ALRO CONSTRUCTION AND DEVELOPMENT CORPORATION
Pefiaranda Extension, Bonot, Legazpi City
Email Addi
Contract LD. 16FL0008
ime: Construction / Upgrading / Rehabilitation of Drainage along National Roads,
Contract Na
Location:
Dsang Maharlika (LZ) KO601-+62:
alro_ construction95@ yahoo.com
‘Tel/Fax No. (02) 480-8036
K0605+382
Brgys. Tughan, North Poblacion, and South Poblacion, Juan, Sorsogon
DERIVATION OF TIME EXTENSION FOR THE PROPOSED VARIATION ORDER NO. 2
ADDITIVE
105 (1) | Subgrade Preparation (Common Materials) | 2448.00 | sqm. 300] sqm/ [8:16
200) ‘Aggregate Subbase Course 345.00 | cum, So] cums | 690
201 ‘Aggregate Base Course 327.00 [| eum. So] cums | 10.58
305; Grouted Riprap 58.00 | cum. 725[ cums | 4640
306 Sione Masonry 73.00 | cum. | 15625[ cums | 14.72
600 (6) | Concrete Curb and Ger (recast) | 360.00] — pes, 3 pes/ [186.67
TOTAL, 273.39
DEDUCTIVE
500 cle) Pipe Culvert, 910mm Dia 141.00] Inn. 1.75 Inm/ [8057
600 Concrete Gutter (Precast) 685.00] pes [poss [17125
TOTAL 251.82
‘TOTAL ADDITIONAL CALENDAR DAYS 2usTCD. ay mCD.
DUE TO VARIATION ORDER NO. 2
Prepare by:
@ C. GUTIERREZ
fenergiMfinager
CERTIFIED
| Bavet
AVEIKLIN
! Olc-cuice, RUC:
{Ole-cHte, CosyALRO CONSTRUCTION AND DEVELOPMENT CORPORATION,
Pefaranda Extension, Bonot, Legazpi City
Email Address: alto_construetion25 @yahox
‘Tel/Fax No. (02) 480-8036
Contract LD, 16FL0008,
Contract Name: Construction / Upgrading / Rehabilitation of Drainage along National Roads,
aang Maharlika (LZ) K0601+623 - K0605+382
Location: Brgys. Tughan, North Poblacion, and South Poblacion, Juban, Sorsogon
DERIVATION OF TIME EXTENSION FOR THE PROPOSED VARIATION ORDER NO. 2
ADDITIVE
1. tem 105 (1) Subgrade Preparation (Common Materials)
Quantity = 2448.00 sqm.
Output per Day 300 squm/day
Additional CD. due V.0.#2 = 8.16 day
2. Item 200 Aggregate Subbase Course
Quantity = 345.00 cum.
‘Output per Day = 50 cum/day
‘Additional C.D. due to V.0.#2 = 6.90 day
3. Item 201 Aggregate Base Course
Quantity 527.00 cum.
(Output per Day 50 cusm/day
Additional CD. duet V.0.#2 = 10.54 day
4, Item 50 Grouted Riprap
Quantity = 58.00 cum,
Output per Day 1.25 cusm/day
Additional CD. duetoV.0.#2 = 46.40 day
5. Item 506 Stone Masonry
Quantity = 23.00 eum,
Output pee D: = 1.5625 cum day
Additional CD.duetoV.0.#2 = 14.72 day
6. Item 600 (6) Concrete Curb and Gutter (Precast)
Quantity = 560.00 pes.
Output per Day 3 pesi/day
Additional C.D. due to V.0.#2 = 186.67 day
Total No. of Calendar Days due to a Gass ob
Variation Order No. 2 (Additive)
DAVE KLINT 8. ALMILLADEDUCTIVE
1. tem 500 (1e) Pipe Culvert, 910mm Dia.
Quantity
Output per Day
Additional C.D. due to V.0. #2
2. Item 600 (5) Concrete Gutter (Precast)
Quantity
Output per Day
Additional C.D, due to V.0. #2
Total No. of Calendar Days due to
Variation Order No. 2 (Deductive)
‘TOTAL ADDITIONAL CALENDAR DAYS
DUE TO VARIATION ORDER NO. 2
141.00 Ina,
1.75 In.m.lday
= 80.57 day
= 1685.00 pes.
4 pes./day
171.25 day
= 25182 CD.
= 2STCD. say 22D,
CERTIFIED PI
ALMILLA,
UCTION SECTION