Excess and Saving Statement

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Name Of Work Improvements to Karhawagaj Sonkasawadi Pandare Road (ODR 183) km 0.0 to 2.

200 Tal-Baramati Dist-Pune


Agreement Ref No : B1/HQ/264/2017-18 Work ID : 2017_RDPUN_242291_15
30542043 Development and improvement of Village
Agency : Proprietor , M/s.D.P. Jagtap and Company , Indapur Budget Head :
Road
Division : Executive Engineer Pune ZP (South) SubDivision : Baramati
Time Limit : 30-10-2017 to 29-04-2018 Bill No : RA - 1st

Excess And Saving Statement

Execute Excess Saving


Ite Tender
d
m Description Quantit Rate Amount Amount Remark
Quantit Quantit Quantit
No y Amount Amount
y y y

Item No. 1: Labour charges for removing grass thorney shurbs,


3,000.00 3,497.50 As per site
1 Jungli shurb Kubabul and alike grass along roadside making 14.70 44,100.00 51,413.25 497.500 7,313.25 0.000 0.00
0 0 Execution
the ground clean by showel and phavaras etc. complete.

Item No.3: Excavation for roadway in hard murum including


dressing section to the required grade, camber and side slopes
As per Box
3 and conveying the excavated materials with all lifts upto a 461.330 82.95 38,267.32 127.810 10,601.84 0.000 0.00 333.520 27,665.48
excavation.
lead of 50m. and spreading for embankment or stacking as
directed. By Mechanical Means. Spec : MORTH 301

Item No. 3: Preparing embankment with approved materials


obtained from the cutting within a lead of 50m. including
laying in layers of 20cm to 30cm breaking clods, dressing to
4 392.130 99.75 39,114.97 127.810 12,749.05 0.000 0.00 264.320 26,365.92
the required lines, curves, grade, section, watering and
compacting with vibratory roller with SCADA complete. Spec :
MORTH 305

Item No.6: Construction of granular sub-base by providing


As per site
close graded Material,spreding in uniform layers with motor
Requirement
grader on prepared surface,mixing by mix in place method 1,249.3
6 148.810 185,915.77 127.810 159,679.42 0.000 0.00 21.000 26,236.35 widening/GSB is
with rotavator at OMC and compacting with vibratory roller to 5
executed Hence
achieve the desired density complete as per clause 401 For
saving
grading 1 Material. Spec : MORTH 401
Item No.7: Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand
packing to proper grade and camber, applying and brooming
requisite type of screening/ binding Materials to fill up the 1,634.5
7 382.800 625,686.60 384.750 628,873.88 1.950 3,187.27 0.000 0.00 A per execution
interstices of coarse aggregate, watering and compacting with 0
Intelligent Compactor with compaction analyzer and V-Sat
attachment. to the required density. By Manual Means Grading
I a) (Using Screening Crushable type such as Murum or Gravel)
Spec : MORTH - 404

Item No.8: Providing, laying, spreading and compacting stone


aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand
packing to proper grade and camber, applying and brooming
requisite type of screening/ binding Materials to fill up the 1,809.7
8 320.630 580,244.11 324.844 587,870.19 4.214 7,626.08 0.000 0.00 As per execution
interstices of coarse aggregate, watering and compacting with 0
Intelligent Compactor with compaction analyzer and V-Sat
attachment.to the required density. By Manual Means Grading
II b) (Using Screening Type B (11.2 mm Aggregate) Spec :
MORTH - 404

Item No.9: Providing and laying modified penetration


macadam surface50 millimeter thick including supplying all
As pre Execution of
materials spreading trap metal layers and key aggregate
length/fanning at
heating and spraying bitumen at the rate of 175Kg/100 sq.mt. 4,275.00 4,507.57
9 214.55 917,201.25 967,100.22 232.575 49,898.97 0.000 0.00 causeway Qty
and compaction with power roller Excluding prime/tack coat 0 5
excess to some
Using V30 grade Bulk(With prior permission of Superintending
extent
Engineer) Spec : As per MORTH specification Fifth Edition
Clause No.507 and IRC-SP-97-2013

Item No.10: Providing and applying tack coat on the prepared


surface heating by fames in Boiler and spraying bitumen set 4,275.00 4,507.57
10 13.75 58,781.25 61,979.16 232.575 3,197.91 0.000 0.00 As per execution
footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.VG-30 0 5
bulk bitumen Spec : M.O.R.T & H - 503

Item No.11: Open Graded Premix Surfacing- Providing and


Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm
aggregates premixed with bituminous binder transported to
site with VTS , laid over a previously prepared surface, finished
to the required grade, level, alignment, and rolling to achieve
the desired compaction VG-30 Bitumen, including providing 4,275.00 4,507.57
11 145.00 763,087.50 653,598.38 232.575 33,723.38 0.000 109,489.13
and laying seal coat sealing voids in a bituminious surface laid 0 5
to the specified level and cross fall using Type‖A‖seal coat but
excluding prime / tack coat. For Bitumen VG-30 bulk--USING
drum mix type hot mix plant with SCADA Paver and Vibratory
roller Spec : As per MORTH specification Fifth Edition Clause
No.510

Item Description-Supplying hard murum/ kankar at the road


site, includin spreading and compacting for sidewidth layers on 1,057.88
12 554.40 586,488.67 721.300 399,888.72 0.000 0.00 336.580 186,599.95
each side with power roller including artificial watering etc. 0
complete. complete. Spec : MORTH 408
Road length is
passing through
Lokwasti-
Item No.17: Providing and laying cement concrete pipe of I.S. Nalewasti.For
458:2003 NP-2 class of required diameter in proper line, level crossing towards
2,219.5
17 & slope including providing, fixing collars in cement mortar 20.000 44,391.00 75.000 166,466.25 55.000 122,075.25 0.000 0.00 the homes ,and
5
1:2, curing etc. complete. (b) 600 mm. Dia. Spec :CD.7 requirements of
Page.No. 162 residing people,at
many places
parrallel crossings
are executed

3,883,278.4 3,700,220.3 227,022.1 376,356.8


Total
4 6 0 3

(Bhikaji Kamble) (R. A. Kokane) (Surendrakumar Katkar)


Sectional Engineer Deputy Engineer Executive Engineer
Zilla Parishad Subdivision Baramati Zilla Parishad Subdivision Baramati Zilla Parishad (South) Pune