1. The Bahile to Oyster Bay Access Road project in MIMAROPA aims to improve access to a military base and sustain economic mobility, but may negatively impact fishermen's livelihoods and use of Oyster Bay.
2. The Apayao - Ilocos Norte Road project in CAR aims to boost tourism but is prone to natural disasters that could endanger lives.
3. The New Cebu International Container Port project in Central Visayas aims to provide more efficient transport infrastructure but could favor international goods over domestic products.
4. The Pasig-Marikina River
1. The Bahile to Oyster Bay Access Road project in MIMAROPA aims to improve access to a military base and sustain economic mobility, but may negatively impact fishermen's livelihoods and use of Oyster Bay.
2. The Apayao - Ilocos Norte Road project in CAR aims to boost tourism but is prone to natural disasters that could endanger lives.
3. The New Cebu International Container Port project in Central Visayas aims to provide more efficient transport infrastructure but could favor international goods over domestic products.
4. The Pasig-Marikina River
1. The Bahile to Oyster Bay Access Road project in MIMAROPA aims to improve access to a military base and sustain economic mobility, but may negatively impact fishermen's livelihoods and use of Oyster Bay.
2. The Apayao - Ilocos Norte Road project in CAR aims to boost tourism but is prone to natural disasters that could endanger lives.
3. The New Cebu International Container Port project in Central Visayas aims to provide more efficient transport infrastructure but could favor international goods over domestic products.
4. The Pasig-Marikina River
In your own observation, how far have the Philippines gone toward
achieving the goals of the national EST strategy?
Ans.
In my own observation, The Philippines today is in outdated towards
achieving the goals of the national EST strategy. Why? It is because some of us still ride on jeepneys, buses, public utility vehicle (PUV) or tricycle. And we all know that they produce greenhouse gases, are ineffective, and are unsafe. Because the Philippine public transportation market is currently characterized by a large number of on-street competing operators for jeepneys, buses, PUVs, and tricycles. This might lead in an inefficient supply of low-quality public transportation, as well as dangerous and congested traffic. It's due to a lack of effective institutions and planning procedures, as well as a lack of enforcement and financial incentives for operators. It could result in.
• A bus market that is underdeveloped, consisting of old, used coach buses
that do not meet demand, particularly for metropolitan mass-transit demands. • Negative externalities: high CO2 emissions, severe air pollution, road safety concerns, lost time, and so on. Fill in the following table, list 5 projects listed in the Build Build Build Portal (http:/www.build.gov.ph/) and offer at least 2 positive and negative community impacts.
Name of Manning Allocated Impact to the Community
Project and Agency Budget Location Positive Negative 1.Bahile to Department of 496,495,000.00 1.Is linking to the 1.Fishermen lose their Oyster Bay Public Works area of military base fishing grounds when Access Road and Highways which will help our more ships begin to is located at soldiers in use Oyster Bay. MIMAROPA transporting goods 2. The restriction for - Mindoro and ease of access to some fishermen using Marinduque their Camp. of Oyster Bay. Romblon 2.This road project Palawan will sustain the area's economic mobility in transporting its agricultural products to nearby municipalities.
2. Apayao - Department of 3,670,000,000.00 1.Visitors take time 1.It is prone to
Ilocos Norte Public Works to breathe in fresh air landslide and floods Road is and Highways at the Ilocos Norte- that may lead to located at Apayao road view injuries or death. CAR - deck. 2.It will damage the Cordillera 2. It is a promising natural habitats of Administrativ tourism destination. animal as well as the e Region habitat of indigenous people.
3. New Cebu Department of 5,439,507.00 1.Aims to free up the 1.Filipino use
International Transportatio existing seaport in the favorably or buy Container n province and provide international product Port a more efficient and rather than our own (Consultancy reliable transport country product. Services) is infrastructure for the 2. International located at unimpeded flow of country will develop Region VII - goods and services in while our country will Central the Visayas. not prosper. Visayas 2. Fast transport of products from other country. 4. Pasig- Department of 7,545,000,000.00 1.Flood Mitigation 1.It will be more Marikina Public Works for Pasig-Marikina floods because there’s River Channel and Highways River Basin. no trees to block the Improvement 2.To lessen the water. Project, Phase damage cause by 2.There’s a possibility III (JICA PH- natural disaster to enter or water in P252) is specifically floods. the river if there are located at open spaces. National Capital Region
5. NLEX - Department of 7,545,000,000.00 1.Reduce travel time 1.Some of residential
SLEX Public Works from SLEX to NLEX areas will be Connector and Highways from 2 hours to just demolish. Road is 20 minutes 2.Some of animals located at 2.Decongest Metro may lost their natural Central Luzon Manila traffic. habitats.