DATASHEET
TRANSMITTER RACK

1.0 General

1.1 Make : Reputed


1.2 Quantity : As per BOM

2.0 Features

2.1 Style : Open Rack as per Attached Drawing


2.2 Location : Outdoor
2.3 Bulk Head Fittings : Not required
2.4 Air Supply & Header : Not Required
2.5 Impulse Piping & Header : To be done at site as per Hook Up
Drawings
2.6 Blow Down Header : Provided
2.7 Impulse Line to Enter Rack : Top & Bottom
2.8 Wiring & Termination : To be done at site
2.9 Paint : Polyurethene IS 5 Shade 631
2.10 Canopy : Provided

3.0 Material

3.1 Construction Material : MS , As per Attached Drawings


3.2 Blow Down Header : 2” NB, CS ASTM A 106 Gr.B
3.3 Impulse Lines & Fitting : As per Hook up Drawings
3.4 Canopy Sheath : CRCA

4.0 Connection & Dimension

4.1 Layout & Dimension : As per Attached Drawings


4.2 Canopy Sheath Thickness : 2 mm CRCA

5.0 Accessories

5.1 Name Plate : Provided


5.2 Blow Down Header : Provided
5.3 Bolts/Nuts/Gaskets etc. : Provided

6.0 Tests ( To be done at Site)

6.1 Hydro Test, Air Leak Test for Tubing /Piping & Fittings

Client : M/s. Bhushan Energy Ltd. Ref: PG-L/3000943276


Project: 2x150 MW CPP
Date 18/3/08
Prep AKD Sh. 1
Chkd KDS TRANSMITTER RACK of
Appd DU
 Sh.3
Rev Date Remarks Name GURGAON Drg No. (4) G71600 –W6706- M16

RACK GROUPING
UNIT-1

Sr.N Rack Transmitter Rack


Service Remarks
o No. Tag No. Type
Common Steam Distribution
1 1TR-11 1PT 01 TYPE-1
Header-1 Pressure
2 1TR-9 1PT 02 BFP common discharge header pressure TYPE-2
CSD Header-1 DESH (1TCV-01) outlet
3 1TR-1 1PT 03 TYPE-3
header Pressure
CSD Header-1 DESH (1TCV-01) outlet
4 1TR-1 1PT 04 TYPE-3
header Pressure
5 1TR-1 1PT 05 CSD Header-1 outlet Pressure TYPE-3

6 1TR-1 1PT 06 CSD Header-1 outlet Pressure TYPE-3


CSD Header-1 DESH (1TCV-02) outlet
7 1TR-1 1PT 07 TYPE-3
header Pressure
CSD Header-1 DESH (1TCV-02) outlet
8 1TR-1 1PT 08 TYPE-3
header Pressure
Spray water pressure at the outlet of
9 1TR-2 1PT 09 TYPE-2
1PRV-101
Spray water pressure at the outlet of
10 1TR-2 1PT 10 TYPE-2
1PRV-101
Spray water pressure at the outlet of
11 1TR-2 1PT 11 TYPE-2
1PRV-103
Spray water pressure at the outlet of
12 1TR-2 1PT 12 TYPE-2
1PRV-103
Feed Water pressure at the outlet of HP
13 1TR-3 1PT 13 TYPE-1
heater -II
CSD Header- I DESH(1TCV-01) outlet
14 1TR-4 1TT 03 TYPE-2A
header temp
CSD Header- I DESH(1TCV-01) outlet
15 1TR-4 1TT 04 TYPE-2A
header temp
CSD Header- I DESH(1TCV-02) outlet
16 1TR-4 1TT 05 TYPE-2A
header temp
CSD Header- I DESH(1TCV-02) outlet
17 1TR- 5 1TT 06 TYPE-2A
header temp
CSD Header- I DESH(1TCV-03) outlet
18 1TR-5 1TT 07 TYPE-2A
header temp
CSD Header- I DESH (1TCV-03) outlet
19 1TR-5 1TT 08 TYPE-2A
header temp
Steam flow from CSD header –I to outlet
20 1TR-6 1FT 01 TYPE-1
to the steam jet Air Ejector
Steam flow at the turbine inlet I from
21 1TR-7 1FT 02 TYPE-1
CSD header -I
Differential pressure across Water Box-A
22 1TR-8 1DPT-CWP-1 TYPE-2
of surface Condenser Unit # 1
Differential pressure across Water Box-B
23 1TR-8 1DPT-CWP-2 TYPE-2
of surface Condenser Unit # 1
Pressure at Common Header of CW
24 1TR-10 OPT-CWP-01 TYPE-1
Pump
Pressure at Common Header of CW
25 1TR-9 OPT-ACW-01 TYPE-2
Pump

Client : M/s. Bhushan Energy Ltd. Ref: PG-L/3000943276


Project: 2x150 MW CPP
Date 18/3/08
Prep AKD Sh. 2
Chkd KDS TRANSMITTER RACK of
Appd DU
 Sh.3
Rev Date Remarks Name GURGAON Drg No. (4) G71600 –W6706- M16

UNIT-2

Sr.N Rack Transmitter Rack


Service Remarks
o No. Tag No. Type
Common Steam Distribution Header-II
1 2TR-10 2PT 01 TYPE-1
pressure
2 2TR-9 2PT 02 BFP common discharge header pressure TYPE-1
CSD Header-IIDESH (2TCV-01) outlet
3 2TR-1 2PT 03 TYPE-3
header Pressure
CSD Header-IIDESH (2TCV-01) outlet
4 2TR-1 2PT 04 TYPE-3
header Pressure
5 2TR-1 2PT 05 CSD Header- II outlet Pressure TYPE-3
6 2TR-1 2PT 06 CSD Header-II outlet Pressure TYPE-3
CSD Header-IIDESH (2TCV-02) outlet
7 2TR-1 2PT 07 TYPE-3
header Pressure
CSD Header-IIDESH (2TCV-02) outlet
8 2TR-1 2PT 08 TYPE-3
header Pressure
Spray water pressure at the outlet of
9 2TR-2 2PT 09 TYPE-2
2PRV-101
Spray water pressure at the outlet of
10 2TR-2 2PT 10 TYPE-2
2PRV-101
Spray water pressure at the outlet of
11 2TR-2 2PT 11 2PRV-103 TYPE-2

Spray water pressure at the outlet of


12 2TR-2 2PT 12 TYPE-2
2PRV-103
Feed water pressure at the outlet of
13 2TR-3 2PT 13 TYPE-1
HP heater-II
CSD Header- II DESH(2TCV-01) outlet
14 2TR-4 2TT 03 TYPE-2A
header temp
CSD Header- II DESH(2TCV-01) outlet
15 2TR-4 2TT 04 TYPE-2A
header temp
CSD Header- II DESH(2TCV-02) outlet
16 2TR-4 2TT 05 TYPE-2A
header temp
CSD Header- II DESH(2TCV-02) outlet
17 2TR-5 2TT 06 TYPE-2A
header temp
CSD Header- II DESH(2TCV-03) outlet
18 2TR-5 2TT 07 TYPE-2A
header temp
CSD Header- II DESH(2TCV-03) outlet
19 2TR-5 2TT 08 TYPE-2A
header temp
Steam flow from CSD header –II to outlet
20 2TR-6 2FT 01 TYPE-1
to the steam jet Air Ejector
Steam flow at the turbine inlet II from CSD
21 2TR-7 2FT 02 TYPE-1
header -II
Differential pressure across Water Box-A
22 2TR-8 2DPT-CWP-1 TYPE-2
of surface Condenser Unit # 2
Differential pressure across Water Box-B
23 2TR-8 2DPT-CWP-2 TYPE-2
of surface Condenser Unit # 2

TOTAL NO. OF TRANSMITTER RACK TYPE-1 = 11


TOTAL NO. OF TRANSMITTER RACK TYPE-2 = 05
TOTAL NO. OF TRANSMITTER RACK TYPE-2A = 04
TOTAL NO. OF TRANSMITTER RACK TYPE-3 = 02

Client : M/s. Bhushan Energy Ltd. Ref: PG-L/3000943276


Project: 2x150 MW CPP
Date 18/3/08
Prep AKD Sh. 3
Chkd KDS TRANSMITTER RACK of
Appd DU
 Sh.3
Rev Date Remarks Name GURGAON Drg No. (4) G71600 –W6706- M16