Installation Guide
Issue 01
Date 2018-10-31
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: http://www.huawei.com
Email: support@huawei.com
Purpose
This document describes how to install and commission the power system.
Cabinet figures provided in this document are for reference only.
Intended Audience
This document is intended for:
Installation and commissioning engineers
Technical support engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Description
Indicates an imminently hazardous situation which, if not
avoided, will result in serious injury or death.
Indicates a potentially hazardous situation which, if not
avoided, could result in serious injury or death.
Indicates a potentially hazardous situation which, if not
avoided, may result in minor or moderate injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to
personal injury.
Calls attention to important information, best practices
and tips.
NOTE is used to address information not related to
personal injury, equipment damage, and environment
deterioration.
Change History
Changes between document issues are cumulative. The latest document issue contains all
updates made in previous issues.
Issue 01 (2018-10-31)
This issue is the first official release.
The SMU software version is V500R002C20.
Contents
10 Commissioning.......................................................................................................................... 39
10.1 Connecting the AC Power Supply ............................................................................................................................ 39
10.2 Setting the Display Language ................................................................................................................................... 40
10.3 Setting the Date and Time ......................................................................................................................................... 40
10.4 Setting Battery Parameters........................................................................................................................................ 40
10.5 Setting Communications Parameters ........................................................................................................................ 41
10.5.1 (Optional) Setting Parameters Before Using WebUI ............................................................................................. 41
10.5.2 Setting Parameters Before Using U2000-SPM ...................................................................................................... 48
10.5.3 (Optional) Setting Parameters Before Using NetEco ............................................................................................. 48
10.5.4 (Optional) Setting Parameters Before Using SNMP .............................................................................................. 50
10.6 Connecting the Battery Supply ................................................................................................................................. 51
10.7 Subsequent Operations ............................................................................................................................................. 52
1 Safety Precautions
Measure contact point voltage with a multimeter before handling a conductor surface or
terminal. Ensure that the contact point has no voltage or the voltage is within the
specified range.
When installing or removing power cables, ensure that the corresponding circuits are
disconnected to prevent electric arcs or sparks.
If AC input power cables need to be routed from the top, bend the cables in a U shape
outside the cabinet and then route them into the cabinet.
Performing maintenance or replacing components may interrupt power to the loads if
batteries are not connected or the battery reserve is insufficient. Ensure that the switches
for primary loads are in the ON position and do not turn off the battery switch and the
AC input switch at the same time.
Cables stored at subzero temperatures must be stored at room temperature for at least 24
hours before they are laid out.
Perform routine maintenance as described in this manual; replace faulty components at
the earliest.
After maintenance is completed, lock cabinet doors and seal cable holes to prevent
rodents from entering the cabinet.
AC and DC Power
The power system is powered by high-voltage power sources. Direct or indirect contact
(through damp objects) with high-voltage power sources may result in serious injury or
death.
Non-standard and improper operations may result in fire or electric shocks.
Before making electrical connections, turn off the protection switch on the upstream
device to cut the power supply.
Before connecting the AC power supply, ensure that electrical connections are complete.
Before connecting cables to loads or battery cables, check cable and terminal polarities
to prevent reverse connections.
ESD
To prevent electrostatic-sensitive components from being damaged by static from human
bodies, wear a grounded electrostatic discharge (ESD) wrist strap or ESD gloves when
touching circuit boards.
When holding a board, hold its edge without touching any components, especially chips.
Package boards with ESD packaging materials before storing or transporting them.
Liquid Prevention
Do not place the product in areas prone to water leakage, such as near air conditioner
vents, ventilation vents, or feeder windows of the equipment room.
Ensure that there is no condensation inside the product or equipment room.
Ensure that no liquid enters the product. Otherwise, short circuits will occur and may
result in serious injury or death.
If any liquid is detected inside the product, immediately disconnect the power supply and
contact the administrator.
Basic Requirements
Avoid skin contact with battery electrolyte. Before handling batteries, wear goggles,
rubber gloves, and protective clothing.
When handling a battery, ensure that its electrodes always point upward. Do not tilt or
overturn batteries.
Before installing or maintaining batteries, switch off the battery circuit breaker or
remove the battery fuse.
Install batteries in a dry, clean, and ventilated environment that is free from sources of
ignition. Do not expose batteries to sunlight or water.
Ensure that the load-bearing capacity of the floor in the installation area is sufficient.
Install additional supports if required.
Secure battery cables to the torque specified in the battery documentation. Loose
connections will result in excessive voltage drop or cause batteries to burn out in the case
of excessive current.
Ensure that battery cables do not come in contact with water.
High short circuit currents or electric shocks can cause equipment damage, personal injury, or
death.
To prevent short circuit or electric shock, disconnect the batteries before performing any
operation or maintenance.
Flammable Gas
Store lead-acid batteries in a place with good ventilation, and take fire safety precautions.
Battery Leakage
High temperatures may result in battery distortion, damage, and electrolyte overflow.
If the battery temperature is higher than 60°C, battery electrolyte may overflow. If the
electrolyte overflows, wear goggles, rubber gloves, and protective clothing and absorb the
leaking electrolyte using sodium bicarbonate (NaHCO3) or sodium carbonate (Na2CO3). Do
not transport or move batteries if there is an electrolyte leakage.
Battery Overdischarge
After connecting the batteries, remove the battery fuse or turn the battery circuit breaker OFF
and then power on the power system. This prevents battery overdischarge. After the power
system is on, replace the battery fuse or turn the battery circuit breaker ON.
Drilling Holes
Do not drill holes into a cabinet without permission. Incorrect drilling operations may affect
the electromagnetic shielding of the cabinet and damage cables inside. Metal shavings from
drilling may short-circuit boards inside the cabinet.
Before drilling holes into a cabinet, wear goggles and protective gloves. Remove cables
from inside the cabinet.
After drilling, clean up any metal shavings that have accumulated inside or outside the
cabinet.
2 Installation Preparations
25 4 16
16 4 16
6 1.5 16
Battery cable 100 16 35
NOTE
1. The size data in the table is the cable sizes applicable when the ambient temperature is 30°C (in air)
and only cables in a single loop are involved.
2. When the ambient temperature is not 30°C or cables in multiple loops are routed together, use cables
with larger cross-sectional areas if the cabling distance is long.
3. The battery cables should be able to resist a temperature of 90°C at least.
2.2 Tools
3 Installing a Cabinet
Procedure
Step 1 Turn over the top cover of the packing case and find the marking-off template on the cover
interior.
Step 2 Drill holes in the positions for four mounting holes on the marking-off template.
Step 3 Mark cabinet mounting holes based on the marking-off template.
----End
----End
For safety, a lifting rope for carrying a cabinet should be able to bear a weight that is more
than three times the maximum weight of the cabinet.
Procedure
Step 1 Remove screws from the holes for mounting lifting eyes.
Step 2 Install lifting eyes.
Step 3 Bind lifting ropes to the cabinet lifting eyes and hoist the cabinet to the target position.
To prevent scraping the cabinet coating, do not use metal lifting ropes such as steel ropes.
To avoid friction between the lifting ropes and the cabinet during hoisting, place protective materials
(such as paper and foamed plastics) where the ropes will contact the cabinet.
Step 4 Remove the lifting ropes and lifting eyes, and reinstall the screws in the holes for mounting
lifting eyes.
----End
Step 2 Place the flat washers, spring washers, and expansion bolts into the mounting holes of the
cabinet.
Step 3 Secure the expansion bolts.
Step 4 Remove triangular supports (if any) from the cabinet base, as shown in the following figure.
----End
Procedure
Step 1 Route a ground cable into the cabinet through the cable hole in the bottom left of the cabinet.
Ensure that the ground cable is installed securely. Inappropriate grounding may cause device
damage and even personal injury.
Step 2 Connect the ground cable from the cabinet ground bar to the site ground bar.
----End
5 Installing a Rectifier
Prerequisites
Rectifiers are intact after unpacking and check. In case of any discrepancy, contact your
local Huawei office.
The filler panels on the slot for installing the rectifiers have been removed from the
cabinet.
Rectifiers are installed from left to right.
Do not put your hands into rectifier slots, avoiding electric shocks.
When a rectifier is running, a high temperature is generated around the air exhaust vent at
the rear. Do not touch the vent or cover the vent with cables or other objects.
Procedure
Step 1 Push the locking latch leftwards.
Step 2 Pull the handle outwards.
Step 3 Gently insert a rectifier into its slot along guide rails.
Step 4 Push the handle upwards.
Step 5 Push the locking latch rightwards to lock the handle.
----End
Procedure
Step 1 Install an intelligent battery detector in the specified position.
----End
7 Installing Cables
Ensure that the upstream AC input circuit breaker is OFF, and attach labels such as "No
operations allowed."
Switch off all circuit breakers before installing cables.
----End
If Huawei BBU is deployed, connect a communications cable between the SMU and Huawei
BBU. The U2000-SPM and NetEco network management systems (NMSs) are supported.
Step 1 Connect one end of a network cable to the RS485/RS232 port on the SMU.
Step 2 Connect the other end of the cable to the MON1 port on Huawei BBU, as shown in Figure
7-2.
(1) RS485/RS232 port on the SMU (2) MON1 port on Huawei BBU
----End
----End
----End
----End
----End
----End
----End
Procedure
Step 1 Install batteries in the battery compartment from right to left.
Step 2 If there are multiple battery strings, repeat the preceding step to install the other battery
strings.
----End
Figure 8-2 Installing a ground cable for the intelligent battery detector
Step 2 Lay out the communications cable for the intelligent battery detector. Connect one end of the
cable to the Ethernet splitter, and the other end to the RS485 port on the intelligent battery
detector.
Figure 8-3 Installing a communications cable for the intelligent battery detector
Step 3 Lay out battery voltage detection cables. Connect one end of each cable to the intelligent
battery detector, and the other end to batteries.
Step 4 Install the DC input power cables for the intelligent battery detector.
1. Connect the PE cable to the cabinet ground bar.
2. Connect the negative cable to the DC output circuit breaker.
3. Connect the positive cable to the RTN+ busbar.
4. Connect the other end of the DC input power cables to the DC input port on the
intelligent battery detector.
Figure 8-5 Installing DC input power cables for the intelligent battery detector
Step 5 Install the protective cover for the intelligent battery detector.
----End
Step 4 Repeat the preceding steps to install copper bars between battery 2 and battery 3 and between
battery 1 and battery 2.
Step 5 If there are multiple battery strings, repeat the preceding steps to install copper bars between
the other batteries and reinstall insulation covers on all batteries.
----End
When installing battery cables, connect the negative cable before the positive cable.
Procedure
Step 1 Remove the insulation cover from battery 4.
Step 2 Take off the negative battery cable from the left side of the battery compartment and connect
the cable to the negative terminal on battery 4.
Step 3 Reinstall the insulation cover on battery 4.
Step 4 If there are multiple battery strings, repeat Step 1 to Step 3 to install negative battery cables
for the remaining battery strings.
Step 5 Remove the insulation cover from battery 1.
Step 6 Take off the positive battery cable from the right side of the battery compartment and connect
the cable to the positive terminal on battery 1.
Step 7 Reinstall the insulation cover on battery 1.
Step 8 If there are multiple battery strings, repeat Step 5 to Step 7 to install positive battery cables for
the remaining battery strings.
----End
10 Commissioning
Performing commissioning procedure provided in this chapter may result in power failure
or alarms. Inform the alarm center before commencing the procedure and after completing
the procedure.
Commissioning should be performed by trained personnel according to the commissioning
instructions provided in this chapter.
Commissioning is performed with the power on. Before you perform commissioning,
remove any conductors such as jewelry or watches, stand on dry insulating material, and
use insulated tools.
During commissioning, do not establish contact between electrical points that have
different electric currents.
Check that the status of a unit or component meets requirements before turning on its
switch.
If you are maintaining or servicing equipment and do not want others to perform any
operation, attach the label "Currently being serviced. Do not switch on." to the equipment.
During commissioning, shut down the power system immediately if any fault is detected.
Rectify the fault, start the power system, and proceed with the commissioning.
If an undesired language is selected, reinstall and restart the SMU and then select the desired language.
Setting Wizard Date and Time Time Zone UTC +08:00 Set to the local time zone.
NOTE Beijing
The date and time Date and Time - Set to the local date and time.
vary with time
zones. Set the NTP Enable No Yes/No
time zone, date,
and time based on NOTE
the local Set the parameter to Yes if you
situation. need to synchronize the SMU time
and the site network server time.
If battery routes 1 and 2 are respectively connected to a battery string (each battery string consists of
four 12 V, 150 Ah batteries in series), set Battery 1 Connected and Battery 2 Connected to Yes
and others to No, and set Single-String Cap. to 150 Ah.
If battery route 1 is connected to two battery strings in parallel (each battery string consists of four
12 V, 150 Ah batteries in series), set Battery 1 Connected to Yes and others to No, and set
Single-String Cap. to 300 Ah.
Internet Explorer is used as an example to illustrate all WebUI operations mentioned in this document.
Setting a LAN
If the SMU is connected to a LAN and a proxy server has been selected, cancel the proxy
server settings.
If the SMU is connected to the Internet but your computer is connected to a LAN, do not
cancel the proxy server settings. Otherwise, you cannot access the SMU.
Set Internet Explorer security before you perform the following operations:
Export historical logs, historical data, statistics, and battery test records.
Upload system configuration files.
Download system configuration files.
Upgrade software.
Second-Level Third-Level
Main Menu Menu Menu Default Value Settings
Setting Wizard Network IP Address 192.168.0.10 Set this
Parameters parameter
according to the
address
provided by the
network
administrator.
Subnet Mask 255.255.255.0 Set this
parameter
according to the
subnet mask
provided by the
network
Second-Level Third-Level
Main Menu Menu Menu Default Value Settings
administrator.
Default 192.168.0.1 Set this
Gateway parameter
according to the
gateway
address
provided by the
network
administrator.
NOTE
If the WiFi
module is
installed, do not
set the default
gateway to
192.168.8.1.
----End
Login Page
Enter https://local IP address for the SMU (for example, https://192.168.0.10) in the address
box of Internet Explorer and press Enter. The login page is displayed, as shown in Figure
10-9.
The preset user name is admin, and the preset password is Changeme.
If a Huawei BBU is deployed, set the Northbound and M/S Protocol parameters.
Procedure
Step 1 Set the port mode, communications protocol type, baud rate, and communications address on
the SMU's LCD.
----End
Step 3 Set the IP Addresses and Ports for the active and standby servers of the NetEco on the
SMU's LCD.
----End
----End
Before setting SNMP parameters, obtain the information listed in Table 10-8 from the NMS.
Information Description
SNMP version SNMP version and port number used by the SMU and NMS.
The SNMP versions include SNMPv1, SNMPv2c, and
SNMP Port Number SNMPv3.
Read Community Name If you use SNMPv1 or SNMPv2c, enter the read community
name and write community name that comply with the NMS.
Write Community Name Otherwise, the SMU will not connect to the NMS.
The read community name must be different from the write
community name.
User Name To enhance the security, you need a user name and password
for authentication if you use SNMPv3. After the authentication
MD5/SHA Password succeeds, the SMU can communicate with the NMS.
DES/AES Password
Trap Target Address IP address and port number reported in the alarm trap.
Information Description
Trap Port
Trap community If you use SNMPv1 or SNMPv2c, community name used for
reporting alarm trap packets.
Procedure
Step 1 Log in to the WebUI. For details, see 10.5.1 (Optional) Setting Parameters Before Using
WebUI.
Step 2 Access the System Settings page and set SNMP.
There are two or more NMSs and the SNMP versions have both SNMPv1 or SNMPv2c
and SNMPv3: Set SNMP Version to ALL in SNMP, and set SNMP Port Number,
Read Community Name, and Write Community Name. Then click Add in SNMPv3,
and set User Name, MD5/SHA Password, and DES/AES Password. Then click
Confirm.
SNMPv1 or SNMPv2c: Set SNMP Version to SNMPv1&SNMPv2c in SNMP, and set
SNMP Port Number, Read Community Name, and Write Community Name.
SNMPv3: Set SNMP Version to SNMPv3 in SNMP, click Add in SNMPv3, and set
User Name, MD5/SHA Password, and DES/AES Password. Then click Confirm.
Step 3 In SNMP Trap, click Add, set Trap Target Address and Trap Port and set Trap
community, and choose SNMP Version.
SNMP Version in this place can be different from the version in Step 2.
Step 4 In Mib files, click Export to export the Mib file and then import it into the NMS.
----End
Follow-up Procedure
You can query the power system operating status, active alarms, and the names of
user-defined dry contact inputs, and configure dry contact outputs on the NMS that is
connected over SNMP.
To avoid damage to batteries, switch on the battery circuit breakers only after you correctly
set battery parameters on the SMU.
Procedure
Step 1 Switch on the battery circuit breaker.
Step 2 Set the positions of all other circuit breakers based on site requirements.
Step 3 Observe the power system for 15 minutes. If no alarm (except the door status alarm) is
generated on the SMU's LCD during this period, the current and voltage for batteries and
loads are normal.
Before delivery, the battery switch is set to AUTO and the system is under automatic
control.
If AC input is unavailable during commissioning, open the panel and flip the battery
switch to the MANUAL position.
After the commissioning is complete, flip the battery switch back to the AUTO position.
----End
Step 4 Lock the cabinet door and hand over the key to the administrator.
Step 5 Ensure that the site is clean before you leave the site.
----End
B
BLVD battery low voltage disconnection
H
HTTPS Hypertext Transfer Protocol Secure
L
LCD liquid crystal display
LLVD load low voltage disconnection
R
RRU remote radio unit
S
SMU Site monitor unit
SNMP Simple Network Management Protocol
SSU solar supply unit
T
TCUC temperature control unit C
U
UIM user interface module