Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Road Development Authority

Programme / Progress

EE Division :- Kalutara CE's Division :- Kalutara


Name of the road : PD's Division :- Western Province
Name of the road Technical Officer :- Chainage From :-
Name of Work Supervisor :-
For the Month of

Expected vehicles to be deployed Expected machineris to be


Chainage Expected no of labour days to be deployed Expected materials to be used
Unit of (No of days) deployed (No of hours) Total
Expected
Description Measurme LHS/RHS Amount
Qty
nt (Rs)
Amount Amount Machine Amount Materia Amount
From to SK Rate S/Sk Rate USK Rate Lorries Rate Days Rate Hours Rate Qty
(Rs) (Rs) ries (Rs) l (Rs)

Routine Maintenance

01 Patching pot holes Cum

Minor Scale Crack


02 Sealing of AC Sqm
overlaying
Vegetation control –
03 Sqm
Road side Maintenance
Clearing vegitation
along boundaries ,
04 Lm
fences,embankments
and etc.

Cutting overhanging No. of


05
Branches trees

Clearing Vegitataion of
abutment/wingwalls of
06 Bridges and silt Lm
deposited on Road
surface of Bridge
Shoulder Maintenance
07 (Filling Scoured Areas) / Cum
re-gravelling
Clearing drains, gullies,
08 Lm
manholes
Replacement of Cover
09 Nos
Slabs
10 Cutting scupper drains Lm

11 Clearing of Culverts No.

Cleaning lead away


12 Lm
Channels
Clearing Bridge water
13 Lm
way
14 Painting Bridges Sqm

Painting Culverts and


15 parapet walls & Culvert Sqm
numbering

16 Gravelling earth road Sqm

Minor repairs to Bridges


17 No
& Culverts

Cleaning Sign board &


18 Direction Board & No
Minor repairs
Painting & numbering
19 KM posts including No
minor repairs
Clearing of silt of road
side (sweeping) - Two
20 Lm
Lane

Clearing of silt of road


side (sweeping) - Four
21 Lm
Lane

22 Edge Correction Sqm

23 Fixing sign boards No

Lane Marking & Edge


24 Sqm
Marking

Road Marking
25 Sqm
(Pedestrian crossing)

26 Painting Kerbs Sqm

Painting Pedestrian
27 Lm
Guard rail

Removal of minor earth


28 Cum
slips

Shoulder repair-
29 Sqm
regravelling

30 reducing high sides Sqm

31 Footwalk repair Sqm

32 Cutting side drains Lm


33 Retaining wall repair Sqm

34 Culvert repair Sqm

35 Minor Bridge repair


Sqm

Kilometer post and


36
guard stone repair
Sqm
Kilometer post and
37 guard stone
replacement
Nos
Maintenance of Street
38 Lights (Replacement of
Strret light )
Nos

You might also like