REF - NO.PSE/P 2603-1 List: HBL Power Systems LTD
REF - NO.PSE/P 2603-1 List: HBL Power Systems LTD
JOB NO : TP-07-3-2603-1
QUANTITY : 1 No.
JOB NO : TP-07-3-2603-1
QUANTITY : 1 No.
SYSTEM CONFIGURATION
Both the chargers are connected to input feeder connected to the ON/OFF MCCB through
input change over switch with ON/OFF Switch + Fuse +Contactor + TOV. The charger
consists of three-phase full wave full controlled thyristor bridge with fast acting
semiconductor fuses.
On the DC side, both chargers are provided with out put ON/OFF Switch + Fuse. Battery is
made parallel during normal condition to both the chargers. A battery to load contactor (K3)
is provided to operate both the chargers parallel.
All the alarms are annunciated by HBL make WINDOW Annunciator with associated Alarm
ACK, Reset and Test push buttons provided on the front panel with audible hooters. One
pair of potential free summary contact terminals is provided in each charger for common
fault.
FCBC is provided with two positions Auto/Manual (SW6) and Mode select switches (SW7)
whose positions are as follows
HBL Power Systems Ltd.
REF. NO. PSE/P86828
REV:1, DT: 20.02.08
SHEET 2 OF 2
If Auto/Manual switch is selected in AUTO position the charger automatically turns into Float
or Boost modes depending on the battery conditions. In this position the functioning of Mode
select switches will be disabled.
OPERATION
1) NORMAL CONDITION:
Under normal conditions the contactor K3 is in ON. Condition, it is assumed that the battery
is fully charged. Both float charger and boost charger will operate in parallel, sharing the
load and also keep the battery on float or fed by running by one charger.
In case main’s failure the battery will take over the load through battery to load contactor.
On resumption of the mains, both the chargers will supply the load and float charges the
battery. Depending on the condition of the battery FCBC goes to boost mode automatically
and come back to Float mode automatically if the AUTO/MANUAL switch is in AUTO
position. If the switch is in MANUAL mode, BOOST mode need to be selected manually.
During FCBC in boost mode load to battery contactor is in OFF position.
The FCBC returns back to float and supplies to load and trickle charge the battery. The
momentary supply is supplied through tapcell diode
FC which is supply load will trickle charge the battery through K3 contactor.
HBL Power Systems Ltd.
REF. NO. PSE/P87828
REV:1, DT: 20.02.08
SHEET: 1 OF 3
RECTIFIER DIVISION
TECHNICAL SPECIFICATION
JOB NO : TP-07-3-2603-1
QUANTITY : 1 No.
6. Output Voltage Regulation: ±1% of set voltage for ±10% input variations, and
0-100% load variations
9. Switchgear:
10. Protection:
a) Surge suppressors
b) Soft start
c) Total current limit
d) Control circuit & voltmeter fuses
e) Rectifier protection fuses
f) I/p phase failure
g) I/P voltage Unbalance protection
11. Digital Meters (48X96 mm, Acc 1.0%) 1) AC input Voltmeter (0-500V)
2) DC output Voltmeter (0-400V)
3) DC output Ammeter (0-200A)
4) Battery Voltmeter (0-400V)
5) Battery Ammeter (300A-0-300A)
FC FCBC
All visual alarms will be provided through HBL make window type annunciator. Audio alarm
through buzzer. Alarm ack, reset and LED test provision through Push Buttons. One pair of
potential free summary contacts terminals is provided grouping all the faults for remote
annunciation.
HBL Power Systems Ltd.
REF. NO. PSE/P87828
REV:1, DT: 20.02.08
SHEET: 3 OF 3
16. MAGNETICS
17. CABLES
650/1100V grade PVC insulated, copper, Multistrand. Ferrules will be provided at both ends of
each wire for identification.
HBL Power Systems Ltd
REF.NO.PSE/P80828
REV: 1, DT: 20.02.08
SHEET 1 OF 4
RECTIFIER DIVISION
BILL OF MATERIAL
JOB NO : TP-07-3-2603-1
QUANTITY : 1 No.