Professional Documents
Culture Documents
The Weaever Carpet Company Wearever Carpet Com...
The Weaever Carpet Company Wearever Carpet Com...
The Weaever Carpet Company Wearever Carpet Com...
× ★★★★★ GE T APP
4,500+ five-star reviews
Home Study tools My courses My books My folder Career Life
answers...
Expert Answer
Ramjakhar
answered this
Decision variables: Let x1, x2 be the number (in 100 yard lots) of shag and scultured carpets to be
produced.
di+, di- be the positive and begative deviation variables for i-th goal.
(b) Solution of the model using LINDO is following (in LINDO model, positive and negative deviation
variables are written as dip (for di+) and din (for di-) respectively)
Optimal solution:
x1 = 40
x2 = 30
d1+ = 20
d3- = 20
0 Comments
0
Practice with similar questions
The Wearever Carpet Company manufactures two brands of carpet-shag and sculptured-in 100- yard
lots. It requires 8 hours to produce one lot of shag carpet and 6 hours to produce one lot of sculptured
carpet. The company has the following production goals, in prioritized order: (1) Do not underutilize
production capacity, which is 480 hours. (2) Achieve product demand of 40 (100-yard...
See answer
The Wearever Carpet Company manufactures two brands of carpet-shag and sculptured-in 100-yard
lots. It requires 8 hours to produce one lot of shag carpet and 6 hours to produce one lot of sculptured
carpet. The company has the following production goals, in prioritized order (1) Do not underutilize
production capacity, which is 480 hours. (2) Achieve product demand of 40 (100-yard...
See answer
Show more
The Wearever Carpet Company manufactures two brands of carpets-shag and sculptured-in 100 yard
lots. It requires 8 hours to produce one lot o shag carpet and 6 hours to produce one lot of sculpture
carpet. The company has the following production goals, in prioritized order: 1) Do Not underutilize
production capacity, which is 480 hours. 2) Achieve product demand for shag is more...
See answer
10/The Wearever Carpet Company manufactures two brands of carpet-shag and sculpt red-in 100-yard
lots. It requires 8 hours to produce one lot of shag carpet and 6 hours to produce one lo of sculptured
carpet. The company has the following production goals, in prioritized order (1) Do not underutilize
production capacity, which is 480 hours. (2) Achieve product demand of 40 (100-yard...
See answer
Show more
COMPANY
CHEGG NETWORK
CUSTOMER SERVICE