Activities Responsibility
On RM receipt
On RM receipt
On RM receipt
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
-
Sl. No. Activities Responsibility
4 Mr. Subhrat
5 Mr. Subhrat
Compound batching and batch testing report –
6 Mr. Vishnu Raj
each compound wise.
7 Mr. Subhrat
9 Mr. Subhrat
10 Mr. Subhrat
11 Mr. Jahangeer
12 Mr. Subhrat
13 Mr. Subhrat
14 Mr. Subhrat
15 Mr. Subhrat
16 Mr. Jahangeer
17 Mr. Jahangeer
18 Mr. Jahangeer
19 Mr. Jahangeer
26 Mr. Jahangeer
Report to /
Frequency
Submit to
On RM receipt PM
On RM receipt PM
On RM receipt -
Daily PM
Daily -
Daily PM
Daily PM
Daily -
Daily -
Daily GM
Daily PM
Daily PM
Daily PM
Daily PM
Daily GM/PM
Daily GM/PM
Daily -
Daily PM
Daily GM
Daily GM
Daily PM
Person
Sl No.
1
2
3
4
5
6
7
Person
Sl No.
1
2
3
4
5
6
7
8
Other Jobs
Sl No.
1
2
3
Jahangir
Activity List
Daily flash% report.
Product dimension check against OA (Non iso report).
Product dimension check sheet report.
Finished product inspection report (Destructive tests) record.
Random secondary visual inspection and record in register.
Jointing cut length giving and jointing rings sampling & random dimensional check
PH range check at hot feed extrusion line and record.
Subhrat
Activity List
Shift wise compound batch sample collection and testing of hardness, tensile and
compression set.
Mixing Parameter checklist record.
Compound batch clearance report.
Extrusion parameter check report.
Preform random inspection report.
Moulding Press parameter check & parameter check sheet record.
Online hardness check at moulding stage and finishing stage.
Product & preform weight check.
Other Jobs
Activity List
Peroxide cure O ing: Post cureing, seconday inspection
Compound trials and follow ups
Dimension check follow up - In special cases
Jahangir
15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
1 Daily flash% report.
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Product dimension check 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
2
against OA (Non iso report).
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Product dimension check 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
3
sheet report. (ISO)
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Finished product inspection 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
4 report (Destructive tests)
record.
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Random secondary visual 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
5 inspection and record in
register.
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Jointing cut length giving
6 and jointing rings sampling 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
& random dimensional
check
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
PH range check at hot feed 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
7
extrusion line and record.
7 PH range check at hot feed
extrusion line and record.
29.12.18 30.12.18 31.12.18
Subhrat
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Mixing Parameter checklist 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
2 record.
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Compound batch clearance 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
3 report.
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Extrusion parameter check 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
4 report.
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
5 Preform random inspection 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
report.
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Moulding Press parameter 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
6 check & parameter check
sheet record.
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Online hardness check at 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
7 moulding stage and finishing
stage.
29.12.18 30.12.18 31.12.18
01.12.18 02.12.18 03.12.18 04.12.18 05.12.18 06.12.18 08.12.18 09.12.18 10.12.18 11.12.18 12.12.18 13.12.18
Product & preform weight 15.12.18 16.12.18 17.12.18 18.12.18 19.12.18 20.12.18 22.12.18 23.12.18 24.12.18 25.12.18 26.12.18 27.12.18
8
check.
29.12.18 30.12.18 31.12.18
QA
DAILY LOG BOOK
1 Pranay
2 Ajith
3 Vishnu
4 Aneesh
5 Asha
6 Rajesh
7 Abdhu
8 Sariga
40 % Compresion set
70° C for 24 hrs 23° C for 72 hrs -10° C 72 hrs
SPEC: SPEC: SPEC:
EW 48
ACT : 8.83 - 9.42 ACT : ACT :
SPEC: SPEC: SPEC:
EP 55
ACT : ACT : ACT :
SPEC: SPEC: SPEC:
EP 60
ACT : ACT : ACT :
SPEC: SPEC: SPEC:
EP 65
ACT : 21.64 - 22.17 ACT : ACT :
SPEC: SPEC: SPEC:
EP 70
ACT : ACT : ACT :
SPEC: SPEC: SPEC:
EP 80
ACT : 14.33 - 14.84 ACT : ACT :
3.5 20
18 10
17 13
65
12
50
20
8.5
Person
Sl No.
1
2
3
4
5
6
7
Person
Sl No.
1
2
3
4
5
6
7
8
Other Jobs
Sl No.
1
2
3
4
5
6
7
8
9
10
11
12
Jahangir
Activity List
Daily flash% report.
Product dimension check against OA (Non iso report).
Product dimension check sheet report.
Finished product inspection report (Destructive tests) record.
Random secondary visual inspection and record in register.
Jointing cut length giving and jointing rings sampling & random dimensional check
PH range check at hot feed extrusion line and record.
Subhrat
Activity List
Shift wise compound batch sample collection and testing of hardness, tensile and
compression set.
Mixing Parameter checklist record.
Compound batch clearance report.
Extrusion parameter check report.
Preform random inspection report.
Moulding Press parameter check & parameter check sheet record.
Online hardness check at moulding stage and finishing stage.
Product & preform weight check.
Other Jobs
Activity List
Peroxide cure O ing: Post cureing, seconday inspection
Compound trials and follow ups
Dimension check follow up - In special cases
Rm check and inspection record.
RM TC verification and filing.
RM Test report generation and record maintain.
1
2
3
4
5
6
7
Rm test tc and RM test data sheet
Compound- Batch and batch testing report
Daily inspection report hard copy with daily production details
Monthly FPIR
Daily TC
a.
b.
Daily Inspection report circulatiion
ISO Related
internal audit plan
monthly internal audit up to date
MRM meeting agenda
MRM meeting minutes
Training
Skill Matrix
Training need identification & Training schedule
Training report and training certificate
Monthly rejection analysis report
Risk assesment review and updation of risk level status and addition of newly identified risks
APPL test reports on every 6 month interval