AMDEC/121027/24/1/0/CV-060 H001-AMDC-CRM2-ENB-N-ARC-GAD-0001 Drawing

AMDEC/121027/24/1/0/CV-061 H001-AMDC-CRM2-ENB-N-ARC-GAD-0002 Drawing

AMDEC/121027/24/1/0/CV-062 H001-AMDC-CRM2-ENB-N-ARC-GAD-0003 Drawing

AMDEC/121027/24/1/0/CV-063 H001-AMDC-CRM2-ENB-N-ARC-GAD-0004 Drawing

AMDEC/121027/24/1/0/CV-064 H001-AMDC-CRM2-ENB-N-ARC-GAD-0005 Drawing

AMDEC/121027/24/1/0/CV-065 H001-AMDC-CRM2-ENB-N-ARC-GAD-0006 Drawing

AMDEC/121027/24/1/0/CV-066 H001-AMDC-CRM2-ENB-N-ARC-GAD-0007 Drawing

AMDEC/121027/24/1/0/CV-068 H001-AMDC-CRM2-ENB-N-CIV-PIL-0011 Drawing

AMDEC/121027/24/1/0/CV-069 H001-AMDC-CRM2-ENB-N-CIV-PIL-0012 Drawing

AMDEC/121027/24/1/0/CV-079 H001-AMDC-CRM2-ENB-N-CIV-SHD-0002 Drawing

AMDEC/121027/24/1/0/CV-112 H001-AMDC-CRM2-INB-N-CIV-PIL-0013 Drawing

AMDEC/121027/24/1/0/CV-113 H001-AMDC-CRM2-INB-N-CIV-PIL-0014 Drawing

AMDEC/121027/24/1/0/CV-114 H001-AMDC-CRM2-INB-N-CIV-PIL-0015 Drawing

AMDEC/121027/24/1/0/CV-115 H001-AMDC-CRM2-INB-N-CIV-BOQ-0019 Drawing

AMDEC/121027/24/1/0/CV-150 H001-AMDC-CRM2-EXB-N-ARC-GAD-0015 Drawing

AMDEC/121027/24/1/0/CV-151 H001-AMDC-CRM2-EXB-N-ARC-GAD-0016 Drawing

AMDEC/121027/24/1/0/CV-152 H001-AMDC-CRM2-EXB-N-ARC-GAD-0017 Drawing

AMDEC/121027/24/1/0/CV-153 H001-AMDC-CRM2-EXB-N-ARC-GAD-0018 Drawing

AMDEC/121027/24/1/0/CV-154 H001-AMDC-CRM2-EXB-N-ARC-GAD-0019 Drawing

AMDEC/121027/24/1/0/CV-155 H001-AMDC-CRM2-EXB-N-ARC-GAD-0020 Drawing

AMDEC/121027/24/1/0/CV-156 H001-AMDC-CRM2-EXB-N-ARC-GAD-0021 Drawing

AMDEC/121027/24/1/0/CV-157 H001-AMDC-CRM2-EXB-N-ARC-GAD-0022 Drawing

AMDEC/121027/24/1/0/CV-159 H001-AMDC-CRM2-EXB-N-CIV-PIL-0017 Drawing

AMDEC/121027/24/1/0/CV-160 H001-AMDC-CRM2-EXB-N-CIV-BOQ-0031 Drawing

AMDEC/121027/24/1/0/CV-161 H001-AMDC-CRM2-EXB-N-CIV-RCC-0017 Drawing

AMDEC/121027/24/1/0/CV-170 H001-AMDC-CRM2-EXB-N-CIV-RCC-0020 Drawing

AMDEC/121027/24/1/0/CV-290 H001-AMDC-CRM2-COM-N-CIV-PIL-0045 Drawing


AMDEC/121027/24/1/0/CV-315 H001-AMDC-CRM2-COM-N-CIV-PIL-0046 Drawing

AMDEC/121027/24/1/0/CV-376 H001-AMDC-CRM2-COM-N-CIV-PIL-0049 Drawing

AMDEC/121027/24/1/0/CV-400 H001-AMDC-CRM2-COM-N-CIV-PIL-0050 Drawing

AMDEC/121027/24/1/0/CV-420 H001-AMDC-CRM2-COM-N-CIV-PIL-0051 Drawing

AMDEC/121027/24/1/0/CV-440 H001-AMDC-CRM2-COM-N-CIV-PIL-0052 Drawing

AMDEC/AMNSI/121027/R/CV/24/081 H001-AMDC-CRM2-EXB-N-CIV-DECXXXX Document

AMDEC/AMNSI/121027/S/CV/24/162 H001-AMDC-CRM2-COM-N-ARC-TSP-0001 Document


ENTRY ECR-ARCHITECTURAL GA PLAN AT-2.0M P2

ENTRY ECR-ARCHITECTURAL GA PLAN AT+1.5M P2

ENTRY ECR-ARCHITECTURAL GA PLAN AT+7.3M P2

ENTRY ECR-ARCHITECTURAL GA PLAN AT+11.6M P2

ENTRY ECR-ARCHITECTURAL GA PLAN ATROOF LEVEL P2

ENTRY ECR-ARCHITECTURAL GA SECTIONS P2

ENTRY ECR-ARCHITECTURAL GA ELEVATIONS P2

ENTRY ECR-LAYOUT OF PILE CAP P1

ENTRY ECR-R.C DETAIL OF PILE CAP P0

ENTRY ECR-SHUTTERING PLAN AT -2.0 M LEVEL P1

INTERMEDIATE ECR - LAYOUT OF PILE P0

INTERMEDIATE ECR - LAYOUT OF PILE CAP P0

SHUTTERING & RCC DETAILS OF PILE CAP FOR INTERMEDIATE ECR P0

INTERMEDIATE ECR-BAR BENDING SCHEDULE PILECAP P0

EXIT ECR-ARCHITECTURAL GA PLAN AT-2.0M P0

EXIT ECR-ARCHITECTURAL GA PLAN AT+1.5M P0

EXIT ECR-ARCHITECTURAL GA PLAN AT+7.3M P0

EXIT ECR-ARCHITECTURAL GA PLAN AT+11.6M P0

EXIT ECR-ARCHITECTURAL GA PLAN AT ROOF LEVEL P0

EXIT ECR-ARCHITECTURAL GA SECTIONS P0

EXIT ECR-ARCHITECTURAL GA SECTIONS P0

EXIT ECR-ARCHITECTURAL GA ELEVATIONS P0

EXIT ECR-LAYOUT OF PILE CAP P0

BAR BENDING SCHEDULE FOR DRAWING NO. AMDEC/121027/24/1/0/CV-161 P0

EXIT ECR - R.C. DETAIL OF PILECAP P0

EXIT ECR-GA PLAN AT BASEMENT LEV. P0

ENTRY LOOPER AREA (AREA-3) - LAYOUT OF PILE P0


CLEANING AREA (AREA-4) - PILE LAYOUT P0

PILE LAYOUT - INTERMEDIATE LOOPER AREA (AREA-07) P0

LAYOUT OF PILE - TEMPER MILL AREA (AREA-08) P0

LAYOUT OF PILE - POST TREATMENT & EXIT LOOPER AREA (AREA-09) P1

CGL#4-BOP ENGINEERING EXIT SIDE PROCESS BAY (AREA-10)


P1
BETWEEN ROW L & M AND COL. 25 & 28 LAYOUT OF PILE

PILE & PILE CAP DESIGN REPORT DOCUMENT FOR ENTRY BAY (G-H
P0
BAY; AXIS 01 TO 13)

Technical Specification for Architectural works P0


24-09-2021 121027_AMNS_CV_DG_0052 - Under approval

24-09-2021 121027_AMNS_CV_DG_0052 - Under approval

24-09-2021 121027_AMNS_CV_DG_0052 - Under approval

24-09-2021 121027_AMNS_CV_DG_0052 - Under approval

24-09-2021 121027_AMNS_CV_DG_0052 - Under approval

24-09-2021 121027_AMNS_CV_DG_0052 - Under approval

24-09-2021 121027_AMNS_CV_DG_0052 - Under approval

31-08-2021 121027_AMNS_CV_DG_0035 04-09-2021 Commented

30-07-2021 121027_AMNS_CV_DG_0017 21-08-2021 commented

31-08-2021 121027_AMNS_CV_DG_0035 04-09-2021 Commented

29-09-2021 121027_AMNS_CV_DG_0057 01-10-2021 commented

29-09-2021 121027_AMNS_CV_DG_0057 01-10-2021 commented

29-09-2021 121027_AMNS_CV_DG_0058 - under approval

29-09-2021 121027_AMNS_CV_DG_0058 - under approval

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

29-09-2021 121027_AMNS_CV_DG_0057 01-10-2021 commented

29-09-2021 121027_AMNS_CV_DG_0057 01-10-2021 commented

28-08-2021 121027_AMNS_CV_DG_0032 06-09-2021 commented

13-09-2021 121027_AMNS_CV_DG_0041 01-10-2021 commented


18-09-2021 121027_AMNS_CV_DG_0047 01-10-2021 commented

29-09-2021 121027_AMNS_CV_DG_0058 - under approval

30-09-2021 121027_AMNS_CV_DG_0060 - under approval

30-09-2021 121027_AMNS_CV_DG_0060 - under approval

29-09-2021 121027_AMNS_CV_DG_0054 - under approval

14-09-2021 121027_AMNS_CV_DG_0043 - under approval

04-10-2021 121027_AMNS_CV_DG_0061 - under approval