1.

Yokogawa SIS CED still not implement the shutdown hierarcy configuration -> to
be discussed with process safety
2. for CED 242, still need confirmation for UOP regarding the reset logic for
membrane skid BDV -> expedite to Ariel/Mas Estu
3. additional IO to be clarified by vendor
460 -> discuss with Mas Widi/Ariel
234 -> discuss with Mas Deden/Kak Albert/Taufik
4. 590 MACP DI for ESD00 not found in IO list -> discuss with Ali
5. 323 USD duplicate USD number (681 & 691) to be replaced with unoccupied USD
number
6. SIS console:
- BDV Open Button -> description to be changed to ESD00-x and change button to
mushroom button
- ESD01 canceling PB after ESD04 -> description to be changed in console