 4,000.00 89,250
624 Pipa Maspion AW 5 m' 134,500.00 134,000.00 500.00 6,700.00 6,200.00 140,700
625 Pipa Maspion AW 6 m' 178,250.00 176,400.00 1,850.00 8,820.00 6,970.00 185,220
626 Pipa Maspion AW 8 m' 276,750.00 275,000.00 1,750.00 13,750.00 12,000.00 288,750
627 Pipa Maspion AW 10 m' 394,500.00 390,000.00 4,500.00 19,500.00 15,000.00 409,500
628 Pipa Maspion AW 12 m' 563,000.00 630,000.00 - 67,000.00 31,500.00 98,500.00 661,500
629 Pipa Maspion AW 14 m' 792,000.00 800,625.00 - 8,625.00 40,031.00 48,656.00 840,656
630 Pipa Maspion AW 16 m' 992,500.00 979,125.00 13,375.00 48,956.00 35,581.00 1,028,081
631 Pipa Maspion C 3/4 m' 3,625.00 3,675.00 - 50.00 184.00 234.00 3,859
632 Pipa Maspion C 5/8 m' 2,010.00 2,100.00 - 90.00 105.00 195.00 2,205
633 Pipa Maspion C 1 m' 5,375.00 7,000.00 - 1,625.00 350.00 1,975.00 7,350
634 Pipa Maspion C 1-1/2 m' 8,000.00 9,000.00 - 1,000.00 450.00 1,450.00 9,450
635 Pipa Maspion C 1-1/4 m' 6,700.00 10,000.00 - 3,300.00 500.00 3,800.00 10,500
636 Pipa Maspion C 2 m' 12,700.00 13,000.00 - 300.00 650.00 950.00 13,650
637 Pipa Maspion C 2-1/2 m' 16,200.00 17,000.00 - 800.00 850.00 1,650.00 17,850
638 Pipa Maspion C 3 m' 18,750.00 19,000.00 - 250.00 950.00 1,200.00 19,950
639 Pipa Maspion C 3-1/2 m' 21,250.00 25,000.00 - 3,750.00 1,250.00 5,000.00 26,250
640 Pipa Maspion C 4 m' 24,200.00 7,000.00 17,200.00 350.00 - 16,850.00 7,350
641 Pipa Maspion D 1/2 m' 11,500.00 12,000.00 - 500.00 600.00 1,100.00 12,600
642 Pipa Maspion D 1-1/2 m' 11,725.00 11,000.00 725.00 550.00 - 175.00 11,550
643 Pipa Maspion D 1-1/4 m' 10,175.00 15,225.00 - 5,050.00 761.00 5,811.00 15,986
644 Pipa Maspion D 2 m' 15,237.50 23,000.00 - 7,762.50 1,150.00 8,912.50 24,150
645 Pipa Maspion D 2-1/2 m' 22,510.00 32,550.00 - 10,040.00 1,627.00 11,667.00 34,177
646 Pipa Maspion D 3 m' 32,750.00 46,000.00 - 13,250.00 2,300.00 15,550.00 48,300
647 Pipa Maspion D 4 m' 46,000.00 75,000.00 - 29,000.00 3,750.00 32,750.00 78,750
648 Pipa Maspion D 5 m' 75,600.00 90,825.00 - 15,225.00 4,541.00 19,766.00 95,366
649 Pipa Maspion D 6 m' 92,250.00 161,000.00 - 68,750.00 8,050.00 76,800.00 169,050
650 Pipa Maspion D 8 m' 160,000.00 280,000.00 - 120,000.00 14,000.00 134,000.00 294,000
651 Pipa Maspion D 10 m' 283,750.00 381,675.00 - 97,925.00 19,084.00 117,009.00 400,759
652 Pipa Maspion D 12 m' 386,500.00 499,800.00 - 113,300.00 24,990.00 138,290.00 524,790
653 Pipa Maspion D 14 m' 513,500.00 646,800.00 - 133,300.00 32,340.00 165,640.00 679,140
654 Pipa Maspion D 16 m' 657,500.00 34,650.00 622,850.00 1,733.00 - 621,117.00 36,383
655 Pipa / selang spiral sel kran m' 28,570.00 6,442.50 22,127.50 322.50 - 21,805.00 6,765
656 Pipa langgeng warna abu - abu AW 1/2 m' 7,225.00 7,847.50 - 622.50 392.50 1,015.00 8,240
657 Pipa langgeng warna abu - abu AW 3/4 m' 8,712.50 9,880.00 - 1,167.50 494.00 1,661.50 10,374
658 Pipa langgeng warna abu - abu AW 1 m' 10,960.00 13,985.00 - 3,025.00 699.00 3,724.00 14,684
659 Pipa langgeng warna abu - abu AW 1 1/4 m' 15,510.00 18,212.50 - 2,702.50 910.50 3,613.00 19,123
660 Pipa langgeng warna abu - abu AW 1 1/2 m' 20,187.50 27,047.50 - 6,860.00 1,352.50 8,212.50 28,400
661 Pipa langgeng warna abu - abu AW 2 m' 30,400.00 34,722.50 - 4,322.50 1,736.50 6,059.00 36,459
662 Pipa langgeng warna abu - abu AW 2 1/2 m' 38,475.00 49,525.00 - 11,050.00 2,476.00 13,526.00 52,001
663 Pipa langgeng warna abu - abu AW 3 m' 55,625.00 72,182.50 - 16,557.50 3,609.50 20,167.00 75,792
664 Pipa langgeng warna abu - abu AW 4 m' 81,227.50 113,850.00 - 32,622.50 5,693.00 38,315.50 119,543
665 Pipa langgeng warna abu - abu AW 5 m' 127,945.00 150,472.50 - 22,527.50 7,523.50 30,051.00 157,996
666 Pipa langgeng warna abu - abu AW 6 m' 169,525.00 234,032.50 - 64,507.50 11,701.50 76,209.00 245,734
667 Pipa langgeng warna abu - abu AW 8 m' 263,227.50 332,500.00 - 69,272.50 16,625.00 85,897.50 349,125
668 Pipa langgeng warna abu - abu AW 10 m' 375,000.00 475,115.00 - 100,115.00 23,756.00 123,871.00 498,871
669 Pipa langgeng warna abu - abu AW 12 m' 535,325.00 835,555.00 - 300,230.00 41,778.00 342,008.00 877,333
670 Pipa langgeng warna abu - abu AW 16 m' 943,625.00 8,712.50 934,912.50 435.50 - 934,477.00 9,148
671 Pipa langgeng warna abu - abu D 1 1/4 m' 9,500.00 9,880.00 - 380.00 494.00 874.00 10,374
672 Pipa langgeng warna abu - abu D 1 1/2 m' 11,030.00 12,912.50 - 1,882.50 645.50 2,528.00 13,558
673 Pipa langgeng warna abu - abu D 2 m' 14,495.00 19,125.00 - 4,630.00 956.00 5,586.00 20,081
674 Pipa langgeng warna abu - abu D 2 1/2 m' 21,400.00 27,740.00 - 6,340.00 1,387.00 7,727.00 29,127
675 Pipa langgeng warna abu - abu D 3 m' 31,130.00 39,007.50 - 7,877.50 1,950.50 9,828.00 40,958
676 Pipa langgeng warna abu - abu D 4 m' 43,745.00 63,717.50 - 19,972.50 3,185.50 23,158.00 66,903
677 Pipa langgeng warna abu - abu D 5 m' 71,750.00 77,397.50 - 5,647.50 3,869.50 9,517.00 81,267
678 Pipa langgeng warna abu - abu D 6 m' 63,250.00 136,877.50 - 73,627.50 6,843.50 80,471.00 143,721
679 Pipa langgeng warna abu - abu D 8 m' 154,750.00 238,877.50 - 84,127.50 11,943.50 96,071.00 250,821
680 Pipa langgeng warna abu - abu D 10 m' 269,500.00 325,575.00 - 56,075.00 16,079.00 72,154.00 341,654
681 Pipa langgeng warna abu - abu D 12 m' 367,700.00 426,405.00 - 58,705.00 21,320.00 80,025.00 447,725
682 Pipa langgeng warna abu - abu D 14 m' 482,525.00 551,932.50 - 69,407.50 27,596.50 97,004.00 579,529
683 Pipa langgeng warna abu - abu D 16 m' 625,000.00 953,412.50 - 328,412.50 47,670.50 376,083.00 1,001,083
684 Pipa langgeng warna abu - abu D 20 m' 1,076,890.00 1,770.00 1,075,120.00 89.00 - 1,075,031.00 1,859
685 Pipa langgeng warna abu - abu C 5/8 m' 2,020.00 2,965.00 - 945.00 148.00 1,093.00 3,113
686 Pipa langgeng warna abu - abu C 1/2 m' 3,345.00 3,220.00 125.00 161.00 36.00 3,381
687 Pipa langgeng warna abu - abu C 3/4 m' 3,620.00 4,505.00 - 885.00 225.00 1,110.00 4,730
688 Pipa langgeng warna abu - abu C 1 m' 5,045.00 5,980.00 - 935.00 299.00 1,234.00 6,279
689 Pipa langgeng warna abu - abu C 1 1/4 m' 6,685.00 7,170.00 - 485.00 359.00 844.00 7,529
690 Pipa langgeng warna abu - abu C 1 1/2 m' 7,997.50 10,822.50 - 2,825.00 541.50 3,366.50 11,364
691 Pipa langgeng warna abu - abu C 2 m' 12,060.00 13,710.00 - 1,650.00 686.00 2,336.00 14,396
692 Pipa langgeng warna abu - abu C 2 1/2 m' 15,365.00 16,707.50 - 1,342.50 835.50 2,178.00 17,543
693 Pipa langgeng warna abu - abu C 3 m' 18,730.00 21,525.00 - 2,795.00 1,076.00 3,871.00 22,601
694 Pipa langgeng warna abu - abu C 4 m' 23,870.00 29,120.00 - 5,250.00 1,456.00 6,706.00 30,576
695 Pipa langgeng warna abu - abu C 5 m' 32,300.00 5,527.50 26,772.50
696 Pipa winlon warna abu - abu AW 1/2 m' 6,175.00 7,067.50 - 892.50 - 1,263.50 - 371.00 5,804
697 Pipa winlon warna abu - abu AW 3/4 m' 7,750.00 9,212.50 - 1,462.50 - 1,791.50 - 329.00 7,421
698 Pipa winlon warna abu - abu AW 1 m' 10,250.00 13,475.00 - 3,225.00 - 3,802.00 - 577.00 9,673
699 Pipa winlon warna abu - abu AW 1 1/4 m' 14,925.00 15,867.50 - 942.50 - 1,718.50 - 776.00 14,149
700 Pipa winlon warna abu - abu AW 1 1/2 m' 17,700.00 22,797.50 - 5,097.50 - 6,136.50 - 1,039.00 16,661
701 Pipa winlon warna abu - abu AW 2 m' 25,400.00 29,727.50 - 4,327.50 - 5,790.50 - 1,463.00 23,937
702 Pipa winlon warna abu - abu AW 2 1/2 m' 33,150.00 41,772.50 - 8,622.50 - 10,558.50 - 1,936.00 31,214
703 Pipa winlon warna abu - abu AW 3 m' 46,500.00 64,322.50 - 17,822.50 - 20,461.50 - 2,639.00 43,861
704 Pipa winlon warna abu - abu AW 4 m' 71,875.00 102,052.50 - 30,177.50 - 34,514.50 - 4,337.00 67,538
705 Pipa winlon warna abu - abu AW 5 m' 113,625.00 128,975.00 - 15,350.00 - 21,820.00 - 6,470.00 107,155
706 Pipa winlon warna abu - abu AW 6 m' 143,550.00 204,737.50 - 61,187.50 10,236.50 71,424.00 214,974
707 Pipa winlon warna abu - abu AW 8 m' 227,950.00 291,362.50 - 63,412.50 14,568.50 77,981.00 305,931
708 Pipa winlon warna abu - abu AW 10 m' 324,250.00 489,912.50 - 165,662.50 24,495.50 190,158.00 514,408
709 Pipa winlon warna abu - abu AW 12 m' 545,250.00 7,782.50 537,467.50 389.50 - 537,078.00 8,172
710 Pipa winlon warna abu - abu D 1 1/4 m' 8,662.50 8,772.50 - 110.00 438.50 548.50 9,211
711 Pipa winlon warna abu - abu D 1 1/2 m' 9,850.00 11,467.50 - 1,617.50 573.50 2,191.00 12,041
712 Pipa winlon warna abu - abu D 2 m' 12,760.00 16,335.00 - 3,575.00 817.00 4,392.00 17,152
713 Pipa winlon warna abu - abu D 2 1/2 m' 18,225.00 23,732.50 - 5,507.50 1,186.50 6,694.00 24,919
714 Pipa winlon warna abu - abu D 3 m' 26,450.00 33,687.50 - 7,237.50 1,684.50 8,922.00 35,372
715 Pipa winlon warna abu - abu D 4 m' 37,510.00 66,660.00 - 29,150.00 3,333.00 32,483.00 69,993
716 Pipa winlon warna abu - abu D 6 m' 59,625.00 117,727.50 - 58,102.50 5,886.50 63,989.00 123,614
717 Pipa winlon warna abu - abu D 8 m' 131,037.50 218,405.00 - 87,367.50 10,920.00 98,287.50 229,325
718 Pipa winlon warna abu - abu D 10 m' 243,100.00 297,220.00 - 54,120.00 14,861.00 68,981.00 312,081
719 Pipa winlon warna abu - abu D 12 m' 330,750.00 1,485.00 329,265.00 74.00 - 329,191.00 1,559
720 Pipa winlon warna abu - abu C 5/8 m' 1,677.50 2,722.50 - 1,045.00 136.50 1,181.50 2,859
721 Pipa winlon warna abu - abu C 1/2 m' 3,025.00 2,887.50 137.50 144.50 7.00 3,032
722 Pipa winlon warna abu - abu C 3/4 m' 3,250.00 4,042.50 - 792.50 202.50 995.00 4,245
723 Pipa winlon warna abu - abu C 1 m' 4,625.00 5,362.50 - 737.50 268.50 1,006.00 5,631
724 Pipa winlon warna abu - abu C 1 1/4 m' 5,850.00 6,737.50 - 887.50 336.50 1,224.00 7,074
725 Pipa winlon warna abu - abu C 1 1/2 m' 7,625.00 9,212.50 - 1,587.50 460.50 2,048.00 9,673
726 Pipa winlon warna abu - abu C 2 m' 10,260.00 11,605.00 - 1,345.00 580.00 1,925.00 12,185
727 Pipa winlon warna abu - abu C 2 1/2 m' 12,900.00 14,355.00 - 1,455.00 718.00 2,173.00 15,073
728 Pipa winlon warna abu - abu C 3 m' 15,977.50 19,855.00 - 3,877.50 993.00 4,870.50 20,848
729 Pipa winlon warna abu - abu C 4 m' 22,025.00 4,757.50 17,267.50 237.50 - 17,030.00 4,995
730 Pipa wavin warna putih AW 1/2 m' 5,825.00 6,517.50 - 692.50 325.50 1,018.00 6,843
731 Pipa wavin warna putih AW 3/4 m' 7,925.00 8,910.00 - 985.00 446.00 1,431.00 9,356
732 Pipa wavin warna putih AW 1 m' 10,825.00 13,365.00 - 2,540.00 668.00 3,208.00 14,033
733 Pipa wavin warna putih AW 1 1/4 m' 16,200.00 15,345.00 855.00 767.00 - 88.00 16,112
734 Pipa wavin warna putih AW 1 1/2 m' 18,600.00 19,635.00 - 1,035.00 982.00 2,017.00 20,617
735 Pipa wavin warna putih AW 2 m' 23,825.00 28,655.00 - 4,830.00 1,433.00 6,263.00 30,088
736 Pipa wavin warna putih AW 2 1/2 m' 34,725.00 38,637.50 - 3,912.50 1,931.50 5,844.00 40,569
737 Pipa wavin warna putih AW 3 m' 48,900.00 64,020.00 - 15,120.00 3,201.00 18,321.00 67,221
738 Pipa wavin warna putih AW 4 m' 81,025.00 106,067.50 - 25,042.50 5,303.50 30,346.00 111,371
739 Pipa wavin warna putih AW 5 m' 128,400.00 148,775.00 - 20,375.00 7,439.00 27,814.00 156,214
740 Pipa wavin warna putih AW 6 m' 180,000.00 249,700.00 - 69,700.00 12,485.00 82,185.00 262,185
741 Pipa wavin warna putih AW 8 m' 302,200.00 386,100.00 - 83,900.00 19,305.00 103,205.00 405,405
742 Pipa wavin warna putih AW 10 m' 465,750.00 544,390.00 - 78,640.00 27,219.00 105,859.00 571,609
743 Pipa wavin warna putih AW 12 m' 658,750.00 8,387.50 650,362.50 419.50 - 649,943.00 8,807
744 Pipa wavin warna putih D 1 1/4 m' 10,175.00 9,487.50 687.50 474.50 - 213.00 9,962
745 Pipa wavin warna putih D 1 1/2 m' 11,500.00 12,155.00 - 655.00 608.00 1,263.00 12,763
746 Pipa wavin warna putih D 2 m' 14,750.00 16,445.00 - 1,695.00 822.00 2,517.00 17,267
747 Pipa wavin warna putih D 2 1/2 m' 19,925.00 20,872.50 - 947.50 1,043.50 1,991.00 21,916
748 Pipa wavin warna putih D 3 m' 26,450.00 32,835.00 - 6,385.00 1,642.00 8,027.00 34,477
749 Pipa wavin warna putih D 4 m' 41,600.00 52,937.50 - 11,337.50 2,646.50 13,984.00 55,584
750 Pipa wavin warna putih D 5 m' 64,200.00 69,822.50 - 5,622.50 3,491.50 9,114.00 73,314
751 Pipa wavin warna putih D 6 m' 84,525.00 122,815.00 - 38,290.00 6,141.00 44,431.00 128,956
752 Pipa wavin warna putih D 8 m' 148,650.00 202,317.50 - 53,667.50 10,115.50 63,783.00 212,433
753 Pipa wavin warna putih D 10 m' 244,875.00 284,020.00 - 39,145.00 14,201.00 53,346.00 298,221
754 Pipa wavin warna putih D 12 m' 343,500.00 4,520.00 338,980.00 226.00 - 338,754.00 4,746
755 Pipa langgeng warna putih AW 1/2 m' 5,372.50 12,385.00 - 7,012.50 619.00 7,631.50 13,004
756 Pipa langgeng warna putih AW 3/4 m' 7,357.50 8,465.00 - 1,107.50 423.00 1,530.50 8,888
757 Pipa langgeng warna putih AW 1 m' 10,057.50 12,697.50 - 2,640.00 634.50 3,274.50 13,332
758 Pipa langgeng warna putih AW 1 1/4 m' 15,085.00 14,697.50 387.50 734.50 347.00 15,432
759 Pipa langgeng warna putih AW 1 1/2 m' 17,325.00 18,655.00 - 1,330.00 933.00 2,263.00 19,588
760 Pipa langgeng warna putih AW 2 m' 22,175.00 27,222.50 - 5,047.50 1,361.50 6,409.00 28,584
761 Pipa langgeng warna putih AW 2 1/2 m' 32,350.00 36,707.50 - 4,357.50 1,835.50 6,193.00 38,543
762 Pipa langgeng warna putih AW 3 m' 43,625.00 60,812.50 - 17,187.50 3,040.50 20,228.00 63,853
763 Pipa langgeng warna putih AW 4 m' 72,250.00 100,765.00 - 28,515.00 5,038.00 33,553.00 105,803
764 Pipa langgeng warna putih AW 5 m' 119,500.00 141,337.50 - 21,837.50 7,066.50 28,904.00 148,404
765 Pipa langgeng warna putih AW 6 m' 167,750.00 237,215.00 - 69,465.00 11,861.00 81,326.00 249,076
766 Pipa langgeng warna putih AW 8 m' 281,750.00 366,795.00 - 85,045.00 18,340.00 103,385.00 385,135
767 Pipa langgeng warna putih AW 10 m' 435,750.00 517,172.50 - 81,422.50 25,858.50 107,281.00 543,031
768 Pipa langgeng warna putih AW 12 m' 614,250.00 708,120.00 - 93,870.00 35,406.00 129,276.00 743,526
769 Pipa langgeng warna putih AW 14 m' 841,000.00 885,117.50 - 44,117.50 44,255.50 88,373.00 929,373
770 Pipa langgeng warna putih AW 16 m' 1,051,500.00 7,970.00 1,043,530.00 398.00 - 1,043,132.00 8,368
771 Pipa langgeng warna putih D 1 1/4 m' 9,450.00 9,015.00 435.00 451.00 16.00 9,466
772 Pipa langgeng warna putih D 1 1/2 m' 10,725.00 11,547.50 - 822.50 577.50 1,400.00 12,125
773 Pipa langgeng warna putih D 2 m' 13,500.00 15,625.00 - 2,125.00 781.00 2,906.00 16,406
774 Pipa langgeng warna putih D 2 1/2 m' 18,562.50 19,830.00 - 1,267.50 992.00 2,259.50 20,822
775 Pipa langgeng warna putih D 3 m' 23,575.00 31,195.00 - 7,620.00 1,560.00 9,180.00 32,755
776 Pipa langgeng warna putih D 4 m' 37,075.00 50,292.50 - 13,217.50 2,514.50 15,732.00 52,807
777 Pipa langgeng warna putih D 5 m' 59,750.00 66,332.50 - 6,582.50 3,316.50 9,899.00 69,649
778 Pipa langgeng warna putih D 6 m' 78,825.00 116,675.00 - 37,850.00 5,834.00 43,684.00 122,509
779 Pipa langgeng warna putih D 8 m' 138,600.00 192,202.50 - 53,602.50 9,610.50 63,213.00 201,813
780 Pipa langgeng warna putih D 10 m' 228,250.00 269,820.00 - 41,570.00 13,491.00 55,061.00 283,311
781 Pipa langgeng warna putih D 12 m' 320,500.00 451,702.50 - 131,202.50 22,585.50 153,788.00 474,288
782 Pipa langgeng warna putih D 14 m' 536,500.00 584,677.50 - 48,177.50 35,233.50 83,411.00 619,911
783 Pipa langgeng warna putih D 16 m' 694,500.00 925,642.50 - 231,142.50 46,282.50 277,425.00 971,925
784 Pipa langgeng warna putih D 20 m' 1,099,675.00 1,770.00 1,097,905.00 89.00 - 1,097,816.00 1,859
785 Pipa langgeng warna putih C 5/8 m' 2,125.00 2,880.00 - 755.00 144.00 899.00 3,024
786 Pipa setara warna putih C 1/2 m' 3,450.00 3,220.00 230.00 161.00 - 69.00 3,381
787 Pipa langgeng warna putih C 3/4 m' 4,100.00 4,370.00 - 270.00 219.00 489.00 4,589
788 Pipa langgeng warna putih C 1 m' 5,200.00 5,805.00 - 605.00 290.00 895.00 6,095
789 Pipa langgeng warna putih C 1 1/4 m' 6,900.00 7,170.00 - 270.00 359.00 629.00 7,529
790 Pipa langgeng warna putih C 1 1/2 m' 8,520.00 10,507.50 - 1,987.50 525.50 2,513.00 11,033
791 Pipa langgeng warna putih C 2 m' 12,485.00 13,310.00 - 825.00 666.00 1,491.00 13,976
792 Pipa langgeng warna putih C 2 1/2 m' 15,815.00 16,220.00 - 405.00 811.00 1,216.00 17,031
793 Pipa langgeng warna putih C 3 m' 19,270.00 16,220.00 3,050.00 811.00 - 2,239.00 17,031
794 Pipa langgeng warna putih C 4 m' 24,830.00 3,822.50 21,007.50 191.50 - 20,816.00 4,014
795 Pipa winlon warna putih AW 1/2 m' 4,300.00 5,142.50 - 842.50 257.50 1,100.00 5,400
796 Pipa winlon warna putih AW 3/4 m' 5,725.00 7,150.00 - 1,425.00 358.00 1,783.00 7,508
797 Pipa winlon warna putih AW 1 m' 7,975.00 9,955.00 - 1,980.00 498.00 2,478.00 10,453
798 Pipa winlon warna putih AW 1 1/4 m' 11,100.00 12,925.00 - 1,825.00 646.00 2,471.00 13,571
799 Pipa winlon warna putih AW 1 1/2 m' 14,400.00 17,820.00 - 3,420.00 891.00 4,311.00 18,711
800 Pipa winlon warna putih AW 2 m' 19,850.00 23,925.00 - 4,075.00 1,196.00 5,271.00 25,121
801 Pipa winlon warna putih AW 2 1/2 m' 26,625.00 32,972.50 - 6,347.50 1,648.50 7,996.00 34,621
802 Pipa winlon warna putih AW 3 m' 36,725.00 54,587.50 - 17,862.50 2,729.50 20,592.00 57,317
803 Pipa winlon warna putih AW 4 m' 60,875.00 81,262.50 - 20,387.50 4,063.50 24,451.00 85,326
804 Pipa winlon warna putih AW 5 m' 90,475.00 116,792.50 - 26,317.50 5,839.50 32,157.00 122,632
805 Pipa winlon warna putih AW 6 m' 129,950.00 183,067.50 - 53,117.50 9,153.50 62,271.00 192,221
806 Pipa winlon warna putih AW 8 m' 203,800.00 263,917.50 - 60,117.50 13,195.50 73,313.00 277,113
807 Pipa winlon warna putih AW 10 m' 293,750.00 6,160.00 287,590.00 308.00 - 287,282.00 6,468
808 Pipa winlon warna putih D 1 1/4 m' 6,875.00 7,480.00 - 605.00 374.00 979.00 7,854
809 Pipa winlon warna putih D 1 1/2 m' 8,375.00 10,065.00 - 1,690.00 503.00 2,193.00 10,568
810 Pipa winlon warna putih D 2 m' 11,200.00 13,612.50 - 2,412.50 680.50 3,093.00 14,293
811 Pipa winlon warna putih D 2 1/2 m' 15,200.00 16,967.50 - 1,767.50 848.50 2,616.00 17,816
812 Pipa winlon warna putih D 3 m' 18,950.00 27,610.00 - 8,660.00 1,381.00 10,041.00 28,991
813 Pipa winlon warna putih D 4 m' 30,725.00 40,590.00 - 9,865.00 2,030.00 11,895.00 42,620
814 Pipa winlon warna putih D 5 m' 45,200.00 57,945.00 - 12,745.00 2,897.00 15,642.00 60,842
815 Pipa winlon warna putih D 6 m' 64,650.00 98,945.00 - 34,295.00 4,947.00 39,242.00 103,892
816 Pipa winlon warna putih D 8 m' 110,137.50 186,367.50 - 76,230.00 9,318.50 85,548.50 195,686
817 Pipa winlon warna putih D 10 m' 207,450.00 1,402.50 206,047.50 70.50 - 205,977.00 1,473
818 Pipa winlon warna putih C 5/8 m' 1,575.00 2,612.50 - 1,037.50 130.50 1,168.00 2,743
819 Pipa winlon warna putih C 1/2 m' 2,915.00 2,832.50 82.50 141.50 59.00 2,974
820 Pipa winlon warna putih C 3/4 m' 3,190.00 4,207.50 - 1,017.50 210.50 1,228.00 4,418
821 Pipa winlon warna putih C 1 m' 4,725.00 4,922.50 - 197.50 246.50 444.00 5,169
822 Pipa winlon warna putih C 1 1/4 m' 5,500.00 6,160.00 - 660.00 308.00 968.00 6,468
823 Pipa winlon warna putih C 1 1/2 m' 6,875.00 8,662.50 - 1,787.50 433.50 2,221.00 9,096
824 Pipa winlon warna putih C 2 m' 9,652.50 10,917.50 - 1,265.00 545.50 1,810.50 11,463
825 Pipa winlon warna putih C 2 1/2 m' 12,155.00 13,585.00 - 1,430.00 679.00 2,109.00 14,264
826 Pipa winlon warna putih C 3 m' 15,150.00 18,122.50 - 2,972.50 897.50 3,870.00 19,020
827 Pipa winlon warna putih C 4 m' 20,185.00 3,482.50 16,702.50 - 1,825.50 - 18,528.00 1,657
828 Pipa vilano warna putih AW 1/2 m' 4,000.00 4,870.00 - 870.00 244.00 1,114.00 5,114
829 Pipa vilano warna putih AW 3/4 m' 5,500.00 6,382.50 - 882.50 319.50 1,202.00 6,702
830 Pipa vilano warna putih AW 1 m' 7,177.50 9,287.50 - 2,110.00 464.50 2,574.50 9,752
831 Pipa vilano warna putih AW 1 1/4 m' 10,450.00 29,035.00 - 18,585.00 1,432.00 20,017.00 30,467
832 Pipa vilano warna putih AW 3 m' 32,650.00 41,785.00 - 9,135.00 2,089.00 11,224.00 43,874
833 Pipa vilano warna putih AW 4 m' 46,975.00 69,670.00 - 22,695.00 3,484.00 26,179.00 73,154
834 Pipa vilano warna putih AW 5 m' 78,250.00 99,282.50 - 21,032.50 4,964.50 25,997.00 104,247
835 Pipa vilano warna putih AW 6 m' 112,000.00 5,805.00 106,195.00 290.00 - 105,905.00 6,095
836 Pipa vilano warna putih D 1 1/4 m' 6,517.50 6,967.50 - 450.00 348.50 798.50 7,316
837 Pipa vilano warna putih D 1 1/2 m' 7,750.00 8,707.50 - 957.50 435.50 1,393.00 9,143
838 Pipa vilano warna putih D 2 m' 10,025.00 12,190.00 - 2,165.00 610.00 2,775.00 12,800
839 Pipa vilano warna putih D 2 1/2 m' 13,750.00 15,675.00 - 1,925.00 784.00 2,709.00 16,459
840 Pipa vilano warna putih D 3 m' 17,625.00 24,382.50 - 6,757.50 1,219.50 7,977.00 25,602
841 Pipa vilano warna putih D 4 m' 27,250.00 31,930.00 - 4,680.00 1,597.00 6,277.00 33,527
842 Pipa vilano warna putih D 5 m' 35,900.00 55,157.50 - 19,257.50 2,757.50 22,015.00 57,915
843 Pipa vilano warna putih D 6 m' 62,000.00 62,000.00 - - 62,000.00
844 PVC Pipe dia. 150 mm m 25,000.00 25,000.00 - - 25,000.00
845 Elbow 90̊, dia 150 mm bh 175,000.00 153,950.00 21,050.00 7,698.00 - 13,352.00 161,648
846 Elbow 45, dia 150 mm bh 185,000.00 143,250.00 41,750.00 7,162.00 - 34,588.00 150,412
847 Sochet dia. 150 bh 115,000.00 125,000.00 - 10,000.00 6,250.00 16,250.00 131,250
848 shortpipe ke HI dan pipa bh 22,000.00 66,000.00 - 44,000.00 3,300.00 47,300.00 69,300
849 saddle branch bh 420,000.00 275,000.00 145,000.00 13,750.00 - 131,250.00 288,750
850 solvent cement kg 15,000.00 330,000.00 - 315,000.00 16,500.00 331,500.00 346,500
851 PVC Pipe dia. 200 mm m 350,000.00 45,000.00 305,000.00 2,250.00 - 302,750.00 47,250
852 Sochet dia. 200 bh 315,000.00 217,800.00 97,200.00 10,890.00 - 86,310.00 228,690
853 Tee dia 200 x 150 mm bh 730,000.00 137,500.00 592,500.00 6,875.00 - 585,625.00 144,375
854 Pipa PVC ( class D ) dia 150 mm m' 90,000.00 530,200.00 - 440,200.00 25,970.00 466,170.00 556,170
855 Bend dia 150, 90 (DV) bh 40,000.00 40,000.00 - - 40,000.00
856 Bend dia 150, 45 (DV) bh 45,750.00 76,200.00 - 30,450.00 - 68,190.00 - 37,740.00 8,010
857 sochet dia 150 mm (DV) bh 36,720.00 33,000.00 3,720.00 1,650.00 - 2,070.00 34,650
858 Pipa PVC ( class D ) dia 4" dia 100 mm, length = 4 m m' 48,700.00 33,000.00 15,700.00 1,650.00 - 14,050.00 34,650
859 Sochet dia. 100 mm bh 49,000.00 26,500.00 22,500.00 1,325.00 - 21,175.00 27,825
860 Bend dia 100, 90 bh 50,000.00 50,000.00 - - 50,000.00
861 Bend dia 100, 45 bh 26,099.00 26,099.00 - - 26,099.00
862 Tee Y 45 ; 4" x 2" bh 58,500.00 35,175.00 23,325.00 1,759.00 - 21,566.00 36,934
863 Tee Y 45 ; 4" x 3" bh 65,000.00 11,880.00 53,120.00 594.00 - 52,526.00 12,474
864 Tee Y 45 ; 4" x 4" bh 85,000.00 37,560.00 47,440.00 1,878.00 - 45,562.00 39,438
865 Dop PVC 4" bh 12,500.00 18,830.00 - 6,330.00 942.00 7,272.00 19,772
866 Reducer 150 x 100 mm bh 48,000.00 26,120.00 21,880.00 1,306.00 - 20,574.00 27,426
867 Pipa PVC ( class D ) dia 3" dia. 75mm, length 4 m m 31,100.00 35,880.00 - 4,780.00 1,794.00 6,574.00 37,674
868 Large Radius Elbow dia. 75, 90o bh 45,000.00 40,430.00 4,570.00 2,022.00 - 2,548.00 42,452
869 Bend dia 75, 45 bh 14,000.00 14,920.00 - 920.00 746.00 1,666.00 15,666
870 Sochet dia. 75 mm bh 9,000.00 9,000.00 - - 9,000.00
871 Dop PVC 3" bh 10,500.00 10,500.00 - - 10,500.00
872 Reducer 100 x 75 mm bh 50,000.00 22,462.00 27,538.00 1,123.00 - 26,415.00 23,585
873 Pipa PVC ( class D ) dia 2" m 30,000.00 18,060.00 11,940.00 903.00 - 11,037.00 18,963
874 Sochet dia. 50 mm bh 17,000.00 10,470.00 6,530.00 524.00 - 6,006.00 10,994
875 Large Radius Elbow dia. 50, 90o bh 11,000.00 6,530.00 4,470.00 327.00 - 4,143.00 6,857
876 Bend dia 50, 45 bh 6,500.00 7,930.00 - 1,430.00 397.00 1,827.00 8,327
877 Dop PVC 2" bh 9,000.00 9,000.00 - - 9,000.00
878 Pipa PVC (class D), Ø 2 1/2" (63 mm) SCJ m 27,500.00 13,400.00 14,100.00 670.00 - 13,430.00 14,070
879 Socket dia 63 mm bh 8,000.00 4,550.00 3,450.00 228.00 - 3,222.00 4,778
880 Bend dia 63, 90o bh 7,200.00 7,960.00 - 760.00 398.00 1,158.00 8,358
881 Bend dia 63, 45o bh 5,200.00 4,690.00 510.00 235.00 - 275.00 4,925
882 Dop PVC 1 1/2" bh 4,100.00 7,000.00 - 2,900.00 350.00 3,250.00 7,350
883 Pipa PVC (class D), Ø 1 1/2" (40 mm) SCJ m 10,500.00 132,860.00 - 122,360.00 6,643.00 129,003.00 139,503
884 Socket dia 40 mm bh 5,200.00 210,850.00 - 205,650.00 10,543.00 216,193.00 221,393
885 Bend dia 40, 90o bh 2,600.00 98,700.00 - 96,100.00 4,935.00 101,035.00 103,635
886 Bend dia 40, 45o bh 3,100.00 67,450.00 - 64,350.00 3,373.00 67,723.00 70,823
887 Dop PVC 1 1/2" bh 2,100.00 31,600.00 - 29,500.00 1,580.00 31,080.00 33,180
888 Pipa PVC D, Ø 1 1/4" (30 mm) SCJ m 10,000.00 399,600.00 - 389,600.00 19,980.00 409,580.00 419,580
889 Socket dia 30 mm bh 3,500.00 290,000.00 - 286,500.00 14,500.00 301,000.00 304,500
890 Bend dia 30, 90o bh 1,500.00 182,300.00 - 180,800.00 9,115.00 189,915.00 191,415
891 Bend dia 30, 45o bh 1,610.00 5,184,700.00 - 5,183,090.00 259,235.00 5,442,325.00 5,443,935
892 Dop PVC 1 1/4" bh 1,040.00 1,230,000.00 - 1,228,960.00 61,500.00 1,290,460.00 1,291,500
893 Pipa PVC D, Ø 1" (25 mm) SCJ m 6,400.00 1,300,000.00 - 1,293,600.00 65,000.00 1,358,600.00 1,365,000
894 Socket dia 25 mm bh 2,200.00 680,000.00 - 677,800.00 34,000.00 711,800.00 714,000
895 Bend dia 25, 90o bh 1,025.00 595,000.00 - 593,975.00 29,750.00 623,725.00 624,750
896 Bend dia 25, 45o bh 1,000.00 301,800.00 - 300,800.00 15,090.00 315,890.00 316,890
897 Dop PVC 1 1/4" bh 850.00 315,000.00 - 314,150.00 2,992,450.00 3,306,600.00 3,307,450
898 Tee Y; 3" x 3" bh 21,000.00 475,000.00 - 454,000.00 23,750.00 477,750.00 498,750
899 Tee Y; 3" x 2" bh 26,000.00 300,000.00 - 274,000.00 15,000.00 289,000.00 315,000
900 Tee ; 2" x 2" bh 11,200.00 66,000.00 - 54,800.00 3,300.00 58,100.00 69,300
901 Sifon Crom Leher Angsa bh 350,000.00 1,588,290.00 - 1,238,290.00 79,415.00 1,317,705.00 1,667,705
902 Pipa PVC Ø 6" m 210,000.00 699,000.00 - 489,000.00 34,950.00 523,950.00 733,950
903 Pipa PVC Ø 4" m 89,000.00 545,000.00 - 456,000.00 27,250.00 483,250.00 572,250
904 Pipa PVC Ø 3" m 75,000.00 396,000.00 - 321,000.00 19,800.00 340,800.00 415,800
905 Pipa PVC Ø 2" m 50,000.00 4,200,000.00 - 4,150,000.00 210,000.00 4,360,000.00 4,410,000
906 Pipa GI Ø 4" m 16,000.00 201,250.00 - 185,250.00 10,063.00 195,313.00 211,313
907 Pipa GI Ø 3" m 18,000.00 605,000.00 - 587,000.00 30,250.00 617,250.00 635,250
908 Pipa GI Ø 2" m 12,000.00 460,000.00 - 448,000.00 23,000.00 471,000.00 483,000
909 PVC Tee R-R Ø 10" x 3" bh 90,000.00 719,000.00 - 629,000.00 35,950.00 664,950.00 754,950
910 PVC Tee R-R Ø 6" x 4" bh 87,000.00 518,000.00 - 431,000.00 25,900.00 456,900.00 543,900
911 PVC Tee R-R Ø 6" x 3" bh 66,000.00 155,400.00 - 89,400.00 7,770.00 97,170.00 163,170
912 PVC Tee R-R Ø 4" x 4" bh 63,000.00 124,800.00 - 61,800.00 6,240.00 68,040.00 131,040
913 PVC Tee R-R Ø 4" x 3" bh 53,000.00 21,000.00 32,000.00 1,050.00 - 30,950.00 22,050
914 PVC Tee R-R Ø 3" x 3" bh 48,000.00 18,000.00 30,000.00 900.00 - 29,100.00 18,900
915 PVC Tee R-R Ø 2" x 3" bh 73,000.00 1,400,000.00 - 1,327,000.00 70,000.00 1,397,000.00 1,470,000
916 PVC Tee R-SC Ø 4" x 2" bh 69,000.00 511,000.00 - 442,000.00 25,550.00 467,550.00 536,550
917 PVC Tee R-SC Ø 3" x 2" bh 51,000.00 41,600.00 9,400.00
918 PVC Tee SC-SC Ø 2" x 2" bh 415,000.00 19,300.00 395,700.00
919 CI Giboult Joint Std Jis Ø 10" bh 395,000.00 66,200.00 328,800.00 - 22,520.00 - 351,320.00 43,680
920 CI Giboult Joint Std SII Ø 6" bh 380,000.00 23,650.00 356,350.00 - 3,385.00 - 359,735.00 20,265
921 CI Giboult Joint Std SII Ø 4" bh 310,000.00 35,650.00 274,350.00 1,783.00 - 272,567.00 37,433
922 CI Giboult Joint Std SII Ø 3" bh 256,000.00 205,200.00 50,800.00 10,260.00 - 40,540.00 215,460
923 CI Gate Valve FL- FL Ø 4" bh 278,000.00 129,100.00 148,900.00 6,455.00 - 142,445.00 135,555
924 CI Plat Cap Ø 4" bh 186,000.00 93,900.00 92,100.00 4,695.00 - 87,405.00 98,595
925 PVC Tapper Core Ø 4" bh 115,000.00 99,700.00 15,300.00 4,985.00 - 10,315.00 104,685
926 PVC Tapper Core Ø 3" bh 101,000.00 37,000.00 64,000.00 1,850.00 - 62,150.00 38,850
927 BS Bend FL- FL Ø 4" x 45 ̊ bh 115,000.00 98,000.00 17,000.00 4,900.00 - 12,100.00 102,900
928 BS Bend FL- FL Ø 3" x 45 ̊ bh 110,000.00 47,000.00 63,000.00 2,350.00 - 60,650.00 49,350
929 BS Flenge Ø 4" bh 55,000.00 275,000.00 - 220,000.00 13,750.00 233,750.00 288,750
930 BS Flange Ø 3" bh 50,000.00 49,610.00 390.00 2,481.00 2,091.00 52,091
931 Karet Packing Ø 4" bh 99,000.00 70,725.00 28,275.00 3,536.00 - 24,739.00 74,261
932 Karet Packing Ø 3" bh 90,000.00 15,700.00 74,300.00 785.00 - 73,515.00 16,485
933 Bronze Gate Valve Ø 3" bh 60,000.00 2,500.00 57,500.00 125.00 - 57,375.00 2,625
934 Bronze Gate Valve Ø 2" bh 55,000.00 668,660.00 - 613,660.00 33,433.00 647,093.00 702,093
935 PVC Valve Sochet Ø 3" bh 90,000.00 143,290.00 - 53,290.00 7,165.00 60,455.00 150,455
936 PVC Valve Sochet Ø 2" bh 66,000.00 49,760.00 16,240.00 2,488.00 - 13,752.00 52,248
937 GI Cap Ø 3" bh 42,000.00 114,600.00 - 72,600.00 5,730.00 78,330.00 120,330
938 GI Cap Ø 2" bh 41,000.00 19,105.00 21,895.00 - 17,045.00 - 38,940.00 2,060
939 GI Elbow Ø 2" bh 6,000.00 40,000.00 - 34,000.00 2,000.00 36,000.00 42,000
940 PVC Bend R- R Ø 4" x 90 ̊ bh 38,000.00 38,000.00 - - 38,000.00
941 PVC Bend R- R Ø 4" x 45 ̊ bh 40,000.00 40,000.00 - - 40,000.00
942 PVC Bend R- R Ø 3" x 45 ̊ bh 25,000.00 18,700.00 6,300.00 935.00 - 5,365.00 19,635
943 PVC Bend R- R Ø 3" x 90 ̊ bh 21,000.00 598,400.00 - 577,400.00 29,920.00 607,320.00 628,320
944 PVC Elbow Ø 2" bh 10,000.00 22,000.00 - 12,000.00 1,100.00 13,100.00 23,100
945 PVC Reducer R-R Ø 4" x 3" bh 65,000.00 11,935.00 53,065.00 597.00 - 52,468.00 12,532
946 PVC Reducer R-R Ø 3" x 2" bh 60,000.00 11,000.00 49,000.00 550.00 - 48,450.00 11,550
947 Beton Path box bh 30,000.00 15,950.00 14,050.00 798.00 - 13,252.00 16,748
948 Beton KS bh 15,000.00 16,500.00 - 1,500.00 825.00 2,325.00 17,325
949 Pipa Selubung Valve M 30,000.00 19,800.00 10,200.00 990.00 - 9,210.00 20,790
950 Penutup Pipa bh 18,000.00 20,900.00 - 2,900.00 1,045.00 3,945.00 21,945
951 Patok UP bh 65,000.00 27,500.00 37,500.00 1,375.00 - 36,125.00 28,875
952 Beton Penahan Ø 10" bh 920,000.00 39,900.00 880,100.00 1,995.00 - 878,105.00 41,895
953 Beton Penahan Ø 6" bh 195,000.00 21,450.00 173,550.00 1,072.00 - 172,478.00 22,522
954 Beton Penahan Ø 4" bh 68,000.00 16,500.00 51,500.00 825.00 - 50,675.00 17,325
955 Beton Penahan Ø 3" bh 135,000.00 17,482.50 117,517.50 874.50 - 116,643.00 18,357
956 Beton Penahan Ø 2" bh 2,500.00 11,025.00 - 8,525.00 551.00 9,076.00 11,576
957 Baut Dynabol bh 4,000.00 64,000.00 - 60,000.00 3,200.00 63,200.00 67,200

BAHAN LISTRIK
958 Coaxial cable 5C - 75 ohm commscof m 25,000.00
959 Box Panel (3 mm) (400 x 600) Bh 850,000.00
960 Figting lampu Broco Bh 15,000.00
961 Inbow dos plastik clipsal E 157 P OB bj 8,000.00
962 Kabel NYM 2 x 1.5 mm Suprime NYM m 7,000.00
963 Kabel NYY 2 x 1.5 mm m 8,900.00
964 Kabel NYM 2 x 2.5 mm m 12,000.00
965 Kabel NYY 3 x 1.5 mm m 14,000.00
966 Kabel NYM 3 x 2.5 mm m 15,500.00
967 Kabel NYY 3 x 2.5 mm m 19,500.00
968 Kabel NYM 4 mm m 30,000.00
969 Kabel NYY 2 x 2,5 mm m 17,000.00
970 Kabel Twisteed 2 x 16 mm m 5,500.00
971 Kabel telephone m 3,000.00
972 Klem clipsal 20 mm bj 2,500.00
973 Casing Lampu Bawah Air bh 85,000.00
974 Casing Lampu Tangga bh 90,000.00
975 Kap Lampu 14 Inchi Aluminium bh 120,000.00
976 Fitting Gantung E27 bh 10,000.00
977 Lampu Son 150 Watt Setara Philips Set 80,000.00
978 Lampu Mercury (halaman) bh 550,000.00
979 Lampu Mercury 125 Watt Setara Philips Set 60,000.00
980 Lampu Mercury 250 Watt Setara Philips Set 66,000.00
981 Lampu Mercury 400 Watt Setara Philips Set 150,000.00
982 Lampu pijar 10 Watt Setara Philips bh 9,000.00
983 Lampu pijar 15 Watt Setara Philips bh 10,000.00
984 Lampu pijar 25 Watt Setara Philips bh 12,000.00
985 Lampu pijar 40 Watt Setara Philips bh 15,500.00
986 Lampu TL 20 Watt Komplit (Ballast Philips) bh 151,000.00
987 Lampu TL 25 Watt Komplit (Ballast Philips) bh 185,000.00
988 Lampu LED (5 Watt) Setara Philips bh 60,000.00
989 Lampu LED (7 Watt) Setara Philips bh 75,000.00
990 Lampu LED (10) Setara Philips bh 85,000.00
991 Lampu LED (13 Watt) Setara Philips bh 94,000.00
992 Lampu Sorot LED (5 Watt) Setara Philips bh 32,000.00
993 Lampu Sorot LED (7 Watt) Setara Philips bh 35,000.00
994 Lampu Sorot LED (10 Watt) Setara Philips bh 40,000.00
995 Lampu Sorot LED (13 Watt) Setara Philips bh 48,000.00
996 Lampu Sorot LED (25 Watt) Setara Philips bh 65,000.00
997 Lampu Sorot LED (100 Watt) Setara Philips (ip65) bh 68,000.00
998 Lampu Sorot Cahaya RGB (LED) 100 watt setara Philips (ip65) bh 40,000.00
999 Lampu Sorot Bawah Cahaya Warm White (bolam) 400 watt setara Philips bh 110,000.00
1000 Lampu Sorot Bawah Cahaya Warm White (LED) 10 watt setara Philips (ip65) bh 45,000.00
1001 Lampu Sorot Bawah Cahaya Warm White (LED) 30 watt setara Philips (ip65) bh 65,000.00
1002 Lampu Esensial (5 Watt) Setara Philips bh 39,000.00
1003 Lampu Esensial (8 Watt) Setara Philips bh 41,000.00
1004 Lampu Esensial (11 Watt) Setara Philips bh 50,000.00
1005 Lampu Esensial (14 Watt) Setara Philips bh 56,500.00
1006 Lampu Esensial (18 Watt) Setara Philips Bh 59,000.00
1007 Scot Light m2 65,000.00
1008 Magnet Contactor 80 A SN - 50 bh 19,000.00
1009 MCB 3 phase 40 A MG bh 445,000.00
1010 MCB 3 phase 63 A MG bh 345,000.00
1011 Panel MDP Unit 36,500,000.00
1012 Panel SDP Unit 19,000,000.00
1013 Pipa clipsal 20 mm bt 12,000.00
1014 Pipa flexible clipsal 20 mm m1 4,000.00
1015 Saklar ganda Setara Broco bh 18,000.00
1016 Saklar tunggal Setara Broco bh 15,000.00
1017 SL 18 Watt Komplit bh 225,000.00
1018 Sock clipsal 20 mm bj 2,000.00
1019 Steker bh 15,000.00
1020 Stop Kontak bh 26,000.00
1021 Stop Kontak Khusus (Kedap Air) bh 35,000.00
1022 Travo max 50 watt bh 147,000.00
1023 Tee dos clipsal 20 mm bh 8,000.00
1024 Time Switch bh 585,000.00
1025 T Foring bh 11,000.00
- - -
MARMER / GRANIT - - -
1026 Marmer (30 x 30) m2 375,000.00 308,000.00 67,000.00 15,400.00 - 51,600.00 323,400
1027 Marmer (40 x 40) m2 417,000.00 715,000.00 - 298,000.00 35,750.00 333,750.00 750,750
1028 Granit (30 x 30) Tekstur Kasar Tebal 3 cm m2 495,000.00 385,000.00 110,000.00 19,250.00 - 90,750.00 404,250
1029 Batu Andesit (30 x 30 x 5 cm) m2 460,000.00 46,200.00 413,800.00 2,310.00 - 411,490.00 48,510
1030 Roster Keramik (12 x 11 x 24) bh 55,000.00
- - -
GRANIT TILE - - -
1031 Essenza 40 x 40 m2 395,000.00 315,150.00 79,850.00 15,758.00 - 64,092.00 330,908
1032 Essenza 60 x 60 m2 470,000.00 387,200.00 82,800.00 19,360.00 - 63,440.00 406,560
1033 Granito 40 x 40 cm m2 435,000.00 348,150.00 86,850.00 17,408.00 - 69,442.00 365,558
1034 Nero Granito 30 x 60 cm m2 385,000.00 305,800.00 79,200.00 15,290.00 - 63,910.00 321,090
1035 Nero Granito 40 x 40 cm m2 430,000.00 348,150.00 81,850.00 17,408.00 - 64,442.00 365,558
1036 Nero Granito 60 x 60 cm m2 435,000.00 345,950.00 89,050.00 19,298.00 - 69,752.00 365,248
1037 Setara Ex Cina 60 x 60 cm m2 220,000.00 181,500.00 38,500.00 9,075.00 - 29,425.00 190,575
1038 Setara Ex Cina 80 x 80 cm m2 235,000.00 231,000.00 4,000.00 11,550.00 7,550.00 242,550
- - -
KERAMIK - - -
1039 Keramik Asia Tile 20 x 20 kelas I warna muda m2 68,000.00 71,500.00 - 3,500.00 3,575.00 7,075.00 75,075
1040 Keramik Setara Asia Tile 20 x 20 kelas I warna tua m2 68,000.00 74,800.00 - 6,800.00 3,740.00 10,540.00 78,540
1041 Keramik Setara Asia Tile 20 x 25 kelas I m2 70,000.00 77,000.00 - 7,000.00 3,850.00 10,850.00 80,850
1042 Keramik Setara Asia Tile 30 x 30 kelas I warna muda m2 55,000.00 55,000.00 - 18,500.00 18,500.00 73,500
1043 Keramik Setara Asia Tile 30 x 30 kelas I warna tua m2 62,000.00 57,200.00 4,800.00 2,860.00 - 1,940.00 60,060
1044 Keramik Setara Asia Tile 40 x 40 kelas I m2 70,000.00 74,800.00 - 4,800.00 3,740.00 8,540.00 78,540
1045 Keramik Setara Asia Tile 60 x 60 kelas I Setara Platinum m2 148,000.00 126,500.00 21,500.00 6,325.00 - 15,175.00 132,825
1046 Keramik Setara ARWANA ( warna putih) m2 58,000.00 51,700.00 6,300.00 17,600.00 11,300.00 69,300
1047 Keramik Setara ARWANA ( warna tua) m2 65,000.00 66,000.00 - 1,000.00 3,300.00 4,300.00 69,300
1048 Keramik Setara Diamond 10/20 cm (Warna Muda) m2 70,000.00 66,000.00 4,000.00 3,300.00 - 700.00 69,300
1049 Keramik Setara Diamond 20/20 cm (Kelas I Warna Muda) m2 75,000.00 60,500.00 14,500.00 3,550.00 - 10,950.00 64,050
1050 Keramik Setara Diamond 30/30 cm (Kelas I Warna Muda) m2 76,000.00 66,000.00 10,000.00 3,300.00 - 6,700.00 69,300
1051 Keramik Setara Diamond 10/20 cm (Warna tua) m2 80,000.00 82,500.00 - 2,500.00 6,750.00 9,250.00 89,250
1052 Keramik Setara Diamond 20/20 cm (Kelas I Warna Tua) m2 71,000.00 66,000.00 5,000.00 3,300.00 - 1,700.00 69,300
1053 Keramik Setara Diamond 30/30 cm (Kelas I Warna Tua) m2 70,000.00 66,000.00 4,000.00 3,300.00 - 700.00 69,300
1054 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna muda) m2 66,000.00 66,000.00 - 3,300.00 3,300.00 69,300
1055 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna tua) m2 68,000.00 82,500.00 - 14,500.00 4,650.00 19,150.00 87,150
1056 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna tua) m2 70,000.00 63,800.00 6,200.00 4,450.00 - 1,750.00 68,250
1057 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna muda) m2 65,000.00 55,000.00 10,000.00 8,000.00 - 2,000.00 63,000
1058 Keramik Setara Ikad (Keramik) Kw. I 30 x 30 cm m2 68,000.00 68,200.00 - 200.00 3,410.00 3,610.00 71,610
1059 Keramik Setara Ikad (Keramik) Kw. I 40 x 40 cm m2 71,000.00 77,000.00 - 6,000.00 3,850.00 9,850.00 80,850
1060 Keramik Setara Ikad (Keramik) Kw. I 50 x 50 cm m2 75,000.00 88,550.00 - 13,550.00 4,428.00 17,978.00 92,978
1061 Keramik Setara KIA 20/20 cm warna muda m2 70,000.00 71,500.00 - 1,500.00
1062 Keramik Setara KIA 30/30 cm warna muda m2 75,000.00 72,600.00 2,400.00 2,475.00 75.00 75,075
1063 Keramik Setara KIA 20/20 cm warna tua m2 65,000.00 77,550.00 - 12,550.00 - 1,320.00 11,230.00 76,230
1064 Keramik Setara KIA 30/30 cm warna tua m2 68,000.00 77,550.00 - 9,550.00 3,878.00 13,428.00 81,428
1065 Keramik Setara Mulia Warna Putih m2 105,000.00 51,700.00 53,300.00 800.00 - 52,500.00 52,500
1066 Keramik Setara Mulia Warna Tua m2 65,000.00 48,950.00 16,050.00 5,335.00 - 10,715.00 54,285
1067 Keramik Setara Mulia 20 x 20 cm Warna Tua m2 58,000.00 47,410.00 10,590.00 3,988.00 - 6,602.00 51,398
1068 Keramik Setara Mulia 20 x 20 cm Warna Muda m2 60,000.00 55,550.00 4,450.00 - 5,769.00 - 10,219.00 49,781
1069 Keramik Setara Mulia 30 x 30 cm Warna Putih m2 62,000.00 57,090.00 4,910.00 1,238.00 - 3,672.00 58,328
1070 Keramik Setara Mulia 30 x 30 Warna Marbel m2 70,000.00 69,850.00 150.00 - 9,905.00 - 10,055.00 59,945
1071 Keramik Setara Mulia 30 x 30 Warna Impresso m2 75,000.00 102,850.00 - 27,850.00 - 29,507.00 - 1,657.00 73,343
1072 Keramik Setara Mulia 40 x 40 cm kelas I m2 78,000.00 143,000.00 - 65,000.00 - 35,007.00 29,993.00 107,993
1073 Keramik Setara ROMAN 20/20 cm m2 85,000.00 86,350.00 - 1,350.00 63,800.00 65,150.00 150,150
1074 Keramik Setara ROMAN 30/30 cm m2 88,000.00 86,350.00 1,650.00 4,318.00 2,668.00 90,668
1075 Tegel PC abu - abu 20/20 cm m2 95,000.00 86,350.00 8,650.00 4,318.00 - 4,332.00 90,668
1076 Tegel PC Warna 20/20 cm m2 95,000.00 69,500.00 25,500.00 21,168.00 - 4,332.00 90,668
1077 Tegel PC Warna 30/30 cm m2 95,000.00 86,350.00 8,650.00 - 2,350.00 - 11,000.00 84,000
1078 Tegel 30 x 30 TB PC m2 95,000.00 86,350.00 8,650.00 4,318.00 - 4,332.00 90,668
1079 Tegel 30 x 30 TB PC Kuning m2 96,000.00 86,350.00 9,650.00 4,318.00 - 5,332.00 90,668
1080 Tegel 30 x 30 Warna Merah m2 96,000.00 86,350.00 9,650.00 4,318.00 - 5,332.00 90,668
1081 Tegel Bata 20 x 20 Merah m2 96,000.00 86,350.00 9,650.00 4,318.00 - 5,332.00 90,668
1082 Tegel Bata 20 x 20 PC m2 96,000.00 82,500.00 13,500.00 6,750.00 - 6,750.00 89,250
1083 Tegel B/TB 20 x 20 Kuning m2 96,000.00 77,000.00 19,000.00 3,850.00 - 15,150.00 80,850
1084 Tegel Mozaik Porselint 30/30 cm m2 118,000.00 7,000.00 111,000.00 350.00 - 110,650.00 7,350
1085 Tegel Wafel 20/20 cm Warna m2 121,000.00 82,500.00 38,500.00 4,125.00 - 34,375.00 86,625
1086 Ubin PC Warna bh 90,000.00 27,500.00 62,500.00 1,900.00 - 60,600.00 29,400
1087 Ubin PC Warna 20 / 20 Cm m2 90,000.00 49,500.00 40,500.00 3,000.00 - 37,500.00 52,500
1088 Batu Lahar 30/30 bh 135,000.00 135,000.00 -
1089 Porselint 11/11 cm bh 90,000.00
1090 Porselen m2 98,000.00
- - -
ATAP - - -
1091 Alang-alang panjang 2,4 meter lbr 28,500.00 16,500.00 12,000.00 825.00 - 11,175.00 17,325
1092 Alluminium foil M2 Double rol 356,000.00 245,300.00 110,700.00 12,265.00 - 98,435.00 257,565
1093 Akustik 60 cm x 120 cm lbr 76,000.00 54,450.00 21,550.00 2,723.00 - 18,827.00 57,173
1094 Asbes Bubungan lbr 58,000.00 49,000.00 9,000.00 2,450.00 - 6,550.00 51,450
1095 Asbes Gelombang 1,80 m x 0,80 m lbr 48,000.00 38,500.00 9,500.00 1,925.00 - 7,575.00 40,425
1096 Asbes Gelombang 1,80 m x 1,05 m lbr 52,000.00 41,800.00 10,200.00 2,090.00 - 8,110.00 43,890
1097 Asbes Gelombang 2,10 m x 1,05 m lbr 68,000.00 45,100.00 22,900.00 2,255.00 - 20,645.00 47,355
1098 Asbes Gelombang 2,4 m x 1,05 m lbr 81,000.00 53,900.00 27,100.00 2,695.00 - 24,405.00 56,595
1099 Asbes Rata 2 m x 1 m x 4 mm lbr 76,000.00 60,500.00 15,500.00 3,025.00 - 12,475.00 63,525
1100 Bentala tanah liat Ex Pejaten bh 82,000.00 93,500.00 - 11,500.00 4,675.00 16,175.00 98,175
1101 Bentala Ex Kapal bh 83,000.00 70,500.00 12,500.00 13,500.00 1,000.00 84,000
1102 Bentala Besar polos Lubang 24 cm bh 97,000.00 82,500.00 14,500.00 4,125.00 - 10,375.00 86,625
1103 Bentala Besar Warna Lubang 25 cm bh 133,000.00 110,000.00 23,000.00 5,500.00 - 17,500.00 115,500
1104 Bentala Besar polos Lubang 90 cm bh 202,000.00 143,000.00 59,000.00 7,150.00 - 51,850.00 150,150
1105 Bentala Besar Warna Lubang 90 cm bh 203,000.00 165,000.00 38,000.00 8,250.00 - 29,750.00 173,250
1106 Bubungan Besar bh 8,500.00 17,600.00 - 9,100.00 880.00 9,980.00 18,480
1107 Bubungan Kecil bh 7,000.00 13,200.00 - 6,200.00 660.00 6,860.00 13,860
1108 Bubungan Bambe Kecil bh 12,000.00 19,250.00 - 7,250.00 963.00 8,213.00 20,213
1109 Bubungan Bulat Karang Pilang bh 29,000.00 19,250.00 9,750.00 7,000.00 - 2,750.00 26,250
1110 Bubungan Bulat Jati Wangi bh 21,000.00 17,050.00 3,950.00 853.00 - 3,097.00 17,903
1111 Bubungan Bulat Ngalayur isi 3,5/m bh 18,000.00 9,900.00 8,100.00 495.00 - 7,605.00 10,395
1112 Bubungan Besar Good Year bh 28,000.00 17,600.00 10,400.00 880.00 - 9,520.00 18,480
1113 Bubungan Beton Cisangkan bh 21,000.00 21,450.00 - 450.00 3,773.00 4,223.00 25,223
1114 Bubungan Gerard lbr 18,000.00 68,500.00 - 50,500.00 5,000.00 55,500.00 73,500
1115 Bubungan Karang Pilang isi 3,5/m bh 28,000.00 19,250.00 8,750.00 10,150.00 1,400.00 29,400
1116 Bubungan Pletong Jatiwangi bh 33,000.00 16,500.00 16,500.00 825.00 - 15,675.00 17,325
1117 Bubungan SL Utama bh 18,000.00 16,500.00 1,500.00 825.00 - 675.00 17,325
1118 Bubungan SL Ngalayur bh 17,500.00 9,350.00 8,150.00 468.00 - 7,682.00 9,818
1119 Bubungan Segi Tiga Karang Pilang bh 27,000.00 19,250.00 7,750.00 963.00 - 6,787.00 20,213
1120 Bubungan Utama isi 3,5/m bh 11,500.00 16,500.00 - 5,000.00 825.00 5,825.00 17,325
1121 Genteng Bambe bh 7,000.00 5,390.00 1,610.00 1,435.00 - 175.00 6,825
1122 Genteng Bambe Karang Pilang bh 8,000.00 5,390.00 2,610.00 1,960.00 - 650.00 7,350
1123 Genteng Bambe Kecil bh 6,000.00 5,170.00 830.00 1,130.00 300.00 6,300
1124 Genteng Beton Cisangkan bh 12,000.00 13,750.00 - 1,750.00 688.00 2,438.00 14,438
1125 Genteng Gemini bh 6,800.00 6,600.00 200.00 750.00 550.00 7,350
1126 Genteng Gerard Polos m2 350,000.00 254,500.00 95,500.00 18,500.00 - 77,000.00 273,000
1127 Genteng Good Year m2 8,500.00 5,500.00 3,000.00 800.00 - 2,200.00 6,300
1128 Genteng Kanmuri (glazur) isi 14/m2 bh 4,100.00 11,550.00 - 7,450.00 578.00 8,028.00 12,128
1129 Genteng Kodok Lokal bh 6,000.00 3,740.00 2,260.00 1,510.00 - 750.00 5,250
1130 Genteng Kodok Kamulan bh 5,100.00 3,850.00 1,250.00 193.00 - 1,057.00 4,043
1131 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bh 6,000.00 5,500.00 500.00 - 71.00 - 571.00 5,429
1132 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bh 7,000.00 5,170.00 1,830.00 605.00 - 1,225.00 5,775
1133 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bh 7,000.00 5,500.00 1,500.00 1,850.00 350.00 7,350
1134 Genteng Kodok Karang Pilang (Surabaya) bh 6,500.00 7,000.00 - 500.00 - 4,459.00 - 3,959.00 2,541
1135 Genteng Kodok Soka bh 4,000.00 2,420.00 1,580.00 1,255.00 - 325.00 3,675
1136 Genteng Lestari bh 3,900.00 3,080.00 820.00 44,170.00 43,350.00 47,250
1137 Genteng Metal m2 59,000.00 40,590.00 18,410.00 28,017.00 9,607.00 68,607
1138 Genteng Metal 80 x 77,6 (Polos) lbr 53,000.00 65,340.00 - 12,340.00 - 55,638.00 - 43,298.00 9,702
1139 Genteng Metal 80 x 77,6 (Pasir) lbr 78,000.00 9,240.00 68,760.00
1140 Genteng Morando Abadi isi 18/m2 bh 10,800.00 4,950.00 5,850.00 248.00 - 5,602.00 5,198
1141 Genteng Morando Jatiwangi isi 18/m2 bh 6,500.00 4,070.00 2,430.00 204.00 - 2,226.00 4,274
1142 Genteng Morando Ngalayur isi 20/m2 bh 5,100.00 63,800.00 - 58,700.00 3,190.00 61,890.00 66,990
1143 Genteng Morando Metal bh 75,000.00 3,080.00 71,920.00 595.00 - 71,325.00 3,675
1144 Genteng Pejaten Mini bh 3,900.00 2,200.00 1,700.00 110.00 - 1,590.00 2,310
1145 Genteng Plentong bh 3,100.00 2,420.00 680.00 121.00 - 559.00 2,541
1146 Genteng plentong dicat bh 4,000.00 2,200.00 1,800.00 950.00 - 850.00 3,150
1147 Genteng Plentong Mantili bh 2,800.00 4,000.00 - 1,200.00 200.00 1,400.00 4,200
1148 Genteng Plentong Pejaten / Darmasaba bh 3,000.00 6,500.00 - 3,500.00 325.00 3,825.00 6,825
1149 Genteng Plentong Jatiwangi / Surabaya bh 3,500.00 6,500.00 - 3,000.00 2,950.00 5,950.00 9,450
1150 Genteng Portugis bh 2,800.00 1,980.00 820.00 99.00 - 721.00 2,079
1151 Genteng Pres Besar bh 3,500.00 2,090.00 1,410.00 105.00 - 1,305.00 2,195
1152 Genteng Pres Besar Cat bh 4,000.00 1,760.00 2,240.00 88.00 - 2,152.00 1,848
1153 Genteng Pres Mini bh 2,900.00 1,980.00 920.00 99.00 - 821.00 2,079
1154 Genteng Pres Mini Cat bh 3,000.00 8,000.00 - 5,000.00 5,650.00 10,650.00 13,650
1155 Genteng Terreal bh 15,000.00 8,000.00 7,000.00 2,500.00 - 4,500.00 10,500
1156 Genteng T. Romana bh 15,000.00 1,980.00 13,020.00 99.00 - 12,921.00 2,079
1157 Genteng Besar polos Lubang 35 cm bh 3,500.00 2,090.00 1,410.00 105.00 - 1,305.00 2,195
1158 Genteng Besar Warna Lubang 35 cm bh 3,800.00 1,760.00 2,040.00 88.00 - 1,952.00 1,848
1159 Fiberglas (1.80 x 0.80) M2 lbr 60,000.00 1,980.00 58,020.00 99.00 - 57,921.00 2,079
1160 Ijuk kg 4,500.00 88,000.00 - 83,500.00 4,400.00 87,900.00 92,400
1161 Ijuk Bersih bh 17,000.00 99,000.00 - 82,000.00 4,950.00 86,950.00 103,950
1162 Ijuk Lampung bh 15,000.00 66,000.00 - 51,000.00 3,300.00 54,300.00 69,300
1163 Ikut Celedu bh 290,000.00 88,000.00 202,000.00 4,400.00 - 197,600.00 92,400
1164 Ikut Celedu Besar Polos bh 109,000.00 80,300.00 28,700.00 4,015.00 - 24,685.00 84,315
1165 Ikut Celedu Besar Warna bh 120,000.00 88,000.00 32,000.00 4,400.00 - 27,600.00 92,400
1166 Ikut Celedu Kecil Polos bh 92,500.00 220,000.00 - 127,500.00 16,250.00 143,750.00 236,250
1167 Ikut Celedu Kecil Warna bh 125,000.00 121,000.00 4,000.00 6,050.00 2,050.00 127,050
1168 Kawat las kg 80,500.00 88,000.00 - 7,500.00 4,400.00 11,900.00 92,400
1169 Kawat Diameter 4 mm kg 35,000.00 104,500.00 - 69,500.00 5,225.00 74,725.00 109,725
1170 Murda / Puntal Paras bh 165,000.00 219,450.00 - 54,450.00 10,973.00 65,423.00 230,423
1171 Murda tanah liat Ex Pejaten bh 145,000.00 99,770.00 45,230.00 4,989.00 - 40,241.00 104,759
1172 Murda Kecil Polos Lubang 25 cm bh 108,000.00 106,480.00 1,520.00 5,324.00 3,804.00 111,804
1173 Murda Kecil Warna Lubang 25 cm bh 128,000.00 119,790.00 8,210.00 5,990.00 - 2,220.00 125780
1174 Profil Aluminium "T" m3 255,000.00 93,500.00 161,500.00 4,675.00 - 156,825.00 98175
1175 Seng BJLS 0,18 gelombang lbr 125,000.00 53,240.00 71,760.00 2,662.00 - 69,098.00 55902
1176 Seng BJLS 0,22 gelombang lbr 135,000.00 66,550.00 68,450.00 3,237.00 - 65,213.00 69,787
1177 Seng BJLS 0,30 gelombang lbr 140,000.00 53,240.00 86,760.00 2,662.00 - 84,098.00 55,902
1178 Seng Zincalume Panjang 6m Tebal 0,5 mm lbr 118,000.00 4,950.00 113,050.00 248.00 - 112,802.00 5,198
1179 Seng Plat Lebar 0,90 M lbr 61,000.00 9,240.00 51,760.00 462.00 - 51,298.00 9,702
1180 Seng Plat 3" x 6" BJLS 28 lbr 87,000.00 5,390.00 81,610.00 269.00 - 81,341.00 5,659
1181 Seng Plat Aluminium lbr 65,000.00 6,600.00 58,400.00 330.00 - 58,070.00 6,930
1182 Sirap lbr 10,000.00 4,180.00 5,820.00 209.00 - 5,611.00 4,389
1183 Subeng Besar Polos lbr 15,600.00
1184 Subeng Besar Warna lbr 8,500.00
1185 Subeng Kecil Polos lbr 8,500.00
1186 Subeng Kecil Warna bh 5,500.00
- - -
TALI - - -
1187 Tali Ijuk kg 11,000.00 5,390.00 5,610.00 270.00 - 5,340.00 5,660
1188 Tali pengikat ikat 25,500.00 16,500.00 9,000.00 825.00 - 8,175.00 17,325
1189 Tali pengikat alang-alang ikat 34,000.00 19,800.00 14,200.00 990.00 - 13,210.00 20,790
1190 Tali Rafia Gulung 6,500.00 3,000.00 3,500.00 150.00 - 3,350.00 3,150
- - -
SANITAIR - - -
1191 Bak mandi fibre glass 70x70x66 cm bh 370,000.00 306,130.00 63,870.00 15,307.00 - 48,563.00 321,437
1192 Bak mandi porselin/ keramik bh 365,000.00 242,500.00 122,500.00 12,125.00 - 110,375.00 254,625
1193 Bak mandi keramik 50x50 bh 209,000.00 187,000.00 22,000.00 9,350.00 - 12,650.00 196,350
1194 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh 218,000.00 341,000.00 - 123,000.00 17,050.00 140,050.00 358,050
1195 Floor Drain Plastic bh 27,000.00 27,500.00 - 500.00 1,375.00 1,875.00 28,875
1196 Floor Drain Stainless bh 90,000.00 49,500.00 40,500.00 2,475.00 - 38,025.00 51,975
1197 Floor drain plastik Setara Alianco bh 30,000.00 1,650,000.00 - 1,620,000.00 82,500.00 1,702,500.00 1,732,500
1198 Floor drain stainless Setara Wasser bh 185,000.00 1,100,000.00 - 915,000.00 55,000.00 970,000.00 1,155,000
1199 Dudukan Kloset dan Perlengkapannya bh 2,800,000.00 1,320,000.00 1,480,000.00 150,000.00 - 1,330,000.00 1,470,000
1200 Kloset duduk INA Komplit bh 1,100,000.00 1,430,000.00 - 330,000.00 71,500.00 401,500.00 1,501,500
1201 closet duduk INA (putih) STD bh 975,000.00 1,100,000.00 - 125,000.00 55,000.00 180,000.00 1,155,000
1202 closet duduk INA (warna) bh 995,000.00 1,705,000.00 - 710,000.00 85,250.00 795,250.00 1,790,250
1203 Kloset duduk Amerika Standar Winplus bh 1,875,000.00 1,815,000.00 60,000.00 90,750.00 30,750.00 1,905,750
1204 closet duduk TOTO (putih) STD bh 1,945,000.00 5,699,100.00 - 3,754,100.00 284,955.00 4,039,055.00 5,984,055
1205 closet duduk TOTO (warna) bh 2,000,000.00 8,457,900.00 - 6,457,900.00 422,895.00 6,880,795.00 8,880,795
1206 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh 6,550,000.00 738,100.00 5,811,900.00 36,905.00 - 5,774,995.00 775,005
1207 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh 6,700,000.00 1,925,000.00 4,775,000.00 96,250.00 - 4,678,750.00 2,021,250
1208 Kloset duduk " TOTO Type AVANTE CW 823 J bh 10,500,000.00 2,589,400.00 7,910,600.00 129,470.00 - 7,781,130.00 2,718,870
1209 Kloset duduk " TOTO Type CW 660J bh 1,850,000.00 810,700.00 1,039,300.00 40,535.00 - 998,765.00 851,235
1210 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh 1,950,000.00 3,388,000.00 - 1,438,000.00 169,400.00 1,607,400.00 3,557,400
1211 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh 2,250,000.00 3,763,100.00 - 1,513,100.00 188,155.00 1,701,255.00 3,951,255
1212 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh 2,350,000.00 3,908,300.00 - 1,558,300.00 195,415.00 1,753,715.00 4,103,715
1213 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh 3,100,000.00 469,150.00 2,630,850.00 23,458.00 - 2,607,392.00 492,608
1214 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh 3,950,000.00 246,950.00 3,703,050.00 12,348.00 - 3,690,702.00 259,298
1215 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh 4,500,000.00 275,000.00 4,225,000.00 13,750.00 - 4,211,250.00 288,750
1216 Kloset jongkok " TOTO Type CE 6 COMPLIT bh 565,000.00 374,000.00 191,000.00 18,700.00 - 172,300.00 392,700
1217 Kloset jongkok " TOTO Type CE 7 COMPLIT bh 575,000.00 175,450.00 399,550.00 8,773.00 - 390,777.00 184,223
1218 closet jongkok porselin/ keramik bh 215,000.00 55,000.00 160,000.00 2,750.00 - 157,250.00 57,750
1219 Kloset porselin jongkok TOTO (standar) bh 315,000.00 76,000.00 239,000.00 3,800.00 - 235,200.00 79,800
1220 Kloset porselin jongkok Ina (standar) bh 118,000.00 242,550.00 - 124,550.00 12,128.00 136,678.00 254,678
1221 Kran biasa Setara Onda bh 25,000.00 330,000.00 - 305,000.00 16,500.00 321,500.00 346,500
1222 Kran SunEi PI/3 JHR bh 215,000.00 271,700.00 - 56,700.00 13,585.00 70,285.00 285,285
1223 Kran TOTO T 205 LCSC bh 275,000.00 280,500.00 - 5,500.00 14,025.00 19,525.00 294,525
1224 Kran TOTO T 205 MC bh 385,000.00 367,400.00 17,600.00 18,370.00 770.00 385,770
1225 Kran TOTO T 23 B13 bh 395,000.00 775,500.00 - 380,500.00 38,775.00 419,275.00 814,275
1226 Kran TOTO T 23 B13V7NB bh 375,000.00 1,364,000.00 - 989,000.00 68,200.00 1,057,200.00 1,432,200
1227 Kran TOTO T 26 - 13 bh 395,000.00 459,800.00 - 64,800.00 22,990.00 87,790.00 482,790
1228 Kran TOTO TX 109 LH bh 985,000.00 121,000.00 864,000.00 6,050.00 - 857,950.00 127,050
1229 Penyekat Urinoir " TOTO " Type A 100 " bh 1,425,000.00 3,300.00 1,421,700.00 165.00 - 1,421,535.00 3,465
1230 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 375,000.00 2,640,000.00 - 2,265,000.00 142,500.00 2,407,500.00 2,782,500
1231 Soap holder " TOTO " Type S 6 N " bh 165,000.00 2,874,960.00 - 2,709,960.00 143,748.00 2,853,708.00 3,018,708
1232 Seal tape bh 5,000.00 1,414,600.00 - 1,409,600.00 70,730.00 1,480,330.00 1,485,330
1233 Urinoir TOTO (STD) bh 3,100,000.00 2,530,000.00 570,000.00 126,500.00 - 443,500.00 2,656,500
1234 Urinoir " TOTO U 57 M bh 1,615,000.00 203,500.00 1,411,500.00 10,175.00 - 1,401,325.00 213,675
1235 Urinoir " TOTO U 57 M BODI bh 495,000.00 258,500.00 236,500.00 12,925.00 - 223,575.00 271,425
1236 Urinoir INA (STD) bh 610,000.00 594,000.00 16,000.00 29,700.00 13,700.00 623,700
1237 Wastagel KIA Standard bh 850,000.00 1,135,000.00 - 285,000.00 56,750.00 341,750.00 1,191,750
1238 Wastagel KIA Warna bh 510,000.00 1,248,500.00 - 738,500.00 62,425.00 800,925.00 1,310,925
1239 Wastafel TOTO (putih) bh 535,000.00 808,500.00 - 273,500.00 40,425.00 313,925.00 848,925
1240 Wastafel TOTO (warna) bh 475,000.00 770,000.00 - 295,000.00 38,500.00 333,500.00 808,500
1241 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh 1,600,000.00 770,000.00 830,000.00 38,500.00 - 791,500.00 808,500
1242 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh 1,750,000.00
1243 Wastafel INA (putih) bh 250,000.00
1244 Wastafel INA (warna) bh 275,000.00
- - -
KUNCI DAN PENGGANTUNG - - -
1245 Engsel H ( 80 x 50) Ps 35,000.00 11,000.00 24,000.00 15,250.00 - 8,750.00 26,250
1246 Engsel kupu-kupu Rafes 4' 304 ps 70,000.00 64,900.00 5,100.00 3,245.00 - 1,855.00 68,145
1247 Engsel pintu Setara ECOLING Ps 52,000.00 73,150.00 - 21,150.00 3,657.00 24,807.00 76,807
1248 Engsel jendela Setara ECOLING Ps 45,000.00 46,310.00 - 1,310.00 2,316.00 3,626.00 48,626
1249 Engsel jendela Setara CAMEL Ps 60,000.00 39,600.00 20,400.00 1,980.00 - 18,420.00 41,580
1250 Espagnoleth Setara Rafes 60 cm Ps 75,000.00 51,700.00 23,300.00 2,585.00 - 20,715.00 54,285
1251 Grendel Setara ESBELA bh 160,000.00 133,100.00 26,900.00 6,655.00 - 20,245.00 139,755
1252 Grendel tanam Setara CAMEL bh 175,000.00 218,350.00 - 43,350.00 10,918.00 54,268.00 229,268
1253 Kait angin biasa Setara CAMEL bh 35,000.00 55,000.00 - 20,000.00 2,750.00 22,750.00 57,750
1254 Kait angin diameter 10 mm bh 40,000.00 40,000.00 -
1255 Kait angin lipat Setara ESBELA bh 70,000.00 86,460.00 - 16,460.00 4,323.00 20,783.00 90,783
1256 Kait angin tarik Setara ESBELA bh 55,000.00 59,950.00 - 4,950.00 2,997.00 7,947.00 62,947
1257 Kunci kuda 2 x putar bh 95,000.00 95,000.00 -
1258 Kunci lif 1 x putar Setara BELLEZA bh 225,000.00 146,300.00 78,700.00 7,315.00 - 71,385.00 153,615
1259 Kunci lif 2 x putar bh 135,000.00 166,100.00 - 31,100.00 8,305.00 39,405.00 174,405
1260 Kunci pintu TOP Setara ESBELA bh 85,000.00 330,000.00 - 245,000.00 16,500.00 261,500.00 346,500
1261 Kunci pintu Vanesa Setara CAMEL bh 215,000.00 199,650.00 15,350.00 9,983.00 - 5,367.00 209,633
1262 Kunci pintu Setara ESBELLA bh 265,000.00 286,000.00 - 21,000.00 14,300.00 35,300.00 300,300
1263 Kunci Pintu 2 x putar Setara SES bh 395,000.00 226,270.00 168,730.00 11,314.00 - 157,416.00 237,584
1264 Kunci pintu Setara DELWIN) bh 295,000.00 198,000.00 97,000.00 9,900.00 - 87,100.00 207,900
1265 Kunci shang hae 2 x putar bh 298,000.00 185,900.00 112,100.00 9,295.00 - 102,805.00 195,195
1266 Kunci slot / Grendel Pintu Setara DELLWYN bh 310,000.00 244,200.00 65,800.00 12,210.00 - 53,590.00 256,410
1267 Kunci tanam 2 slag Setara Dexon bh 245,000.00 291,500.00 - 46,500.00 14,575.00 61,075.00 306,075
1268 Kunci silinder bh 95,000.00 95,000.00 -
1269 Door holder bh 80,000.00 80,000.00 -
1270 Rel pintu sorong m' 415,000.00 415,000.00 -
1271 Rolling door plaat m2 495,000.00 133,100.00 361,900.00 6,655.00 - 355,245.00 139,755
1272 Rolling Door Aluminium m2 375,000.00 650,000.00 - 275,000.00 32,500.00 307,500.00 682,500
1273 Besi Tangga D 19, Enamel Cat bh 53,000.00
1274 Handle Besi Ø 12, Enamel Cat bh 29,000.00
- - -
PAKU - - -
1273 Paku Beton kg 58,000.00 33,000.00 25,000.00 1,650.00 - 23,350.00 34,650
1274 Paku Usuk kg 15,000.00 14,625.00 375.00 731.00 356.00 15,356
1275 Paku Reng kg 15,000.00 14,250.00 750.00 713.00 - 37.00 14,963
1276 Paku List kg 22,000.00 21,191.67 808.33 1,059.33 251.00 22,251
1277 Paku Seng Ulir bh 2,500.00 900.00 1,600.00 45.00 - 1,555.00 945
1278 Paku 2-4 cm kg 18,000.00 15,271.67 2,728.33 763.33 - 1,965.00 16,035
1279 Paku Pancing 60 x 230 kg 25,000.00 16,500.00 8,500.00 825.00 - 7,675.00 17,325
1280 Paku 5-12 cm kg 18,000.00 17,297.78 702.22 865.22 163.00 18,163
1281 Paku 2 cm (30 kg) 3/4 inch SQ dus 450,000.00 471,800.00 - 21,800.00 - 276,410.00 - 254,610.00 195,390
1282 Paku 2,5 cm (30 kg) 1 inch SQ dus 455,000.00 466,200.00 - 11,200.00 - 276,690.00 - 265,490.00 189,510
1283 Paku 3 cm (30 kg) 1 1/4 inch SQ dus 460,000.00 457,800.00 2,200.00 - 277,110.00 - 279,310.00 180,690
1284 Paku 4 cm (30 kg) 1 1/2 inch SQ dus 475,000.00 436,800.00 38,200.00 21,840.00 - 16,360.00 458,640
1285 Paku 5 cm (30 kg) 2 inch SQ dus 485,000.00 393,400.00 91,600.00 19,670.00 - 71,930.00 413,070
1286 Paku 7,10,12 cm (3,4,5) inch SQ dus 486,000.00 389,200.00 96,800.00 19,460.00 - 77,340.00 408,660
1287 Paku 5 -12 cm (27kg) 2,3,4,5 inch dus 486,000.00 306,600.00 179,400.00 15,330.00 - 164,070.00 321,930
1288 Paku skrup 1/2" kg 48,000.00 48,000.00 -
1289 Paku skrup 2" kg 49,000.00 49,000.00 -
1290 Paku skrup 3.5" kg 45,000.00 45,000.00 -
1291 Bendrat 20 kg rol 302,000.00 250,600.00 51,400.00 12,530.00 - 38,870.00 263,130
1292 Sekrup Kalisiboard buah 550.00 220.00 330.00 11.00 - 319.00 231
- - -
BETON CETAK - - -
1293 Paving Arahan 30 x 30 tebal 6 cm (K225) m2 115,000.00 150,000.00 - 35,000.00 7,500.00 42,500.00 157,500
1294 Paving Arahan 20 x 20 tebal 6 cm (K225) m2 90,000.00 150,000.00 - 60,000.00 7,500.00 67,500.00 157,500
1295 Paving 10 x 20 cm tebal 6 cm K225 (Polos) m2 85,000.00 78,650.00 6,350.00 3,933.00 - 2,417.00 82,583
1296 Paving 10 x 20 cm tebal 6 cm K225 (Warna) m2 70,000.00 125,400.00 - 55,400.00 6,270.00 61,670.00 131,670
1297 Paving 20 x 20 cm tebal 6 cm K225 (Polos) m2 90,000.00 78,650.00 11,350.00 3,933.00 - 7,417.00 82,583
1298 Paving 20 x 20 cm tebal 6 cm K225 (Warna) m2 100,000.00 125,400.00 - 25,400.00 6,270.00 31,670.00 131,670
1299 Paving 10 x 20 cm tebal 6 cm K350 (Polos) m2 109,000.00 90,750.00 18,250.00 - 8,167.00 - 26,417.00 82,583
1300 Paving 10 x 20 cm tebal 6 cm K350 (Warna) m2 115,000.00 136,400.00 - 21,400.00 - 4,730.00 16,670.00 131,670
1301 Paving 20 x 20 cm tebal 6 cm K350 (Polos) m2 125,000.00 90,750.00 34,250.00 4,538.00 - 29,712.00 95,288
1302 Paving 20 x 20 cm tebal 6 cm K350 (Warna) m2 135,000.00 136,950.00 - 1,950.00 6,270.00 8,220.00 143,220
1303 Paving 10 x 20 cm tebal 8 cm K225 (Polos) m2 80,000.00 79,860.00 140.00 15,428.00 15,288.00 95,288
1304 Paving 10 x 20 cm tebal 8 cm K225 (Warna) m2 105,000.00 136,950.00 - 31,950.00 6,848.00 38,798.00 143,798
1305 Paving 20 x 20 cm tebal 8 cm K225 (Polos) m2 102,000.00 79,860.00 22,140.00 15,428.00 - 6,712.00 95,288
1306 Paving 20 x 20 cm tebal 8 cm K225 (Warna) m2 120,000.00 137,280.00 - 17,280.00 6,864.00 24,144.00 144,144
1307 Paving 10 x 20 cm tebal 8 cm K350 (Polos) m2 119,000.00 99,550.00 19,450.00 4,978.00 - 14,472.00 104,528
1308 Paving 10 x 20 cm tebal 8 cm K350 (Warna) m2 145,000.00 146,850.00 - 1,850.00 7,343.00 9,193.00 154,193
1309 Paving 20 x 20 cm tebal 8 cm K350 (Polos) m2 135,000.00 99,770.00 35,230.00 4,989.00 - 30,241.00 104,759
1310 Paving 20 x 20 cm tebal 8 cm K350 (Warna) m2 145,000.00 146,300.00 - 1,300.00 7,315.00 8,615.00 153,615
1311 Paving 20 x 20 cm tebal 8 cm K400 (Polos) m2 146,000.00 117,700.00 28,300.00 5,885.00 - 22,415.00 123,585
1312 Paving 20 x 20 cm tebal 8 cm K400 (Warna) m2 186,000.00 156,200.00 29,800.00 4,810.00 - 24,990.00 161,010
1313 Paving Tiga Berlian tebal 6 Cm K225 (Polos) m2 85,000.00 75,460.00 9,540.00 3,773.00 - 5,767.00 79,233
1314 Paving Tiga Berlian tebal 6 cm K225 (Warna) m2 95,000.00 122,100.00 - 27,100.00 6,105.00 33,205.00 128,205
1315 Paving segi enam xexagon 6 cm K225 pc m2 96,800.00 96,800.00 -
1316 Paving segi enam xexagon 6 cm K225 merah m2 105,000.00 105,000.00 -
1317 Paving segi enam xexagon 6 cm K225 hitam m2 119,000.00 119,000.00 -
1318 Paving segi enam xexagon 6 cm K300 pc m2 110,000.00 110,000.00 -
1319 Paving segi enam xexagon 6 cm K300 merah m2 105,000.00 105,000.00 -
1320 Paving segi enam xexagon 6 cm K300 hitam m2 146,000.00 146,000.00 -
1321 Paving segi enam xexagon 6 cm K350 pc m2 156,000.00 156,000.00 -
1322 Paving segi enam xexagon 6 cm K350 merah m2 158,000.00 158,000.00 -
1323 Paving segi enam xexagon 6 cm K350 hitam m2 160,000.00 160,000.00 -
1324 Paving segi enam xexagon 6 cm K400 pc m2 178,000.00 178,000.00 -
1325 Paving segi enam xexagon 6 cm K400 merah m2 165,000.00 165,000.00 -
1326 Paving segi enam xexagon 6 cm K400 hitam m2 160,000.00 160,000.00 -
1327 Paving bujur sangkar tanpa tias 6 cm K225 pc m2 160,000.00 160,000.00 -
1328 Paving bujur sangkar tanpa tias 6 cm K225 merah m2 175,000.00 175,000.00 -
1329 Paving bujur sangkar tanpa tias 6 cm K225 hitam m2 185,000.00 185,000.00 -
1330 Paving bujur sangkar tanpa tias 8 cm K225 pc m2 205,000.00 205,000.00 -
1331 Paving bujur sangkar tanpa tias 8 cm K225 merah m2 210,000.00 210,000.00 -
1332 Paving bujur sangkar tanpa tias 8 cm K225 hitam m2 215,000.00 215,000.00 -
1333 Box Culvert Type 600x600x1200 K 350 bh 1,800,000.00 2,949,933.33 - 1,149,933.33 147,496.67 1,297,430.00 3,097,430
1334 Box Culvert Type 800x800x1200 K 350 bh 2,430,000.00 3,676,666.67 - 1,246,666.67 183,833.33 1,430,500.00 3,860,500
1335 Box Culvert Type 1000x1000X1200 K 350 bh 3,540,000.00 4,315,416.67 - 775,416.67 215,771.33 991,188.00 4,531,188
1336 Box Culvert Type 1200x1200X1200 K 350 bh 4,764,000.00 4,496,000.00 268,000.00 224,800.00 - 43,200.00 4,720,800
1337 Box Culvert Type 1500x1500x1200 K 350 bh 7,650,000.00 10,420,000.00 - 2,770,000.00 521,000.00 3,291,000.00 10,941,000
1338 Box Culvert Type 2000x2000x1200 K 350 bh 11,325,000.00 14,331,666.67 - 3,006,666.67 716,583.33 3,723,250.00 15,048,250
1339 Box Culvert Type 3000x2000x1200 K 350 bh 18,540,000.00 14,680,000.00 3,860,000.00 734,000.00 - 3,126,000.00 15,414,000
1340 Box Culvert Type 3000x2500x1200 K 350 bh 21,400,000.00 15,927,500.00 5,472,500.00 796,375.00 - 4,676,125.00 16,723,875
1341 Box Culvert Type 3000x3000x1200 K 350 bh 23,500,000.00 17,220,500.00 6,279,500.00 861,025.00 - 5,418,475.00 18,081,525
1342 Saluran Berbentuk U Type 300x300x1200 K350 bh 412,300.00 422,000.00 - 9,700.00 11,100.00 20,800.00 433,100
1343 Saluran Berbentuk U Type 300x400x1200 K350 bh 435,000.00 502,500.00 - 67,500.00 25,125.00 92,625.00 527,625
1344 Saluran Berbentuk U Type 300x500x1200 K350 bh 475,000.00 583,000.00 - 108,000.00 29,150.00 137,150.00 612,150
1345 Saluran Berbentuk U Type 400x400x1200 K350 bh 447,000.00 584,500.00 - 137,500.00 29,225.00 166,725.00 613,725
1346 Saluran Berbentuk U Type 400x600x1200 K350 bh 679,400.00 815,500.00 - 136,100.00 40,775.00 176,875.00 856,275
1347 Saluran Berbentuk U Type 400x700x1200 K350 bh 698,200.00 1,200,000.00 - 501,800.00 60,000.00 561,800.00 1,260,000
1348 Saluran Berbentuk U Type 500x500x1200 K350 bh 565,400.00 1,200,000.00 - 634,600.00 60,000.00 694,600.00 1,260,000
1349 Saluran Berbentuk U Type 500x600x1200 K350 bh 699,000.00 1,300,000.00 - 601,000.00 65,000.00 666,000.00 1,365,000
1350 Saluran Berbentuk U Type 500x700x1200 K350 bh 844,000.00 1,400,000.00 - 556,000.00 70,000.00 626,000.00 1,470,000
1351 Saluran Berbentuk U Type 600x600x1200 K350 bh 762,300.00 1,389,033.33 - 626,733.33 69,451.67 696,185.00 1,458,485
1352 Saluran Berbentuk U Type 600x700x1200 K350 bh 879,200.00 1,096,500.00 - 217,300.00 54,825.00 272,125.00 1,151,325
1353 Saluran Berbentuk U Type 700x700x1200 K350 bh 937,100.00 1,650,960.00 - 713,860.00 82,548.00 796,408.00 1,733,508
1354 Saluran Berbentuk U Type 600x800x1200 K350 bh 897,300.00 1,226,000.00 - 328,700.00 61,300.00 390,000.00 1,287,300
1355 Saluran Berbentuk U Type 800x800x1200 K350 bh 1,230,000.00 1,992,100.00 - 762,100.00 99,605.00 861,705.00 2,091,705
1356 Saluran Berbentuk U Type 800x1000x1200 K350 bh 1,540,000.00 1,752,500.00 - 212,500.00 87,625.00 300,125.00 1,840,125
1357 Saluran Berbentuk U Type 1000x1000x1200 K350 bh 1,930,000.00 1,840,000.00 90,000.00 92,000.00 2,000.00 1,932,000
1358 Bentala Exs Kapal (Paras) bh 25,000.00 68,000.00 - 43,000.00 3,400.00 46,400.00 71,400
1359 Bentala Exs Kapal (Terakota) bh 30,000.00 68,000.00 - 38,000.00 3,400.00 41,400.00 71,400
1360 Kanstein Segi Lima P40 bh 51,500.00 29,150.00 22,350.00 1,458.00 - 20,892.00 30,608
1361 Kanstein Segi Lima P50 bh 60,000.00 35,750.00 24,250.00 1,788.00 - 22,462.00 37,538
1362 Kanstein 40x28x15/12 cm bh 65,000.00 65,000.00 -
1363 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) m' 98,000.00 98,000.00 -
1364 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) bh 49,000.00 60,000.00 - 11,000.00 3,000.00 14,000.00 63,000
1365 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) m' 88,000.00
1366 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) bh 44,000.00 22,500.00 21,500.00 3,750.00 - 17,750.00 26,250
1367 Kansteen K.250 bh 45,000.00 61,500.00 - 16,500.00 6,750.00 23,250.00 68,250
1368 Kansteen Pendek K.250 bh 34,500.00 82,000.00 - 47,500.00 4,100.00 51,600.00 86,100
1369 Kansteen Jalan Masuk K.250 bh 80,000.00 35,750.00 44,250.00 1,788.00 - 42,462.00 37,538
1370 Kansteen Jalan Masuk 15x40x50 K.300 bh 85,000.00
1371 Kansteen Segilima P.50, T.20, L.15 K.250 bh 49,000.00 60,000.00 - 11,000.00 3,000.00 14,000.00 63,000
1372 Kansteen Bulat P.50, T.30, LA.10 LB.15 K.250 bh 83,000.00 83,000.00 -
1373 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m' 62,000.00 43,000.00 19,000.00 4,250.00 - 14,750.00 47,250
1374 Kansteen Jumbo P.50, T.30, L.15 K.250 bh 115,000.00 94,000.00 21,000.00 4,700.00 - 16,300.00 98,700
1375 Kansteen Jumbo 15x30x50 K.300 bh 55,000.00 87,000.00 - 32,000.00 4,350.00 36,350.00 91,350
1376 Kansteen Jumbo Mini 15x20x50 K.300 bh 45,000.00 55,000.00 - 10,000.00 2,750.00 12,750.00 57,750
1377 Kansteen Persegi T 15, P50, L 20 K 225 bh 76,000.00 76,000.00 -
1378 Kasnteen Kursi K225 bh 120,000.00 120,000.00 -
1379 Kansteen Kursi T 15, L 40, P 50 K 225 bh 160,000.00 80,000.00 160,000.00 -
1380 Kansteen Kursi T 10, L 40, P 50 K 225 bh 130,000.00 130,000.00
1381 Kansteen Jumbo 15 x 30 x 50 K.300 m' 110,000.00 57,000.00 53,000.00 6,000.00 - 47,000.00 63,000
1382 Kansteen Jumbo Mini 15 x 20 x 50 K.300 m' 90,000.00 54,000.00 36,000.00 9,000.00 - 27,000.00 63,000
1383 Kansteen Kursi (Jalan Masuk) 15 x 40 x 60 K.300 bh 110,000.00 569,500.00 - 459,500.00 28,475.00 487,975.00 597,975
1384 Kansteen kotak (P:50,t.20,La.10,Lb.16cm) K225 m' 100,000.00 791,000.00 - 691,000.00 39,550.00 730,550.00 830,550
1385 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) m' 105,000.00 917,000.00 - 812,000.00 65,850.00 877,850.00 982,850
1386 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) m' 95,000.00 700,000.00 - 605,000.00 35,000.00 640,000.00 735,000
1387 Tutup Got (Grill) (P:45, L:24, T:9 cm) bh 67,000.00 592,000.00 - 525,000.00 29,600.00 554,600.00 621,600
1388 Tutup Got (Grill) (P:30, L:24, T:9 cm) bh 67,000.00 733,000.00 - 666,000.00 36,650.00 702,650.00 769,650
1389 Plat Penutup 600 x 1200 bh 541,000.00 838,000.00 - 297,000.00 41,900.00 338,900.00 879,900
1390 Plat Penutup 800 x 1200 bh 675,000.00 1,032,500.00 - 357,500.00 51,625.00 409,125.00 1,084,125
1391 Plat Penutup 1000 x 1200 bh 890,000.00 1,200,000.00 - 310,000.00 60,000.00 370,000.00 1,260,000
1392 Frame Manhole 600x600 bh 543,200.00 78,430.00 464,770.00 3,927.00 - 460,843.00 82,357
1393 Frame Manhole 800x800 bh 675,400.00 61,000.00 614,400.00 3,050.00 - 611,350.00 64,050
1394 Frame Manhole 1000x1000 bh 763,200.00 13,400.00 749,800.00 2,350.00 - 747,450.00 15,750
1395 Cover manhole 600x600 bh 534,500.00
1396 Cover manhole 800x800 bh 675,400.00
1397 Cover manhole 1000x1000 bh 763,200.00
1398 Grass Block 36 X 54 cm tebal 9 cm K 225 m2 105,000.00
1399 Grass Block lobang 5, 30 X 30 cm tebal 7 cm K 225 m2 85,000.00
1400 Beton Cetak Greas Blok K.250 bh 20,500.00
1401 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) bh 47,500.00 47,500.00 - - 47,500.00
1402 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) bh 52,500.00

PLAFOND & TIRPLEK - - -


1401 Acustik 30/30 lbr 167,500.00 84,700.00 82,800.00 4,235.00 - 78,565.00 88,935
1402 Celling teak (0,62 x 2,40) m2 lbr 235,000.00 105,600.00 129,400.00 5,280.00 - 124,120.00 110,880
1403 Eternit lbr 30,000.00 18,150.00 11,850.00 908.00 - 10,942.00 19,058
1404 Playwood 3 mm lbr 75,000.00 54,708.33 20,291.67 2,735.67 - 17,556.00 57,444
1405 Playwood 4 mm Setara Meranti lbr 180,000.00 69,575.00 110,425.00 3,479.00 - 106,946.00 73,054
1406 Plywood 5 mm lbr 189,000.00 122,100.00 66,900.00 6,105.00 - 60,795.00 128,205
1407 Playwood 9 mm Setara Meranti lbr 210,000.00 148,500.00 61,500.00 7,425.00 - 54,075.00 155,925
1408 Playwood aluminium lbr 155,000.00 118,800.00 36,200.00 5,940.00 - 30,260.00 124,740
1409 Gypsum Board (120x240x9) lbr 68,000.00 79,200.00 - 11,200.00 3,960.00 15,160.00 83,160
1410 Kalsiboard (4,5 x 1220 x 2420) mm lbr 78,500.00 113,080.00 - 34,580.00 5,654.00 40,234.00 118,734
1411 Tea Block 18 mm lbr 300,000.00 141,900.00 158,100.00 7,095.00 - 151,005.00 148,995
1412 Hard board MDF lbr 305,000.00 74,800.00 230,200.00 3,740.00 - 226,460.00 78,540
1413 Multiplek 6 mm lbr 195,800.00 115,500.00 80,300.00 5,775.00 - 74,525.00 121,275
1414 Multiplek 9mm lbr 243,000.00 44,300.00 198,700.00 2,215.00 - 196,485.00 46,515
1415 Multiplek 12 mm lbr 280,000.00
1416 Triplek tebal 3mm (2,7mm) kayu sengon lbr 48,500.00 52,500.00 - 4,000.00 2,625.00 6,625.00 55,125
1417 Triplek tebal 3mm (2,7mm) kayu semi meranti lbr 57,800.00 54,000.00 3,800.00 2,700.00 - 1,100.00 56,700
1418 Triplek tebal 4mm (3,6mm) kayu sengon lbr 60,000.00 64,500.00 - 4,500.00 3,225.00 7,725.00 67,725
1419 Triplek tebal 4mm (3,6mm) kayu semi meranti lbr 71,000.00 65,800.00 5,200.00 3,290.00 - 1,910.00 69,090
1420 Triplek tebal 6mm (5,2mm) kayu sengon I lbr 71,000.00 59,000.00 12,000.00 2,950.00 - 9,050.00 61,950
1421 Triplek tebal 6mm (5,2mm) kayu sengon II lbr 64,400.00 76,500.00 - 12,100.00 3,825.00 15,925.00 80,325
1422 Triplek tebal 6mm (5,2mm) kayu semi meranti lbr 87,800.00 61,500.00 26,300.00 3,075.00 - 23,225.00 64,575
1423 Triplek tebal 6mm (5,2mm) kayu semi meranti II lbr 79,000.00 97,000.00 - 18,000.00 4,850.00 22,850.00 101,850
1424 Triplek tebal 8,0mm kayu sengon I lbr 101,750.00 89,000.00 12,750.00 4,450.00 - 8,300.00 93,450
1425 Triplek tebal 8,0mm kayu sengon II lbr 97,400.00 107,500.00 - 10,100.00 5,375.00 15,475.00 112,875
1426 Triplek tebal 8,0mm kayu semi meranti lbr 122,500.00 94,500.00 28,000.00 4,725.00 - 23,275.00 99,225
1427 Triplek tebal 9,0mm kayu semi meranti II lbr 112,500.00 129,500.00 - 17,000.00 6,475.00 23,475.00 135,975
1428 Triplek tebal 12 mm kayu sengon I lbr 148,500.00 178,000.00 - 29,500.00 8,900.00 38,400.00 186,900
1429 Triplek tebal 12 mm kayu semi meranti lbr 210,800.00 210,000.00 800.00 10,500.00 9,700.00 220,500
1430 Triplek tebal 15 mm kayu semi meranti lbr 250,000.00 232,000.00 18,000.00 11,600.00 - 6,400.00 243,600
1431 Triplek tebal 18 mm kayu semi meranti lbr 211,000.00 72,500.00 138,500.00 3,625.00 - 134,875.00 76,125
1432 Teakwood 122 x 244 x 2,7 mm lbr 89,100.00 87,500.00 1,600.00 4,375.00 2,775.00 91,875
1433 Melamine Putih/Biru 2,7 lbr 102,900.00 106,500.00 - 3,600.00 5,325.00 8,925.00 111,825
1434 Triplek aluminium jruk asli lbr 120,500.00 69,500.00 51,000.00 3,475.00 - 47,525.00 72,975
1435 Triplek aluminium jruk standar lbr 98,500.00 167,500.00 - 69,000.00 8,375.00 77,375.00 175,875
1436 Block board 18 mm sengon lbr 200,200.00 205,000.00 - 4,800.00 10,250.00 15,050.00 215,250
1437 Block board 18 mm meranti super lbr 232,000.00 207,500.00 24,500.00 10,375.00 - 14,125.00 217,875
1438 Teak block 18mm lbr 257,900.00 19,360.00 238,540.00 968.00 - 237,572.00 20,328
1439 Rangka Aluminium m 38,500.00 22,000.00 16,500.00 1,100.00 - 15,400.00 23,100
1440 Rangka Metal Furing (2 x 4 cm) panjang 4 m btg 55,200.00 27,500.00 27,700.00 1,375.00 - 26,325.00 28,875
1441 Rangka Metal Furing (4 x 4 cm) panjang 4 m btg 57,000.00 84,700.00 - 27,700.00 4,235.00 31,935.00 88,935
1442 Teak wood (1,20x2,40x 0,4) lbr 88,900.00 72,600.00 16,300.00 3,630.00 - 12,670.00 76,230
1443 Teak wood (0,90x2,00 x 0,4) lbr 145,800.00 106,000.00 39,800.00 5,300.00 - 34,500.00 111,300
1444 Jabar Wood 4 mm lbr 146,500.00
- - -
BUIS BETON - - -
1445 Buis beton Diameter 25 x 75 bh 89,600.00 56,650.00 32,950.00 2,833.00 - 30,117.00 59,483
1446 Buis beton Diameter 30 x 75 bh 113,900.00 72,600.00 41,300.00 3,630.00 - 37,670.00 76,230
1447 Buis beton Diameter 50 x 75 bh 201,000.00 99,000.00 102,000.00 4,950.00 - 97,050.00 103,950
1448 Buis Beton diameter 80 cm bj 156,500.00 113,066.67 43,433.33 5,653.33 - 37,780.00 118,720
1449 Buis Beton diameter 25 cm bj 85,000.00 55,166.67 29,833.33 2,758.33 - 27,075.00 57,925
1450 Buis Beton diameter 50 cm bj 95,000.00 50,333.33 44,666.67 2,516.67 - 42,150.00 52,850
1451 Buis Beton diameter 100 cm bj 250,000.00
- - -
BETON READY MIX - - -
1452 Beton Ready Mix K-175 TM Kap 7 m3 m3 850,000.00 850,000.00 -
1453 Beton Ready Mix K-225 TM Kap 7 m3 m3 905,000.00 905,000.00 -
1454 Beton Ready Mix K-250 TM Kap 7 m3 m3 930,000.00 930,000.00 -
1455 Beton Ready Mix K-275 TM Kap 7 m3 m3 945,000.00 945,000.00 -
1456 Beton Ready Mix K-300 TM Kap 7 m3 m3 965,000.00 965,000.00 -
1457 Beton Ready Mix K-350 TM Kap 7 m3 m3 1,025,000.00 1,025,000.00 -
1458 Sewa Concrete pump/M3 ls 35,000.00 35,000.00 -
1459 Formite/penjaga jarak bekisting/spacer bh 3,000.00 3,000.00 -
- - -
TALANG - - -
1460 Talang Karet L = 0.50 m' 20,000.00 99,000.00 - 79,000.00 4,950.00 83,950.00 103,950
1461 Talang Karet L = 0.90 m' 29,000.00 126,500.00 - 97,500.00 6,325.00 103,825.00 132,825
1462 Pipa Talang PVC Setara Maspion 6" Setengah Lingkaran m' 110,000.00 71,500.00 38,500.00 3,575.00 - 34,925.00 75,075
1463 Pipa Talang PVC Setara Maspion 6" Kotak m' 200,000.00 93,500.00 106,500.00 4,675.00 - 101,825.00 98,175
- - -
ASPAL, BBM DAN PELUMAS - - -
1464 Aspal Penetrasi 60/70 kg 15,600.00 12,000.00 3,600.00 600.00 - 3,000.00 12,600
1465 Aspal Curah kg 15,500.00 12,000.00 3,500.00 600.00 - 2,900.00 12,600
1466 Aspal RC kg 12,000.00 10,000.00 2,000.00 500.00 - 1,500.00 10,500
1467 Aspal Emulsi ltr 18,000.00 14,200.00 3,800.00 710.00 - 3,090.00 14,910
1468 Aspal Emulsi CRS 1 ltr 13,000.00 10,300.00 2,700.00 515.00 - 2,185.00 10,815
1469 Aspal Emulsi CRS 1 Modif ltr 14,500.00 10,900.00 3,600.00 545.00 - 3,055.00 11,445
1470 Aspal Emulsi CRS 2 ltr 15,500.00 11,650.00 3,850.00 583.00 - 3,267.00 12,233
1471 Aspal Emulsi CSS 1 h Modif ltr 13,000.00 10,400.00 2,600.00 520.00 - 2,080.00 10,920
1472 Aspal Emulsi CSS 1 h ltr 12,500.00 9,650.00 2,850.00 483.00 - 2,367.00 10,133
1473 Aspal Emulsi CSS 1 / PCE ltr 14,000.00 10,200.00 3,800.00 510.00 - 3,290.00 10,710
1474 Minyak Aspal ( fluck oil ) ltr 8,500.00 13,350.00 - 4,850.00 668.00 5,518.00 14,018
1475 Minyak Tanah ltr 14,500.00 3,000.00 11,500.00 150.00 - 11,350.00 3,150
1476 Minyak Tanah Industri ltr 9,150.00 7,625.00 1,525.00 381.00 - 1,144.00 8,006
1477 Solar ltr 9,150.00 7,500.00 1,650.00 375.00 - 1,275.00 7,875
1478 Solar Industri ltr 9,662.50 - 9,662.50 - -
1479 Premium ltr 10,000.00 - 10,000.00 -
1480 Premium (industri) ltr 8,700.00 - 8,700.00 - -
1481 Pelumas ( olie ) ltr 35,000.00 28,350.00 6,650.00 1,418.00 - 5,232.00 29,768
1482 Kayu Api m3 425,000.00 385,000.00 40,000.00 19,250.00 - 20,750.00 404,250
1483 Gas elpiji kg 470,000.00 - 470,000.00 - -
1484 Minyak Begesting ( B 115 ) ltr 40,000.00 30,666.67 9,333.33 1,533.33 - 7,800.00 32,200
1485 Aspal Cold Mix (Readymix) kg 2,500.00 2,250.00 250.00 113.00 - 137.00 2,363
- - -
ALAT PEMADAM KEBAKARAN - - -
1486 Instalasi pipa induk BS 3" Sch M' 254,000.00 203,500.00 50,500.00 10,175.00 - 40,325.00 213,675
1487 Intalasi pipa distribusi BS 2" Sch M' 187,000.00 137,500.00 49,500.00 6,875.00 - 42,625.00 144,375
1488 Seamesi conection Bh 2,600,000.00 1,980,000.00 620,000.00 99,000.00 - 521,000.00 2,079,000
1489 Box hidran dengan kelengkapannya bh 3,700,000.00 2,750,000.00 950,000.00 137,500.00 - 812,500.00 2,887,500
1490 Selang pemadam 30 m bh 4,500,000.00 3,520,000.00 980,000.00 176,000.00 - 804,000.00 3,696,000
1491 Pemadam api ringan 6 kg bh 1,533,000.00 121,000.00 1,412,000.00 6,050.00 - 1,405,950.00 127,050
- - -
TANAMAN - - -
1492 Pohon Lianglio / Salix Babylonica pohon 750,000.00 520,000.00 230,000.00 26,000.00 - 204,000.00 546,000
1493 Palem Ekor Tupai / Wodyetia Bifurcata pohon 75,000.00 1,550,000.00 - 1,475,000.00 77,500.00 1,552,500.00 1,627,500
1494 Pohon Hias pohon 56,000.00 1,500,000.00 - 1,444,000.00 75,000.00 1,519,000.00 1,575,000
1495 Pohon Jepun / Plumeria Rubra pohon 400,000.00 2,000,000.00 - 1,600,000.00 100,000.00 1,700,000.00 2,100,000
1496 Pohon Pudak / Pandanus Tectorius pohon 250,000.00 1,600,000.00 - 1,350,000.00 80,000.00 1,430,000.00 1,680,000
1497 Pohon Ketapag Kencana / Terminalia Molineti pohon 150,000.00 70,000.00 80,000.00 3,500.00 - 76,500.00 73,500
1498 Pohon Sente Batang Hitam / Alokasia 'black' pohon 60,000.00 1,400,000.00 - 1,340,000.00 70,000.00 1,410,000.00 1,470,000
1499 Pohon Dadap Merah / Erythrina Crista Galli pohon 300,000.00 1,600,000.00 - 1,300,000.00 80,000.00 1,380,000.00 1,680,000
1500 Pohon Jepun Pagoda / Plumeria 'pagoda' pohon 350,000.00 1,300,000.00 - 950,000.00 65,000.00 1,015,000.00 1,365,000
1501 Pohon Tabebuya / Chrysotricha sp pohon 500,000.00 8,500.00 491,500.00 425.00 - 491,075.00 8,925
1502 Rumput (Sekelas rumput mutiara) m2 21,000.00 9,000.00 12,000.00 450.00 - 11,550.00 9,450
1503 Semak Jempiring / Gardenia Jasminioides polybag 5,000.00 4,000.00 1,000.00 200.00 - 800.00 4,200
1504 Semak Spathyphilum / Spathyphylum sp polybag 7,500.00 40,000.00 - 32,500.00 2,000.00 34,500.00 42,000
1505 Semak Reulia Besar / Reulia Malacosperma Giant polybag 250,000.00 5,000.00 245,000.00 250.00 - 244,750.00 5,250
1506 Semak Anturium Bunga / Anthurium Andreanum polybag 10,000.00 9,000.00 1,000.00 450.00 - 550.00 9,450
1507 Semak Hemigrapis / Hemigrapis sp polybag 2,500.00 13,000.00 - 10,500.00 650.00 11,150.00 13,650
1508 Semak Puring / Codeaium variegatum polybag 5,000.00 9,000.00 - 4,000.00 450.00 4,450.00 9,450
1509 Semak Pakis Bulu / Nephrolepis biserrata polybag 7,500.00 7,000.00 500.00 350.00 - 150.00 7,350
1510 Tanaman rumput mutiara/jepang m2 25,000.00 16,000.00 9,000.00 800.00 - 8,200.00 16,800
1511 Tanaman perdu m2 33,000.00 4,700.00 28,300.00 235.00 - 28,065.00 4,935
1512 Lili Bangkok / Hymenocalis litoralis polybag 3,500.00 16,000.00 - 12,500.00 800.00 13,300.00 16,800
1513 Jempiring / Gardenia jasminioides polybag 10,000.00 4,000.00 6,000.00 200.00 - 5,800.00 4,200
1514 Kaki Laba-laba / Oxmosilum Liniare Yellow polybag 22,000.00 13,000.00 9,000.00 650.00 - 8,350.00 13,650
1515 Semak Bawang-bawangan / Ornithogalum umbrellatum polybag 3,000.00 10,000.00 - 7,000.00 500.00 7,500.00 10,500
1516 Semak Kebang Kertas Daun Kecil / Bogenvile small leave polybag 17,500.00 15,000.00 2,500.00 750.00 - 1,750.00 15,750
1517 Semak Lily Paris / Hymenocallis Speciosa polybag 2,500.00 8,000.00 - 5,500.00 400.00 5,900.00 8,400
1518 Semak Daun Philodendron / Philodendron sp polybag 7,000.00 150,000.00 - 143,000.00 7,500.00 150,500.00 157,500
1519 Semak Bunga Yolanda / Yolanda white flower polybag 8,500.00 8,500.00 -
1520 Semak Karembusa Putih / Tebermontana carembusa 'white' polybag 7,000.00 162000 - 155,000.00 8,100.00 163,100.00 170,100
1521 Semak Simbang Darah / Excoecaria Cochinechinensis polybag 7,000.00
1522 Semak Bromelia / Bromelia sp polybag 50,000.00
1523 Pupuk Kandang m3 15,000.00
- - -
LAIN - LAIN - - -
1524 Air Bersih ltr 100.00 30.00 70.00 2.00 - 68.00 32
1525 Bak Cuci Aluminium 2 Lubang bh 495,000.00 225,500.00 269,500.00 - 88,725.00 - 358,225.00 136,775
1526 Belanja Foto Copy Lembar 420.00 72,600.00 - 72,180.00 3,630.00 75,810.00 76,230
1527 Cangkul bh 98,000.00 159,500.00 - 61,500.00 7,975.00 69,475.00 167,475
1528 Cangkul Gigi bh 165,000.00 26,400.00 138,600.00 1,320.00 - 137,280.00 27,720
1529 Ember bh 13,000.00 506,000.00 - 493,000.00 25,300.00 518,300.00 531,300
1530 Ember Hitam bh 17,000.00 80,300.00 - 63,300.00 4,015.00 67,315.00 84,315
1531 Gerinding bh 575,000.00 92,950.00 482,050.00 4,648.00 - 477,402.00 97,598
1532 Helm Proyek bh 45,000.00 399,300.00 - 354,300.00 19,965.00 374,265.00 419,265
1533 Hammer 3 kg bh 110,000.00 8,800.00 101,200.00 440.00 - 100,760.00 9,240
1534 Instalasi Tata Suara Titik 475,000.00 15,950.00 459,050.00 798.00 - 458,252.00 16,748
1535 Isi Bay Fresh Ruangan bh 60,000.00 39,600.00 20,400.00 1,980.00 - 18,420.00 41,580
1536 Isi Staples No 30. Pack 70,000.00 79,200.00 - 9,200.00 3,960.00 13,160.00 83,160
1537 Isi Sabun Hand Soap bh 21,400.00 52,800.00 - 31,400.00 2,640.00 34,040.00 55,440
1538 Isi Kapur Barus Kg 50,000.00 485,100.00 - 435,100.00 24,235.00 459,335.00 509,335
1539 Kapi bh 18,000.00 88,000.00 - 70,000.00 4,400.00 74,400.00 92,400
1540 Keni 2" bh 7,000.00 14,520.00 - 7,520.00 726.00 8,246.00 15,246
1541 Keranjang Sampah bh 45,000.00 66,000.00 - 21,000.00 3,300.00 24,300.00 69,300
1542 Keset bh 95,000.00 6,600.00 88,400.00 330.00 - 88,070.00 6,930
1543 Lap Kanebo bh 80,000.00 133,100.00 - 53,100.00 6,675.00 59,775.00 139,775
1544 Lap Pel / Alat Pengepelan bh 230,000.00 33,220.00 196,780.00 1,661.00 - 195,119.00 34,881
1545 Linggis bh 75,000.00 59,950.00 15,050.00 2,998.00 - 12,052.00 62,948
1546 Masker bh 15,000.00 35,000.00 - 20,000.00 1,750.00 21,750.00 36,750
1547 Ompreng Besar (bak Adonan) bh 375,000.00 121,000.00 254,000.00 6,050.00 - 247,950.00 127,050
1548 Panyong bh 115,000.00 115,000.00 -
1549 Pembersih Ban ltr 45,000.00
1550 Pembersih Lantai Galon 65,000.00
1551 Pembersih Lantai Toilet bh 20,000.00
1552 Pembersih Kaca Galon 60,000.00
1553 Pembersih Toilet Galon 45,000.00
1554 Pengelasan cm 25,000.00
1555 Pengharum Mobil Cair Ltr 40,000.00
1556 Pengharum Ruangan bh 33,500.00
1557 Sabun bh 13,000.00
1558 Sabit bh 45,000.00
1559 Sapu lidi Ikat 10,000.00
1560 Sapu Ijuk bh 30,000.00
1561 Sapu Bulu Ayam Super bh 60,000.00
1562 Shampo Mobil bh 40,000.00
1563 Sepatu Karet Ltr 145,000.00
1564 Sikat baja bh 28,000.00
1565 Sikat Ban bh 17,400.00
1566 Skop bh 78,000.00
1567 Tempat Sampah Tutup bh 270,000.00
1568 Tissue Gulung bh 54,000.00
1569 Tissue Kotak Pack 18,000.00
1570 Water mur Bh 48,000.00
1571 Pipa Tremi dan Casing pelindung Ls 145,000.00
1572 Pelumas (Oli) Ltr 47,280.00
1573 Ramset m 10,000.00
1574 Pembuangan lumpur eks. Bor m3 132,000.00
1575 Mobilisasi dan demobilisasi alat bor auger ZKL28 unit 174,240,000.00
1576 Mobilisasi dan demobilisasi alat bor auger ZKL28 Unit 178,200,000.00
1577 Service Crane kapasitas 50 ton bln 15,000,000.00
1578 Excavator PC200 bln 123,420,000.00
1579 Pengadaan rail beam untuk pemancangan ls 22,440,000.00
1580 Pemotongan kepala tiang pancang turap m' 125,400.00
1581 Galian tanah untuk capping beam m3 138,600.00
1582 Pembuangan tanah galian m3 125,400.00
1583 Pekerjaan Cetakan/Tutup Kepala Kolom bh 330,000.00
1584 Pek. Pembuatan papan nama proyek ls 1,320,000.00
Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian

Denpasar, 2 Januari 2018


Bidang Penataan Ruang
Bidang Penataan Ruang dan Bangkim

I Gede Cipta Sudewa Atmaja, ST., MT.


NIP. 19690426 199803 1 012 Agus Sudarmo, ST.
NIP. 19700907 199903 1 006

Bidang Air Minum Dan PLP Bidang Sumber Daya Air

I Ketut Dirga, ST., M.Si. I Gst. Ngurah Putra Sanjaya, ST.


NIP. 19670820 199103 1 007 NIP. 19660316 199703 1 003

Bidang Bina Marga


Bidang Jasa Konstruksi dan Bina Program

I Wayan Dirgayasa, ST.


NIP. 19680314 199703 1 005 Ir. I Gde Made Bhaju Pravita, MM.
NIP. 19681114 199803 1 003

Mengetahui,
PLT. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar

Ir. Nym. Ngurah Jimmy Sidharta W, MT.


Pembina Utama Muda
NIP. 19640913 199303 1 006
DAFTAR HARGA SATUAN UPAH
TAHUN 2021

HARGA
NO NAMA SATUAN
Rp
1 2 3 4
1 Pekerja Hari 112,000.00
2 Tukang Gali Hari 111,000.00
3 Tukang batu/tembok Hari 115,000.00
4 Tukang Kayu Hari 115,000.00
5 Tukang besi/besi beton Hari 115,000.00
6 Tukang Cat/pelitur Hari 115,000.00
7 Tukang pipa Hari 115,000.00
8 Tukang pipa/operator pompa Hari 115,000.00
9 Tukang Style Bali Hari 160,000.00
10 Tukang Listrik Hari 115,000.00
11 Tukang Las Hari 115,000.00
12 Tukang aluminium Hari 115,000.00
13 Kepala Tukang Hari 120,000.00
14 Kepala Tukang Style Bali Hari 180,000.00
15 Mandor Style Bali Hari 200,000.00
16 Mandor Hari 130,000.00
17 Juru Ukur Hari 162,000.00
18 Pembantu Juru Ukur Hari 135,000.00
19 Mekanik alat berat Hari 125,000.00
20 Operator alat berat Hari 120,000.00
21 Pembantu operator Hari 115,000.00
22 Supir truk Hari 110,000.00
23 Kernet truk Hari 100,000.00
24 Juru gambar (drafter) Hari 210,000.00
25 Operator printer/plotter Hari 112,000.00
26 Tukang Masak Aspal Hari 110,000.00
27 Tukang Cor Aspal Hari 110,000.00
28 Pekerja Pembantu Tukang Aspal Hari 111,000.00
29 Penjaga Api Hari 111,000.00
30 Sopir SIM A Hari 111,000.00
31 Sopir SIM B1 Hari 111,000.00
32 Sopir SIM B2 Hari 111,000.00
33 Operator Hari 111,000.00
34 Operator Semi Terampil Hari 111,000.00
35 Pembantu Operator Hari 111,000.00
36 Pembantu Sopir Hari 111,000.00
37 Mekanik Terampil Hari 112,000.00
38 Masinis Hari 115,000.00
39 Pembantu Masinis Hari 111,000.00
40 Ongkos Kerja Pemasangan dan Pengelasan Hari 111,000.00
42 Ongkos Pemasangan Lampu Ls 25,000.00
43 Ongkos Pemasangan Panel Ls 550,000.00
44 Pembantu Mekanik Hari 111,000.00
45 Pasang Atap Alang-Alang Hari 111,000.00
46 Pasang Bata Gosok Dua Muka m2 355,000.00
47 Pasang Bata Gosok Satu Muka m2 250,000.00
48 Pasang Batu Paras Diukir m2 350,000.00
49 Pasang Patu Paras Siap Diukir m2 350,000.00
50 Ongkos Ngebor O 30 cm m' 85,000.00
51 Ongkos Polis Kaca Tempered Tebal 5mm m' 75,000.00
52 Ongkos Polis Kaca Tempered Tebal 6mm m' 75,000.00
53 Ongkos Polis Kaca Tempered Tebal 8mm m' 75,000.00
54 Ongkos Polis Kaca Tempered Tebal 10mm m' 75,000.00
55 Ongkos Polis Kaca Tempered Tebal 12mm m' 75,000.00
56 Ongkos Polis Kaca Tempered Tebal 19mm m' 75,000.00
UPAH KERJA LAINNYA :
57 Pasangan Bata Gosok 2 Muka m2 355,000.00
58 Pasangan Paras Kerobokan 1 Muka m2 200,000.00
59 Pasangan Bata Press 1 Muka m2 200,000.00
60 Pasangan Paras 1 Muka m2 200,000.00
61 Pasangan Batu Palimanan Tebal 3 cm m2 200,000.00
62 Pasangan Paras + Bata Gosok 1 Muka m2 200,000.00
63 Pasangan Bata Gosok Diukir m2 355,000.00
64 Pasangan Batu Tabas Karangasem Diukir m2 355,000.00
65 Pasangan Paras + Bata Gosok Diukir m2 280,000.00
66 Membuat Sanggah Kemulan Batu Hitam 40cm x 90cm Atap Ijuk Unit 350,000.00
67 Membuat Sanggah Kemulan Batu Hitam 40cm x 90cm Atap Genteng Unit 300,000.00
68 Membuat Sanggah Kemulan Paras Bata 40cm x 90cm Atap Ijuk Unit 350,000.00
69 Membuat Sanggah Kemulan Paras Bata 40cm x 90cm Atap Genteng Unit 300,000.00
70 Membuat Sanggah Pertiwi Batu Hitam Atap Ijuk 190cm x 190cm Unit 800,000.00
71 Membuat Sanggah Pertiwi Batu Hitam Atap Genteng 190cm x 190cm Unit 700,000.00
72 Membuat Sanggah Pertiwi Paras Bata Atap Ijuk 190cm x 190cm Unit 750,000.00
73 Membuat Sanggah Pertiwi Paras Bata Atap Genteng 190cm x 190cm Unit 750,000.00
74 Membuat Sanggah Hyang Ibu Batu Hitam Atap Ijuk 200cm x 200cm Unit 1,550,000.00
75 Membuat Sanggah Hyang Ibu Batu Hitam Atap Genteng 200cm x 200cm Unit 1,550,000.00
76 Membuat Sanggah Hyang Ibu Paras Bata Atap Ijuk 200cm x 200cm Unit 1,550,000.00
77 Membuat Sanggah Hyang Ibu Paras Bata Atap Genteng 200cm x 200cm Unit 1,550,000.00
78 Membuat Sanggah Taksu Batu Hitam Atap Ijuk 40cmx40cm Unit 300,000.00
79 Membuat Sanggah Taksu Batu Hitam Atap Genteng 40cm x 40cm Unit 300,000.00
80 Membuat Sanggah Taksu Paras Bata Atap Ijuk 40cm x 40cm Unit 300,000.00
81 Membuat Sanggah Taksu Paras Bata Atap Genteng 40cm x 40cm Unit 300,000.00
82 1 Titik Instalasi Stop Kontak, Lampu Exhaust Fan dan Celling Pan titik 65,000.00
83 1 Tititk Instalasi AC titik 65,000.00
84 1 Titik Instalasi Telephone titik 65,000.00
85 1 Titik Instalasi MATV titik 65,000.00

Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian

Bidang Penataan Ruang Bidang Penataan Bangunan dan Pengembangan


Kawasan Permukiman

I Gede Cipta Sudewa Atmaja, ST., MT. Agus Sudarmo, ST.


NIP. 19690426 199803 1 012 NIP. 19700907 199903 1 006

Bidang Air Minum Dan PLP Bidang Penataan Ruang dan Bangkim

I Ketut Dirga, ST., M.Si. Agus Sudarmo, ST.


NIP. 19670820 199103 1 007 NIP. 19700907 199903 1 006

Bidang Bina Marga Bidang Jasa Konstruksi dan Bina Program

I Wayan Dirgayasa, ST. Ir. I Gde Made Bhaju Pravita, MM.


NIP.19680314 199703 1 005 NIP. 19681114 199803 1 003

Mengetahui,
PLT. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar

Ir. Nym. Ngurah Jimmy Sidharta W, MT.


Pembina Utama Muda
NIP. 19640913 199303 1 006
DAFTAR ANALISA PEKERJAAN
TAHUN 2021

I HARGA SATUAN PEKERJAAN PERSIAPAN (PERMEN PUPR 28/PRT/M/2016)

1 1 M2 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Kayu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 72,800.00
B. BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250 12,000.00 15,000.00
Semen portland (Gersik) Kg 5.000 1,250.00 6,250.00
Pasir beton m3 0.005 195,000.00 975.00
Koral beton m3 0.009 412,000.00 3,708.00
Kayu 5/7 m3 0.072 6,700,000.00 482,400.00
paku biasa 2"-5" Kg 0.060 18,000.00 1,080.00
Residu Liter 0.400 45,000.00 18,000.00
JUMLAH HARGA BAHAN 527,413.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 600,213.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 600,213.00

2 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.200 112,000.00 22,400.00
Tukang Kayu OH 0.400 115,000.00 46,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.020 130,000.00 2,600.00
JUMLAH TENAGA KERJA 73,400.00
B. BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250 12,000.00 15,000.00
Semen portland (Gersik) kg 2.50 1,250.00 3,125.00
Seng gelombang Lbr 1.20 125,000.00 150,000.00
Pasir Beton m3 0.005 195,000.00 975.00
Koral beton m3 0.009 412,000.00 3,708.00
Kayu 5/7 m3 0.072 6,700,000.00 482,400.00
Paku biasa 2" - 5" kg 0.060 18,000.00 1,080.00
Meni Besi Liter 0.45 40,000.00 18,000.00
JUMLAH HARGA BAHAN 674,288.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 747,688.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 747,688.00
3 1 M2 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.200 112,000.00 22,400.00
Tukang kayu OH 0.300 115,000.00 34,500.00
Kepala tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.020 130,000.00 2,600.00
JUMLAH TENAGA KERJA 61,900.00
B. BAHAN
Dolken kayu Ø 8 -10/ 400 cm Batang 1.00 12,000.00 12,000.00
Semen portland (Gersik) Kg 2.000 1,250.00 2,500.00
Kawat duri M' 25.000 120,000.00 3,000,000.00
Pasir beton m3 0.005 195,000.00 975.00
Koral beton m3 0.009 412,000.00 3,708.00
Paku biasa 2" - 5" Kg 0.060 18,000.00 1,080.00

JUMLAH HARGA BAHAN 3,014,500.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,076,400.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 3,076,400.00

4 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.10 112,000.00 11,200.00
Tukang kayu OH 0.10 115,000.00 11,500.00
Kepala tukang OH 0.01 120,000.00 1,200.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 24,550.00
B. BAHAN
Kayu balok 5/7 m3 0.012 6,700,000.00 80,400.00
Paku 2" - 3" Kg 0.02 18,000.00 360.00
Kayu Papan 3/20 m3 0.007 6,715,000.00 47,005.00
JUMLAH HARGA BAHAN 127,765.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 152,315.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 152,315.00
5 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.00 112,000.00 224,000.00 ok
Tukang kayu OH 2.00 115,000.00 230,000.00 ok
Tukang batu OH 1.00 115,000.00 115,000.00
Kepala tukang OH 0.30 120,000.00 36,000.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 611,500.00
B. BAHAN
Dolken Kayu Ø 8 - 10/400 cm Batang 1.250 12,000.00 15,000.00
Kayu m3 0.180 6,800,000.00 1,224,000.00
Paku Biasa kg 0.850 18,000.00 15,300.00
Besi Strip kg 1.100 13,000.00 14,300.00
Semen portland (Gersik) kg 35.000 1,250.00 43,750.00
Pasir Pasang m3 0.150 215,000.00 32,250.00
Pasir Beton m3 0.100 195,000.00 19,500.00
Koral Beton m3 0.150 412,000.00 61,800.00
Bata Merah bh 30.000 2,800.00 84,000.00
Seng Plat lbr 0.250 61,000.00 15,250.00
Jendela Nako bh 0.200 47,500.00 9,500.00
Kaca Polos m2 0.080 259,000.00 20,720.00
Kunci Tanam bh 0.150 245,000.00 36,750.00
Plywood 4 mm lbr 0.060 180,000.00 10,800.00
JUMLAH HARGA BAHAN 1,602,920.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,214,420.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,214,420.00

6 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.00 112,000.00 112,000.00
Tukang Kayu OH 2.00 115,000.00 230,000.00
Kepala Tukang OH 0.20 120,000.00 24,000.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 372,500.00
B. BAHAN
Dolken kayu diameter 8-10/400 cm btg 1.70 12,000.00 20,400.00
Kayu Meranti m3 0.210 6,800,000.00 1,428,000.00
Paku Biasa 2" - 5" kg 0.300 18,000.00 5,400.00
Semen portland (Gersik) kg 10.50 1,250.00 13,125.00
Pasir Beton m3 0.03 195,000.00 5,850.00
Koral Beton m3 0.05 412,000.00 20,600.00
Seng gelombang BJLS 30 lbr 1.50 128,000.00 192,000.00
Seng Pelat Lbr 0.250 125,000.00 31,250.00
JUMLAH HARGA BAHAN 1,716,625.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,089,125.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,089,125.00
7 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.00 112,000.00 112,000.00
Tukang kayu OH 1.50 115,000.00 172,500.00
Kepala tukang OH 0.15 120,000.00 18,000.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 309,000.00
B. BAHAN
Dolken kayu Ø 8-10/400 cm Batang 3.00 12,000.00 36,000.00
Kayu m3 0.276 6,800,000.00 1,876,800.00
Paku Biasa Kg 0.700 18,000.00 12,600.00
Seng gelombang Kg 1.500 125,000.00 187,500.00
JUMLAH HARGA BAHAN 2,112,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,421,900.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,421,900.00

8 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.10 112,000.00 11,200.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 17,700.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 17,700.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 17,700.00

9 1 M2 PEMBUATAN BEDENG BURUH


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.00 112,000.00 224,000.00
Tukang Kayu OH 1.00 115,000.00 115,000.00
Kepala tukang OH 0.20 120,000.00 24,000.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 369,500.00
B. BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.25 12,000.00 15,000.00
Kayu m3 0.186 6,800,000.00 1,264,800.00
Paku Biasa kg 0.300 18,000.00 5,400.00
Semen portland (Gersik) kg 18.00 1,250.00 22,500.00
Pasir Beton m3 0.03 195,000.00 5,850.00
Koral Beton m3 0.05 412,000.00 20,600.00
Seng gelombang lbr 1.50 125,000.00 187,500.00
Plywood 4 mm lbr 1.350 180,000.00 243,000.00
JUMLAH HARGA BAHAN 1,764,650.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,134,150.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,134,150.00
10 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X25) CM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu OH 0.30 112,000.00 33,600.00
Kepala tukang OH 0.03 120,000.00 3,600.00
JUMLAH TENAGA KERJA 37,200.00
B. BAHAN
Kayu papan kelas III m3 0.036 6,715,000.00 241,740.00
Kayu balok 5/7 kelas III m3 0.014 18,000.00 252.00
Paku Biasa kg 0.08 12,000.00 960.00
JUMLAH HARGA BAHAN 242,952.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 280,152.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 280,152.00

11 1 M2 PEMBUATAN STEGGER DARI BAMBU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.00 112,000.00 112,000.00
Tukang kayu OH 2.00 115,000.00 230,000.00
Kepala Tukang OH 0.20 120,000.00 24,000.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 372,500.00
B. BAHAN
Bambu diameter 6-8/600 cm btg 1.25 15,000.00 18,750.00
Tali ijuk m3 0.186 11,000.00 2,046.00
JUMLAH HARGA BAHAN 20,796.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 393,296.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 393,296.00

12 1 M2 PEMBUATAN JALAN SEMENTARA


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.000 112,000.00 112,000.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 112,650.00
B. BAHAN
Batu Kali m3 0.150 305,000.00 45,750.00
Batu Pecah 5 - 7 m3 0.090 205,000.00 18,450.00
Pasir Pasang m3 0.010 215,000.00 2,150.00
JUMLAH HARGA BAHAN 66,350.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 179,000.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 179,000.00
13 1 M3 BONGKARAN BETON BERTULANG
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 13.334 112,000.00 1,493,408.00
Mandor OH 0.666 130,000.00 86,580.00
JUMLAH TENAGA KERJA 1,579,988.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,579,988.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,579,988.00

14 1 M3 BONGKARAN DINDING TEMBOK BATA


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 6.667 112,000.00 746,704.00
Mandor OH 0.333 130,000.00 43,290.00
JUMLAH TENAGA KERJA 789,994.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 789,994.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 789,994.00

15 1 M2 PEMASANGAN PAGAR KAWAT JARING GALVANIS PANJANG 240 CM


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.042 112,000.00 4,704.00
Tukang Besi OH 0.004 115,000.00 460.00
Kepala Tukang OH 0.002 120,000.00 240.00
Mandor OH 0.042 130,000.00 5,460.00
JUMLAH TENAGA KERJA 10,864.00
B. BAHAN
Kawat Jaring ' Lbr 0.1434 49,500.00 7,098.30

JUMLAH HARGA BAHAN 7,098.30


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 17,962.30
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 17,962.30
16 1 M2 PEMASANGAN PANEL BETON PRACETAK 5X50X240 CM UNTUK PAGAR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.375 112,000.00 42,000.00
Tukang kayu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.012 120,000.00 1,440.00
Mandor OH 0.019 130,000.00 2,470.00
JUMLAH TENAGA KERJA 60,285.00
B. BAHAN
Panel beton pracetak Lbr 0.986 15,000.00 14,790.00
Kolom beton pracetak Batang 0.525 330,000.00 173,250.00
Semen PC (Gersik) Kg 45 1,250.00 56,250.00
Pasir Beton m3 0.075 195,000.00 14,625.00
Koral m3 0.146 412,000.00 60,152.00

JUMLAH HARGA BAHAN 319,067.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 379,352.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 379,352.00

17 BONGKAR 1 M3 BETON SECARA KONVENSIONAL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.600 112,000.00 403,200.00
Mandor OH 0.360 130,000.00 46,800.00
JUMLAH TENAGA KERJA 450,000.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 450,000.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 450,000.00

II HARGA SATUAN PEKERJAAN TANAH (PERMEN PUPR 28/PRT/M/2016)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.750 112,000.00 84,000.00
Mandor OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 87,250.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 87,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 87,250.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.900 112,000.00 100,800.00
Mandor OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 106,650.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 106,650.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 106,650.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.050 112,000.00 117,600.00
Mandor OH 0.067 130,000.00 8,710.00
JUMLAH TENAGA KERJA 126,310.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 126,310.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 126,310.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.000 112,000.00 112,000.00
Mandor OH 0.032 130,000.00 4,160.00
JUMLAH TENAGA KERJA 116,160.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 116,160.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 116,160.00
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Mandor OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 175,800.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATANP
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 175,800.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 175,800.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.200 112,000.00 134,400.00
Mandor OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 140,250.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 140,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 140,250.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.050 112,000.00 5,600.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 6,250.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 6,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 6,250.00
8 1 M3 PEMBUANGAN TANAH SEJAUH 30 METER
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.330 112,000.00 36,960.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 38,260.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 38,260.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 38,260.00

9 1 M3 PENGURUGAN KEMBALI GALIAN TANAH


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.500 112,000.00 56,000.00
Mandor OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 62,500.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 62,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 62,500.00

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.500 112,000.00 56,000.00
Mandor OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 62,500.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 62,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 62,500.00
11 1 M3 URUGAN PASIR
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 34,900.00
B. BAHAN
Pasur Urug m3 1.200 195,000.00 234,000.00
JUMLAH HARGA BAHAN 234,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 268,900.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 268,900.00

12 1 M3 PEMASANGAN LAPISAN PUDEL CAMPURAN 1KP : 3PP : 7TL


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.800 112,000.00 89,600.00
Tukang OH 0.400 115,000.00 46,000.00
Kepala Tukang OH 0.040 120,000.00 4,800.00
Mandor OH 0.080 130,000.00 10,400.00
JUMLAH TENAGA KERJA 150,800.00
B. BAHAN
Kapur Padam m3 0.135 785,000.00 105,975.00
Pasir Pasang m3 0.400 215,000.00 86,000.00
Tanah Liat m3 0.948 118,000.00 111,864.00

JUMLAH HARGA BAHAN 303,839.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 454,639.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 454,639.00

13 1 M2 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.150 112,000.00 16,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 18,750.00
B. BAHAN
Ijuk m3 6.000 4,500.00 27,000.00
JUMLAH HARGA BAHAN 27,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 45,750.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 45,750.00
14 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2500 112,000.00 28,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 31,250.00
B. BAHAN
Sirtu m3 1.200 248,000.00 297,600.00
JUMLAH HARGA BAHAN 297,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 328,850.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 328,850.00

15 1 M3 TIMBUNAN PASIR SEBAGAI BAHAN PENGISI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 40,000.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 45,200.00
B. BAHAN
Pasir Pasang M3 1.2000 215,000.00 258,000.00
JUMLAH HARGA BAHAN 258,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 303,200.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 303,200.00

III HARGA SATUAN PEKERJAAN PONDASI (PERMEN PUPR 28/PRT/M/2016)


1 1 M3 BATU BELAH CAMP. 1 SP : 3 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 120,000.00 9,000.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 273,000.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) Kg 202.000 1,250.00 252,500.00
Pasir Pasang m3 0.485 215,000.00 104,275.00
JUMLAH HARGA BAHAN 602,775.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 875,775.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 875,775.00
2 1 M3 BATU BELAH CAMP. 1 SP : 4 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 120,000.00 9,000.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 273,000.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) Kg 163.000 1,250.00 203,750.00
Pasir Pasang m3 0.520 215,000.00 111,800.00
JUMLAH HARGA BAHAN 561,550.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 834,550.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 834,550.00

3 1 M3 BATU BELAH CAMP. 1 SP : 5 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 120,000.00 9,000.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 273,000.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 136.000 1,250.00 170,000.00
Pasir Pasang m3 0.544 215,000.00 116,960.00
JUMLAH HARGA BAHAN 532,960.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 805,960.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 805,960.00

4 1 M3 BATU BELAH CAMP. 1 SP : 6 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 120,000.00 9,000.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 273,000.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 117.000 1,250.00 146,250.00
Pasir Pasang m3 0.561 215,000.00 120,615.00
JUMLAH HARGA BAHAN 512,865.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 785,865.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 785,865.00
5 1 M3 BATU BELAH CAMP. 1 SP : 8 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 120,000.00 9,000.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 273,000.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 91.000 1,250.00 113,750.00
Pasir Pasang m3 0.584 215,000.00 125,560.00
JUMLAH HARGA BAHAN 485,310.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 758,310.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 758,310.00

6 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1SP : 1KP : 2PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 120,000.00 9,000.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 273,000.00
B. BAHAN
Batu Belah m3 1.200 130,000.00 156,000.00
Kapur kg 0.170 15,000.00 2,550.00
Semen portland (Gersik) m3 0.170 1,250.00 212.50
Pasir Pasang m3 0.340 215,000.00 73,100.00
JUMLAH HARGA BAHAN 231,862.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 504,862.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 504,862.50

7 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1SP : 3KP : 10PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 120,000.00 9,000.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 273,000.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 61.000 1,250.00 76,250.00
Kapur m3 0.147 15,000.00 2,205.00
Pasir Pasang m3 0.492 215,000.00 105,780.00
JUMLAH HARGA BAHAN 430,235.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 703,235.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 703,235.00
8 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1/4 SP : 1KP : 4PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 205,000.00 307,500.00
Tukang Batu OH 0.750 112,000.00 84,000.00
Kepala Tukang OH 0.075 115,000.00 8,625.00
Mandor OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 409,125.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 41.000 1,250.00 51,250.00
Kapur m3 0.131 15,000.00 1,965.00
Pasir Pasang m3 0.523 18,000.00 9,414.00
JUMLAH HARGA BAHAN 308,629.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 717,754.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 717,754.00

9 1 M3 PASANGAN PONDASI SIKLOP, 60% BETON CAMPURAN 1 SP : 2 PB : 3 KR DAN 40% BATU BELAH
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.400 112,000.00 380,800.00
Tukang Batu OH 0.850 115,000.00 97,750.00
Kepala Tukang OH 0.085 120,000.00 10,200.00
Mandor OH 0.170 130,000.00 22,100.00
JUMLAH TENAGA KERJA 510,850.00
B. BAHAN
Batu Belah m3 0.480 205,000.00 98,400.00
Semen portland (Gersik) kg 194.000 1,250.00 242,500.00
Pasir Beton m3 0.312 195,000.00 60,840.00
Koral Beton m3 0.468 412,000.00 192,816.00
JUMLAH HARGA BAHAN 594,556.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,105,406.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,105,406.00

10 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.400 112,000.00 268,800.00
Tukang Batu OH 0.800 115,000.00 92,000.00
Kepala Tukang OH 0.080 120,000.00 9,600.00
Mandor OH 0.119 130,000.00 15,470.00
JUMLAH TENAGA KERJA 385,870.00
B. BAHAN
Batu Belah m3 0.4500 205,000.00 92,250.00
Semen portland (Gersik) kg 194.0000 1,250.00 242,500.00
Pasir Beton m3 0.3120 195,000.00 60,840.00
Koral Beton m3 0.4680 412,000.00 192,816.00
JUMLAH HARGA BAHAN 588,406.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 974,276.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 974,276.00
11 1 M3 PASANGAN BATU KOSONG
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.780 112,000.00 87,360.00
Tukang Batu OH 0.390 115,000.00 44,850.00
Kepala Tukang OH 0.039 120,000.00 4,680.00
Mandor OH 0.039 130,000.00 5,070.00
JUMLAH TENAGA KERJA 141,960.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Pasir Urug m3 0.432 195,000.00 84,240.00
JUMLAH HARGA BAHAN 330,240.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 472,200.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 472,200.00

IV PEKERJAAN DINDING (PERMEN PUPR 28/PRT/M/2016))


1 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 2,800.00 196,000.00
Semen kg 18.950 1,250.00 23,687.50
Pasir Pasang m3 0.038 215,000.00 8,170.00
JUMLAH HARGA BAHAN 227,857.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 276,107.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 276,107.50

2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 2,800.00 196,000.00
Semen kg 14.370 1,250.00 17,962.50
Pasir Pasang m3 0.040 215,000.00 8,600.00
JUMLAH HARGA BAHAN 222,562.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 270,812.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 270,812.50
3 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 2,800.00 196,000.00
Semen kg 11.500 1,250.00 14,375.00
Pasir Pasang m3 0.043 215,000.00 9,245.00
JUMLAH HARGA BAHAN 219,620.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 267,870.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 267,870.00

4 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 2,800.00 196,000.00
Semen kg 9.680 1,250.00 12,100.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
JUMLAH HARGA BAHAN 217,775.00
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 266,025.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 266,025.00

5 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 2,800.00 196,000.00
Semen kg 8.320 1,250.00 10,400.00
Pasir Pasang m3 0.049 215,000.00 10,535.00
JUMLAH HARGA BAHAN 216,935.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 265,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 265,185.00
6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 2,800.00 196,000.00
Semen kg 6.500 1,250.00 8,125.00
Pasir Pasang m3 0.050 215,000.00 10,750.00
JUMLAH HARGA BAHAN 214,875.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 263,125.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 263,125.00

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SP : 3 KP : 10 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 2,800.00 196,000.00
Semen Portland (Gersik) kg 4.500 1,250.00 5,625.00
Kapur Padam m3 0.015 318,000.00 4,770.00
Pasir Pasang m3 0.050 215,000.00 10,750.00
JUMLAH HARGA BAHAN 217,145.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 265,395.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 265,395.00

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SP : 3 KP : 10 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 2,800.00 196,000.00
Semen Portland (Gersik) kg 4.500 1,250.00 5,625.00
Kapur Padam m3 0.015 318,000.00 4,770.00
Pasir Pasang m3 0.050 215,000.00 10,750.00
JUMLAH HARGA BAHAN 217,145.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 265,395.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 265,395.00
9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SM : 1 KP : 2 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 2,800.00 196,000.00
Semen Merah kg 0.014 1,250.00 17.50
Kapur Padam m3 0.014 318,000.00 4,452.00
Pasir Pasang m3 0.028 215,000.00 6,020.00
JUMLAH HARGA BAHAN 206,489.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 254,739.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 254,739.50

10 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 2 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,500.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 2,800.00 392,000.00
Semen Portland (Gersik) kg 44.5 1,250.00 55,625.00
Pasir Pasang m3 0.08 215,000.00 17,200.00
JUMLAH HARGA BAHAN 464,825.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 561,325.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 561,325.00

11 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 3 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,500.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 2,800.00 392,000.00
Semen Portland (Gersik) kg 32.950 1,250.00 41,187.50
Pasir Pasang m3 0.091 215,000.00 19,565.00
JUMLAH HARGA BAHAN 452,752.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 549,252.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 549,252.50
12 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 4 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,500.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 2,800.00 392,000.00
Semen Portland (Gersik) kg 26.550 1,250.00 33,187.50
Pasir Pasang m3 0.093 215,000.00 19,995.00
JUMLAH HARGA BAHAN 445,182.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 541,682.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 541,682.50

13 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 5 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,500.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 2,800.00 392,000.00
Semen Portland (Gersik) kg 22.200 1,250.00 27,750.00
Pasir Pasang m3 0.102 215,000.00 21,930.00
JUMLAH HARGA BAHAN 441,680.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 538,180.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 538,180.00

14 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 6 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,500.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 2,800.00 392,000.00
Semen Portland (Gersik) kg 18.500 1,250.00 23,125.00
Pasir Pasang m3 0.122 215,000.00 26,230.00
JUMLAH HARGA BAHAN 441,355.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 537,855.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 537,855.00
15 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 3 KP : 10 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,500.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 2,800.00 392,000.00
Semen Portland (Gersik) kg 10.080 1,250.00 12,600.00
Kapur padam m3 0.0275 318,000.00 8,745.00
Pasir Pasang m3 0.0925 215,000.00 19,887.50
JUMLAH HARGA BAHAN 433,232.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 529,732.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 529,732.50

16 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 20), campuran spesi 1 pc : 3 ps


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
HB-20 bh 12.5000 2,800.00 35,000.00
Semen Portland (Gersik) Kg 30.320 1,250.00 37,900.00
Pasir Pasang m3 0.7280 215,000.00 156,520.00
Besi Beton 8 mm kg 0.2800 9,800.00 2,744.00
JUMLAH HARGA BAHAN 232,164.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 280,414.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 280,414.00

17 1 M2 PASANGAN DINDING BATAKO (1pc : 5ps)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang Batu OH 0.0100 115,000.00 1,150.00
Kepala Tukang OH 0.3200 120,000.00 38,400.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 52,700.00
B. BAHAN
Batako Buntu bh 16.5000 2,800.00 46,200.00
Semen Portland (Gersik) Kg 7.500 1,250.00 9,375.00
Pasir Pasang m3 0.0270 215,000.00 5,805.00
JUMLAH HARGA BAHAN 61,380.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 114,080.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 114,080.00

17 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 20), campuran spesi 1 psp : 4 pp


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
HB-20 bh 12.5000 2,800.00 35,000.00
Semen Portland (Gersik) Kg 24.260 1,250.00 30,325.00
Pasir Pasang m3 0.7720 215,000.00 165,980.00
Besi Beton 8 mm kg 0.2800 9,800.00 2,744.00
JUMLAH HARGA BAHAN 234,049.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 282,299.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 282,299.00
18 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 15), campuran spesi 1 psp : 3 pp
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
HB-15 bh 22.7400 2,800.00 63,672.00
Semen Portland (Gersik) Kg 22.740 1,250.00 28,425.00
Pasir Pasang m3 0.550 215,000.00 118,250.00
Besi Beton 8 mm kg 0.2800 9,800.00 2,744.00
JUMLAH HARGA BAHAN 213,091.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 261,341.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 261,341.00

19 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 15), campuran spesi 1 psp : 4 pp


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
HB-15 bh 22.7400 2,800.00 63,672.00
Semen Portland (Gersik) Kg 18.200 1,250.00 22,750.00
Pasir Pasang m3 0.582 215,000.00 125,130.00
Besi Beton 8 mm kg 0.280 9,800.00 2,744.00
JUMLAH HARGA BAHAN 214,296.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 262,546.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 262,546.00

20 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 psp : 3 pp


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
HB-15 bh 12.5000 2,800.00 35,000.00
Semen Portland (Gersik) Kg 15.160 1,250.00 18,950.00
Pasir Pasang m3 0.364 215,000.00 78,260.00
Besi Beton 8 mm kg 0.280 9,800.00 2,744.00
JUMLAH HARGA BAHAN 134,954.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 183,204.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 183,204.00
21 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 psp : 4 pp
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
HB-15 bh 12.5000 2,800.00 35,000.00
Semen Portland (Gersik) Kg 15.160 1,250.00 18,950.00
Pasir Pasang m3 0.364 215,000.00 78,260.00
Besi Beton 8 mm kg 0.280 9,800.00 2,744.00
JUMLAH HARGA BAHAN 134,954.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 183,204.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 183,204.00

22 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 3 Ps


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata rooster bh 30.000 55,000.00 1,650,000.00
Semen Portland (Gersik) kg 11.000 1,250.00 13,750.00
Pasir Pasang m3 0.035 215,000.00 7,525.00
JUMLAH HARGA BAHAN 1,671,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,719,525.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,719,525.00

23 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 4 Ps


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata roster bh 30.000 55,000.00 1,650,000.00
Semen Portland (Gersik) kg 11.000 1,250.00 13,750.00
Pasir Pasang m3 0.035 215,000.00 7,525.00
JUMLAH HARGA BAHAN 1,671,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,719,525.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,719,525.00
24 1 M2 PASANGAN DINDING Bata Berongga Ekspose (12 x 11 x 24) CM camp 1 Pc : 3 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Bata berongga bh 30.000 1,200.00 36,000.00
Semen Portland (Gersik) kg 11.000 1,250.00 13,750.00
Pasir Pasang m3 0.035 215,000.00 7,525.00
JUMLAH HARGA BAHAN 57,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 105,525.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 105,525.00

25 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 7.5 CM DENGAN MORTAR SIAP PAKAI
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.670 112,000.00 75,040.00
Tukang Batu OH 1.300 115,000.00 149,500.00
Kepala Tukang OH 0.13 120,000.00 15,600.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 240,530.00
B. BAHAN
Bata ringan tebal 7,5 cm bh 8.400 9,812.50 82,425.00
Mortar siap pakai kg 0.473 3,200.00 1,513.60
JUMLAH HARGA BAHAN 83,938.60
C. PERALATAN
Peralatan % 10
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 324,468.60
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 324,468.60

26 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 10 CM DENGAN MORTAR SIAP PAKAI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.670 112,000.00 75,040.00
Tukang Batu OH 1.300 115,000.00 149,500.00
Kepala Tukang OH 0.13 120,000.00 15,600.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 240,530.00
B. BAHAN
Bata ringan tebal 10 cm bh 8.400 9,812.50 82,425.00
Mortar siap pakai kg 0.063 130,000.00 8,190.00
JUMLAH HARGA BAHAN 90,615.00
C. PERALATAN
Peralatan % 10
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 331,145.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 331,145.00
V PEKERJAAN PLESTERAN (PERMEN PUPR 28/PRT/M/2016)
1 1 M2 PLESTERAN CAMP. 1 PC : 1 PP TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 120,000.00 1,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,600.00
B. BAHAN
Semen Portland (Gersik) kg 15.504 1,250.00 19,380.00
Pasir Pasang m3 0.016 215,000.00 3,440.00
JUMLAH HARGA BAHAN 22,820.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 77,420.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 77,420.00

2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 120,000.00 1,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,600.00
B. BAHAN
Semen Portland (Gersik) kg 10.224 1,250.00 12,780.00
Pasir Pasang m3 0.020 215,000.00 4,300.00
JUMLAH HARGA BAHAN 17,080.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 71,680.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 71,680.00

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 120,000.00 1,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,600.00
B. BAHAN
Semen Portland (Gersik) kg 7.776 1,250.00 9,720.00
Pasir Pasang m3 0.023 215,000.00 4,945.00
JUMLAH HARGA BAHAN 14,665.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,265.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 69,265.00
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 120,000.00 1,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,600.00
B. BAHAN
Semen Portland (Gersik) kg 6.240 1,250.00 7,800.00
Pasir Pasang m3 0.024 215,000.00 5,160.00
JUMLAH HARGA BAHAN 12,960.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 67,560.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 67,560.00

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 120,000.00 1,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,600.00
B. BAHAN
Semen Portland (Gersik) kg 5.184 1,250.00 6,480.00
Pasir Pasang m3 0.026 215,000.00 5,590.00
JUMLAH HARGA BAHAN 12,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 66,670.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 66,670.00

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 120,000.00 1,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,600.00
B. BAHAN
Semen Portland (Gersik) kg 4.416 1,250.00 5,520.00
Pasir Pasang m3 0.027 215,000.00 5,805.00
JUMLAH HARGA BAHAN 11,325.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,925.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,925.00
7 1 M2 PLESTERAN CAMP. 1 PC : 7 PS TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 120,000.00 1,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,600.00
B. BAHAN
Semen Portland (Gersik) kg 3.936 1,250.00 4,920.00
Pasir Pasang m3 0.028 215,000.00 6,020.00
JUMLAH HARGA BAHAN 10,940.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,540.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,540.00

8 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 120,000.00 1,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,600.00
B. BAHAN
Semen Portland (Gersik) kg 3.456 1,250.00 4,320.00
Pasir Pasang m3 0.029 215,000.00 6,235.00
JUMLAH HARGA BAHAN 10,555.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,155.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,155.00

9 1 M2 PLESTERAN CAMP. 1 PC : 2PP TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 112,000.00 44,800.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 73,060.00
B. BAHAN
Semen Portland (Gersik) Kg 13.632 1,250.00 17,040.00
Pasir Pasang m3 0.027 215,000.00 5,805.00
JUMLAH HARGA BAHAN 22,845.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 95,905.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 95,905.00
10 1 M2 PLESTERAN CAMP. 1 PC : 3PS TEBAL 20 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 56,210.00
B. BAHAN
Semen Portland (Gersik) kg 10.368 1,250.00 12,960.00
Pasir Pasang m3 0.031 215,000.00 6,665.00
JUMLAH HARGA BAHAN 19,625.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 75,835.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 75,835.00

11 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Batu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 71,890.00
B. BAHAN
Semen Portland (Gersik) kg 10.3680 1,250.00 12,960.00
Pasir Pasang m3 0.0310 215,000.00 6,665.00
JUMLAH HARGA BAHAN 19,625.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 91,515.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 91,515.00

12 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 112,000.00 44,800.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 73,060.00
B. BAHAN
Semen Portland (Gersik) kg 8.320 1,250.00 10,400.00
Pasir Pasang m3 0.032 215,000.00 6,880.00
JUMLAH HARGA BAHAN 17,280.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 90,340.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 90,340.00
13 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Batu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 73,060.00
B. BAHAN
Semen Portland (Gersik) kg 6.9120 1,250.00 8,640.00
Pasir Pasang m3 0.0350 215,000.00 7,525.00
JUMLAH HARGA BAHAN 16,165.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 89,225.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 89,225.00

14 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Batu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 73,060.00
B. BAHAN
Semen Portland (Gersik) kg 5.8880 1,250.00 7,360.00
Pasir Pasang m3 0.0360 215,000.00 7,740.00
JUMLAH HARGA BAHAN 15,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,160.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,160.00

15 1 M2 PLESTERAN CAMP. 1 PC : 1 KP : 2 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Batu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 73,060.00
B. BAHAN
Semen Portland (Gersik) kg 5.8880 1,250.00 7,360.00
Pasir Pasang m3 0.0360 215,000.00 7,740.00
JUMLAH HARGA BAHAN 15,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,160.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,160.00
16 1 M2 PLESTERAN BERAPEN 1 PS : 5PP TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.150 112,000.00 16,800.00
Tukang Batu OH 0.075 115,000.00 8,625.00
Kepala Tukang OH 0.008 120,000.00 960.00
Mandor OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 27,425.00
B. BAHAN
Semen Portland (Gersik) kg 5.184 1,250.00 6,480.00
Pasir Pasang m3 0.026 215,000.00 5,590.00
JUMLAH HARGA BAHAN 12,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 39,495.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 39,495.00

17 1 M' PLESTERAN SKONING 1 PC : 3 PS, TEBAL 10 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.080 112,000.00 8,960.00
Tukang Batu OH 0.400 115,000.00 46,000.00
Kepala Tukang OH 0.040 120,000.00 4,800.00
Mandor OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 60,280.00
B. BAHAN
Semen Portland (Gersik) kg 0.500 1,250.00 625.00
Pasir Pasang m3 0.013 215,000.00 2,795.00
JUMLAH HARGA BAHAN 3,420.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 63,700.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 63,700.00

18 1 M2 PLESTERAN GRANIT 1 SP : 2 GRANIT TEBAL 1 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.450 112,000.00 50,400.00
Tukang Batu OH 0.225 115,000.00 25,875.00
Kepala Tukang OH 0.023 120,000.00 2,760.00
Mandor OH 0.023 130,000.00 2,990.00
JUMLAH TENAGA KERJA 82,025.00
B. BAHAN
Semen Portland (Gersik) Kg 10.000 1,250.00 12,500.00
Batu Granit Kg 15.000 215,000.00 3,225,000.00
JUMLAH HARGA BAHAN 3,237,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,319,525.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 3,319,525.00
19 1 M2 PLESTERAN TRASO 1 SP : 2 TRASO TEBAL 1 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.450 112,000.00 50,400.00
Tukang Batu OH 0.225 115,000.00 25,875.00
Kepala Tukang OH 0.023 120,000.00 2,760.00
Mandor OH 0.023 130,000.00 2,990.00
JUMLAH TENAGA KERJA 82,025.00
B. BAHAN
Semen Portland (Gersik) Kg 10.000 1,250.00 12,500.00
Batu Granit Kg 15.000 215,000.00 3,225,000.00
JUMLAH HARGA BAHAN 3,237,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,319,525.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 3,319,525.00

20 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN
Semen Portland (Gersik) kg 4.320 1,250.00 5,400.00
Pasir Pasang m3 0.006 215,000.00 1,290.00
JUMLAH HARGA BAHAN 6,690.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 54,940.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 54,940.00

21 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.150 112,000.00 16,800.00
Tukang Batu OH 0.075 115,000.00 8,625.00
Kepala Tukang OH 0.008 120,000.00 960.00
Mandor OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 27,425.00
B. BAHAN
Semen Portland (Gersik) kg 3.108 1,250.00 3,885.00
JUMLAH HARGA BAHAN 3,885.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 31,310.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 31,310.00
22 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.070 112,000.00 7,840.00
Tukang Batu OH 0.035 115,000.00 4,025.00
Kepala Tukang OH 0.004 120,000.00 480.00
Mandor OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 12,865.00
B. BAHAN
Semen Portland (Gersik) kg 1.600 1,250.00 2,000.00
JUMLAH HARGA BAHAN 2,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,865.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 14,865.00

23 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 120,000.00 1,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,600.00
B. BAHAN
Semen Portland (Gersik) kg 6.340 1,250.00 7,925.00
Pasir Pasang m3 0.012 215,000.00 2,580.00
JUMLAH HARGA BAHAN 10,505.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,105.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,105.00

24 1 M2 PLESTERAN MENGGUNAKAN SEMEN MU - 301, TEBAL 10 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 112,000.00 44,800.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 73,060.00
B. BAHAN
Semen MU-301 kg 2.00 2,155.00 4,310.00
JUMLAH HARGA BAHAN 4,310.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 77,370.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 77,370.00
25 1 M2 ACIAN MENGGUNAKAN SEMEN MU - 200,TEBAL 1,5MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 112,000.00 44,800.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 73,060.00
B. BAHAN
Semen MU-200 kg 3.500 3,412.50 11,943.75
JUMLAH HARGA BAHAN 11,943.75
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 85,003.75
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 85,003.75

26 1 M2 PEKERJAAN ACIAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.200 112,000.00 22,400.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.01 120,000.00 1,200.00
Mandor OH 0.01 130,000.00 1,300.00
JUMLAH TENAGA KERJA 36,400.00
B. BAHAN
Semen Portland (Gersik) kg 3.25 1,250.00 4,062.50 - 162.50
JUMLAH HARGA BAHAN 4,062.50 4.06
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 40,462.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 40,462.50

VI PEKERJAAN KAYU (PERMEN PUPR 28/PRT/M/2016)


1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 7.0000 112,000.00 784,000.00
Tukang kayu OH 21.0000 115,000.00 2,415,000.00
Kepala Tukang OH 2.1000 120,000.00 252,000.00
Mandor OH 0.3500 130,000.00 45,500.00
JUMLAH TENAGA KERJA 3,496,500.00
B. BAHAN
Balok Kayu Jati m3 1.1000 9,500,000.00 10,450,000.00
Paku 10 Cm Kg 1.2500 18,000.00 22,500.00
Lem Kayu Kg 1.0000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 10,488,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 13,985,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 13,985,000.00
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS III
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 6.0000 112,000.00 672,000.00
Tukang kayu OH 18.0000 115,000.00 2,070,000.00
Kepala Tukang OH 1.8000 120,000.00 216,000.00
Mandor OH 0.3000 130,000.00 39,000.00
JUMLAH TENAGA KERJA 2,997,000.00
B. BAHAN
Balok Kayu Kruing m3 1.2000 6,750,000.00 8,100,000.00
Paku 10 Cm Kg 1.2500 18,000.00 22,500.00
Lem Kayu Kg 1.0000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 8,138,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 11,135,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 11,135,500.00

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3500 112,000.00 39,200.00
Tukang kayu OH 1.0500 115,000.00 120,750.00
Kepala Tukang OH 0.1050 120,000.00 12,600.00
Mandor OH 0.0180 130,000.00 2,340.00
JUMLAH TENAGA KERJA 174,890.00
B. BAHAN
Papan Kayu Kamper m3 0.0400 9,500,000.00 380,000.00
Paku 5-7 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 380,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 555,790.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 555,790.00

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3500 112,000.00 39,200.00
Tukang kayu OH 1.0500 115,000.00 120,750.00
Kepala Tukang OH 0.1050 120,000.00 12,600.00
Mandor OH 0.0180 130,000.00 2,340.00
JUMLAH TENAGA KERJA 174,890.00
B. BAHAN
Papan Kayu Kruing m3 0.0400 7,450,000.00 298,000.00
Paku 5-7 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 298,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 473,790.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 473,790.00
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 112,000.00 112,000.00
Tukang kayu OH 3.0000 115,000.00 345,000.00
Kepala Tukang OH 0.3000 120,000.00 36,000.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 499,500.00
B. BAHAN
Papan Kayu Kamper m3 0.0400 9,500,000.00 380,000.00
Lem Kayu Kg 0.5000 16,000.00 8,000.00
JUMLAH HARGA BAHAN 388,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 887,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 887,500.00

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 112,000.00 89,600.00
Tukang kayu OH 2.4000 115,000.00 276,000.00
Kepala Tukang OH 0.2400 120,000.00 28,800.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 399,600.00
B. BAHAN
Papan Kayu Kamper m3 0.0240 9,500,000.00 228,000.00
Lem Kayu Kg 0.3000 16,000.00 4,800.00
JUMLAH HARGA BAHAN 232,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 632,400.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 632,400.00

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 112,000.00 112,000.00
Tukang kayu OH 3.0000 115,000.00 345,000.00
Kepala Tukang OH 0.3000 120,000.00 36,000.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 499,500.00
B. BAHAN
Papan Kayu Kamper m3 0.0640 9,500,000.00 608,000.00
Lem Kayu Kg 0.5000 16,000.00 8,000.00
JUMLAH HARGA BAHAN 616,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,115,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,115,500.00
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 112,000.00 78,400.00
Tukang kayu OH 2.1000 115,000.00 241,500.00
Kepala Tukang OH 0.2100 120,000.00 25,200.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 349,650.00
B. BAHAN
Papan Kayu Kamper m3 0.0250 9,500,000.00 237,500.00
Paku 1-2,5 Cm Kg 0.0300 18,000.00 540.00
Lem Kayu Kg 0.5000 16,000.00 8,000.00
Plywood 4 mm Lbr 1.0000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 426,040.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 775,690.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 775,690.00

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 112,000.00 89,600.00
Tukang kayu OH 2.4000 115,000.00 276,000.00
Kepala Tukang OH 0.2400 120,000.00 28,800.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 399,600.00
B. BAHAN
Papan Kayu Kamper m3 0.0256 9,500,000.00 243,200.00
Paku 1-2,5 Cm Kg 0.0300 18,000.00 540.00
Lem Kayu Kg 0.5000 16,000.00 8,000.00
Plywood 4 mm Lbr 1.0000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 431,740.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 831,340.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 831,340.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6700 112,000.00 75,040.00
Tukang kayu OH 2.0000 115,000.00 230,000.00
Kepala Tukang OH 0.2000 120,000.00 24,000.00
Mandor OH 0.3350 130,000.00 43,550.00
JUMLAH TENAGA KERJA 372,590.00
B. BAHAN
Papan Kayu Kamper m3 0.0600 9,500,000.00 570,000.00
Paku 1-2,5 Cm Kg 0.1500 18,000.00 2,700.00
JUMLAH HARGA BAHAN 572,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 945,290.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 945,290.00
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 112,000.00 89,600.00
Tukang kayu OH 2.4000 115,000.00 276,000.00
Kepala Tukang OH 0.2400 120,000.00 28,800.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 399,600.00
B. BAHAN
Papan Kayu Jati m3 0.0250 12,000,000.00 300,000.00
Paku 1-2,5 Cm Kg 0.0300 18,000.00 540.00
Lem Kayu Kg 0.3000 16,000.00 4,800.00
Teakwood 4 mm uk 90x220 cm Lbr 1.0000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 485,340.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 884,940.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 884,940.00

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8500 112,000.00 95,200.00
Tukang kayu OH 2.5500 115,000.00 293,250.00
Kepala Tukang OH 0.2550 120,000.00 30,600.00
Mandor OH 0.0430 130,000.00 5,590.00
JUMLAH TENAGA KERJA 424,640.00
B. BAHAN
Papan Kayu Kamper m3 0.0250 9,500,000.00 237,500.00
Paku 1-2,5 Cm Kg 0.0300 18,000.00 540.00
Lem Kayu Kg 0.8000 16,000.00 12,800.00
Teakwood 4 mm uk 90x220 cm Lbr 1.0000 88,900.00 88,900.00
Formika Lbr 0.5000 120,500.00 60,250.00
JUMLAH HARGA BAHAN 399,990.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 824,630.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 824,630.00

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS II Bentang 6 M'


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 4.0000 112,000.00 448,000.00
Tukang kayu OH 12.0000 115,000.00 1,380,000.00
Kepala Tukang OH 1.2000 120,000.00 144,000.00
Mandor OH 0.2000 130,000.00 26,000.00
JUMLAH TENAGA KERJA 1,998,000.00
B. BAHAN
Balok Kayu Kamper m3 1.1000 8,850,000.00 9,735,000.00
Besi Strip Tebal 5 cm Kg 15.0000 13,000.00 195,000.00
Paku 12 Cm Kg 5.6000 18,000.00 100,800.00
JUMLAH HARGA BAHAN 10,030,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,028,800.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 12,028,800.00
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 6.7000 112,000.00 750,400.00
Tukang kayu OH 20.1000 115,000.00 2,311,500.00
Kepala Tukang OH 2.0100 120,000.00 241,200.00
Mandor OH 0.3350 130,000.00 43,550.00
JUMLAH TENAGA KERJA 3,346,650.00
B. BAHAN
Balok Kayu Jati m3 1.2000 9,500,000.00 11,400,000.00
Besi Strip Tebal 5 cm Kg 15.0000 13,000.00 195,000.00
Paku 12 Cm Kg 5.6000 18,000.00 100,800.00
JUMLAH HARGA BAHAN 11,695,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 15,042,450.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 15,042,450.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.4000 112,000.00 268,800.00
Tukang kayu OH 7.2000 115,000.00 828,000.00
Kepala Tukang OH 0.7200 120,000.00 86,400.00
Mandor OH 0.1200 130,000.00 15,600.00
JUMLAH TENAGA KERJA 1,198,800.00
B. BAHAN
Balok Kayu Jati m3 1.1000 9,500,000.00 10,450,000.00
Besi Strip Tebal 5 cm Kg 15.0000 13,000.00 195,000.00
Paku 12 Cm Kg 3.0000 18,000.00 54,000.00
JUMLAH HARGA BAHAN 10,699,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 11,897,800.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 11,897,800.00

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,550.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0140 6,700,000.00 93,800.00
Reng ( 2 x 3 ) Cm m3 0.0036 4,500,000.00 16,200.00
Paku 5 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 114,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 139,050.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 139,050.00
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,550.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0140 6,700,000.00 93,800.00
Reng ( 2 x 3 ) Cm Kg 0.0072 4,500,000.00 32,400.00
Paku 5 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 130,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 155,250.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 155,250.00

18 MEMASANG 1 M2 USUK EXPOSE KAYU KLS I KAMPER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,550.00
B. BAHAN
Usuk ( 5 x 7 ) Cm m3 0.0105 6,700,000.00 70,350.00
Paku 5 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 74,850.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 99,400.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 99,400.00

19 MEMASANG 1 M2 RENG KAYU KLS I KAMPER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,550.00
B. BAHAN
Reng ( 2 x 3 ) Cm m3 0.0036 4,500,000.00 16,200.00
Paku 5 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 20,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 45,250.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 45,250.00
20 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1200 112,000.00 13,440.00
Tukang kayu OH 0.1200 115,000.00 13,800.00
Kepala Tukang OH 0.0120 120,000.00 1,440.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 29,460.00
B. BAHAN
Balok Kayu Kamper m3 0.1650 8,850,000.00 1,460,250.00
Paku 5 Cm dan 10 Cm Kg 0.2000 18,000.00 3,600.00
JUMLAH HARGA BAHAN 1,463,850.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,493,310.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,493,310.00

21 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang kayu OH 0.3000 115,000.00 34,500.00
Kepala Tukang OH 0.0300 120,000.00 3,600.00
Mandor OH 0.0750 130,000.00 9,750.00
JUMLAH TENAGA KERJA 64,650.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0154 6,700,000.00 103,180.00
Paku 7 Cm dan 10 Cm Kg 0.2000 18,000.00 3,600.00
JUMLAH HARGA BAHAN 106,780.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 171,430.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 171,430.00

22 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang kayu OH 0.3000 115,000.00 34,500.00
Kepala Tukang OH 0.0300 120,000.00 3,600.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 61,800.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0163 6,700,000.00 109,210.00
Paku 7 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 113,710.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 175,510.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 175,510.00
23 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 37,250.00
B. BAHAN
Papan Kayu Kamper m3 0.0108 9,500,000.00 102,600.00
Paku 7 Cm dan 10 Cm Kg 0.1000 18,000.00 1,800.00
JUMLAH HARGA BAHAN 104,400.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 141,650.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 141,650.00

24 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 37,250.00
B. BAHAN
Papan Kayu Kamper m3 0.0110 9,500,000.00 104,500.00
Paku 7 Cm dan 10 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 105,400.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 142,650.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 142,650.00

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang kayu OH 0.4500 115,000.00 51,750.00
Kepala Tukang OH 0.0450 120,000.00 5,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 74,990.00
B. BAHAN
Balok Kayu Kamper m3 0.0280 8,850,000.00 247,800.00
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
JUMLAH HARGA BAHAN 250,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 325,490.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 325,490.00
26 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang kayu OH 0.4500 115,000.00 51,750.00
Kepala Tukang OH 0.0450 120,000.00 5,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 74,990.00
B. BAHAN
Balok Kayu Kamper m3 0.0280 8,850,000.00 247,800.00
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
Teakwood 4 mm uk 90x220 cm Lbr 0.8600 88,900.00 76,454.00
Lem Kayu Kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 335,914.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 410,904.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 410,904.00

27 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang kayu OH 0.6000 115,000.00 69,000.00
Kepala Tukang OH 0.0600 120,000.00 7,200.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 99,900.00
B. BAHAN
Balok Kayu Kamper m3 0.0280 8,850,000.00 247,800.00
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
Plywood tebal 4 mm uk 120 x 240 cm Lbr 0.8600 88,900.00 76,454.00
Lem Kayu Kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 335,914.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 435,814.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 435,814.00

28 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA HOLO


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang kayu OH 0.4500 115,000.00 51,750.00
Kepala Tukang OH 0.0450 120,000.00 5,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 74,990.00
B. BAHAN
Rangka Holo Btg 1.5000 -
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
Teakwood 4 mm uk 90x220 cm Lbr 0.8600 88,900.00 76,454.00
Lem Kayu Kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 88,114.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 163,104.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 163,104.00
29 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA HOLO
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang kayu OH 0.6000 115,000.00 69,000.00
Kepala Tukang OH 0.0600 120,000.00 7,200.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 99,900.00
B. BAHAN
Rangka Holo Btg 1.5000 38,500.00 57,750.00
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
Plywood tebal 4 mm uk 120 x 240 cm Lbr 0.8600 180,000.00 154,800.00
Lem Kayu Kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 224,210.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 324,110.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 324,110.00

30 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6000 112,000.00 67,200.00
Tukang kayu OH 1.8000 115,000.00 207,000.00
Kepala Tukang OH 0.1800 120,000.00 21,600.00
Mandor OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 299,700.00
B. BAHAN
Papan Kayu Kamper m3 0.0070 9,500,000.00 66,500.00
Paku 5 Cm dan 10 Cm Kg 0.1000 18,000.00 1,800.00
Paku Skrup 10 cm Kg 0.1500 550.00 82.50
JUMLAH HARGA BAHAN 68,382.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 368,082.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 368,082.50

31 MEMASANG 1 M2 LAMBRIZIRING DARI CONWOOD UKURAN (100 x 3050 x 11 mm)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0250 112,000.00 2,800.00
Tukang kayu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 120,000.00 960.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 12,515.00
B. BAHAN
- m3 4.0000 75,000.00 300,000.00
Paku 1 Cm dan 2.5 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 300,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 313,415.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 313,415.00
32 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0250 112,000.00 2,800.00
Tukang kayu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 120,000.00 960.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 12,515.00
B. BAHAN
Plywood tebal 4 mm uk 120 x 240 cm Lbr 0.4000 180,000.00 72,000.00
Paku 1 Cm dan 2.5 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 72,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 85,415.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 85,415.00

VII PEKERJAAN BETON ( PERMEN PUPR 28/PRT/M/2016))


1 MEMBUAT 1 M³ BETON CAMPURAN 1PC ; 2PS ; 3KRL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.600 112,000.00 179,200.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.030 120,000.00 3,600.00
Mandor OH 0.089 130,000.00 11,534.90
JUMLAH TENAGA KERJA 225,959.90
B. BAHAN
Semen Portland (Gersik) kg 336.000 1,250.00 420,000.00
Pasir Beton kg 0.540 195,000.00 105,300.00
Koral Beton kg 0.810 412,000.00 333,720.00

JUMLAH HARGA BAHAN 859,020.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,084,979.90
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,084,979.90

1 MEMBUAT 1 M³ BETON CAMPURAN 1PC ; 3PS ; 5KRL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.250 112,000.00 140,000.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.087 130,000.00 11,364.60
JUMLAH TENAGA KERJA 166,224.60
B. BAHAN
Semen Portland (Gersik) kg 275.000 1,250.00 343,750.00
Pasir Beton kg 0.621 195,000.00 121,039.29
Koral Beton kg 0.740 412,000.00 304,880.00

JUMLAH HARGA BAHAN 769,669.29


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 935,893.89
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 935,893.89

1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,575.00
B. BAHAN
Semen Portland (Gersik) kg 247.000 1,250.00 308,750.00
Pasir Beton kg 869 139.29 121,039.29
Koral Beton kg 999 305.19 304,880.00
Air Liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 756,169.29
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 986,744.29
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 986,744.29

2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,575.00
B. BAHAN
Semen Portland (Gersik) kg 276.000 1,250.00 345,000.00
Pasir Beton kg 828 139.29 115,328.57
Koral Beton kg 1,012 305.19 308,847.41
Air lt 215 100.00 21,500.00
JUMLAH HARGA BAHAN 790,675.98
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,021,250.98
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,021,250.98
3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 112,000.00 184,800.00
Tukang Batu OH 0.2750 115,000.00 31,625.00
Kepala Tukang OH 0.0280 120,000.00 3,360.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,575.00
B. BAHAN
Semen Portland (Gersik) kg 299.0000 1,250.00 373,750.00
Pasir Beton kg 799 139.29 111,289.29
Koral Beton kg 1,017 305.19 310,373.33
Air lt 215 100.00 21,500.00
JUMLAH HARGA BAHAN 816,912.62
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,047,487.62
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,047,487.62

4 MEMBUAT 1 M³ LANTAI KERJA BETON MUTU F'C = 7,4 MPA SLUMP (3-6)CM, W/C =0.87
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.200 112,000.00 134,400.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 167,600.00
B. BAHAN
Semen Portland (Gersik) kg 230.0000 1,250.00 287,500.00
Pasir Beton kg 893 139.29 124,382.14
Koral Beton kg 1,027 305.19 313,425.19
Air lt 200 100.00 20,000.00
JUMLAH HARGA BAHAN 745,307.33
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 912,907.33
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 912,907.33

5 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,575.00
B. BAHAN
Semen Portland (Gersik) kg 326.0000 1,250.00 407,500.00
Pasir Beton kg 760 139.29 105,857.14
Koral Beton kg 1,029 305.19 314,035.56
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 848,892.70
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,079,467.70
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,079,467.70
6 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,575.00
B. BAHAN
Semen Portland (Gersik) kg 352.0000 1,250.00 440,000.00
Pasir Beton kg 731 139.29 101,817.86
Koral Beton kg 1,031 305.19 314,645.93
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 877,963.78
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,108,538.78
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,108,538.78

7 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,575.00
B. BAHAN
Semen Portland (Gersik) kg 371.000 1,250.00 463,750.00
Pasir Beton kg 698 139.29 97,221.43
Koral Beton kg 1,047 305.19 319,528.89
Air lietr 215 100.00 21,500.00
JUMLAH HARGA BAHAN 902,000.32
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,132,575.32
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,132,575.32

8 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,575.00
B. BAHAN
Semen Portland (Gersik) kg 384.000 1,250.00 480,000.00
Pasir Beton kg 692 139.29 96,385.71
Koral Beton kg 1,039 305.19 317,087.41
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 914,973.12
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,145,548.12
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,145,548.12
9 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,575.00
B. BAHAN
Semen Portland (Gersik) kg 406.000 1,250.00 507,500.00
Pasir Beton kg 684 139.29 95,271.43
Koral Beton kg 1,026 305.19 313,120.00
Air Liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 937,391.43
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,167,966.43
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,167,966.43
10 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,575.00
B. BAHAN
Semen Portland (Gersik) kg 413.000 1,250.00 516,250.00
Pasir Beton kg 681 139.29 94,853.57
Koral Beton kg 1,021 305.19 311,594.07
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 944,197.65
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,174,772.65
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,174,772.65 CEK

11 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.100 112,000.00 235,200.00
Tukang Batu OH 0.350 115,000.00 40,250.00
Kepala Tukang OH 0.035 120,000.00 4,200.00
Mandor OH 0.105 130,000.00 13,650.00
JUMLAH TENAGA KERJA 293,300.00
B. BAHAN
Semen Portland (Gersik) kg 439.0000 1,250.00 548,750.00
Pasir Beton kg 670 139.29 93,321.43
Koral Beton kg 1,006 305.19 307,016.30
Air lt 215 100.00 21,500.00
JUMLAH HARGA BAHAN 970,587.72
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,263,887.72
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,263,887.72

12 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.100 112,000.00 235,200.00
Tukang Batu OH 0.350 115,000.00 40,250.00
Kepala Tukang OH 0.035 120,000.00 4,200.00
Mandor OH 0.105 130,000.00 13,650.00
JUMLAH TENAGA KERJA 293,300.00
B. BAHAN
Semen Portland (Gersik) kg 448.0000 1,250.00 560,000.00
Pasir Beton kg 667 139.29 92,903.57
Koral Beton kg 1,000 305.19 305,185.19
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 979,588.76
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,272,888.76
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,272,888.76
13 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.070 112,000.00 7,840.00
Tukang Besi OH 0.070 115,000.00 8,050.00
Kepala Tukang OH 0.007 120,000.00 840.00
Mandor OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 17,250.00
B. BAHAN
Besi Beton (Polos/ Ulir) kg 10.500 9,800.00 102,900.00
Kawat Beton kg 0.150 32,000.00 4,800.00
JUMLAH HARGA BAHAN 107,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 124,950.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 124,950.00
Harga Satuan Pekerjaan untuk 1 Kg 12,495.00

14 PEMBESIAN 10 KG kabel prategang (prestressed) polos/strands


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.050 112,000.00 5,600.00
Tukang Besi OH 0.050 115,000.00 5,750.00
Kepala Tukang OH 0.005 120,000.00 600.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 12,340.00
B. BAHAN
Besi Beton (Polos/ Ulir) kg 10.500 9,800.00 102,900.00
Kawat Beton kg 0.100 32,000.00 3,200.00
JUMLAH HARGA BAHAN 106,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 118,440.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 118,440.00
Harga Satuan Pekerjaan untuk 1 Kg 11,844.00

15 PEMBESIAN 10 KG DENGAN BESI POLOS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0700 112,000.00 7,840.00
Tukang Besi OH 0.0700 115,000.00 8,050.00
Kepala Tukang OH 0.0070 120,000.00 840.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 17,250.00
B. BAHAN
Besi Beton (Polos/ Ulir) kg 10.5000 816.67 8,575.00
Kawat Beton m3 0.1500 32,000.00 4,800.00
JUMLAH HARGA BAHAN 13,375.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 30,625.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 30,625.00
Harga Satuan Pekerjaan untuk 1 Kg 3,062.50
16 Pemasangan 10 Kg jaring kawat baja (wiremesh)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.025 112,000.00 2,800.00
Tukang Besi OH 0.025 115,000.00 2,875.00
Kepala Tukang OH 0.025 120,000.00 3,000.00
Mandor OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 8,805.00
B. BAHAN
Jaring kawat baja dilas kg 10.200 277,650.00 2,832,030.00
Kawat Beton kg 0.0500 32,000.00 1,600.00
JUMLAH HARGA BAHAN 2,833,630.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,842,435.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 2,842,435.00

17 1 M2 PASANG BEKISTING UNTUK PONDASI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.520 112,000.00 58,240.00
Tukang Kayu OH 0.260 115,000.00 29,900.00
Kepala Tukang OH 0.026 120,000.00 3,120.00
Mandor OH 0.026 130,000.00 3,380.00
JUMLAH TENAGA KERJA 94,640.00
B. BAHAN
Kayu Kelas III m3 0.040 2,000,000.00 80,000.00
Paku Biasa 5 - 10 cm kg 0.300 18,000.00 5,400.00
Minyak Bekisting ltr 0.100 45,000.00 4,500.00
JUMLAH HARGA BAHAN 89,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 184,540.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 184,540.00

18 1 M2 PASANG BEKISTING UNTUK SLOOF


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5200 112,000.00 58,240.00
Tukang Kayu OH 0.2600 115,000.00 29,900.00
Kepala Tukang OH 0.0260 120,000.00 3,120.00
Mandor OH 0.0260 130,000.00 3,380.00
JUMLAH TENAGA KERJA 94,640.00
B. BAHAN
Kayu Kelas III m3 0.045 2,000,000.00 90,000.00
Paku Biasa 5cm - 10cm kg 0.300 18,000.00 5,400.00
Minyak Bekisting ltr 0.100 45,000.00 4,500.00
JUMLAH HARGA BAHAN 99,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 194,540.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 194,540.00
19 1 M2 PASANG BEKISTING UNTUK KOLOM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.660 112,000.00 73,920.00
Tukang Kayu OH 0.330 115,000.00 37,950.00
Kepala Tukang OH 0.033 120,000.00 3,960.00
Mandor OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 120,120.00
B. BAHAN
Kayu Kelas III m3 0.040 2,000,000.00 80,000.00
Paku Biasa 5cm - 12cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.200 45,000.00 9,000.00
Balok kayu kelas II m3 0.015 4,150,000.00 62,250.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu 8 - 10 cm /4 m Batang 2.000 8,000.00 16,000.00
JUMLAH HARGA BAHAN 213,825.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 333,945.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 333,945.00

20 1 M2 PASANG BEKISTING UNTUK BALOK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.660 112,000.00 73,920.00
Tukang Kayu OH 0.330 115,000.00 37,950.00
Kepala Tukang OH 0.033 120,000.00 3,960.00
Mandor OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 120,120.00
B. BAHAN
Kayu Kelas III m3 0.040 2,000,000.00 80,000.00
Paku Biasa 5 cm - 12 cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.200 45,000.00 9,000.00
Balok kayu kelas II m3 0.018 4,150,000.00 74,700.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu Ø (8 - 10)cm /4 m btg 2.000 8,000.00 16,000.00
JUMLAH HARGA BAHAN 226,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 346,395.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 346,395.00
21 1 M2 PASANG BEKISTING UNTUK PLAT LANTAI
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.660 112,000.00 73,920.00
Tukang Kayu OH 0.330 115,000.00 37,950.00
Kepala Tukang OH 0.033 120,000.00 3,960.00
Mandor OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 120,120.00
B. BAHAN
Kayu Kelas III m3 0.040 2,000,000.00 80,000.00
Paku Biasa 5cm - 12cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.200 45,000.00 9,000.00
Balok kayu kelas II m3 0.015 4,150,000.00 62,250.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu Ø( 8 - 10) cm /4 m btg 6.000 8,000.00 48,000.00
JUMLAH HARGA BAHAN 245,825.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 365,945.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 365,945.00

22 1 M2 PASANG BEKISTING UNTUK DINDING


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6600 112,000.00 73,920.00
Tukang Kayu OH 0.3300 115,000.00 37,950.00
Kepala Tukang OH 0.0330 120,000.00 3,960.00
Mandor OH 0.0330 130,000.00 4,290.00
JUMLAH TENAGA KERJA 120,120.00
B. BAHAN
Kayu Kelas III m3 0.030 2,000,000.00 60,000.00
Paku Biasa 5cm - 12 cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.200 45,000.00 9,000.00
Balok kayu kelas II m3 0.020 4,150,000.00 83,000.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu Ø ( 8 - 10)cm/4 m btg 3.000 8,000.00 24,000.00
Formite/penjaga jarak bekisting/spacer Bh 4.000 3,000.00 12,000.00
JUMLAH HARGA BAHAN 234,575.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 354,695.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 354,695.00
23 1 M2 PASANG BEKISTING UNTUK TANGGA
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6600 112,000.00 73,920.00
Tukang Kayu OH 0.3300 115,000.00 37,950.00
Kepala Tukang OH 0.0330 120,000.00 3,960.00
Mandor OH 0.0330 130,000.00 4,290.00
JUMLAH TENAGA KERJA 120,120.00
B. BAHAN
Kayu Kelas III m3 0.030 2,000,000.00 60,000.00
Paku Biasa 5cm - 12 cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.150 45,000.00 6,750.00
Balok kayu kelas II m3 0.015 4,150,000.00 62,250.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu Ø (8 - 10)cm /4 m btg 2.000 8,000.00 16,000.00
JUMLAH HARGA BAHAN 191,575.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 311,695.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 311,695.00

24 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.150 112,000.00 16,800.00
Tukang Kayu OH 0.050 115,000.00 5,750.00
Kepala Tukang OH 0.005 120,000.00 600.00
Mandor OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 24,190.00
B. BAHAN
Kayu Kelas III (papan) m3 0.0264 2,000,000.00 52,800.00
Paku Biasa 5 cm - 12 cm kg 0.600 18,000.00 10,800.00
Dolken Kayu Ø (8 - 10) cm /4 m btg 0.500 8,000.00 4,000.00
JUMLAH HARGA BAHAN 67,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 91,790.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 91,790.00
25 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.180 112,000.00 20,160.00
Tukang Batu OH 0.020 115,000.00 2,300.00
Tukang Kayu OH 0.020 115,000.00 2,300.00
Tukang Besi OH 0.020 115,000.00 2,300.00
Kepala Tukang OH 0.006 120,000.00 720.00
Mandor OH 0.009 130,000.00 1,170.00
JUMLAH TENAGA KERJA 28,950.00
B. BAHAN
Kayu Kelas III m3 0.002 2,000,000.00 4,000.00
Paku Biasa 5cm - 12cm kg 0.010 18,000.00 180.00
Minyak bekisting Liter
Besi Beton polos kg 3.000 12,500.00 37,500.00
Kawat Beton kg 0.450 32,000.00 14,400.00
Semen Portland ( Gersik) kg 4.000 1,250.00 5,000.00
Pasir Beton m3 0.006 195,000.00 1,170.00
Koral Beton m3 0.009 412,000.00 3,708.00
JUMLAH HARGA BAHAN 65,958.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 94,908.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 94,908.00

26 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.297 112,000.00 33,264.00
Tukang Batu OH 0.033 115,000.00 3,795.00
Tukang Kayu OH 0.033 115,000.00 3,795.00
Tukang Besi OH 0.033 115,000.00 3,795.00
Kepala Tukang OH 0.010 120,000.00 1,200.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 47,799.00
B. BAHAN
Kayu Kelas III m3 0.003 2,000,000.00 6,000.00
Paku Biasa 5 cm - 12 cm kg 0.020 18,000.00 360.00
Minyak bekisting Liter
Besi Beton Polos kg 3.600 12,500.00 45,000.00
Kawat Beton kg 0.050 32,000.00 1,600.00
Semen kg 5.500 1,250.00 6,875.00
Pasir Beton m3 0.009 195,000.00 1,755.00
Koral Beton m3 0.015 412,000.00 6,180.00
JUMLAH HARGA BAHAN 67,770.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 115,569.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 115,569.00
27 1 M2 BEKISTING DINDING BETON BIASA DENGAN MULTIFLEX 12 mm *2 kali pakai*
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2400 112,000.00 26,880.00
Tukang Kayu OH 0.1200 115,000.00 13,800.00
Kepala Tukang OH 0.0120 120,000.00 1,440.00
Mandor OH 0.0240 130,000.00 3,120.00
JUMLAH TENAGA KERJA 45,240.00
B. BAHAN
Multiflex 12 mm Lbr 0.2030 280,000.00 56,840.00
Kaso 5/7 cm M3 0.0090 2,500,000.00 22,500.00
Paku 5 cm dan 7 cm Kg 0.2400 18,000.00 4,320.00
Minyak Bekisting L 0.2000 45,000.00 9,000.00
JUMLAH HARGA BAHAN 92,660.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 137,900.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 137,900.00

28 1 M2 BEKISTING PONDASI DAN SLOOF BETON BIASA MENGGUNAKAN PAPAN 3/20 CM *2 kali pakai*
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.1500 115,000.00 17,250.00
Kepala Tukang OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 56,550.00
B. BAHAN
Papan 3/20 cm Kayu Kelas II Lbr 0.0220 1,450,000.00 31,900.00
Kaso 5/7 cm M3 0.0160 2,500,000.00 40,000.00
Paku 5 cm dan 7 cm Kg 0.2400 18,000.00 4,320.00
Minyak Bekisting L 0.2000 45,000.00 9,000.00
JUMLAH HARGA BAHAN 85,220.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 141,770.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 141,770.00

29 1 M2 PERANCAH/PENYOKONG BEKISTING DINDING BETON MENGGUNAKAN KAYU 5/7 ,Tinggi Maks 2,5 m *2 kali pakai*
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3600 112,000.00 40,320.00
Tukang Kayu OH 0.1800 115,000.00 20,700.00
Kepala Tukang OH 0.0180 120,000.00 2,160.00
Mandor OH 0.0360 130,000.00 4,680.00
JUMLAH TENAGA KERJA 67,860.00
B. BAHAN
Kaso 5/7 cm M3 0.0170 2,500,000.00 42,500.00
Paku 5 cm dan 7 cm Kg 0.2400 18,000.00 4,320.00
JUMLAH HARGA BAHAN 46,820.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 114,680.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 114,680.00
30 1 M2 PERANCAH/PENYOKONG BEKISTING PONDASI DAN SLOOF BETON MENGGUNAKAN KAYU 5/7 ,Tinggi Maks 2,0 m *2 kali pakai*
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang Kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 37,700.00
B. BAHAN
Kaso 5/7 cm M3 0.0190 2,500,000.00 47,500.00
Paku 5 cm dan 7 cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 52,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 89,700.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 89,700.00

VIII HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM (PERMEN PUPR 28/PRT/M/2016)
1 1 KG PEMASANGAN BESI PROFIL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.060 112,000.00 6,720.00
Tukang las konstruksi OH 0.060 115,000.00 6,900.00
Kepala tukang OH 0.006 120,000.00 720.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 14,730.00
B. BAHAN
Besi Profil Kg 1.150 15,000.00 17,250.00

JUMLAH HARGA BAHAN 17,250.00


C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 31,980.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 31,980.00

2 1 KG PEMASANGAN RANGKA KUDA-KUDA BAJA IWF


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.060 112,000.00 6,720.00
Tukang las konstruksi OH 0.060 115,000.00 6,900.00
Kepala tukang OH 0.006 120,000.00 720.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 14,730.00
B. BAHAN
Besi baja IWF Kg 1.150 15,000.00 17,250.00

JUMLAH HARGA BAHAN 17,250.00


C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 31,980.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 31,980.00
3 100 KG PENGERJAAN PEKERJAAN PERAKITAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.060 112,000.00 6,720.00
Tukang las konstruksi OH 0.060 115,000.00 6,900.00
Kepala tukang OH 0.006 120,000.00 720.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 14,730.00
B. BAHAN
Besi baja IWF Kg 1.150 15,000.00 17,250.00

JUMLAH HARGA BAHAN 17,250.00


C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 31,980.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 31,980.00

4 1 M2 PEMASANGAN PINTU ROLLING DOOR BESI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.200 112,000.00 134,400.00
Tukang las biasa OH 1.200 115,000.00 138,000.00
Kepala tukang OH 0.120 120,000.00 14,400.00
Mandor OH 0.006 130,000.00 780.00
JUMLAH TENAGA KERJA 287,580.00
B. BAHAN
Pintu gulung besi m2 1.000 495,000.00 495,000.00
JUMLAH HARGA BAHAN 495,000.00
C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 782,580.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 782,580.00

5 1 M2 PEMASANGAN ROLLING DOOR ALLUMINIUM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.000 112,000.00 112,000.00
Tukang khusus aluminium OH 1.000 115,000.00 115,000.00
Kepala tukang OH 0.100 120,000.00 12,000.00
Mandor OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 245,500.00
B. BAHAN
Rolling door alluminium m2 1.000 375,000.00 375,000.00
JUMLAH HARGA BAHAN 375,000.00
C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 620,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 620,500.00
6 1 M2 PEMASANGAN KUSEN PINTU ALLUMINIUM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.043 112,000.00 4,816.00
Tukang khusus aluminium OH 0.043 115,000.00 4,945.00
Kepala tukang OH 0.004 120,000.00 516.00
Mandor OH 0.002 130,000.00 273.00
JUMLAH TENAGA KERJA 10,550.00
B. BAHAN
Profil alluminium m 1.100 18,000.00 19,800.00
Skrup fixer buah 2.000 1,000.00 2,000.00
Sealant Tube 0.060 80,600.00 4,836.00

JUMLAH HARGA BAHAN 26,636.00


C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 37,186.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 37,186.00

7 1 M2 PEMASANGAN PINTU ALLUMINIUM STRIP LEBAR 8 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.085 112,000.00 9,520.00
Tukang khusus aluminium OH 0.085 115,000.00 9,775.00
Kepala tukang OH 0.0085 120,000.00 1,020.00
Mandor OH 0.0042 130,000.00 546.00
JUMLAH TENAGA KERJA 20,861.00
B. BAHAN
Profil alluminium m 4.400 18,000.00 79,200.00
Alluminium strip m 14.600 22,000.00 321,200.00

JUMLAH HARGA BAHAN 400,400.00


C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 421,261.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 421,261.00

8 1 M2 PEMASANGAN RANGKA BESI HOLLOW 1 X40.40.2MM, MODUL 60 X 120 CM, UNTUK PARTISI
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang besi OH 0.250 115,000.00 28,750.00
Kepala Tukang OH 0.025 120,000.00 3,000.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 61,440.00
B. BAHAN
Rangka metal hollow 40.40.2 mm m 3.500 55,200.00 193,200.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 55,200.00 55,200.00

JUMLAH HARGA BAHAN 248,400.00


C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 309,840.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 309,840.00
9 1 M2 PEMASANGAN RANGKA BESI HOLLOW 1 X40.40.2MM, MODUL 60 X 120 CM, UNTUK PLAFON
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.350 112,000.00 39,200.00
Tukang besi OH 0.350 115,000.00 40,250.00
Kepala Tukang OH 0.035 120,000.00 4,200.00
Mandor OH 0.018 130,000.00 2,340.00
JUMLAH TENAGA KERJA 85,990.00
B. BAHAN
Rangka metal hollow 40.40.2 mm m 4.000 38,500.00 154,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 38,500.00 38,500.00

JUMLAH HARGA BAHAN 192,500.00


C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 278,490.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 278,490.00

10 1 M2 PEMASANGAN ATAP PELANA RANGKA ATAP BAJA CANAI DINGIN PROFIL C75
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.734 112,000.00 82,208.00
Tukang besi OH 0.734 115,000.00 84,410.00
Kepala Tukang OH 0.073 120,000.00 8,760.00
Mandor OH 0.037 130,000.00 4,810.00
JUMLAH TENAGA KERJA 180,188.00
B. BAHAN
Baja ringan canai dingin C75 kg 3.065 19,800.00 60,687.00
JUMLAH HARGA BAHAN 60,687.00
C. PERALATAN
Peralatan % 10 6,068.70 6,068.70

JUMLAH HARGA ALAT 6,068.70


D. Jumlah (A + B + C) 246,943.70
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 246,943.70

11 1 M2 PEMASANGAN ATAP JURAI RANGKA ATAP BAJA CANAI DINGIN PROFIL C75
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.760 112,000.00 85,164.80
Tukang besi OH 0.760 115,000.00 87,446.00
Kepala Tukang OH 0.0760 120,000.00 9,120.00
Mandor OH 0.0380 130,000.00 4,940.00
JUMLAH TENAGA KERJA 186,670.80
B. BAHAN
Baja ringan canai dingin C75 kg 4.050 19,800.00 80,190.00
JUMLAH HARGA BAHAN 80,190.00
C. PERALATAN
Peralatan % 10 8,019.00 8,019.00

JUMLAH HARGA ALAT 8,019.00


D. Jumlah (A + B + C) 274,879.80
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 274,879.80
IX PEKERJAAN PENUTUP ATAP (PERMEN PUPR 28/PRT/M/2016)
1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang Kayu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 120,000.00 960.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 27,425.00
B. BAHAN
Genteng Plentong bh 25.0000 3,100.00 77,500.00
JUMLAH HARGA BAHAN 77,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 104,925.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 104,925.00

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang Kayu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 120,000.00 960.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 27,425.00
B. BAHAN
Genteng Plentong dicat bh 25.0000 4,000.00 100,000.00
JUMLAH HARGA BAHAN 100,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 127,425.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 127,425.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Kayu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 70,460.00
B. BAHAN
Bubungan Plentong bh 5.0000 33,000.00 165,000.00
Semen kg 10.8000 1,250.00 13,500.00
Pasir Pasang m3 0.0320 215,000.00 6,880.00
JUMLAH HARGA BAHAN 185,380.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 255,840.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 255,840.00
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1400 112,000.00 15,680.00
Tukang Kayu OH 0.0670 115,000.00 7,705.00
Kepala Tukang OH 0.0070 120,000.00 840.00
Mandor OH 0.0070 130,000.00 910.00
JUMLAH TENAGA KERJA 25,135.00
B. BAHAN
Asbes Gelombang 1.8 mx0.92mx5mm lbr 0.6600 52,000.00 34,320.00
Paku Pancing 60 x 230 kg 2.0000 25,000.00 50,000.00
JUMLAH HARGA BAHAN 84,320.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 109,455.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 109,455.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0840 112,000.00 9,408.00
Tukang Kayu OH 0.1250 115,000.00 14,375.00
Kepala Tukang OH 0.0130 120,000.00 1,560.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 25,863.00
B. BAHAN
Bubungan Stel Gelombang lbr 2.4000 58,000.00 139,200.00
Paku Skrup 3,5" kg 4.0000 45,000.00 180,000.00
JUMLAH HARGA BAHAN 319,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 345,063.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 345,063.00

6 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0330 112,000.00 3,696.00
Tukang Kayu OH 0.0330 115,000.00 3,795.00
Kepala Tukang OH 0.0030 120,000.00 360.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 8,111.00
B. BAHAN
Aluminium Foil m2 1.1000 3,560.00 3,916.00
JUMLAH HARGA BAHAN 3,916.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,027.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 12,027.00
7 1 M1 PASANG NOK SENG GELOMBANG
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang Kayu OH 0.0700 115,000.00 8,050.00
Kepala Tukang OH 0.0080 120,000.00 960.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 26,590.00
B. BAHAN
Seng Plat 3" x 6" BJLS 28 lbr 0.3000 87,000.00 26,100.00
Paku biasa 1/2" - 1" kg 0.0400 18,000.00 720.00
JUMLAH HARGA BAHAN 26,820.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 53,410.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 53,410.00

8 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 8,850.00
B. BAHAN
Murda / Puntal Paras lbr 1.0000 92,500.00 92,500.00
Semen kg 0.0130 1,250.00 16.25
JUMLAH HARGA BAHAN 92,516.25
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 101,366.25
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 101,366.25

X PEKERJAAN PLAFOND / LANGIT - LANGIT (PERMEM PUPR 28/PRT/M/2016))


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0300 112,000.00 3,360.00
Tukang Kayu OH 0.0700 115,000.00 8,050.00
Kepala Tukang OH 0.0070 120,000.00 840.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 12,770.00
B. BAHAN
Asbes Semen lbr 1.1000 52,000.00 57,200.00
Paku biasa 1/2" - 1" kg 0.0100 18,000.00 180.00
JUMLAH HARGA BAHAN 57,380.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 70,150.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 70,150.00
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/3 MM, 4MM, 6MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang Kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,550.00
B. BAHAN
TRIIPLEKS lbr 0.3750 64,400.00 24,150.00
Paku biasa 1/2" - 1" kg 0.0300 18,000.00 540.00
JUMLAH HARGA BAHAN 24,690.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 49,240.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 49,240.00

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 112,000.00 89,600.00
Tukang Kayu OH 0.8000 115,000.00 92,000.00
Kepala Tukang OH 0.0800 120,000.00 9,600.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 196,400.00
B. BAHAN
Kayu Papan Kamper m3 0.0150 9,500,000.00 142,500.00
Paku biasa 1/2" - 1" kg 0.0100 18,000.00 180.00
JUMLAH HARGA BAHAN 142,680.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 339,080.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 339,080.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Tukang Kayu OH 0.0500 115,000.00 5,750.00
Kepala Tukang OH 0.0050 120,000.00 600.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 12,340.00
B. BAHAN
List Kayu Profil 4/5 cm m3 1.0500 26,000.00 27,300.00
Paku list kg 0.0100 22,000.00 220.00
JUMLAH HARGA BAHAN 27,520.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 39,860.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 39,860.00
5 1 M1 PASANG LIST LANGIT-LANGIT GYPSUM PROFIL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Tukang Kayu OH 0.0500 115,000.00 5,750.00
Kepala Tukang OH 0.0050 120,000.00 600.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 12,340.00
B. BAHAN
List Gypsum 2/5 cm m' 1.0500 15,000.00 15,750.00
Paku list kg 0.0100 85,000.00 850.00
JUMLAH HARGA BAHAN 16,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 28,940.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 28,940.00

6 1 M2 PASANG LANGIT-LANGIT AKUSTIK UKURAN (60 x 120) CM + RANGKA ALUMINIUM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5000 112,000.00 56,000.00
Tukang Besi OH 0.5000 115,000.00 57,500.00
Kepala Tukang OH 0.0500 120,000.00 6,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 122,750.00
B. BAHAN
Profil Aluminium "T" m1 3.6000 42,500.00 153,000.00
Kawat Diameter 4 mm kg 0.1500 35,000.00 5,250.00
Ramset m1 1.0500 10,000.00 10,500.00
Akustik 60 cm x 120 cm lbr 1.5000 76,000.00 114,000.00
JUMLAH HARGA BAHAN 282,750.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 405,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 405,500.00

7 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1800 112,000.00 20,160.00
Tukang Kayu OH 0.3200 115,000.00 36,800.00
Kepala Tukang OH 0.0320 120,000.00 3,840.00
Mandor OH 0.0090 130,000.00 1,170.00
JUMLAH TENAGA KERJA 61,970.00
B. BAHAN
Kamper Usuk 4/6 cm m3 0.0230 9,500,000.00 218,500.00
Paku Biasa 2" - 5" kg 0.0600 18,000.00 1,080.00
Asbes lbr 1.1000 52,000.00 57,200.00
JUMLAH HARGA BAHAN 276,780.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 338,750.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 338,750.00
8 1 M2 PLAFOND GYPSUM, RANGKA KAYU
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 120,000.00 4,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 80,000.00
B. BAHAN
Gypsum Board (120x240x9) Lbr 0.3640 68,000.00 24,752.00
Kayu Kruing Usuk M3 0.0230 7,450,000.00 171,350.00
Paku Kalsiboard Kg 0.2600 550.00 143.00
JUMLAH HARGA BAHAN 196,245.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 276,245.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 276,245.00

9 1 M2 PLAFOND GYPSUM, RANGKA HOLO


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 120,000.00 4,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 80,000.00
B. BAHAN
Gypsum Board (120x240x9) Lbr 0.3640 68,000.00 24,752.00
Rangka Metal Furing (4 x 4 cm) panjang 4 m Btg 1.0000 57,000.00 57,000.00
Paku Kalsiboard Kg 0.1100 550.00 60.50
JUMLAH HARGA BAHAN 81,812.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 161,812.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 161,812.50

10 1 M2 PLAFOND KALSIBOARD, RANGKA KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 120,000.00 4,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 80,000.00
B. BAHAN
Kalsiboard (4,5 x 1220 x 2420) mm Lbr 0.3640 78,500.00 28,574.00
Kayu Kruing Usuk M3 0.0230 7,450,000.00 171,350.00
Paku Kalsiboard Kg 0.2600 550.00 143.00
JUMLAH HARGA BAHAN 200,067.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 280,067.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 280,067.00
11 1 M2 PLAFOND KALSIBOARD, RANGKA HOLO
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 120,000.00 4,200.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 80,000.00
B. BAHAN
Kalsiboard (4,5 x 1220 x 2420) mm Lbr 0.3640 78,500.00 28,574.00
- M3 1.0000 57,000.00 57,000.00
Paku Kalsiboard Kg 0.1100 550.00 60.50
JUMLAH HARGA BAHAN 85,634.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 165,634.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 165,634.50

XI PEKERJAAN SANITASI ( PERMEN PUPR 28/PRT/M/2016) )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.3000 112,000.00 369,600.00
Tukang Batu OH 1.1000 115,000.00 126,500.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.1600 130,000.00 20,800.00
JUMLAH TENAGA KERJA 517,020.00
B. BAHAN
Kloset duduk/ monoblok bh 1.0000 6,550,000.00 6,550,000.00
Perlengkapan 6% x harga kloset 393,000.00 393,000.00
JUMLAH HARGA BAHAN 6,943,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 7,460,020.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 7,460,020.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 112,000.00 112,000.00
Tukang Batu OH 1.5000 115,000.00 172,500.00
Kepala Tukang OH 1.5000 120,000.00 180,000.00
Mandor OH 0.1600 130,000.00 20,800.00
JUMLAH TENAGA KERJA 485,300.00
B. BAHAN
Kloset jongkok porselen bh 1.0000 575,000.00 575,000.00
Semen kg 6.0000 1,250.00 7,500.00
Pasir Pasang m3 0.0100 215,000.00 2,150.00
JUMLAH HARGA BAHAN 584,650.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,069,950.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,069,950.00
3 MEMASANG 1 BUAH URINOIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 112,000.00 112,000.00
Tukang Batu OH 1.0000 115,000.00 115,000.00
Kepala Tukang OH 0.1000 120,000.00 12,000.00
Mandor OH 0.1000 130,000.00 13,000.00
JUMLAH TENAGA KERJA 252,000.00
B. BAHAN
Urinoir bh 1.0000 375,000.00 375,000.00
Perlengkapan 30% x harga Urinoir 112,500.00 112,500.00
Semen kg 6.0000 1,250.00 7,500.00
Pasir Pasang m3 0.0100 215,000.00 2,150.00
JUMLAH HARGA BAHAN 497,150.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 749,150.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 749,150.00

4 MEMASANG 1 BUAH WASHTAFEL KIA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.2000 112,000.00 134,400.00
Tukang Batu OH 1.4500 115,000.00 166,750.00
Kepala Tukang OH 0.1500 120,000.00 18,000.00
Mandor OH 0.1000 130,000.00 13,000.00
JUMLAH TENAGA KERJA 332,150.00
B. BAHAN
Wastafel bh 1.0000 510,000.00 510,000.00
Perlengkapan 12% x harga wast 61,200.00 61,200.00
Semen kg 6.0000 1,250.00 7,500.00
Pasir Pasang m3 0.0100 215,000.00 2,150.00
JUMLAH HARGA BAHAN 580,850.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 913,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 913,000.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.8000 112,000.00 201,600.00
Tukang Batu OH 2.7000 115,000.00 310,500.00
Kepala Tukang OH 0.5400 120,000.00 64,800.00
Mandor OH 0.1100 130,000.00 14,300.00
JUMLAH TENAGA KERJA 591,200.00
B. BAHAN
Bak Fibreglass bh 1.0000 370,000.00 370,000.00
Perlengkapan 18% x harga bak 66,600.00 66,600.00
JUMLAH HARGA BAHAN 436,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,027,800.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,027,800.00
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0540 112,000.00 6,048.00
Tukang Pipa OH 0.0900 115,000.00 10,350.00
Kepala Tukang OH 0.0090 120,000.00 1,080.00
Mandor OH 0.0270 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,988.00
B. BAHAN
Pipa Galvanis m' 1.2000 70,000.00 84,000.00
Perlengkapan 35% x harga pipa 24,500.00 24,500.00
JUMLAH HARGA BAHAN 108,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 129,488.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 129,488.00

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1080 112,000.00 12,096.00
Tukang Pipa OH 0.1800 115,000.00 20,700.00
Kepala Tukang OH 0.0180 120,000.00 2,160.00
Mandor OH 0.0054 130,000.00 702.00
JUMLAH TENAGA KERJA 35,658.00
B. BAHAN
Pipa Galvanis m' 1.2000 178,500.00 214,200.00
Perlengkapan 35% x harga pipa 62,475.00 62,475.00
JUMLAH HARGA BAHAN 276,675.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 312,333.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 312,333.00

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0360 112,000.00 4,032.00
Tukang Pipa OH 0.0600 115,000.00 6,900.00
Kepala Tukang OH 0.0060 120,000.00 720.00
Mandor OH 0.0018 130,000.00 234.00
JUMLAH TENAGA KERJA 11,886.00
B. BAHAN
Pipa PVC m' 1.2000 21,250.00 25,500.00
Perlengkapan 35% x harga pipa 7,437.50 7,437.50
JUMLAH HARGA BAHAN 32,937.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 44,823.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 44,823.50
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0540 112,000.00 6,048.00
Tukang Pipa OH 0.0900 115,000.00 10,350.00
Kepala Tukang OH 0.0090 120,000.00 1,080.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 17,868.00
B. BAHAN
Pipa PVC m' 1.2000 31,550.00 37,860.00
Perlengkapan 35% x harga pipa 11,042.50 11,042.50
JUMLAH HARGA BAHAN 48,902.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 66,770.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 66,770.50

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0810 112,000.00 9,072.00
Tukang Pipa OH 0.1350 115,000.00 15,525.00
Kepala Tukang OH 0.0135 120,000.00 1,620.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 26,737.00
B. BAHAN
Pipa PVC m' 1.2000 60,250.00 72,300.00
Perlengkapan 35% x harga pipa 21,087.50 21,087.50
JUMLAH HARGA BAHAN 93,387.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 120,124.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 120,124.50

11 MEMASANG 1 M1 PIPA PVC TYPE AW f 4"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0810 112,000.00 9,072.00
Tukang Pipa OH 0.1350 115,000.00 15,525.00
Kepala Tukang OH 0.0135 120,000.00 1,620.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 26,737.00
B. BAHAN
Pipa PVC m' 1.2000 85,250.00 102,300.00
Perlengkapan 35% x harga pipa 29,837.50 29,837.50
JUMLAH HARGA BAHAN 132,137.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 158,874.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 158,874.50
12 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Pipa OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
JUMLAH TENAGA KERJA 12,700.00
B. BAHAN
Kran air bh 1.0000 215,000.00 215,000.00
Seal tape bh 0.0250 1,425,000.00 35,625.00
JUMLAH HARGA BAHAN 250,625.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 263,325.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 263,325.00

XII PEKERJAAN BESI DAN ALUMINIUM (PERMEN PUPR 28/PRT/M/2016)


1 1 KG MEMASANG RANGKA BAJA IWF
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0060 112,000.00 672.00
Tukang besi OH 0.0600 115,000.00 6,900.00
Kepala Tukang OH 0.0060 120,000.00 720.00
Mandor OH 0.0003 130,000.00 39.00
JUMLAH TENAGA KERJA 8,331.00
B. BAHAN
Besi Baja WF kg 1.1500 15,000.00 17,250.00
JUMLAH HARGA BAHAN 17,250.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,581.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 25,581.00

2 1 M2 PASANG JENDELA NAKO & TRALIS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang Besi OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 47,930.00
B. BAHAN
Rangka + Kaca Nako m2 1.1000 184,500.00 202,950.00
Paku biasa 1 cm - 2,5 cm bh 10.0000 18,000.00 180,000.00
Besi strip m' 7.0000 18,000.00 126,000.00
JUMLAH HARGA BAHAN 508,950.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 556,880.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 556,880.00
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang Besi OH 0.4000 115,000.00 46,000.00
Kepala Tukang OH 0.0250 120,000.00 3,000.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 72,700.00
B. BAHAN
Seng plat lbr 1.0500 61,000.00 64,050.00
Paku biasa 0,5" - 1" kg 0.0150 18,000.00 270.00
Kayu papan kelas II/III m3 0.0190 7,450,000.00 141,550.00
JUMLAH HARGA BAHAN 205,870.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 278,570.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 278,570.00

XII PEKERJAAN KUNCI DAN KACA PERMEN PUPR 28/PRT/M/2016)


1 1 BH PASANG KUNCI TANAM BIASA
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.5000 115,000.00 57,500.00
Kepala Tukang OH 0.0500 130,000.00 6,500.00
Mandor OH -
JUMLAH TENAGA KERJA 64,000.00
B. BAHAN
Kunci Tanam Biasa bh 1.0000 245,000.00 245,000.00
JUMLAH HARGA BAHAN 245,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 309,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 309,000.00

2 1 PS PASANG ENGSEL PINTU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.1250 115,000.00 14,375.00
Kepala Tukang OH 0.0130 130,000.00 1,690.00
Mandor OH
JUMLAH TENAGA KERJA 16,065.00
B. BAHAN
Engsel Pintu ps 1.0000 52,000.00 52,000.00
JUMLAH HARGA BAHAN 52,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 68,065.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 68,065.00
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 130,000.00 1,300.00
Mandor OH
JUMLAH TENAGA KERJA 12,800.00
B. BAHAN
Engsel Jendela ps 1.0000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 57,800.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 57,800.00

4 1 BH PASANG KAIT ANGIN


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0010 130,000.00 130.00
Mandor OH
JUMLAH TENAGA KERJA 11,630.00
B. BAHAN
Kait Angin ps 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 46,630.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 46,630.00

5 1 BH PASANG KUNCI SLOT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.2500 115,000.00 28,750.00
Kepala Tukang OH 0.0250 130,000.00 3,250.00
Mandor OH
JUMLAH TENAGA KERJA 32,000.00
B. BAHAN
Kunci Slot bh 1.0000 310,000.00 310,000.00
JUMLAH HARGA BAHAN 310,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 342,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 342,000.00
6 1 M2 PASANG KACA, TEBAL5 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 112,000.00 17,920.00
Tukang Besi OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.1600 120,000.00 19,200.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 56,560.00
B. BAHAN
Kaca bh 1.1000 259,000.00 284,900.00
JUMLAH HARGA BAHAN 284,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 341,460.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 341,460.00

7 1 M2 PASANG KACA TEMPERED TEBAL 5 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 112,000.00 17,920.00
Tukang Besi OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.1600 120,000.00 19,200.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 56,560.00
B. BAHAN
Kaca bh 1.1000 265,000.00 291,500.00
JUMLAH HARGA BAHAN 291,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 348,060.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 348,060.00
8 1 M2 PASANG KACA TEMPERED TEBAL 6 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 112,000.00 17,920.00
Tukang Besi OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.1600 120,000.00 19,200.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 56,560.00
B. BAHAN
Kaca bh 1.1000 370,000.00 407,000.00
JUMLAH HARGA BAHAN 407,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 463,560.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 463,560.00

9 1 M2 PASANG KACA TEMPERED TEBAL 12 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 112,000.00 17,920.00
Tukang Besi OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.1600 120,000.00 19,200.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 56,560.00
B. BAHAN
Kaca bh 1.1000 685,000.00 753,500.00
JUMLAH HARGA BAHAN 753,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 810,060.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 810,060.00

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (40 X 40) CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 265,000.00 3,445.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,510.00
B. BAHAN 2.5
Ubin abu-abu bh 6.63 15,000.00 99,450.00
Semen kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
JUMLAH HARGA BAHAN 121,375.00
C. PERALATAN 6.25
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 168,885.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 168,885.00
2 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (30 X 30) CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 265,000.00 3,445.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,510.00
B. BAHAN 3.33333333333
Ubin abu-abu bh 11.87 1,363.64 16,186.36 11.1111111111
Semen kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
JUMLAH HARGA BAHAN 38,361.36
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 85,871.36
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 85,871.36

3 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (20 X 20) CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.270 112,000.00 30,240.00
Tukang Batu OH 0.135 115,000.00 15,525.00
Kepala Tukang OH 0.014 265,000.00 3,710.00
Mandor OH 0.014 130,000.00 1,820.00
JUMLAH TENAGA KERJA 51,295.00
B. BAHAN
Ubin abu-abu bh 26.50 3,600.00 95,400.00
Semen kg 10.40 1,250.00 13,000.00 5
Pasir Pasang m3 0.045 215,000.00 9,675.00
JUMLAH HARGA BAHAN 118,075.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 169,370.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 169,370.00

4 1 M2 PASANG LANTAI UBIN WARNA UKURAN (40 X 40) CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 120,000.00 1,560.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 45,625.00
B. BAHAN
Ubin Warna 40 x 40 bh 6.63 15,000.00 99,450.00
Semen kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
Semen warna/semen grouting kg 0.60 1,000.00 600.00
JUMLAH HARGA BAHAN 121,975.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 167,600.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 167,600.00
5 1 M2 PASANG LANTAI UBIN WARNA 30 X 30 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.13 115,000.00 14,950.00
Kepala Tukang OH 0.013 120,000.00 1,560.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,320.00
B. BAHAN
Ubin Warna 30 x 30 bh 11.87 4,633.53 55,000.00
Semen kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
Semen warna/semen grouting kg 0.60 14,000.00 8,400.00
JUMLAH HARGA BAHAN 85,575.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 132,895.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 132,895.00

6 1 M2 PASANG LANTAI UBIN WARNA 20 X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.270 112,000.00 30,240.00
Tukang Batu OH 0.135 115,000.00 15,525.00
Kepala Tukang OH 0.014 120,000.00 1,680.00
Mandor OH 0.014 130,000.00 1,820.00
JUMLAH TENAGA KERJA 49,265.00
B. BAHAN
Ubin Warna 20 x 20 bh 26.50 3,600.00 95,400.00
Semen kg 10.40 1,250.00 13,000.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
Semen warna/semen grouting kg 1.00 14,000.00 14,000.00
JUMLAH HARGA BAHAN 132,075.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 181,340.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 181,340.00

7 1 M2 PASANG LANTAI UBIN TERASO UKURAN 40 X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 120,000.00 1,560.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 45,625.00
B. BAHAN
Ubin Teraso 40 x 40 bh 6.63 15,000.00 99,450.00
Semen Portland (Gersik) kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 1.30 215,000.00 279,500.00
Semen warna/semen grouting kg 0.045 14,000.00 630.00
JUMLAH HARGA BAHAN 391,830.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 437,455.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 437,455.00
8 1 M2 PASANG LANTAI UBIN TERASO UKURAN 30 X 30 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.130 115,000.00 14,950.00
Kepala Tukang OH 0.013 120,000.00 1,560.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,320.00
B. BAHAN
Ubin Teraso 40 x 40 bh 11.87 8,181.82 97,118.18
Semen Portland (Gersik) kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 1.50 215,000.00 322,500.00
Semen warna/semen grouting kg 0.045 14,000.00 630.00
JUMLAH HARGA BAHAN 432,748.18
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 480,068.18
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 480,068.18

9 1 M2 PASANG LANTAI UBIN GRANIT UKURAN 40 X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 120,000.00 1,560.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 45,625.00
B. BAHAN
Ubin Teraso 40 x 40 bh 6.63 15,000.00 99,450.00
Semen Portland (Gersik) kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 1.30 215,000.00 279,500.00
Semen warna/semen grouting kg 0.045 14,000.00 630.00
JUMLAH HARGA BAHAN 391,830.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 437,455.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 437,455.00

10 1 M2 PASANG LANTAI UBIN GRANIT UKURAN 30 X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.130 115,000.00 14,950.00
Kepala Tukang OH 0.013 120,000.00 1,560.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,320.00
B. BAHAN
Ubin Granit 30 x 30 bh 11.87 8,727.27 103,592.73
Semen Portland (Gersik) kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 1.50 215,000.00 322,500.00
Semen warna/semen grouting kg 0.045 14,000.00 630.00
JUMLAH HARGA BAHAN 439,222.73
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 486,542.73
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 486,542.73
11 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.130 115,000.00 14,950.00
Kepala Tukang OH 0.013 120,000.00 1,560.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 46,200.00
B. BAHAN
Marmer Granit 40 x 40 bh 6.63 62,500.00 414,375.00
Semen Portland (Gersik) kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 1.30 215,000.00 279,500.00
Semen warna/semen grouting kg 0.045 14,000.00 630.00
JUMLAH HARGA BAHAN 706,755.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 752,955.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 752,955.00

12 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.130 115,000.00 14,950.00
Kepala Tukang OH 0.013 120,000.00 1,560.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,320.00
B. BAHAN
Ubin Granit 30 x 30 bh 11.87 34,090.91 404,659.09
Semen Portland (Gersik) kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 1.50 215,000.00 322,500.00
Semen warna/semen grouting kg 0.045 14,000.00 630.00
JUMLAH HARGA BAHAN 740,289.09
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 787,609.09
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 787,609.09

13 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.24 112,000.00 26,880.00
Tukang Batu OH 0.12 115,000.00 13,800.00
Kepala Tukang OH 0.012 120,000.00 1,440.00
Mandor OH 0.012 130,000.00 1,560.00
JUMLAH TENAGA KERJA 43,680.00
B. BAHAN
Keramik 60 x 60 bh 3.10 48,435.66 150,150.54
Semen kg 9.60 1,250.00 12,000.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
Semen warna/semen grouting kg 1.50 14,000.00 21,000.00
JUMLAH HARGA BAHAN 192,825.54
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 236,505.54
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 236,505.54
14 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 112,000.00 78,400.00
Tukang Batu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 120,000.00 4,200.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 127,400.00
B. BAHAN
Keramik 20 x 20 bh 26.5000 2,566.04 68,000.00
Semen kg 10.4000 1,250.00 13,000.00
Pasir Pasang m3 0.0450 215,000.00 9,675.00
Semen warna/semen grouting kg 1.6200 14,000.00 22,680.00
JUMLAH HARGA BAHAN 113,355.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 240,755.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 240,755.00

15 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 15 CM X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin PC bh 5.30 2,452.83 13,000.00
Semen Portland kg 1.65 1,250.00 2,062.50
Pasir Pasang m3 0.004 215,000.00 860.00
JUMLAH HARGA BAHAN 15,922.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 38,082.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 38,082.50

16 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 10 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin PC bh 3.53 3,396.23 11,988.68
Semen Portland kg 1.24 1,250.00 1,550.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 14,183.68
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 36,343.68
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 36,343.68
17 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 10 CM X 40 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin PC bh 2.65 15,000.00 39,750.00
Semen Portland kg 1.24 1,250.00 1,550.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 41,945.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 64,105.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 64,105.00

18 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin warna bh 2.65 3,600.00 9,540.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.15 14,000.00 2,100.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 13,710.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 35,870.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 35,870.00

19 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin warna bh 2.65 15,000.00 39,750.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.15 14,000.00 2,100.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 43,920.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 66,080.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 66,080.00
20 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 40 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin warna bh 2.65 3,283.02 8,700.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00 1,400.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 12,170.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 34,330.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 34,330.00

21 1 M' PASANGPLINT UBIN TERASO UKURAN 10 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin teraso bh 3.53 3,283.02 11,589.06
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00 1,400.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 15,059.06
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,219.06
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 37,219.06

22 1 M' PASANG PLINT UBIN TERASO UKURAN 10 CM X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin teraso bh 2.65 15,000.00 39,750.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00 1,400.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 43,220.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,380.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,380.00
23 1 M' PASANG PLINT UBIN GRANIT UKURAN 10 CM X 40 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin granit bh 2.65 15,000.00 39,750.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 41,820.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 63,980.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 63,980.00

24 1 M' PASANG PLINT UBIN GRANIT UKURAN 10 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint ubin granit bh 3.53 15,000.00 52,950.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00 1,400.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 56,420.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 78,580.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 78,580.00

25 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 CM X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint teralux kerang bh 2.63 15,000.00 39,450.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00 1,400.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 42,920.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,080.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,080.00
26 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 CM X 30 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint teralux kerang bh 3.53 15,000.00 52,950.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00 1,400.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 56,420.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 78,580.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 78,580.00

27 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 60 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint teralux marmer bh 1.70 15,000.00 25,500.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00 1,400.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 28,970.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 51,130.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 51,130.00

28 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint teralux marmer bh 2.65 15,000.00 39,750.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00 1,400.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 43,220.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,380.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,380.00
29 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 30 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Plint teralux marmer bh 2.65 25,486.79 67,540.00
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 14,000.00 1,400.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 71,010.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 93,170.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 93,170.00

30 1 M2 PASANG LANTAI KERAMIK UKURAN 33 CM X 33 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Ubin keramik Doos 1.05 7,132.08 7,488.68
Semen Portland (Gersik) Kg 10.00 1,250.00 12,500.00
Pasir Pasang M3 0.045 215,000.00 9,675.00
Semen Warna Kg 0.50 14,000.00 7,000.00

JUMLAH HARGA BAHAN 19,988.68


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 42,148.68
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 42,148.68

31 1 M2 PASANG LANTAI KERAMIK UKURAN 30 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 120,000.00 1,080.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,160.00
B. BAHAN
Ubin keramik Doos 1.05 15,000.00 15,750.00
Semen Portland (Gersik) Kg 10.00 1,250.00 12,500.00
Pasir Pasang M3 0.045 215,000.00 9,675.00
Semen Warna Kg 0.50 14,000.00 7,000.00

JUMLAH HARGA BAHAN 28,250.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,410.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 50,410.00
32 1 M2 PASANG LANTAI KERAMIK UKURAN 20 CM X 20 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.70 112,000.00 78,400.00
Tukang Batu OH 0.35 115,000.00 40,250.00
Kepala Tukang OH 0.035 120,000.00 4,200.00
Mandor OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 127,400.00
B. BAHAN
Ubin keramik Doos 1.05 68,000.00 71,400.00
Semen Portland (Gersik) Kg 10.40 1,250.00 13,000.00
Pasir Pasang M3 0.045 215,000.00 9,675.00
Semen Warna Kg 0.50 14,000.00 7,000.00

JUMLAH HARGA BAHAN 84,400.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 211,800.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 211,800.00

33 1 M2 PASANG LANTAI KERAMIK UKURAN 10 CM X 33 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.05 112,000.00 117,600.00
Tukang Batu OH 0.525 115,000.00 60,375.00
Kepala Tukang OH 0.053 120,000.00 6,360.00
Mandor OH 0.053 130,000.00 6,890.00
JUMLAH TENAGA KERJA 191,225.00
B. BAHAN
Ubin keramik bh 33.00 2,303.03 76,000.00 10
Semen Portland (Gersik) Kg 9.80 1,250.00 12,250.00 3.33333333333
Pasir Pasang M3 0.045 215,000.00 9,675.00 33.3333333333
Semen Warna Kg 4.37 14,000.00 61,180.00

JUMLAH HARGA BAHAN 88,250.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 279,475.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 279,475.00

34 1 M2 PASANG LANTAI KERAMIK MOZAIK UKURAN 30 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.70 112,000.00 78,400.00
Tukang Batu OH 0.350 115,000.00 40,250.00
Kepala Tukang OH 0.035 120,000.00 4,200.00
Mandor OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 127,400.00
B. BAHAN
Ubin keramik Doos 11.87 15,000.00 178,050.00
Semen Portland (Gersik) Kg 14.15 1,250.00 17,687.50
Pasir Pasang M3 0.039 215,000.00 8,385.00
Semen Warna Kg 2.00 14,000.00 28,000.00

JUMLAH HARGA BAHAN 195,737.50


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 323,137.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 323,137.50
35 1 M' PASANG PLINT KERAMIK UKURAN 10 CM X 20 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.035 120,000.00 4,200.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 25,280.00
B. BAHAN
Plint keramik Bh 5.30 13,200.00 69,960.00
Semen Portland (Gersik) Kg 1.14 1,250.00 1,425.00
Pasir Pasang M3 0.003 215,000.00 645.00
Semen Warna Kg 0.025 14,000.00 350.00

JUMLAH HARGA BAHAN 71,385.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 96,665.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 96,665.00

36 1 M' PASANG PLINT KERAMIK UKURAN 10 CM X 10 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.035 120,000.00 4,200.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 25,280.00
B. BAHAN
Plint keramik Bh 10.60 13,200.00 139,920.00
Semen Portland (Gersik) Kg 1.14 1,250.00 1,425.00
Pasir Pasang M3 0.003 215,000.00 645.00
Semen Warna Kg 0.05 14,000.00 700.00

JUMLAH HARGA BAHAN 141,345.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 166,625.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 166,625.00

37 1 M' PASANG PLINT KERAMIK UKURAN 5 CM X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.035 120,000.00 4,200.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 25,280.00
B. BAHAN
Plint keramik Bh 5.30 13,200.00 69,960.00
Semen Portland (Gersik) Kg 0.57 1,250.00 712.50
Pasir Pasang M3 0.0015 215,000.00 322.50
Semen Warna Kg 0.013 14,000.00 182.00

JUMLAH HARGA BAHAN 70,672.50


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 95,952.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 95,952.50
38 1 M2 PASANG DINDING KERAMIK 10 CM X 20 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.90 112,000.00 100,800.00
Tukang Batu OH 0.45 115,000.00 51,750.00
Kepala Tukang OH 0.045 120,000.00 5,400.00
Mandor OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 163,800.00
B. BAHAN
Keramik dinding buah 53.00 10,000.00 530,000.00
Semen Portland Kg 9.30 1,250.00 11,625.00
Pasir pasang M3 0.018 215,000.00 3,870.00
Semen warna Kg 2.75 14,000.00 38,500.00
JUMLAH HARGA BAHAN 541,625.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 705,425.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 705,425.00

39 1 M2 PASANG DINDING KERAMIK 20 CM X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.90 112,000.00 100,800.00
Tukang Batu OH 0.45 115,000.00 51,750.00
Kepala Tukang OH 0.045 120,000.00 5,400.00
Mandor OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 163,800.00
B. BAHAN
Keramik dinding buah 26.50 3,000.00 79,500.00
Semen Portland Kg 9.30 1,250.00 11,625.00
Pasir pasang M3 0.018 215,000.00 3,870.00
Semen warna Kg 1.94 14,000.00 27,160.00
JUMLAH HARGA BAHAN 91,125.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 254,925.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 254,925.00

40 1 M2 PASANG DINDING MARMER 100 CM X 100 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.30 112,000.00 145,600.00
Tukang Batu OH 0.65 115,000.00 74,750.00
Kepala Tukang OH 0.065 120,000.00 7,800.00
Mandor OH 0.065 130,000.00 8,450.00
JUMLAH TENAGA KERJA 236,600.00
B. BAHAN
Keramik dinding buah 1.06 148,000.00 156,880.00
Semen Portland Kg 12.44 1,250.00 15,550.00
Pasir pasang M3 0.025 215,000.00 5,375.00
Semen warna Kg 0.65 14,000.00 9,100.00
Paku 12 cm buah 3.03 18,000.00 54,540.00
JUMLAH HARGA BAHAN
172,430.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 409,030.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 409,030.00
41 1 M2 PEMASANGAN PAVING BLOCK NATURAL Tebal 6 cm ( 20x20 cm)
KOEFISIEN HARGA SATUAN JUMLAH HARGA 20 1 M2 PEMASANGAN PAVING BLOCK NATURAL Tebal 6 cm ( 20x20 cm)
NO. URAIAN SATUAN
(Rp.) (Rp.) KOEFISIENHARGA SATUANJUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Tukang Batu OH 0.5000 115,000.00 57,500.00 A. TENAGA
Pekerja OH 0.2500 112,000.00 28,000.00 Tukang Batu OH 0.5000 - -
Kepala tukang OH 0.0500 120,000.00 6,000.00 Pekerja OH 0.2500 - -
Mandor OH 0.0013 130,000.00 169.00 Kepala tukang OH 0.0500 - -
JUMLAH TENAGA K ` 91,669.00 Mandor OH 0.0013 - -
B. BAHAN JUMLAH TENA ` -
Paving 20 x 20 cm tebal 6 cm K225 m2 1.01 90,000.00 90,900.00 B. BAHAN
JUMLAH HARGA BAHAN 90,900.00 Paving 20 x 20 c m2 1.01 - -
C. PERALATAN JUMLAH HARGA BAHAN -
JUMLAH HARGA ALAT C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 182,569.00
E. Overhead & Profit 0 %xD - D. Jumlah (A + B + C) -
F. Harga Satuan Pekerjaan (D+E) 182,569.00 E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) -

42 1 M2 PEMASANGAN PAVING BLOCK BERWARNA Tebal 6 cm ( 20x20 cm)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.5000 115,000.00 57,500.00
Pekerja OH 0.2500 112,000.00 28,000.00
Kepala tukang OH 0.0500 120,000.00 6,000.00
Mandor OH 0.0013 130,000.00 169.00
JUMLAH TENAGA K ` 91,669.00
B. BAHAN
Paving 20 x 20 cm tebal 6 cm K225 ( Warna ) m2 1.01 100,000.00 101,000.00
JUMLAH HARGA BAHAN 101,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 189,669.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 189,669.00

43 1 M2 PEMASANGAN PAVING BLOCK BERWARNA Tebal 8 cm ( 20x20 cm)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.5000 115,000.00 57,500.00
Pekerja OH 0.5000 112,000.00 56,000.00
Kepala tukang OH 0.0500 120,000.00 6,000.00
Mandor OH 0.0013 130,000.00 169.00
JUMLAH TENAGA K ` 119,669.00
B. BAHAN
Paving 20 x 20 cm tebal 8 cm K225 ( Warna ) m2 1.01 120,000.00 121,200.00
JUMLAH HARGA BAHAN 121,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 240,869.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 240,869.00
44 1 M2 PEMASANGAN PAVING BLOCK NATURAL Tebal 8 cm ( 20x20 cm)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.5000 115,000.00 57,500.00
Pekerja OH 0.5000 112,000.00 56,000.00
Kepala tukang OH 0.0500 120,000.00 6,000.00
Mandor OH 0.0013 130,000.00 169.00
JUMLAH TENAGA K ` 119,669.00
B. BAHAN
Paving 20 x 20 cm tebal 8 cm K225 ( Natural ) m2 1.01 102,000.00 103,020.00
JUMLAH HARGA BAHAN 103,020.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 222,689.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 222,689.00

XIV PEKERJAAN PENGECATAN (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PEKERJAAN MENGIKIS ATAU MENGEROK CAT TEMBOK CARA MANUAL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 17,840.00
B. BAHAN
Kapi bh 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 18,740.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 18,740.00
2 1 M2 PEKERJAAN LAPIS PLAMIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0200 112,000.00 2,240.00
Tukang cat OH 0.0300 115,000.00 3,450.00
Kepala Tukang OH 0.0030 120,000.00 360.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 6,180.00
B. BAHAN
Plamir Tembok kg 0.1000 -
Amplas Lbr 0.5000 -
Kapi bh 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 7,080.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 7,080.00

3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0200 112,000.00 2,240.00
Tukang cat OH 0.0630 115,000.00 7,245.00
Kepala Tukang OH 0.0063 120,000.00 756.00
Mandor OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 10,566.00
B. BAHAN
Plamir kg 0.1000 45,000.00 4,500.00
Cat dasar kg 0.1000 65,000.00 6,500.00
Cat Penutup 2x kg 0.2600 26,500.00 6,890.00
JUMLAH HARGA BAHAN 17,890.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 28,456.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 28,456.00

4 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN KUAS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0600 112,000.00 6,720.00
Tukang cat OH 0.0500 115,000.00 5,750.00
Kepala Tukang OH 0.0050 120,000.00 600.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 13,460.00
B. BAHAN
Cat Tembok Vinilex kg 0.2400 26,500.00 6,360.00
Kuas Bh 0.0150 12,000.00 180.00
JUMLAH HARGA BAHAN 6,540.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 20,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 20,000.00
5 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN ROLL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0400 112,000.00 4,480.00
Tukang cat OH 0.0300 115,000.00 3,450.00
Kepala Tukang OH 0.0030 120,000.00 360.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 8,550.00
B. BAHAN
Cat Tembok Vinilex kg 0.4700 26,500.00 12,455.00
Roll Bh 0.0100 28,500.00 285.00
JUMLAH HARGA BAHAN 12,740.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 21,290.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 21,290.00

6 1 M2 PEKERJAAN PENGECATAN LANGIT -LANGIT 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN KUAS TERMASUK PLAMIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0800 112,000.00 8,960.00
Tukang cat OH 0.0600 115,000.00 6,900.00
Kepala Tukang OH 0.0060 120,000.00 720.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 17,100.00
B. BAHAN
Plamir Tembok kg 0.1000 -
Cat Tembok Vinilex Kg 0.2400 26,500.00 6,360.00
Amplas Lbr 0.5000 -
Kuas Bh 0.0150 12,000.00 180.00
Kapi Bh 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 7,440.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,540.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,540.00

7 1 M2 PEKERJAAN PENGECATAN PLAFOND 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN ROLL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0600 112,000.00 6,720.00
Tukang cat OH 0.0400 115,000.00 4,600.00
Kepala Tukang OH 0.0040 120,000.00 480.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 12,190.00
B. BAHAN
Plamir Tembok kg 0.1000 45,000.00 4,500.00
Cat Tembok Vinilex Kg 0.4700 26,500.00 12,455.00
Amplas Lbr 0.5000 5,000.00 2,500.00
Roll Bh 0.0100 28,500.00 285.00
Kapi Bh 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 20,640.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 32,830.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 32,830.00
8 1 M2 WATERPROOFING
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0150 112,000.00 1,680.00
Tukang cat OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.0140 120,000.00 1,680.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 22,410.00
B. BAHAN
Waterprofing dumplix 3 kg 0.4500 34,000.00 15,300.00
JUMLAH HARGA BAHAN 15,300.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,710.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 37,710.00

9 1 M2 PEKERJAAN PASANG WALL PAPER DENGAN PEREKAT SILK HOUSE


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0100 112,000.00 1,120.00
Tukang cat OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 14,470.00
B. BAHAN
Wall Paper m2 1.1000 775,000.00 852,500.00
Perekat Kg 0.2000 -
JUMLAH HARGA BAHAN 852,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 866,970.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 866,970.00

10 1 M2 PEKERJAAN MELAPIS MENI KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0750 112,000.00 8,400.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 8,920.00
B. BAHAN
Meni kg 0.1700 40,000.00 6,800.00
Minyak Cat ltr 0.1000 28,000.00 2,800.00
Kuas bh 0.0150 12,000.00 180.00
JUMLAH HARGA BAHAN 9,780.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 18,700.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 18,700.00
11 1 M2 PEKERJAAN MENDEMPUL ATAU MEMPLAMIR DAN MENGGOSOK KAYU
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1100 115,000.00 12,650.00
Kepala Tukang OH 0.0110 120,000.00 1,320.00
JUMLAH TENAGA KERJA 13,970.00
B. BAHAN
Dempul kayu kg 0.1500 40,000.00 6,000.00
Plamir Kayu Kg 0.0080 28,000.00 224.00
Minyak Cat Ltr 0.1000 28,000.00 2,800.00
Amplas Lbr 1.0000 5,000.00 5,000.00
Kuas Bh 0.0150 12,000.00 180.00
JUMLAH HARGA BAHAN 14,204.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 28,174.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 28,174.00

12 1 M2 PEKERJAAN PENGECATAN DASAR 1 LAPIS PADA KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 120,000.00 960.00
JUMLAH TENAGA KERJA 9,585.00
B. BAHAN
Cat Dasar Kg 0.1700 65,000.00 11,050.00
Minyak Cat Ltr 0.1000 28,000.00 2,800.00
Amplas Lbr 1.0000 5,000.00 5,000.00
Kuas Bh 0.0150 12,000.00 180.00
JUMLAH HARGA BAHAN 19,030.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 28,615.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 28,615.00

13 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang cat OH 0.1500 115,000.00 17,250.00
Kepala Tukang OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 36,890.00
B. BAHAN
Cat Tembok Vinilex kg 0.3000 26,500.00 7,950.00
Minyak Cat Ltr 0.2000 28,000.00 5,600.00
Kuas Bh 0.0200 12,000.00 240.00
JUMLAH HARGA BAHAN 13,790.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,680.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 50,680.00
14 1 M2 PEKERJAAN MENGEROK KARAT ATAU CAT PADA PERMUKAAN BAJA DENGAN SODA API
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 35,550.00
B. BAHAN
Amplas Lbr 0.5000 5,000.00 2,500.00
Sikat Baja Bh 0.0500 28,000.00 1,400.00
Soda Api Kg 0.0500 11,000.00 550.00
JUMLAH HARGA BAHAN 4,450.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 40,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 40,000.00

15 1 M2 PEKERJAAN MELAPIS MENI PADA PERMUKAAN BAJA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0750 112,000.00 8,400.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 8,920.00
B. BAHAN
Meni kg 0.1000 40,000.00 4,000.00
Minyak Cat Kg 0.1000 28,000.00 2,800.00
Amplas Bh 0.5000 5,000.00 2,500.00
Kuas Bh 0.0150 12,000.00 180.00
JUMLAH HARGA BAHAN 9,480.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 18,400.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 18,400.00

16 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA SECARA MANUAL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang cat OH 0.1500 115,000.00 17,250.00
Kepala Tukang OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 36,890.00
B. BAHAN
Cat Warna Zingkronasi Kg 0.2000 57,000.00 11,400.00
Minyak Cat Kg 0.1000 28,000.00 2,800.00
Kuas Bh 0.0200 12,000.00 240.00
JUMLAH HARGA BAHAN 14,440.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 51,330.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 51,330.00
17 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA/KAYU DENGAN SEMPROT
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0200 112,000.00 2,240.00
Tukang cat OH 0.1500 115,000.00 17,250.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 19,740.00
B. BAHAN
Cat Warna Zingkronasi Kg 0.4000 57,000.00 22,800.00
Minyak Cat Kg 0.1000 28,000.00 2,800.00
JUMLAH HARGA BAHAN 25,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 45,340.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 45,340.00

18 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN TEAK OIL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
JUMLAH TENAGA KERJA 12,700.00
B. BAHAN
Teak Oil Ltr 0.3000 65,000.00 19,500.00
Amplas Lbr 0.5000 5,000.00 2,500.00
Kuas Bh 0.0150 12,000.00 180.00
JUMLAH HARGA BAHAN 22,180.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 34,880.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 34,880.00

19 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN POLITUR 2 LAPIS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2500 112,000.00 28,000.00
Tukang cat OH 0.2500 115,000.00 28,750.00
Kepala Tukang OH 0.0250 120,000.00 3,000.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 61,440.00
B. BAHAN
Wood Filler Kg 0.1000 45,000.00 4,500.00
Politur Jadi Ltr 0.2000 70,000.00 14,000.00
Amplas Lbr 1.0000 5,000.00 5,000.00
Kuas Bh 0.0200 12,000.00 240.00
JUMLAH HARGA BAHAN 23,740.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 85,180.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 85,180.00
20 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN VERNIS 2 LAPIS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
JUMLAH TENAGA KERJA 12,700.00
B. BAHAN
Vernis Ltr 0.3000 40,000.00 12,000.00
Amplas Lbr 0.5000 5,000.00 2,500.00
Kuas Bh 0.0200 12,000.00 240.00
JUMLAH HARGA BAHAN 14,740.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 27,440.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 27,440.00

21 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN RESIDU/TER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
JUMLAH TENAGA KERJA 12,700.00
B. BAHAN
Residu/ter Ltr 0.3500 45,000.00 15,750.00
Minyak Tanah Ltr 0.0300 14,500.00 435.00
Kuas Bh 0.0200 12,000.00 240.00
JUMLAH HARGA BAHAN 16,425.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 29,125.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 29,125.00

4 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN KUAS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Tukang cat OH 0.1200 115,000.00 13,800.00
Kepala Tukang OH 0.0050 120,000.00 600.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 20,390.00
B. BAHAN
Coating Batu Alam kg 0.2400 75,000.00 18,000.00
Kuas Bh 0.0150 12,000.00 180.00
JUMLAH HARGA BAHAN 18,180.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 38,570.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 38,570.00

XVII PEKERJAAN ELEKTRIKAL (PERMEN PUPR 28/PRT/2016)


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 65,000.00 65,000.00
JUMLAH TENAGA KERJA 65,000.00
B. BAHAN
Kabel NYM 3 x 2.5 mm ex. Supreme m1 8.0000 15,500.00 124,000.00
Pipa Clipsal 20 mm hitam bt 3.0000 12,000.00 36,000.00
Tee dos clipsal 20 mm hitam bh 2.0000 8,000.00 16,000.00
Klem clipsal 20 mm hitam bj 15.0000 2,500.00 37,500.00
Sock clipsal 20 mm hitam bj 3.0000 2,000.00 6,000.00
Inbow dos plastik clipsal E 157 P bj 1.0000 8,000.00 8,000.00
JUMLAH HARGA BAHAN 227,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 292,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 292,500.00
2 1 TITIK INSTALASI AC
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 65,000.00 65,000.00
JUMLAH TENAGA KERJA 65,000.00
B. BAHAN
Kabel NYM 3 x 2.5 mm ex. Supreme m1 10.0000 15,500.00 155,000.00
Pipa Clipsal 20 mm hitam bt 3.0000 12,000.00 36,000.00
Tee dos clipsal 20 mm hitam bh 1.0000 8,000.00 8,000.00
Klem clipsal 20 mm hitam bj 15.0000 2,500.00 37,500.00
Sock clipsal 20 mm hitam bj 4.0000 2,000.00 8,000.00
Inbow dos plastik clipsal E 157 P bj 1.0000 8,000.00 8,000.00
Pipa flexible clipsal 20 mm hitam m1 1.0000 12,000.00 12,000.00
JUMLAH HARGA BAHAN 264,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 329,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 329,500.00

3 1 TITIK INSTALASI TELEPHONE


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 65,000.00 65,000.00
JUMLAH TENAGA KERJA 65,000.00
B. BAHAN
Kabel Telephone m1 25.0000 3,000.00 75,000.00
Pipa Clipsal 20 mm hitam bt 8.0000 12,000.00 96,000.00
Tee dos clipsal 20 mm hitam bh 1.0000 8,000.00 8,000.00
Klem clipsal 20 mm hitam bj 25.0000 2,500.00 62,500.00
Sock clipsal 20 mm hitam bj 5.0000 2,000.00 10,000.00
Inbow dos plastik clipsal E 157 P bj 1.0000 8,000.00 8,000.00
JUMLAH HARGA BAHAN 259,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 324,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 324,500.00

4 1 TITIK INSTALASI MATV


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 65,000.00 65,000.00
JUMLAH TENAGA KERJA 65,000.00
B. BAHAN
Coaxial cable 5C-75 ohm commscof m1 20.0000 25,000.00 500,000.00
Pipa Clipsal 20 mm hitam bt 6.0000 2,000.00 12,000.00
Tee dos clipsal 20 mm hitam bh 2.0000 8,000.00 16,000.00
Klem clipsal 20 mm hitam bj 20.0000 2,500.00 50,000.00
Sock clipsal 20 mm hitam bj 6.0000 2,000.00 12,000.00
Inbow dos plastik clipsal E 157 P bj 1.0000 8,000.00 8,000.00
JUMLAH HARGA BAHAN 598,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 663,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 663,000.00
5 1 TITIK PEMASANGAN LAMPU
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 65,000.00 65,000.00
JUMLAH TENAGA KERJA 65,000.00
B. BAHAN
Lampu Philip 18 watt bh 1.0000 59,000.00 59,000.00
JUMLAH HARGA BAHAN 59,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 124,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 124,000.00

XVIII PEKERJAAN ANGKUT MATERIAL DAN/ ATAU HASIL GALIAN (PERMEN PUPR 28/PRT/M/2016)
1 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 50 M'
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4220 112,000.00 47,264.00
Mandor OH 0.0211 130,000.00 2,743.00
JUMLAH TENAGA KERJA 50,007.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,007.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 50,007.00

2 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 100 M'
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6000 112,000.00 67,200.00
Mandor OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 71,100.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 71,100.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 71,100.00
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2021

NO URAIAN PEKERJAAN HARGA

1 2 3
I HARGA SATUAN PEKERJAAN PERSIAPAN (PERMEN PUPR 28/PRT/M/2016)
1 1 M2 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER Rp. 600,213.00
2 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER Rp. 747,688.00
3 1 M2 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER Rp. 3,076,400.00
4 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK Rp. 152,315.00
5 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN Rp. 2,214,420.00
6 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT Rp. 2,089,125.00
7 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU Rp. 2,421,900.00
8 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN Rp. 17,700.00
9 1 M2 PEMBUATAN BEDENG BURUH Rp. 2,134,150.00
10 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X25) CM Rp. 280,152.00
11 1 M2 PEMBUATAN STEGGER DARI BAMBU Rp. 393,296.00
12 1 M2 PEMBUATAN JALAN SEMENTARA Rp. 179,000.00
13 1 M3 BONGKARAN BETON BERTULANG Rp. 1,579,988.00
14 1 M3 BONGKARAN DINDING TEMBOK BATA Rp. 789,994.00
15 1 M2 PEMASANGAN PAGAR KAWAT JARING GALVANIS PANJANG 240 CM Rp. 17,962.30
16 1 M2 PEMASANGAN PANEL BETON PRACETAK 5X50X240 CM UNTUK PAGAR Rp. 379,352.00
17 BONGKAR 1 M3 BETON SECARA KONVENSIONAL Rp. 450,000.00

II HARGA SATUAN PEKERJAAN TANAH (PERMEN PUPR 28/PRT/M/2016)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER Rp. 87,250.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER Rp. 106,650.00
3 1 M3 GALIAN TANAH BIASA DALAM 3 METER Rp. 126,310.00
4 1 M3 GALIAN TANAH KERAS DALAM 1METER Rp. 116,160.00
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER Rp. 175,800.00
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER Rp. 140,250.00
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER Rp. 6,250.00
8 1 M3 PEMBUANGAN TANAH SEJAUH 30 METER Rp. 38,260.00
9 1 M3 PENGURUGAN KEMBALI GALIAN TANAH Rp. 62,500.00
10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) Rp. 62,500.00
11 1 M3 URUGAN PASIR Rp. 268,900.00
12 1 M3 PEMASANGAN LAPISAN PUDEL CAMPURAN 1KP : 3PP : 7TL Rp. 454,639.00
13 1 M2 PEMASANGAN LAPISAN IJUK TEBAL 10 CM Rp. 45,750.00
14 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan Rp. 328,850.00
15 1 M3 TIMBUNAN PASIR SEBAGAI BAHAN PENGISI Rp. 303,200.00

III HARGA SATUAN PEKERJAAN PONDASI (PERMEN PUPR 28/PRT/M/2016)


1 1 M3 BATU BELAH CAMP. 1 SP : 3 PP Rp. 875,775.00
2 1 M3 BATU BELAH CAMP. 1 SP : 4 PP Rp. 834,550.00
3 1 M3 BATU BELAH CAMP. 1 SP : 5 PP Rp. 805,960.00
4 1 M3 BATU BELAH CAMP. 1 SP : 6 PP Rp. 785,865.00
5 1 M3 BATU BELAH CAMP. 1 SP : 8 PP Rp. 758,310.00
6 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1SP : 1KP : 2PP Rp. 504,862.50
7 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1SP : 3KP : 10PP Rp. 703,235.00
8 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1/4 SP : 1KP : 4PP Rp. 717,754.00
9 1 M3 PASANGAN PONDASI SIKLOP, 60% BETON CAMPURAN 1 SP : 2 PB : 3 KR DAN 40% BATU BELAH Rp. 1,105,406.00
10 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M 974,276.00
11 1 M3 PASANGAN BATU KOSONG 472,200.00
IV PEKERJAAN DINDING (PERMEN PUPR 28/PRT/M/2016))
1 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS Rp. 276,107.50
2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS Rp. 270,812.50
3 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS Rp. 267,870.00
4 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS Rp. 266,025.00
5 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS Rp. 265,185.00
6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS Rp. 263,125.00
7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SP : 3 KP : 10 PP Rp. 265,395.00
8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SP : 3 KP : 10 PP Rp. 265,395.00
9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SM : 1 KP : 2 PP Rp. 254,739.50
10 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 2 PP Rp. 561,325.00
11 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 3 PP Rp. 549,252.50
12 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 4 PP Rp. 541,682.50
13 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 5 PP Rp. 538,180.00
14 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 6 PP Rp. 537,855.00
15 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 3 KP : 10 PP Rp. 529,732.50
16 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 20), campuran spesi 1 pc : 3 ps Rp. 280,414.00
17 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 20), campuran spesi 1 psp : 4 pp Rp. 282,299.00
18 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 15), campuran spesi 1 psp : 3 pp Rp. 261,341.00
19 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 15), campuran spesi 1 psp : 4 pp Rp. 262,546.00
20 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 psp : 3 pp Rp. 183,204.00
21 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 psp : 4 pp Rp. 183,204.00
22 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 3 Ps Rp. 1,719,525.00
23 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 4 Ps Rp. 1,719,525.00
24 1 M2 PASANGAN DINDING Bata Berongga Ekspose (12 x 11 x 24) CM camp 1 Pc : 3 PP Rp. 105,525.00
25 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 7.5 CM DENGAN MORTAR SIAP PAKAI Rp. 324,468.60
26 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 10 CM DENGAN MORTAR SIAP PAKAI Rp. 331,145.00

V PEKERJAAN PLESTERAN (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PP TEBAL 15 MM Rp. 77,420.00
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM Rp. 71,680.00
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM Rp. 69,265.00
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM Rp. 67,560.00
5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM Rp. 66,670.00
6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM Rp. 65,925.00
7 1 M2 PLESTERAN CAMP. 1 PC : 7 PS TEBAL 15 MM Rp. 65,540.00
8 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM Rp. 65,155.00
9 1 M2 PLESTERAN CAMP. 1 PC : 2PP TEBAL 20 MM Rp. 95,905.00
10 1 M2 PLESTERAN CAMP. 1 PC : 3PS TEBAL 20 MM Rp. 75,835.00
11 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM Rp. 91,515.00
12 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM Rp. 90,340.00
13 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM Rp. 89,225.00
14 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM Rp. 88,160.00
15 1 M2 PLESTERAN CAMP. 1 PC : 1 KP : 2 PS TEBAL 20 MM Rp. 88,160.00
16 1 M2 PLESTERAN BERAPEN 1 PS : 5PP TEBAL 15 MM Rp. 39,495.00
17 1 M' PLESTERAN SKONING 1 PC : 3 PS, TEBAL 10 MM Rp. 63,700.00
18 1 M2 PLESTERAN GRANIT 1 SP : 2 GRANIT TEBAL 1 CM Rp. 3,319,525.00
19 1 M2 PLESTERAN TRASO 1 SP : 2 TRASO TEBAL 1 CM Rp. 3,319,525.00
20 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS Rp. 54,940.00
21 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH Rp. 31,310.00
22 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE Rp. 14,865.00
23 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS Rp. 65,105.00
24 1 M2 PLESTERAN MENGGUNAKAN SEMEN MU - 301, TEBAL 10 MM Rp. 77,370.00
25 1 M2 ACIAN MENGGUNAKAN SEMEN MU - 200,TEBAL 1,5MM Rp. 85,003.75
26 1 M2 PEKERJAAN ACIAN Rp. 40,462.50
VI PEKERJAAN KAYU (PERMEN PUPR 28/PRT/M/2016)
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I Rp. 13,985,000.00
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS III Rp. 11,135,500.00
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II Rp. 555,790.00
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III Rp. 473,790.00
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS II Rp. 887,500.00
6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS II Rp. 632,400.00
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS II Rp. 1,115,500.00
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm) Rp. 775,690.00
9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS II Rp. 831,340.00
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS II Rp. 945,290.00
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I Rp. 884,940.00
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II Rp. 824,630.00
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS II Bentang 6 M' Rp. 12,028,800.00
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I Rp. 15,042,450.00
15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II Rp. 11,897,800.00
16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II Rp. 139,050.00
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II Rp. 155,250.00
18 MEMASANG 1 M2 USUK EXPOSE KAYU KLS I KAMPER Rp. 99,400.00
19 MEMASANG 1 M2 RENG KAYU KLS I KAMPER Rp. 45,250.00
20 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II Rp. 1,493,310.00
21 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II Rp. 171,430.00
22 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II Rp. 175,510.00
23 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS II Rp. 141,650.00
24 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS II Rp. 142,650.00
25 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II Rp. 325,490.00
26 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II Rp. 410,904.00
27 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II Rp. 435,814.00
28 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA HOLO Rp. 163,104.00
29 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA HOLO Rp. 324,110.00
30 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I Rp. 368,082.50
31 MEMASANG 1 M2 LAMBRIZIRING DARI CONWOOD UKURAN (100 x 3050 x 11 mm) Rp. 313,415.00
32 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM Rp. 85,415.00

VII PEKERJAAN BETON ( PERMEN PUPR 28/PRT/M/2016))


MEMBUAT 1 M³ BETON CAMPURAN 1PC ; 2PS ; 3KRL 1,084,979.90
MEMBUAT 1 M³ BETON CAMPURAN 1PC ; 3PS ; 5KRL 935,893.89
1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87 Rp. 986,744.29
2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78 Rp. 1,021,250.98
3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72 Rp. 1,047,487.62
4 MEMBUAT 1 M³ LANTAI KERJA BETON MUTU F'C = 7,4 MPA SLUMP (3-6)CM, W/C =0.87 Rp. 912,907.33
5 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66 Rp. 1,079,467.70
6 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61 Rp. 1,108,538.78
7 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58 Rp. 1,132,575.32
8 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56 Rp. 1,145,548.12
9 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53 Rp. 1,167,966.43
10 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52 Rp. 1,174,772.65
11 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49 Rp. 1,263,887.72
12 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48 Rp. 1,272,888.76
13 PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 12,495.00
14 PEMBESIAN 1 KG kabel prategang (prestressed) polos/strands Rp. 11,844.00
15 PEMBESIAN 1 KG DENGAN BESI POLOS Rp. 3,062.50
16 Pemasangan 10 Kg jaring kawat baja (wiremesh) Rp. 2,842,435.00
17 1 M2 PASANG BEKISTING UNTUK PONDASI Rp. 184,540.00
18 1 M2 PASANG BEKISTING UNTUK SLOOF Rp. 194,540.00
19 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 333,945.00
20 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 346,395.00
21 1 M2 PASANG BEKISTING UNTUK PLAT LANTAI Rp. 365,945.00
22 1 M2 PASANG BEKISTING UNTUK DINDING Rp. 354,695.00
23 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 311,695.00
24 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON Rp. 91,790.00
25 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) Rp. 94,908.00
26 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) Rp. 115,569.00
27 1 M2 BEKISTING DINDING BETON BIASA DENGAN MULTIFLEX 12 mm *2 kali pakai* Rp. 137,900.00
28 1 M2 BEKISTING PONDASI DAN SLOOF BETON BIASA MENGGUNAKAN PAPAN 3/20 CM *2 kali pakai* Rp. 141,770.00
29 1 M2 PERANCAH/PENYOKONG BEKISTING DINDING BETON MENGGUNAKAN KAYU 5/7 ,Tinggi Maks 2,5 m *2 kali pakai* Rp. 114,680.00
30 1 M2 PERANCAH/PENYOKONG BEKISTING PONDASI DAN SLOOF BETON MENGGUNAKAN KAYU 5/7 ,Tinggi Maks 2,0 m *2 kali pakai* Rp. 89,700.00
VIII HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM (PERMEN PUPR 28/PRT/M/2016)
1 1 KG PEMASANGAN BESI PROFIL Rp. 31,980.00
2 1 KG PEMASANGAN RANGKA KUDA-KUDA BAJA IWF Rp. 31,980.00
3 100 KG PENGERJAAN PEKERJAAN PERAKITAN Rp. 31,980.00
4 1 M2 PEMASANGAN PINTU ROLLING DOOR BESI Rp. 782,580.00
5 1 M2 PEMASANGAN ROLLING DOOR ALLUMINIUM Rp. 620,500.00
6 1 M2 PEMASANGAN KUSEN PINTU ALLUMINIUM Rp. 37,186.00
7 1 M2 PEMASANGAN PINTU ALLUMINIUM STRIP LEBAR 8 CM Rp. 421,261.00
8 1 M2 PEMASANGAN RANGKA BESI HOLLOW 1 X40.40.2MM, MODUL 60 X 120 CM, UNTUK PARTISI Rp. 309,840.00
9 1 M2 PEMASANGAN RANGKA BESI HOLLOW 1 X40.40.2MM, MODUL 60 X 120 CM, UNTUK PLAFON Rp. 278,490.00
10 1 M2 PEMASANGAN ATAP PELANA RANGKA ATAP BAJA CANAI DINGIN PROFIL C75 Rp. 246,943.70
11 1 M2 PEMASANGAN ATAP JURAI RANGKA ATAP BAJA CANAI DINGIN PROFIL C75 Rp. 274,879.80

IX PEKERJAAN PENUTUP ATAP (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG Rp. 104,925.00
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT Rp. 127,425.00
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG Rp. 255,840.00
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM Rp. 109,455.00
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M Rp. 345,063.00
6 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL Rp. 12,027.00
7 1 M1 PASANG NOK SENG GELOMBANG Rp. 53,410.00
8 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU Rp. 101,366.25

X PEKERJAAN PLAFOND / LANGIT - LANGIT (PERMEM PUPR 28/PRT/M/2016))


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM Rp. 70,150.00
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/3 MM, 4MM, 6MM Rp. 49,240.00
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING Rp. 339,080.00
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL Rp. 39,860.00
5 1 M1 PASANG LIST LANGIT-LANGIT GYPSUM PROFIL Rp. 28,940.00
6 1 M2 PASANG LANGIT-LANGIT AKUSTIK UKURAN (60 x 120) CM + RANGKA ALUMINIUM Rp. 405,500.00
7 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA Rp. 338,750.00
8 1 M2 PLAFOND GYPSUM, RANGKA KAYU Rp. 276,245.00
9 1 M2 PLAFOND GYPSUM, RANGKA HOLO Rp. 161,812.50
10 1 M2 PLAFOND KALSIBOARD, RANGKA KAYU Rp. 280,067.00
11 1 M2 PLAFOND KALSIBOARD, RANGKA HOLO Rp. 165,634.50

XI PEKERJAAN SANITASI ( PERMEN PUPR 28/PRT/M/2016) )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK Rp. 7,460,020.00
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN Rp. 1,069,950.00
3 MEMASANG 1 BUAH URINOIR Rp. 749,150.00
4 MEMASANG 1 BUAH WASHTAFEL KIA Rp. 913,000.00
5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 Rp. 1,027,800.00
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " Rp. 129,488.00
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" Rp. 312,333.00
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5" Rp. 44,823.50
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp. 66,770.50
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" Rp. 120,124.50
11 MEMASANG 1 M1 PIPA PVC TYPE AW f 4" Rp. 158,874.50
12 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" Rp. 263,325.00
XII PEKERJAAN BESI DAN ALUMINIUM (PERMEN PUPR 28/PRT/M/2016)
1 1 KG MEMASANG RANGKA BAJA IWF Rp. 25,581.00
2 1 M2 PASANG JENDELA NAKO & TRALIS Rp. 556,880.00
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 Rp. 278,570.00

XIII PEKERJAAN KUNCI DAN KACA PERMEN PUPR 28/PRT/M/2016)


1 1 BH PASANG KUNCI TANAM BIASA Rp. 309,000.00
2 1 PS PASANG ENGSEL PINTU Rp. 68,065.00
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU Rp. 57,800.00
4 1 BH PASANG KAIT ANGIN Rp. 46,630.00
5 1 BH PASANG KUNCI SLOT Rp. 342,000.00
6 1 M2 PASANG KACA, TEBAL5 MM Rp. 341,460.00
7 1 M2 PASANG KACA TEMPERED TEBAL 5 MM Rp. 348,060.00
8 1 M2 PASANG KACA TEMPERED TEBAL 6 MM Rp. 463,560.00
9 1 M2 PASANG KACA TEMPERED TEBAL 12 MM Rp. 810,060.00

XIV PEKERJAAN PENUTUP LANTAI DAN DINDING (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (40 X 40) CM Rp. 168,885.00
2 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (30 X 30) CM Rp. 85,871.36
3 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (20 X 20) CM Rp. 169,370.00
4 1 M2 PASANG LANTAI UBIN WARNA UKURAN (40 X 40) CM Rp. 167,600.00
5 1 M2 PASANG LANTAI UBIN WARNA 30 X 30 CM Rp. 132,895.00
6 1 M2 PASANG LANTAI UBIN WARNA 20 X 20 CM Rp. 181,340.00
7 1 M2 PASANG LANTAI UBIN TERASO UKURAN 40 X 40 CM Rp. 437,455.00
8 1 M2 PASANG LANTAI UBIN TERASO UKURAN 30 X 30 CM Rp. 480,068.18
9 1 M2 PASANG LANTAI UBIN GRANIT UKURAN 40 X 40 CM Rp. 437,455.00
10 1 M2 PASANG LANTAI UBIN GRANIT UKURAN 30 X 30 CM Rp. 486,542.73
11 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM Rp. 752,955.00
12 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM Rp. 787,609.09
13 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM Rp. 236,505.54
14 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp. 240,755.00
15 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 15 CM X 20 CM Rp. 38,082.50
16 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 10 CM X 30 CM Rp. 36,343.68
17 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 10 CM X 40 CM Rp. 64,105.00
18 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 20 CM Rp. 35,870.00
19 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 30 CM Rp. 66,080.00
20 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 40 CM Rp. 34,330.00
21 1 M' PASANGPLINT UBIN TERASO UKURAN 10 CM X 30 CM Rp. 37,219.06
22 1 M' PASANG PLINT UBIN TERASO UKURAN 10 CM X 40 CM Rp. 65,380.00
23 1 M' PASANG PLINT UBIN GRANIT UKURAN 10 CM X 40 CM Rp. 63,980.00
24 1 M' PASANG PLINT UBIN GRANIT UKURAN 10 CM X 30 CM Rp. 78,580.00
25 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 CM X 40 CM Rp. 65,080.00
26 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 CM X 30 CM Rp. 78,580.00
27 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 60 CM Rp. 51,130.00
28 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 40 CM Rp. 65,380.00
29 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 30 CM Rp. 93,170.00
30 1 M2 PASANG LANTAI KERAMIK UKURAN 33 CM X 33 CM Rp. 42,148.68
31 1 M2 PASANG LANTAI KERAMIK UKURAN 30 CM X 30 CM Rp. 50,410.00
32 1 M2 PASANG LANTAI KERAMIK UKURAN 20 CM X 20 CM Rp. 211,800.00
33 1 M2 PASANG LANTAI KERAMIK UKURAN 10 CM X 33 CM Rp. 279,475.00
34 1 M2 PASANG LANTAI KERAMIK MOZAIK UKURAN 30 CM X 30 CM Rp. 323,137.50
35 1 M' PASANG PLINT KERAMIK UKURAN 10 CM X 20 CM Rp. 96,665.00
36 1 M' PASANG PLINT KERAMIK UKURAN 10 CM X 10 CM Rp. 166,625.00
37 1 M' PASANG PLINT KERAMIK UKURAN 5 CM X 20 CM Rp. 95,952.50
38 1 M2 PASANG DINDING KERAMIK 10 CM X 20 CM Rp. 705,425.00
39 1 M2 PASANG DINDING KERAMIK 20 CM X 20 CM Rp. 254,925.00
40 1 M2 PASANG DINDING MARMER 100 CM X 100 CM Rp. 409,030.00
41 1 M2 PEMASANGAN PAVING BLOCK NATURAL Tebal 6 cm ( 20x20 cm) Rp. 182,569.00
42 1 M2 PEMASANGAN PAVING BLOCK BERWARNA Tebal 6 cm ( 20x20 cm) Rp. 189,669.00
43 1 M2 PEMASANGAN PAVING BLOCK BERWARNA Tebal 8 cm ( 20x20 cm) Rp. 240,869.00
44 1 M2 PEMASANGAN PAVING BLOCK NATURAL Tebal 8 cm ( 20x20 cm) Rp. 222,689.00
XV PEKERJAAN PENGECATAN (PERMEN PUPR 28/PRT/M/2016)
1 1 M2 PEKERJAAN MENGIKIS ATAU MENGEROK CAT TEMBOK CARA MANUAL Rp. 18,740.00
2 1 M2 PEKERJAAN LAPIS PLAMIR Rp. 7,080.00
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) Rp. 28,456.00
4 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN KUAS Rp. 20,000.00
5 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN ROLL Rp. 21,290.00
6 1 M2 PEKERJAAN PENGECATAN LANGIT -LANGIT 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN KUAS TERMASUK PLAMIR Rp. 24,540.00
7 1 M2 PEKERJAAN PENGECATAN PLAFOND 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN ROLL Rp. 32,830.00
8 1 M2 WATERPROOFING Rp. 37,710.00
9 1 M2 PEKERJAAN PASANG WALL PAPER DENGAN PEREKAT SILK HOUSE Rp. 866,970.00
10 1 M2 PEKERJAAN MELAPIS MENI KAYU Rp. 18,700.00
11 1 M2 PEKERJAAN MENDEMPUL ATAU MEMPLAMIR DAN MENGGOSOK KAYU Rp. 28,174.00
12 1 M2 PEKERJAAN PENGECATAN DASAR 1 LAPIS PADA KAYU Rp. 28,615.00
13 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA KAYU Rp. 50,680.00
14 1 M2 PEKERJAAN MENGEROK KARAT ATAU CAT PADA PERMUKAAN BAJA DENGAN SODA API Rp. 40,000.00
15 1 M2 PEKERJAAN MELAPIS MENI PADA PERMUKAAN BAJA Rp. 18,400.00
16 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA SECARA MANUAL Rp. 51,330.00
17 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA/KAYU DENGAN SEMPROT Rp. 45,340.00
18 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN TEAK OIL Rp. 34,880.00
19 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN POLITUR 2 LAPIS Rp. 85,180.00
20 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN VERNIS 2 LAPIS Rp. 27,440.00
21 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN RESIDU/TER Rp. 29,125.00

XIV PEKERJAAN ELEKTRIKAL (PERMEN PUPR 28/PRT/2016)


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN Rp. 292,500.00
2 1 TITIK INSTALASI AC Rp. 329,500.00
3 1 TITIK INSTALASI TELEPHONE Rp. 324,500.00
4 1 TITIK INSTALASI MATV Rp. 663,000.00
5 1 TITIK PEMASANGAN LAMPU Rp. 124,000.00

XV PEKERJAAN ANGKUT MATERIAL DAN/ ATAU HASIL GALIAN (PERMEN PUPR 28/PRT/M/2016)

1 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 50 M' Rp 50,007.00
2 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 100 M' Rp 71,100.00
Ditetapkan di Denpasar
pada tanggal  
Plt. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar
 
 
 
Ir. Nyoman Ngurah Jimmy Sidharta W.MT
Pembina Utama Muda
Nip. 19640913 199303 1 006
 
RENCANA ANGGARAN BIAYA
(RAB)

Kegiatan : Pemeliharaan Penyengker Padmasana


Pekerjaan : Pemeliharaan Penyengker Padmasana
Lokasi : Kota Denpasar
Tahun : 2019

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

1 2 3 4 5

A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi 1.00 ls Rp 450,000.00 Rp 450,000.00
Total : Rp 450,000.00

Jumlah Total A : Rp 450,000.00

B. PEMELIHARAAN PADMANSANA
1 Pek. Bongkaran dan Pembuangan Bongkaran 1.00 ls Rp 2,650,000.00 Rp 2,650,000.00
2 Pek. Galian 1.76 m3 Rp 87,250.00 Rp 153,560.00
3 Pek. Pas. Cor Pondasi Beton Siklop 2.11 m2 Rp 1,105,406.00 Rp 2,334,617.47
4 Pek. Pas. Bekisting Beton Siklop (2xpakai) 5.28 m2 Rp 137,900.00 Rp 728,112.00
5 Pek. Pembesian Sloof 15x20 9.89 kg Rp 12,495.00 Rp 123,629.28
6 Pek. Pembesian Kolom 15x15 6.88 kg Rp 12,495.00 Rp 85,938.11
7 Pek. Bekisting Sloof 15x20 (2x pakai) 1.76 m2 Rp 137,900.00 Rp 242,704.00
8 Pek. Cor Beton Camp. 1pc : 2ps : 3krl 0.20 m3 Rp 1,084,979.90 Rp 216,453.49
9 Pek. Pas. Batako Pada Kebun 0.32 m2 Rp 114,080.00 Rp 36,505.60
10 Pek. Plesteran 0.56 m2 Rp 69,265.00 Rp 38,788.40
11 Pek. Acian 0.56 m2 Rp 40,462.50 Rp 22,659.00
12 Pek. Urugan Pasir 0.84 m3 Rp 268,900.00 Rp 225,876.00
13 Pek. Bongkaran Paving Lama 14.81 m2 Rp 11,850.00 Rp 175,439.25
14 Pek. Pas. Paving Lama 12.21 m2 Rp 88,000.00 Rp 1,074,040.00
15 Pek. Pas. Paving Beton 10x20 t=6cm 2.60 m2 Rp 177,250.00 Rp 460,850.00
16 Pek. Pas. Tembok Penyengker Paras-Bata Gosok 16.28 m2 Rp 2,042,331.67 Rp 33,249,159.53
17 Pek. Servis Paras dan Pembersihan Paras-Bata 1.00 ls Rp 1,200,000.00 Rp 1,200,000.00
18 Pek. Coating 47.04 m2 Rp 38,570.00 Rp 1,814,332.80
Total : Rp 44,832,664.93

Jumlah Total B : Rp 44,832,664.93

Real Cost : Rp 45,282,664.93


PPn (10%) : Rp 4,528,266.49
Total Cost : Rp 49,810,931.43
Dibulatkan : Rp 49,810,000.00

Terbilang : ## - - - ##

Denpasar,
Dibuat Oleh :
Kontraktor
CV. Oscarindo Primatama

NI PUTU YULI ARINI


Direktris