Download as pdf or txt
Download as pdf or txt
You are on page 1of 104

GOVERNMENT

BUILDING
KEMENTERIAN
SUMBER MANUSIA

THE EVERLY
HOTEL ALAMANDA
SHOPPING CENTRE
SHAFTBURY
MALL

PPAM JINTAN

APARTMENT
SADERI
Source: Garis Panduan Perancangan Tempat Letak Kenderaan
(TLK) Putrajaya
POSITIVE AND NEGATIVE VIEW
VIEW FROM STREET TO THE SITE
SOUND AND SMELL
LE CORDON BLEU INSTITUTE
LOCATION : PETALING JAYA
CATEGORY : BANDAR SUNWAY, MALAYSIA
FLOOR AREA :2000SQM
COMPLETED YEAR AROUND 2015
LOCATION : BANDAR SUNWAY, MALAYSIA

• LE CORDON BLEU IS A WORLD RENOWNED NETWORK OF EDUCATIONAL


INSTITUTIONS DEDICATED TO PROVIDING THE HIGHEST LEVEL OF
CULINARY AND HOSPITALITY INSTRUCTION THROUGH WORLD-CLASS
PROGRAMMERS.
• FOUNDED IN PARIS IN 1895, TODAY LE CORDON BLEU HAS A PRESENCE PARKING RESTAURANTS TRANSIT ATTRACTIONS HOTELS
IN SOME 20 COUNTRIES WITH MORE THAN 40 INTERNATIONAL
SCHOOLS ATTENDED BY 20,000 STUDENTS ANNUALLY LEARNING LE CORDON BLEU MALAYSIA IS LOCATED IN THE HEART OF BANDAR SUNWAY, A
FACILITIES VIBRANT RESORT LIVING TOWNSHIP DESIGNED AROUND A CLUSTER OF
PRESTIGIOUS EDUCATIONAL INSTITUTIONS.
PROGRAMMES
LE CORDON BLEU OFFER A WIDE RANGE OF CULINARY
ARTS, WINE, MANAGEMENT AND HOSPITALITY
PROGRAMS.

1. CUISINE
BLENDED
LEARNING • CUISINE COURSES OFFER THE MOST COMPREHENSIVE
TEACHER LED SMALL E-LEARNING
GROUP INSTRUCTION TRAINING

PROJECTS
• TEACHERS NECESSARY SKILLS TO CREATE FINE
COLLABORATI INDIVIDUAL CUISINE DISHES
ON TEAM LEARNING
• PROVIDES PRACTICAL SESSIONS, DEMONSTRATIONS
WORK
AND THEORY LESSONS
1-DEMONSTRATION & PRACTICAL
2-ONE-ON-ONE COACHING THROUGH LMS
3-VIRTUAL CLASSROOM
4-ASSESSMENT
5-WEBINARS
6-WORKSHOPS/PROJECTS
7-SELF STUDY & RESEARCH
PRACTICAL

CLASSES WORKSHOPS
2-PASTRY & CONFECTIONERY 4-GOURMET & SHORT COURSES

3-BAKERY, DANISH PASTRIES & ARTISAN


BREADS
CLASSROOM FACILITIES
FACILITIES AND SPACES •LECTURE THEATRES WITH
DEMONSTRATION AREAS AND
AUDIO-VISUAL TECHNOLOGY
• PASTRY KITCHENS
• CEILING-MOUNTED DEMONSTRATION
• CUISINE KITCHEN
MIRRORS
• DEMONSTRATION ROOMS
• LARGE OPEN-PLAN EVENTS AREA
• PRODUCTION KITCHENS
•INTERACTIVE SMART BOARD
• PRACTICE RESTAURANT
TECHNOLOGY
• WINE CLASSROOM

PRACTICAL FACILITIES CAMPUS FACILITIES


•ON-SITE CAFÉ, FOOD COURT WITH ASIAN
• SELF-CONTAINED WORK STATIONS WITH HOT
TO WESTERN CUISINES
ADMISSION ,STUDENT SERVICES AND COUNSELLING RECEPTION AREA PLATE AND GAS RANGE, INDIVIDUAL CHILLERS
• STUDENT LIBRARY WITH FACE
AND PREPARATION AREA FOR EACH STUDENT
RECOGNITION CAPABILITY FEATURING ALL
• DIGITAL SOUS-VIDE WATER BATHS
CATEGORY OF LEARNING MATERIALS, SOFT
• SMOKER & DEHYDRATOR
SKILLS TRAINING MATERIALS, CULINARY,
• MULTI-ZONE CONVECTION OVENS
AND HOSPITALITY MANAGEMENT BOOKS
• FULLY EQUIPPED BAKERY KITCHENS WITH
• STUDENT AREA EQUIPPED WITH
RETARDER/PROOFERS AND STONE BASED DECK
MICROWAVE, IRON, & FRIDGE QUIET STUDY
OVENS
AREA AND COMPUTER ACCESS
•VENTILATED CEILINGS
• GYMNASIUM & INTERNATIONAL STUDENT
• TEMPERATURE AND HUMIDITY CONTROLLED
LOUNGE
KITCHENS
CUISINE DEMO ROOM

CUISINE PRACTICE KITCHEN


PASTRY PRACTICE KITCHEN
PRACTICE RESTAURANT

• THE INTERIOR SPACES ARE PROVIDED WITH


ALL IMPORTANT INSTRUMENT NEEDED
DURING TEACHING CLASS. THE PASTRY
KITCHEN IS SEPARATED FROM BAKERY AND
OTHER COOKING SPACES.

• RESTAURANTS ARE PROVIDED IN ORDER


BAKERY PRACTICE KITCHEN FOR THE STUDENTS TO PRACTICE AND GET
ADAPTED TO THE ENVIRONMENT.

• DIFFERENT COOKING SPACE TEACHES THE


STUDENT WITH DIFFERENT ABILITY OF
LEARNING CERTAIN TECHNIQUES AND
PRACTICAL SKILLS.

THEORY ROOM
TYPE OF ROOMS FUNCTIONS ADJACENT SPACES
TEACHING STUDENTS OF WASHROOM, STORAGE
CLASSROOM VARIOUS COURSES

STORAGE TO STORE FOOD CLASSROOM


PRODUCTS
TO SPENT FREE TIME KITCHEN STATION AND
CCC AND RELAX AFTER THE FIRE EXIT
EATING AREA
CLASS
TO SERVE THE DISHES KITCHEN STATION
PRACTICE TO CUSTOMERS
RESTAURANT

WASHROOM FOR PERSONAL KITCHEN

Theory room EMERGENCY USE STATION,LEARNING


ROOM
FOR SAFE MEANS OF LEARNING ROOM AND
FIRE EXIT ESCAPE DURING TEACHER’S ROOM
EMERGENCY EVENT LIKE
FIRE.
KITCHEN TO LEARN COOKING PRACTICE RESTAURANT,
SEATING AREA

MECHANICAL ROOM FOR ELECTRIC AND SEATING AREA


WATER APPLIANCES

PERSONAL SPACE RELAXING AREA FOR KITCHEN STATION


FOR CHEFS CHEFS AFTER WORK

• THE KITCHEN IS IN MIDDLE OF THE FLOOR IN ORDER


TO BE ACCESSIBLE FROM BOTH THE ENDS OF THE
FLOOR
• CLASSROOM IS AT THE CORNER IN ORDER TO BE
AWAY FROM CHAOTIC NOISE GOING AROUND THE
KITCHEN
• SEATING AREAS AND PERSONAL SPACES ARE BESIDE
KITCHEN IN ORDER TO BE EASILY ACCESSIBLE FOR
USERS
• STORAGE IS PLACED AT THE CORNER WITH HUGE
SPACE IN ORDER TO IGNORE ANY KIND OF CHAOS OR
COLLISION IN THE MIDDLE OF THE FLOOR
• RESTAURANTS IS PLACED IN THE RIGHT END OF THE
KITCHEN CLASSROOM PRACTICE RESTAURANT BUILDING WITH AESTHETIC VIEW IN ORDER FOR THE
CUSTOMERS TO ENJOY AND HAVE COMFORT ZONE
STAIRCASE KITCHEN PRACTICE RESTAURANT

MATERIALS USED FOR BUILDING

Theory room

SECTION

STAIRCASE
PRACTICE RESTAURANT

REFLECTIVE GLASS ALUMINIUM SHUTTERS

FRONT ELEVATION
STRENGTH

• HAVE THE NECESSARY COURSES PROVIDED FOR LEARNING


THE PRACTICAL SKILLS
• CONTAINS ALL THE IMPORTANT SPACES NEED FOR LEANING
THE PRACTICAL SKILLS OF COOKING

LACKING
• HAVE LIMITED NUMBER OF SPACES
• THE SPACES ARE TO CROWDED
• COULD HAVE PROVIDED MODERN INTERIOR DESIGN SKILLS
• LESS SUSTAINABLE ENERGY STRATEGY
• THE INTERIOR DESIGN IS BORING AND DULL
• ARCHITECTS: C.F. MØLLER
• AREA: 4700 M²
• YEAR: 2014
• PHOTOGRAPHS: MARTÍN SCHUBERT
•LANDSCAPE ARCHITECT: C.F. MØLLER ARCHITECTS
• ENGINEER: COWI
• CLIENT: HERNINGSHOLM VOCATIONAL SCHOOL
• CITY: HERNING
• COUNTRY: DENMARK

THE VOCATIONAL SCHOOL IS DESIGNED


INSIDE-OUT - WITH A FOCUS ON THE CREATION OF
OPTIMAL AND PRACTICAL LEARNING AND STUDY
ENVIRONMENTS - AS WELL AS OUT-SIDE-IN, IN
RELATION TO THE SURROUNDING CONTEXT WHERE
WELCOMING URBAN SPACES PROVIDE
POSSIBILITIES FOR OUTDOOR WORK AND
TEACHING.
HERNINGSHOLM MUSEUM VETERINARY CLINIC RECYCLING SHOPPING MARKET GYM CENTER

HERNINGSHOLM UNIVERSITY RESTAURANTS RESIDENTIAL AREA PARKING AREA


NORTH

ELEMENTS RADIATE OUT FROM A CENTRE ORGANIZATION

SOUTH
HORIZONTAL SOLAR SCREEN

THE BUILDING IS AN ANGULAR LAYOUT THAT BRINGS


TOGETHER THREE BUILDING VOLUMES UNDER A
SLOPING ROOF, WHICH IN SCALE RESPONDS TO THE
SURROUNDINGS BY DROPPING FROM THREE FLOORS
FURTHEST SOUTH TO TWO FLOORS IN THE FAR NORTH.
THE ANGULAR BUILDING CREATES THREE NEW
OUTDOOR URBAN AND LEARNING SPACES IN
CONJUNCTION WITH THE NEIGHBOURING BUILDINGS:
THE PLAZA, THE STUDY GARDEN AND A FRONT
GARDEN. THE BUILDING IS A WEDGE-SHAPED
STRUCTURE CONSISTING OF THREE SEPARATE
VERTICAL SOLAR SCREEN
BLOCKS UNDER A SLOPING ROOF. IN TERMS OF
TRANSPARENT NORTH VACADE
SCALE, THIS CONTRASTS WITH THE SURROUNDINGS
AND DIMINISHES FROM THREE STOREYS FURTHEST TO • VERTICAL SOLAR SCREEN IS ON EAST AND WEST
FACADES WHICH PROTECTS FROM LOW SOLAR VERTICAL
THE SOUTH, TO TWO STOREYS ON THE
CIRCULATION
NORTHERNMOST FLANK. ANGLES • DECENTRALIZED
ACCESS
• HORIZONTAL SOLAR SCREEN IS ON SOUTH FAÇADE • ACCESS FROM
THAT GIVES PROTECTION FROM HIGH SOLAR ANGLES GARDENS
AND REFLECTION OF LIGHT. HORIZONTAL
CIRCULATION
• TRANSPARENT NORTH ACCESS OPENS THE BUILDING • MAIN STAIRS
TOWARDS THE GARDENS STARTING FROM
THE MAIN ACCESS

HORIZONTAL CIRCULATION
ANALYSE OF FUNCTIONS INSIDE THE BUILDING ANALYSE OF OPEN PLAZA
INNOVATIVE CLASSROOMS THE COMMERCIAL COLLEGE HAS AN INNOVATIVE THE PLAZA BECOMES AN IMPORTANT DESTINATION THAT BRINGS TOGETHER
INTERIOR – WITH FOCUS ON CREATING OPTIMUM LEARNING SPACES AND STUDY THE SURROUNDING INSTITUTIONS AND USERS. THE PLAZA INCORPORATES
ENVIRONMENTS – AND EXTERIOR IN RELATION TO THE SURROUNDING CONTEXT, GREENERY IN THE FORM OF TWO LARGE CRACKS IN THE POURED CONCRETE;
WHERE ATTRACTIVE AND WELCOMING SPACES PROVIDE EXCELLENT MERGING THE URBAN SCALE WITH THE HUMAN SCALE. IN DRY WEATHER, THE
OPPORTUNITIES FOR WORKING AND TEACHING OUTDOORS. TRIANGULATED DEPRESSIONS OFFER SEATING IN THE GREEN. DURING
RAINFALL, THE RECESSES ACT AS NATURAL INFILTRATION AND RETENTION
BASINS TO RELIEVE THE SEWERS.
TYPE OF ROOMS FUNCTIONS ADJACENT SPACES

GROUND FLOOR TEACHING STUDENTS


OF VARIOUS COURSES
LEARNING ROOMS
LEARNING ROOM

PLAY GROUND TO HAVE SOME STUDIO CAFE


PHYSICAL ACTIVITIES
GAMES
TO SPENT LEISURE TIME LEARNING
STUDIO CAFE AND SOCIALIZE WITH ROOM,WORKSHOP,WASH
EACH OTHER OR RELAX ROOM, MECHANICAL
ROOM
TO DO PRACTICAL WORK WASHROOM ,STUDIO
WORKSHOP CAFE

WASHROOM FOR PERSONAL STUDIO CAFÉ,


OPEN PLAZA EMERGENCY USE WASHROOM
FOR SAFE MEANS OF LEARNING ROOM
FIRE EXIT ESCAPE DURING
EMERGENCY EVENT LIKE
FIRE.

OPEN GARDEN MAIN ENTRANCE THE PASSAGE THROUGH LEARNING ROOM


WHICH USERS CAN
MAIN ENTRANCE ENTER THE MAIN
BUILDING AREA
MAIN STAIRCASE THAT LEADS THE USERS GROUP ROOM
AREA FROM ONE FLOOR TO
THE OTHER FLOOR
GROUP ROOM0 AN OPEN DISCUSSION WORKSHOP, MAIN
FOR EVENT OR STAIRCASE AREA
ASSIGNMENTS
PREPARATION ROOM TO HAVE SOME FIRE EXIT, WASHROOM
PHYSICAL ACTIVITIES
GAMES
TO THE WEST, AROUND EXISTING TREES, A QUIET GREEN GARDEN SPACE CALLED
STUDY GARDEN IS FORMED, FOR LEARNING, REFLECTION AND CONTEMPLATION;
WHILE TO THE SOUTH A MORE SEMI-PUBLIC SPACE FRONT GARDEN IS ESTABLISHED
WITH DIRECT ACCESS FROM THE CLASSROOMS ON THE GROUND FLOOR. 

• ALL THE LEARNING ROOMS ARE ATTACHED AT SIDE OF THE BUILDING THAT
PROVIDES HIGHEST POSSIBILITY OF DAYLIGHT PENETRATION
• STUDIO CAFES ARE SITUATED IN MIDDLE OF FLOOR PLAN IN ORDER TO GIVE
FLEXIBLE USE AND ENTRANCE FROM EVERY OF THE BUILDING
• THREE FIRE EXITS ARE PROVIDED AT EVERY CORNER OF THE BUILDING IN ORDER
TO GIVE FASTER USAGE WHEN IN NEED OF EMERGENCY
• THE MAIN ENTRANCE IS SITUATED IN AN PLACE TO GIVE THE USER MULTIPLE
STUDIO CAFE MAIN STAIR CASE AREA PLAY GROUND OPTIONS TO CHOOSE FOR USAGE OF ANY PURPOSE.
FIRST FLOOR TYPE OF ROOMS FUNCTIONS ADJACENT SPACES
TEACHING STUDENTS OF LEARNING ROOMS, FIRE
LEARNING ROOM VARIOUS COURSES EXIT

PREPARATION ROOM TO HAVE SOME FIRE EXIT, WASHROOM


PHYSICAL ACTIVITIES
GAMES
TO SPENT LEISURE TIME WASHROOM,WORKSHOP,
STUDIO CAFE AND SOCIALIZE WITH MECHANICAL ROOM
EACH OTHER OR RELAX
TO DO PRACTICAL WORK WASHROOM, STUDIO
WORKSHOP CAFÉ

WASHROOM FOR PERSONAL WORKSHOP,STUDIO CAFÉ


EMERGENCY USE

FOR SAFE MEANS OF LEARNING ROOMS


FIRE EXIT ESCAPE DURING
EMERGENCY EVENT LIKE
FIRE.
GROUP ROOM AN OPEN DISCUSSION STUDIO CAFÉ, MAIN
FOR EVENT OR STAIRCASE AREA
ASSIGNMENTS

• ALL THE LEARNING ROOMS ARE ATTACHED AT SIDE OF THE BUILDING THAT
PROVIDES HIGHEST POSSIBILITY OF DAYLIGHT PENETRATION
• STUDIO CAFES ARE SITUATED IN MIDDLE OF FLOOR PLAN IN ORDER TO GIVE
FLEXIBLE USE AND ENTRANCE FROM EVERY OF THE BUILDING
• THREE FIRE EXITS ARE PROVIDED AT EVERY CORNER OF THE BUILDING IN ORDER
TO GIVE FASTER USAGE WHEN IN NEED OF EMERGENCY
• MAIN STAIRCASE AREA IS SITUATED IN THE MIDDLE OF THE BUILDING ACTS LIKE A
MULTIPURPOSE SYSTEM WHICH GIVES THE USER TO SIT OR HOLD ANY MEETING
PUBLICLY.

LEARNING ROOM MAIN STAIRE CASE CORRIDOR LEARNING ROOM STUDIO CAFE
AREA
SECOND FLOOR TYPE OF ROOMS FUNCTIONS ADJACENT SPACES
TEACHING STUDENTS OF LEARNING ROOMS,FIRE
LEARNING ROOM VARIOUS COURSES EXIT,TEACHER’S ROOM

PREPARATION ROOM TO HAVE SOME LEARNING ROOM


PHYSICAL ACTIVITIES
GAMES
TO SPENT LEISURE TIME IN MIDDLE OF FLOOR
STUDIO CAFE AND SOCIALIZE WITH (LEARNING ROOM,
EACH OTHER OR RELAX TEACHER’S ROOM,
WORKSHOP, WASHROOM)
TO DO PRACTICAL WORK BESIDE PRINTING ROOM
WORKSHOP

WASHROOM FOR PERSONAL BESIDE MECHANICAL


EMERGENCY USE ROOMS

FOR SAFE MEANS OF LEARNING ROOM AND


FIRE EXIT ESCAPE DURING TEACHER’S ROOM
EMERGENCY EVENT LIKE
FIRE.
TEACHERS ROOM FOR PERSONAL USE LIKE FIRE EXIT,LEARNING
RELAXING, DISCUSSION ROOM AND TEACHER’S
WITH COLLEAGUES FOR ROOM
TEACHERS.
PRINTING ROOM FOR PRINTING WORKSHOP AND
PURPOSES LEARNING ROOM
• THE PERSONAL SPACES FOR LECTURERS ARE PLACED ON THE SECOND FLOOR TO
HAVE SOME PERSONAL SPACE.IT IS SITUATED CLOSE TO THE LEARNING ROOM AND
STUDIO CAFES FOR EASY ACCESSIBLE FOR THE USER
• PRINTER AND WORKSHOPS ARE PLACED IN THE MIDDLE SO THAT USERS FROM
LEARNING ROOM AREA CAN EASILY GET ACCESS THROUGH IT
c • MORE THAN HALF OF THE ROOMS ARE EXPOSED TOWARDS THE TRANSPARENT
GLASS USED IN BUILDING IN ORDER FOR THE FULL PENETRATION OF DAYLIGHT

LEARNING AREA

LEARNING AREA
• THE FACADES ARE DIFFERENTIATED BY
ORIENTATION

• THE FEATURE REVEALS THAT PROVIDE SHADING


FOR THE FACADE ARCHITECTURE, USING MASSIVE
PREFABRICATED FIBRE CEMENT FACADE PANELS
IN COMBINATION WITH TALL, BRONZE-ANODIZED
WEST ELEVATION PERFORATED ALUMINIUM SHUTTERS WHICH ADD
WARMTH AND VARIATION TO THE COMPOSITION.

• THE FACADES WERE GIVEN IN ORDER TO GIVE MORE


VIBRANT COLOUR OF EXPRESSION AND LIGHTENING

EAST ELEVATION

NORTH ELEVATION

PREFABRICATED LOW E WINDOW


FIBRE CEMENT GLASSES
SOUTH ELEVATION FACADE PANELS
LEARNING ROOM
LEARNING ROOM GROUP ROOM
STUDIO CAFE
PREPARATION LEARNING ROOM
ROOM

WORKSHOP STUDIO CAFE

WORKSHOP

PREPARATION ROOM
STUDIO CAFE
LEARNING ROOM
STUDIO CAFE LEARNING ROOM

WORKSHOP
MAIN STAIR CASE
AREA PLAY GROUND

LEARNING ROOM

PREPARATION ROOM
VENT STRIP BETWEEN
SOLAR SCREENS DAYLIGHT SPACES
• SOUTH – FACING • THE USAGE OF • GIVES BETTER THERMAL
NATURAL
HAS OVERHANG FINS REFLECT AMOUNT OF EFFECT
COMMON AREA VENTILATION RAINWATER
SHADES FACADES DAYLIGHT INTO DAYLIGHT • DOUBLE AND
• USE OF • IMPROVES RESERVOIR
• USE OF THE LEARNING • INTERIOR SPACES TRIPLE
RECREATIONAL COMFORTN • IMPROVES
PERFORATED AREAS, GET LIT FROM HEIGHT
FURNITURE ESS BIODIVERSITY
SHUTTERS TO ALLOWING LESS DIFFERENT ANGLES ATRIUM
• GOOD AMOUNT AROUND • WATER CAN BE
SCREEN OFF SUN USE OF DUE TO SUFFICIENT ENABLES
OF SPACES FOR THE RECYCLED AND
• USE OF PLANT AS ARTIFICIAL ENTRANCE OF NATURAL
COLLABORATIO SPACES USED FO VARIOUS
SHADING DEVICE DAYLIGHT DAYLIGHT THROUGH VENTILATION
N • REDUCES PURPOSES
THE BUILDING STRATEGY
ENERGY
LOAD

SECTION
LOW E NATURAL HYBRID
LOW ENERGY VENTILATION GREEN ROOF
WINDOWS DAYLIGHT VENTILATION
CONSTRUCTION • BALANCES • COOLS BY
• ALLOWS • THE • IMPROVES
• LESS HEAT LOSS MECHANICAL EVAPORATION
LESS HEAT WINDOWS COMFORTNE VISUAL
• HIGH VENTILATION ON • REDUCES
LOSS ALLOW SS AROUND COMFORT
INSULATIONS DEMAND DRAIN LOADS
• CONTROLS SKYLIGHT THE SPACES • ALLOWS
IMPROVES • LOW ENERGY • INSULATES
PASSIVE DEEP • REDUCES VISIBILITY OF
THERMAL CONSUMPTION AND REDUCES
ENERGY INSIDE ENERGY INDOOR
COMFORT ANDS • HIGH DEGREE OF COOLING
GAIN BUILDING LOAD ACTIVITY
ENERGY LOSS HEAT RECOVERY LOADS

• THE HERNINGSHOLM BUILDING PROVIDES OPPORTUNITY FOR THE USERS TO


HAVE AN OPEN AND COMFORTABLE ZONE. THE ARCHITECT HAVE MADE SURE
TO APPLY GREAT DEAL OF SUSTAINABLE DESIGN IN THE BUILDING . SUCH
SUSTAINABLE DESIGN PROVIDES THE OPPORTUNITY TO SAVE ENERGY AS
MUCH AS IT IS POSSIBLE STARTING FROM LIGHTNING, VENTILATION OR
WATER.THE LEARNING CENTERS ARE EXPOSED WITH FACADES IN ORDER TO
ALLOW MAXIMUM DAYLIGHT

•  NATURAL LIGHT FILLS THE SCHOOL THROUGH CAREFULLY ORIENTED


GLAZED FACADES OPTIMIZED FOR ENERGY EFFICIENCY. IN A NOD TO
ENVIRONMENTAL SUSTAINABILITY, TWO DEPRESSED POCKETS OF GREENERY
IN THE PLAZA OFFER SEATING IN THE DRY WEATHER BUT DOUBLE AS
NATURAL INFILTRATION AND RETENTION BASINS TO RELIEVE THE SEWERS
DURING RAINFALL.
• ALLOWS WALKING ACTIVITIES AROUND THE • ALL THE LEARNING ROOMS ARE PROVIDED WITH
BUILDING HUGE VIEW OUTSIDE PROVIDING A COMFORT
• THE COLOR USED IN INTERIOR DESIGN ARE SIMPLE ZONE FOR THE USER WHICH BENEFITS THEM
AND STANDARD THAT ALLOWS USERS TO FEEL MENTALLY TO CONCENTRATE IN WORK
COMFORT AND SOCIALIZE WITH THE ENVIRONMENT

• AS PART OF SUSTAINABLE DESIGN, STORM WATER


RESERVOIR HAS BEEN CREATED IN ORDER TO MAKE
THE USAGE OF THE WATER IN GREEN LAND OR OTHER • PHYSICAL ACTIVITIES IN PLAYGROUND CAN
• THE ARENA WHICH IS THE PART OF STAIRS
PURPOSES THAT GETS STORED IN RESERVOIR.   OFFERS MORE SPACE AND ACTIVITY AS PROVIDE GREAT EFFECTS ON THEIR BODY
• IN DRY WEATHER, THE TRIANGULATED DEPRESSIONS WELL AS PRODUCTIVITY FOR USERS AND BRAIN
OFFER SEATING IN THE GREEN. DURING RAINFALL,
• THE ARENA ALSO AS PART OF STANDARD
THE RECESSES ACT AS NATURAL INFILTRATION AND
INTERIOR SPACE DESIGN WHICH IS
RETENTION BASINS TO RELIEVE THE SEWERS.. AESTHETICALLY PLEASING
SUMMARY

STRENGTH LACKING OR WEAKNESS

• AS MUCH IT WAS POSSIBLE THE ARCHITECT TRIED TO APPLIED THE


• TOO MUCH EXPOSURE TO THE SURROUNDINGS REDUCES THE
SUSTAINABLE DESIGN STRATEGIES
PRIVACY.
• MADE PROPER USE OF DAYLIGHT FOR THE LEARNING SPACES
• THE FORM COULD HAVE BEEN MORE INTERESTING
• IT HAD FREE FLOW OF SPACES FROM EVERY ANGLES
• COULD HAVE MORE FLOORS FOR MORE SPACES FOR STUDENTS
• THE CONSTRUCTION OF OPEN PLAZA AND GARDEN CREATES AN
• COULD HAVE MADE THE SPACE MORE INTERESTING AND OPEN
AESTHETIC VIEW FOR THE SPACES INSIDE THE BUILDING
• COULD HAVE UTILIZED THE OPEN PLAZA OR GARDEN FOR
• THE SPACES ARE WELL CONNECTED TO EACH OTHER
LEARNING SPACE.
• THE INTERIOR DESIGN OF THE SPACES PLAYED A GREAT BY
• CONSIDERATION FOR DISABLE PEOPLE SHOULD HAVE BEEN
KEEPING IT SIMPLE AND MODERN STYLE
APPLIED
• THE USE OF MATERIALS LIKE LOW E WINDOWS AND
PREFABRICATED CEMENT PANELS IS ONE OF THE EXCELLENT
CHOICE TO BUILD THE DESIGN
Embelgasse Vocational School for Administration
- ARCHITECTS: ALLESWIRDGUT ARCHITEKTUR
- AREA: 5820 M²
- CONSTRUCTION YEAR: 2015
- MANUFACTURERS: FUNDERMAX
- LOCATION: AUSTRIA - WIEN
- PROJECT YEAR: 2011

THE DESIGN CONCEPT OF THE BUILDING IS STRIKING THE CONNECTION BETWEEN


OUTSIDE AND INSIDE ENVIRONMENT WITH THE MAXIMUM TRANSPARENCY AND
OPENNESS THAT COULD BE ACHIEVED. THE EXTERIOR FAÇADE WAS DESIGNED TO
FOLLOW A SIMPLE PERPENDICULAR GRID FORMED OF A MIXTURE BETWEEN SHADING
DEVICES, WINDOWS AND GLASS PANELS.
> LOCATION ANALYSIS

DUE TO THIS LOCATION ALSO THE


DESIGNER FACED A CHALLENGE
IN DESIGN AS THE BUILDING IT
LOCATED BETWEEN TWO
BUILDINGS – SKIN TO SKIN –
WHICH ALSO GAVE HIM
INSPIRATION TO USE THE
MODERN DESIGN TO MAKE A
CONTRAST WITH THE
SURROUNDING CLASSIC
BUILDINGS,

- THE BUILDING IS LOCATED WITHIN A RESIDENTIAL BUILDING


AREA MIXED WITH GREEN AREA
- THE ONLY THING THAT SURROUNDS THE NEW SCHOOL
BUILDING IN EMBELGASSE IN VIENNA'S 5TH DISTRICT IS THE
CIRCUMFERENCE OF THE BLOCK AND SOME PUBLIC AREAS
LIKE MOSQUE AND SOME COMMERCIAL SHOPS.

SURROUNDINGS:-

AS SHOWN IN GRAPH, VIENNA CLIMATE MARKED BY WARMNESS, MARKET MOSQUE CAFE RESTAURANT
PRECIPITATION & MUGGY FOR MOST TIME OF YEAR AND THESE FACTORS
PLAYED THE MAIN ROLE IN FAÇADE DESIGN AND MATERIALS CHOICE. THIS HELPED IN FACILTATING IN DESTRICT CIRCULATION.
> BUILDING FORM

TRANSPARENT ADMINISTRATION!
MATERIALS USED:-
DESIGN KEY :- 
DEMONSTRATES CLOSENESS TO CITIZENS, OPENNESS,
1. 3 LAYERS REFLECTIVE GLASS PANELS
AND TRANSPARENCE.
2. ALUMINIUM
3. ALUMINIUM CLADDING SHEETS
- DUE TO VIENNA’S CLIMATE OBSERVATION
4. PRECAST CONCRETE UNITS
- SINCE IT IS LOCATED BETWEEN TWO BUILDINGS
SO THE DESIGNER PREFERRED TO MAKE IT
TRANSPARENT AS POSSIBLE.

THANKS TO THE LARGE REFLECTIVE GLASS SURFACE


USED FOR THE MAIN FAÇADE AND THE DOUBLE FLOOR
LOBBY 🡪 BOTH HELPED IN CONNECTION THE INSIDE
ENVIRONMENT WITH OUTSIDE AND REFLECT THE
SURROUNDING ENVIRONMENT (SKY & STREETS)
SHOWING THE BUILDING TO BE TRANSPARENT .
> ANALYSIS OF INTERIOR SPACES ORGANIZATION

BETWEEN THE STANDARD ORGANIZATION PATTERNS THE DESIGNER CHOSE THE PERPENDICULAR
GRID PATTERN TO FOLLOW IN INTERIOR SPACES ORGANIZATION TO MAXIMIZE THE USABLE SPACES
AND PROVIDE THE NEEDED CALM AND INSPIRE ENVIRONMENT FOR USERS.
ALTHOUGH, HE USE THE ACUTE ANGLE TO ACHIEVE THE MAXIMUM USE OF THE EXTERIOR GREEN AREA
VIEW.

WITH THIS SPACES ORGANIZATION, THE DESIGNER HELPED IN PROMOTING

1. INSPIRING OPEN AREAS 2. OPEN DESIGNING STUDIOS 3. PRESENTATION OF FINAL

4. STUDY IMPROVMENTS 5. GROUP WORKING & DESIGN 6. TEAM WORKING


> ELEVATIONS

REFLECTIVE GLASS PANELS TO REFLECT THE


SURROUNDING ENVIRONMENT LIKE SKIES AND
BUILDINGS.

REFLECTIVE GLASS PANELS TO REFLECT THE


SURROUNDING ENVIRONMENT LIKE SKIES AND
BUILDINGS.
MAIN ELEVATION IS SHOWING THE PRACTICAL EFFECT OF REFLECTIVE GLASS FAÇADE AND DOUBLE HEIGHT GROUND FLOOR LOBBY SO WHEREVER
YOU ARE STANDING EITHER YOU SEE A REFLECTION OF SURROUNDING ENVIRONMENT OR DIRECTLY SEEING THE OPPOSITE VIEW OF BUILDING.

REFLECTIVE GLASS PANELS WITH ALUMINIUM


FRAMES TO REFLECT THE SURROUNDING
ENVIRONMENT LIKE SKIES AND BUILDINGS.

THE BACK ELEVATION OF BUILDING IS SHOWING THE SUN SHADES USED AND THE 360 PANORAMA TERRACE CREATED BY THE DESIGNER
> SECTIONS

IN THIS SECTION IT SHOWING HOW THE DOUBLE HEIGHT


GROUND FLOOR LOBBY HELPED MAKING THE BUILDING
MORE TRANSPARENT AND OPEN TO OUTSIDE.
BESIDE, IT SHOWING HOW THE DESIGNER CREATED A
DIRECT WAY BETWEEN ENTRANCE, RECEPTION AND THE
OPEEN TERRACE AREA.

SECONDARY SECTION IS SHOWING BOTH THE METHOD OF


NATURAL LIGHT USED FOR UNDERGROUND FLOOR BY USING
ELEVATED LARGE WINDOWS (CLERESTORY CONCEPT ) AND
THE OUTSIDE 360 PANORAMA TERRACE LOCATED IN THE
SECOND FLOOR.
> GROUND FLOOR PLAN ANALYSIS

ROOM TYPE FUNCTION ADJACENT


ROOMS

THIS AREA WAS FIRE STAIRS,


CREATED TO CONFERENCE
GREEN OPEN PROVIDE THE BEST ROOM,
STUDY AREA INSPIRING BASKETBALL
ENVIRONMENT PLAYGROUND
THIS ROOM IS CONFERENCE
USED FOR GUESTS ROOM,
WAITING & CANDIDATES RECEPTION
ROOM WAITING &
MEETING
THIS PLAYGROUND FIRE
WOULD BE THE STAIRCASE,
BASKETBALL MAIN AREA FOR RECEPTION.
PLAYGROUND PLAY AND
ENTERTAINMENT
THIS ROOM IS WAITING ROOM
USED FOR
CONFERENCE PRESENTATIONS
ROOM AND
CONFERENCES
FOR AUDIENCES.
ROOM TYPE FUNCTION ADJACENT
> FIRST FLOOR PLAN ANALYSIS ROOMS

THIS AREA WAS LECTURE


CREATED TO ROOM, LIFTS,
GROUPS PROVIDE PROPER STAIRS
MEETING SPACE FOR
ROOM GROUP
DISCUSSIONS &
WORK
THIS ROOM IS LECTURE
USED FOR ROOMS,
COMPUTER STUDENTS TO USE TOILETS
LAB COMPUTER &
Softwares courses
THIS AREA MAINLY FIRE
USED FOR STAIRCASE,
OPEN WAITING FOR LECTURE
SEATING COURSES & ROOMS,
AREA LECTURES START COMPUTER
LABS, MEETING
ROOM
THIS ROOM IS COMPUTER
USED FOR LAB, MEETING
LECTURE LECTURES AND ROOM, WAITING
ROOMS COURSES AREA.
THESE ROOMS MEETING ROOM,
WERE USED FOR WAITING AREA
NOTE DESIGN DISCUSSIONS AND
STUDIOS DESIGNS
THE ARCHITECT DESIGN SHOWED THAT STARTING FROM FIRST FLOOR THE CREATED AREAS PREPARATIONS
WILL BE MOSTLY SEMI-PRIVATE SPACES SUCH AS COMPUTER LABS, STUDY ROOMS, LECTURE GROUND FLOOR FIRST FLOOR
ROOMS, MEETING ROOMS. IT BE EASLY OBSERVED WHEN COMPARING THE GROUND FLOOR
SPACES WITH THE REST OF BUILDING. - SMALL GUEST TOILETS - LARGER TOILETS
- NO SERVICE ROOMS - MEP SERVICE ROOM, LIFT
- MULTI USE SPACES - ONE FUNCTIONAL ROOMS
> SECOND FLOOR PLAN ANALYSIS
ROOM TYPE FUNCTION ADJACENT
ROOMS

THIS AREA WAS FIRE STAIRS,


CREATED TO TERRACE,
GROUP PROVIDE A PROPER SERVICES
DISCUSSION SPACE FOR
ROOMS DISCUSSIONS AND
DEBATES
THIS SPACE IS FIRE
DESIGNED TO HAVE STAIRCASE,
TERRACE AN ACCESSIBLE GROUP
OPEN AREA DISCUSSION
ROOMS.
THIS SPACES CAN FIRE
BE USED FOR SOLO STAIRCASE,
CALM STUDY OR GROUP
SEATING & READING OR DISCUSSION
WAITING WAITING OR RELAX ROOMS,
AREA
- STUDENTS AND TEACHERS ALSO USE A SUNNY
TERRACE ON THE SECOND UPPER FLOOR AS A
COMPLEMENT OF THE GREEN INNER
COURTYARD—AN OUTDOOR SPACE IS THUS CLOSE
AND ACCESSIBLE AT ANY TIME. 
> CONCLUSION
TRANSPARENT ADMINISTRATION!

CONCEPT DESCRIPTION CAN BE ONE WORD OR A


SHORT SENTENCE BUT TO CREATE AN
IMPRESSIVE DESIGN THERE IS MORE TO TAKE IN
CONSIDERATION FOR BEST RESULTS,

IN MY OPINION;
THE DESIGNER CREATED A GOOD CONNECTION
BETWEEN INNER & OUTER ENVIRONMENTS. I LIKE
HIS CHOICE OF MODERN FACADES AND DESIGN
TO MAKE A CONTRAST WITH THE SURROUNDING
OLD DESIGNED BUILDINGS.

ALTHOUGH,
I THINK IT WOULD BE BETTER IF HE HAD
PROVIDED MORE OPENINGS IN THE HIGHER
FLOORS INSTEAD OF ENCLOSED TYPICAL FLOOR
PLANS, TO HELP IN VENTILATION AND
LIGHTNING.

BESIDE,
I WOULD PREFER IF HE DESIGNED AN ICONIC
ROOF OR AT LEAST DIFFERENT IN SHAPE SO IT
MAKE IT EASIER FOR PEOPLE TO FIND IT WITHIN
THIS DISTRICT THROUGH VARIOUS METHODS.
DIMENSION OF SEATING POSITIONS
DIMENSION OF PARKING
DIMENSION OF ARENA

DIMENSION OF STAIRS AND CORRIDOR


DIMENSION OF WORKSTATION
DIMENSION OF RAMPS
DIMENSION OF ESCALATOR
DIMENSION OF ESCALATOR

You might also like