Plant - Sloc1 ---------> Stock - Sub set of Storage Location .
----------------------> component-1 ,2
Logical Transfer - Transfer Posting
Un restricted (Free to use ) ---------------------------------------------541----------------->Sub Contractor Stock type - (O) Quality ( not allowed for sale) Block
MB52 ( Material + Plant) Execute
MMBE single material
Physical Transfer - Stock Transfer
Transfer --------- Plant -1 to Plant-2 ( Within Company Code) ( Intra Company
Stock Transfer)
Plant-1 ( Sloc-1 -----> SLoc2) Stock Transfer
Company code-A Company Code -B ( Inter Company Stock Transfer )
Plant-A ------------- Plant-B
Material Master - View : Basic Data - Purchasing - Accounting
Level-
Client Level Data MARA
P.Org Level Data MARC
Plant Level Data-----------MARC ---------------------------------------where the
materials are valuated
Sloc Level Data --- qty
P.org --- Multiple Plant
Material Type - Function ----------------> Raw /Semi-Finished /Finished /Packaging / Trading / Service /Pipeline/ Number Range 1*** 2*** Layout ( Mandatory - Optional - Display - Hidden ) Price Control - S- Standard Price V- Moving average price ( Total value of stock/ Total Quantity )
Day 1 - 100 1 PC MAP= 100
Day 7 - 200 1 PC MAP = 150
MBEW - valuation Table .
Valuation Type S7 : Rs : 25000 S7 : Ref: Rs : 12000 Status 50K 20 USD Origin
Valuation Category-------- Multiple Valuation Type ( New , Old ).
Valuation Class -> Link Material with GL Account OBYC
PIR - 4 ME11 (PIR Creation Screen) Radio Button
Standard Sub-Contracting Consignment Pipeline (X)
PO Confirmation Control- Blank , 0004
PO - GR ( Blank) PO- IBD - GR ( 0004) Can be maintained in PIR