This document summarizes the work of improvements to the Karhawagaj Sonkasawadi Pandare Road from km 0.0 to 2.200. It was undertaken between October 30, 2017 to April 29, 2018. The summary includes 11 items of work related to excavation, preparation of embankment, construction of sub-base and laying of stone aggregates, modified penetration macadam and open graded premix surfacing. The quantities executed and rates are provided for comparison with the tender quantities and rates for each item.
This document summarizes the work of improvements to the Karhawagaj Sonkasawadi Pandare Road from km 0.0 to 2.200. It was undertaken between October 30, 2017 to April 29, 2018. The summary includes 11 items of work related to excavation, preparation of embankment, construction of sub-base and laying of stone aggregates, modified penetration macadam and open graded premix surfacing. The quantities executed and rates are provided for comparison with the tender quantities and rates for each item.
This document summarizes the work of improvements to the Karhawagaj Sonkasawadi Pandare Road from km 0.0 to 2.200. It was undertaken between October 30, 2017 to April 29, 2018. The summary includes 11 items of work related to excavation, preparation of embankment, construction of sub-base and laying of stone aggregates, modified penetration macadam and open graded premix surfacing. The quantities executed and rates are provided for comparison with the tender quantities and rates for each item.
This document summarizes the work of improvements to the Karhawagaj Sonkasawadi Pandare Road from km 0.0 to 2.200. It was undertaken between October 30, 2017 to April 29, 2018. The summary includes 11 items of work related to excavation, preparation of embankment, construction of sub-base and laying of stone aggregates, modified penetration macadam and open graded premix surfacing. The quantities executed and rates are provided for comparison with the tender quantities and rates for each item.
Name Of Work Improvements to Karhawagaj Sonkasawadi Pandare Road (ODR 183) km 0.0 to 2.
200 Tal-Baramati Dist-Pune
Agreement Ref No : B1/HQ/264/2017-18 Work ID : 2017_RDPUN_242291_15 30542043 Development and improvement of Village Agency : Proprietor , M/s.D.P. Jagtap and Company , Indapur Budget Head : Road Division : Executive Engineer Pune ZP (South) SubDivision : Baramati Time Limit : 30-10-2017 to 29-04-2018 Bill No : RA - 1st
Excess And Saving Statement
Execute Excess Saving
Ite Tender d m Description Quantit Rate Amount Amount Remark Quantit Quantit Quantit No y Amount Amount y y y
Item No. 1: Labour charges for removing grass thorney shurbs,
3,000.00 3,497.50 As per site 1 Jungli shurb Kubabul and alike grass along roadside making 14.70 44,100.00 51,413.25 497.500 7,313.25 0.000 0.00 0 0 Execution the ground clean by showel and phavaras etc. complete.
Item No.3: Excavation for roadway in hard murum including
dressing section to the required grade, camber and side slopes As per Box 3 and conveying the excavated materials with all lifts upto a 461.330 82.95 38,267.32 127.810 10,601.84 0.000 0.00 333.520 27,665.48 excavation. lead of 50m. and spreading for embankment or stacking as directed. By Mechanical Means. Spec : MORTH 301
Item No. 3: Preparing embankment with approved materials
obtained from the cutting within a lead of 50m. including laying in layers of 20cm to 30cm breaking clods, dressing to 4 392.130 99.75 39,114.97 127.810 12,749.05 0.000 0.00 264.320 26,365.92 the required lines, curves, grade, section, watering and compacting with vibratory roller with SCADA complete. Spec : MORTH 305
Item No.6: Construction of granular sub-base by providing
As per site close graded Material,spreding in uniform layers with motor Requirement grader on prepared surface,mixing by mix in place method 1,249.3 6 148.810 185,915.77 127.810 159,679.42 0.000 0.00 21.000 26,236.35 widening/GSB is with rotavator at OMC and compacting with vibratory roller to 5 executed Hence achieve the desired density complete as per clause 401 For saving grading 1 Material. Spec : MORTH 401 Item No.7: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the 1,634.5 7 382.800 625,686.60 384.750 628,873.88 1.950 3,187.27 0.000 0.00 A per execution interstices of coarse aggregate, watering and compacting with 0 Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. By Manual Means Grading I a) (Using Screening Crushable type such as Murum or Gravel) Spec : MORTH - 404
Item No.8: Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the 1,809.7 8 320.630 580,244.11 324.844 587,870.19 4.214 7,626.08 0.000 0.00 As per execution interstices of coarse aggregate, watering and compacting with 0 Intelligent Compactor with compaction analyzer and V-Sat attachment.to the required density. By Manual Means Grading II b) (Using Screening Type B (11.2 mm Aggregate) Spec : MORTH - 404
Item No.9: Providing and laying modified penetration
macadam surface50 millimeter thick including supplying all As pre Execution of materials spreading trap metal layers and key aggregate length/fanning at heating and spraying bitumen at the rate of 175Kg/100 sq.mt. 4,275.00 4,507.57 9 214.55 917,201.25 967,100.22 232.575 49,898.97 0.000 0.00 causeway Qty and compaction with power roller Excluding prime/tack coat 0 5 excess to some Using V30 grade Bulk(With prior permission of Superintending extent Engineer) Spec : As per MORTH specification Fifth Edition Clause No.507 and IRC-SP-97-2013
Item No.10: Providing and applying tack coat on the prepared
surface heating by fames in Boiler and spraying bitumen set 4,275.00 4,507.57 10 13.75 58,781.25 61,979.16 232.575 3,197.91 0.000 0.00 As per execution footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.VG-30 0 5 bulk bitumen Spec : M.O.R.T & H - 503
Item No.11: Open Graded Premix Surfacing- Providing and
Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction VG-30 Bitumen, including providing 4,275.00 4,507.57 11 145.00 763,087.50 653,598.38 232.575 33,723.38 0.000 109,489.13 and laying seal coat sealing voids in a bituminious surface laid 0 5 to the specified level and cross fall using Type‖A‖seal coat but excluding prime / tack coat. For Bitumen VG-30 bulk--USING drum mix type hot mix plant with SCADA Paver and Vibratory roller Spec : As per MORTH specification Fifth Edition Clause No.510
Item Description-Supplying hard murum/ kankar at the road
site, includin spreading and compacting for sidewidth layers on 1,057.88 12 554.40 586,488.67 721.300 399,888.72 0.000 0.00 336.580 186,599.95 each side with power roller including artificial watering etc. 0 complete. complete. Spec : MORTH 408 Road length is passing through Lokwasti- Item No.17: Providing and laying cement concrete pipe of I.S. Nalewasti.For 458:2003 NP-2 class of required diameter in proper line, level crossing towards 2,219.5 17 & slope including providing, fixing collars in cement mortar 20.000 44,391.00 75.000 166,466.25 55.000 122,075.25 0.000 0.00 the homes ,and 5 1:2, curing etc. complete. (b) 600 mm. Dia. Spec :CD.7 requirements of Page.No. 162 residing people,at many places parrallel crossings are executed
3,883,278.4 3,700,220.3 227,022.1 376,356.8
Total 4 6 0 3
(Bhikaji Kamble) (R. A. Kokane) (Surendrakumar Katkar)