Professional Documents
Culture Documents
Kertajati Industrial Estate Majalengka
Kertajati Industrial Estate Majalengka
ESTATE MAJALENGKA
KERTAJATI INDUSTRIAL ESTATE
C I T Y MAJALENGKA
city of Bandung, the capital of West Java province. Strategically placed around the growing area of West Java,
Kertajati
accessibility Kertajati service is guaranteed by the highway and railway connecting Bandung, Kertajati, and
Industrial
Cirebon, and toll road Cileunyi - Sumedang - Dawuan (Cisumdawu) to connect Bandung and Kertajati; Cikopo toll
Estate
Majalengka road - palimanan (Cipali) connecting Kertajati Industrial Estate Majalengka ( KIEM); and also a direct link to the
port of Cirebon.
Majalengka Kertajati overall service is built on an area of 1,800 ha and its construction is divided into three stages. Currently
K E R T A J A T I
new development completed ditahap terminal 1A with an area of 96 200 square meters. As for the ultimate
airport terminal brings the concept of peacocks have reached 209 500 sq m.
Since it was established last May by President Joko Widodo (Jokowi), and officially put into operation in June
2018, now Kertajati new service has one runway or runway 2,500 meters. This runway will increase to 3,500
meters in order to accommodate wide-body aircraft such as the Airbus A380-800. Ditahap end of this airport will
have two runways.
With such capacity could Kertajati Airport serves 5.6 million passengers per year and will be able to
accommodate 18 million passenger traffic in the next year. Seeing the growing needs of the community
interested in the air-based transportation, the airport with an investment of Rp 2.6 Trillion This certainly could
guarantee meeting the needs of air travel in the future.
Airport owner's three-letter code KJT, beginning this operation is targeted to open 14 domestic and international
routes. Including pilgrimage flight service could be felt from the airport pride of West Java at the end of this year.
The high mobility of people will automatically take the movement of goods. This service also provides cargo at
the beginning of the operation in which the initial operation of the 0,004 million tons of one could be
served. While the overall cargo in BIJB will be expanded to reach 1.5 million tons by the year 2045.
The air seemed Kertajati Airport Area Area Check-In Hall
Residentia
IK l Area
Warehous
M
e Toll Gate
Landfills Kertajati
Industrial Area
Industrial
Area Industrial Area
Industrial Area
WTP
Business Center
Business Center
Lake
Soho Residential
Food Court
F A C I L I T Y
Office Residential
Office Soho
RAPBN Indonesia 2019 West Java + DKI Jakarta + Banten Population Number
2.439,7 T Regional Income
DKI Jakarta Rp. 3.900.000
Indonesia 267 m
Java 150,4 m
RAPBD Jawa Barat 2019 Karawang Rp. 3.913.078
37,05 T Cilegon Rp. 4.230.000
West Java
Dki Jakarta 84.630 m
RAPBD DKI 2019 Bandung Rp. 1.791.636 Banten
89,08 T Majalengka Rp. 3.339.580
RAPBD Banten 2019
-
12,31 T
J A V A
ELECTRICITY
W A T E R
PLN Indonesia
Ø Electric substation (Special
agreement with PLN)
WATER GAS
PDAM Indonesia PGN Indonesia
E lec tric ity is an important inf ras truc ture in s upporting ec onomic
growth, enc ouraging inves tment, and indus trial equity, whic h has a
f urther impac t on the c reation of employment and regional
ec onomies .
T he s tability of elec tric ity s upply is the k ey to the growth of the
modern indus try whic h will s pur improvement in the national
ec onomy.
K IE M has been a pioneer in the c ons truc tion of elec tric s ubs tations
in indus trial es tates in K ertajati c los e to the elec tric ity load c enter in
indus trial es tates . S o it is very s trategic and ef f ec tive in s erving
c us tomer needs . In addition to s upplying indus trial areas , the
pres enc e of 2 0 0 MVA s ubs tations will later s trengthen the J ava-B ali
elec tric ity s ys tem by adding the elec tric power c apac ity s ent.
JAKARTA
A C C E S S
HALIM
Patimban
Seaport
157
km
KARAWANG 2 Ho
u rs Planned toll road
Kertajati
International Airport
I N L A N D
KERTAJATI
Km 157
Exit toll
30 km
25 min
s
WALINI CIREBON
m
50 k
E A S Y
BANDUNG Cileunyi 40 m
in s
TEGAL LUAR
Cutting Embankment TOTAL
19.2 km 25.58 km 142.3 km
(13.49%) (16.57%) (100%)
Est. Time
Tunnel Elevated
45 Mins
16.82 km 82.7 km
(11.82%) (58.12%)