FINAL ACCOUNT
• Contractual provision
– Either before or within a reasonable time after practical
completion, C’tor should send document related to
preparing final account.
– Subject to C’tor compliance to this obligations, the QS shall
prepare Final Account within the provision time frame of
final measurement and valuation as stated in the
appendix.
– When the Final Acc completed, the Arch/S.O. shall send a
copy to C’tor and relevant extract to each NSC.
06/10/2019 b-saidin@utm.my_SBEQ3333 4
b-saidin@utm.my_SBEQ3333 2
10/6/19
FINAL ACCOUNT
• Sum to be deducted:
– Prime cost sum and amount in respect of sub con &
associated C’tor profit.
– Provisional sums and value of works described as
provisional.
– Variations that are omission including omission of any
other works carried out under changed condition as a
result of variations.
– Amount allowable to employer under fluctuations clauses.
– Any other amount that is required by the Contract to be
deducted from Contract Sum.
06/10/2019 b-saidin@utm.my_SBEQ3333 5
FINAL ACCOUNT
• Sum to be added:
– Total amount of NSC finally adjusted in accordance with
relevant sub con conditions.
– Where C’tor has tendered for the works, that was have
been performed by NSC and the tender accepted, the
amount of tender suitably adjusted.
– Any amount due to the Nominated supplier, including cash
discount .
– The contractor profit on the amount referred as above.
06/10/2019 b-saidin@utm.my_SBEQ3333 6
b-saidin@utm.my_SBEQ3333 3
10/6/19
FINAL ACCOUNT
• Sum to be added:
– Any amount payable by S.O. relating to statutory fees and
charges, setting out the works, opening up and testing,
remedial works where the Arch/S.O authorized payment.
– Addition due to variations including addition for other
works carried out under change condition as a result of
variations.
– The value of works against provisional sums or provisional
qty included in the Contract Bill.
– Any amount payable by S.O. by way of reimbursement for
direct loss and expense.
06/10/2019 b-saidin@utm.my_SBEQ3333 7
FINAL ACCOUNT
• Sum to be added :
– Any amount expended by the C’tor as a result of loss
damage by fire or other perils where the risks are insured
by the employer and c’tor are entitle to reimbursement.
– Any amount payable to the C’tor under fluctuations clause.
– Any other amount that is required by the Contract to be
added to the Contract Sum.
06/10/2019 b-saidin@utm.my_SBEQ3333 8
b-saidin@utm.my_SBEQ3333 4
10/6/19
FINAL ACCOUNT
06/10/2019 b-saidin@utm.my_SBEQ3333 9
FINAL ACCOUNT
• Final Account procedure
– Original Contract Sum as starting point.
– The bulk of Final Account will consist measured work
priced at the original bill rates.
– If C’tor has reason to doubt accuracy any of the original
billed items, he can request QS on work concern to be
measured on site.
06/10/2019 b-saidin@utm.my_SBEQ3333 10
b-saidin@utm.my_SBEQ3333 5
10/6/19
FINAL ACCOUNT
• Final Account procedure (cont’d…)
– All relevant item must be shown separately.
– When preparing final account, QS should give C’tor or his
rep opportunities to be present when measurements and
details are taken or recorded.
– So, the document will prepared in full liaison with C’tor.
06/10/2019 b-saidin@utm.my_SBEQ3333 11
FINAL ACCOUNT
• Final Account procedure (cont’d…)
– From the draft final account, anticipated expenditure can
be prepared.
– This in to enable the account to be finalised fairly soon
after work complete as well as interim payment to the
C’tor represent realistic assessment of the value of work
performed.
06/10/2019 b-saidin@utm.my_SBEQ3333 12
b-saidin@utm.my_SBEQ3333 6
10/6/19
FINAL ACCOUNT
• Final Account procedure (cont’d…)
– Delay in settlement of the Final Account represent
additional cost to the C’tor related to the financial
commitment.
– The S.O/QS have a contractual responsibility to keep the
date stipulated in contract for complete the account with
all necessary supporting data provide by C’tor.
06/10/2019 b-saidin@utm.my_SBEQ3333 13
FINAL ACCOUNT
• Final Account procedure (cont’d…)
– Any Addition to the original contract sum complete with
KPK, APK and PHK
– Any Omission to the original contract sum complete with
KPK, APK and PHK
– New Contract Sum will take after adjustment on addition
and/or omission.
06/10/2019 b-saidin@utm.my_SBEQ3333 14
b-saidin@utm.my_SBEQ3333 7
10/6/19
FINAL ACCOUNT
• Final Certificate
– The Arch/S.O to issue Final Certificate within three (3)
month of the end of defect liability period or of
completion of making good defects.
– The amount of the final certificate is the difference
between the total of final account and the amount
previously stated due under interim certificate.
06/10/2019 b-saidin@utm.my_SBEQ3333 15
FINAL ACCOUNT
06/10/2019 b-saidin@utm.my_SBEQ3333 16
b-saidin@utm.my_SBEQ3333 8
10/6/19
FOR
06/10/2019 b-saidin@utm.my_SBEQ3333 17
SUMMARY
VARIATION
ITEM NO. LIST OF VARIATION ITEMS ADDITION (RM) OMISSION (RM)
145,000.00 (59,620.00)
(59,620.00)
06/10/2019 b-saidin@utm.my_SBEQ3333 18
b-saidin@utm.my_SBEQ3333 9
10/6/19
MAIN CONTRACTOR : SYSTEM METAL ALUMINIUM & GLASS CONSTRUCTION SDN. BHD.
SUMMARY
40,000.00 -
This variation, details of which are attached hereto constitutes a nett ADDITION TO your contract and has been valued at
Ringgit Malaysia : Fourty Thousand Only (RM40,000.00) which sum shall be ADDED TO the Contract Amount
…………………………………………… …………………………………….
PAKATAN UKUR BAHAN SDN. BHD. Y ARCHITECTS
DATE……………………………………. DATE……………….……………..
We, the undersigned, hereby agree to the variation details and the valuation
……………………………………………………………………………….
SYSTEM METAL ALUMINIUM & GLASS CONSTRUCTION SDN. BHD. DATE ……………………….
………………………………………………………………..
AGREED BY SWISSHARTA SDN. BHD. DATE ……………………….
06/10/2019 ………………………………………………………………..
b-saidin@utm.my_SBEQ3333 19
NAME OF SIGNATORY
PERAKUAN MUKTAMAD
UNTUK
ANTARA
DAN
KONTRAKTOR .....................
06/10/2019 b-saidin@utm.my_SBEQ3333 20
b-saidin@utm.my_SBEQ3333 10
10/6/19
CADANGAN MEMBINA DAN MENYIAPKAN KILANG 1292 MACHAP, KLUANG, JOHOR DARUL
TAKZIM - KERJA BANGUNAN DAN KERJA LAIN YANG BERKAITAN (FASA 2)
PERAKUAN MUKTAMAD
ISI KANDUNGAN
8) Lampiran
06/10/2019 b-saidin@utm.my_SBEQ3333 21
PERAKUAN MUKTAMAD
KURANGKAN*
1 Wang Tahanan (jika berkenaan)
(a) Kontraktor utama.... RM -
(b) Subkontraktor-subkontraktor
Dinamakan (Jumlah b/h dari
*Lampiran A1-Jumlah Ruangan 10).... RM -
(c) Pembekal-pembekal Dinamakan
(Jumlah b/h dari Lampiran A2-
Jumlah Ruangan 5).... RM -
2 Bayaran Interim yang terdahulu (No.1 - No.9) RM 2,029,916.22
TOLAK
1 Bayaran balik wang pendahuluan ke atas
Kontrak/bayaran sementara ke atas Peralatan
dan Loji Berjentera (jika berkenaan)*
(a) Kontraktor Utama.... RM -
(b) Subkontraktor-subkontraktor Dinamakan
(Jumlah b/h dari Lampiran A1-Jumlah
Ruangan 6).... RM -
2 Ganti Rugi Tertentu dan Ditetapkan
(a) As contract RM 304.00/hari RM 30,096.00
3 Premium insurans dan caruman PERKESO yang
dibayar oleh Kerajaan.... RM -
4 Gaji pekerja yang dibayar oleh Kerajaan.... RM -
5 Kos kepada Kerajaan akibat kegagalan RM -
Kontraktor mematuhi arahan P.P....
6 Kos membaiki kecacatan
7 Pengurangan nilai kerja kerana kecacatan
8 Potongan-potongan lain yang dibenarkan
(a) Penyiapan kerja-kerja civil RM 196,971.00
(b) Penyiapan kerja-kerja mekanikal & elektrikal RM 147,000.00
06/10/2019 b-saidin@utm.my_SBEQ3333 RM 374,067.00 22
BAYARAN MUKTAMAD DI SYORKAN KENA DIBAYAR - 45,726.08
b-saidin@utm.my_SBEQ3333 11
10/6/19
Saya/ Kami, yang bertandatangani di bawah ini mengaku penerimaan Perakuan Muktamad di atas dan setelah
meneliti butir-butir terkandung di dalamnya, bersetuju dengan Bayaran Muktamad Di syorkan Kena Di Bayar dan
mengaku bahawa Saya/Kami tidak ada tuntutan
…………………………………. ………………………………….
Tandatangan Saksi Tandatangan Kontraktor
Alamat : ……………………………………….
……………………………………….
………………………………………. ……………………………………….
Cop Kontraktor
Tarikh : ………………………………………. Tarikh : ……………………………………….
Saya dengan ini mengesahkan bahawa bayaran akhir di bawah ini berjumlah Ringgit Malaysia : Tiga Puluh Tiga
Ribu Dua Ratus Enam Puluh Empat dan Sen Empat Puluh Lima Sahaja (RM 33,264.45) yang menunjukkan
baki muktamad di bawah kontrak adalah patut dan kena di bayar oleh Kerajaan seperti berikut :
Bayaran diperakukan
(a) Kepada Kontraktor Utama....* -RM 45,726.08
(b) Kepada Subkontraktor-subkontraktor Dinamakan
(Jumlah b/h dari Lampiran A1-Jumlah
Ruangan 10)....
(c) Kepada Pembekal-pembekal Dinamakan
(Jumlah b/h dari Lampiran A2-Jumlah
Ruangan 9)....
(d) Kepada Penerima Hak-Penerima Hak yang
diluluskan (Jumlah b/h dari Lampiran
A3-Jumlah Ruangan 9)....
Jumlah Bayaran Muktamad -RM 45,726.08
Perakuan yang bertandatangan oleh Ketua Pengarah/Akuan Statutori yang dikehendaki di bawah Fasal Syarat-Syarat
Kontrak telah di kemukakan oleh Kontraktor dan Sub Kontraktor- Sub Kontraktor Dinamakan.
Tarikh :
FINAL SUMMARY
B BUILDER'S WORK
Add
06/10/2019 b-saidin@utm.my_SBEQ3333 24
b-saidin@utm.my_SBEQ3333 12
10/6/19
SURAT AKUAN
d) Saya telah menjelaskan bayaran gaji atau upah kepada pekerja-pekerja di bawah
Kontraktor ....................... dan saya tidak boleh dituntut oleh pihak yang berkenaan
setelah menyiapkan kerja-kerja tersebut.
e) Jabatan yang berkaitan tidak boleh didakwa atau dituntut oleh pihak pekerja
Kontraktor ......................... setelah kerja-kerja ini siap dalam pengurusan kerja.
dan saya membuat akuan ini dengan penuh kepercayaan bahawa apa-apa yang tersebut di
dalamnya adalah benar serta menurut Akta Akuan Berkanun 1960.
..........................
DIHADAPAN SAYA
.....................................................................................
06/10/2019 b-saidin@utm.my_SBEQ3333
(Tandatangan Hakim/Majistret/Pesuruhjaya Sumpah) 25
Thank You
b-saidin@utm.my
06/10/2019 b-saidin@utm.my_SBEQ3333 26
b-saidin@utm.my_SBEQ3333 13