Download as pdf
Download as pdf
You are on page 1of 1
‘Part 1: Application (to be completed by the requesting Contractor) Seyed Thahir Company _| Adeeb Group Email__| thahir@adeebgroup.com 0562163956 Emergency 2tevel | Ahamed Ashith (0562681366) & (0565087933 cael 05 ) Description: | Lifting FAHU ‘Location: Loading Bay - Near Gate Number - 03 Working Time: ckbox) Night [a] | 24/7[—] | Justification for daytime work (08:00-18:00 Hrs) ight Time: 00:00Hrs to 07-0085 SarTimeand — | 09:00 PM Fish Timeand Dater | 07-00 AM Date. 30-12-2021 31-12-2021 4 UNDERTAKING Statement ( from the “Emaar Project Manager” ) ‘Any construction works more than one night should be done on a 24/7 shift, woks are to be completed ASAP. No bartiers are installed unless they are absolutely required and even then only installed just before work starts. ‘Traffic lanes are not blocked with construction equipment. No loitering of laborers on the Boulevard. ‘Access to construction vehicles will only be given from 12mn to 7am only. Barricades should be well maintained at alltime. Signage should be all updated, any relevant signage should be removed. Provision of housekeeping should be observed at construction areas. Landscaping should always be well planted once construction is over. NO concrete barrier is allowed in Downtown however in case it is required, ensure concrete barrier placing is at the minimum ONLY to satisfy Local Authority (RTA) requirement. 410, Reinstatement in the work area shall be done as per quality standard and damaged items shall be replaced with new. 111. No working area should be unattended and work should be continuous until its completed. T confirm that | have read the Specific instruction above and adhere with strict compliance. homed ARIA Name and Designation : spooject Erginect eyeene eax Other preequite approvals sem[—] bel] [esc tanoscarel—] vce] __emnetat(—] prosecrs—] ‘Approver comments and Conditions: (@discoimer ~| ‘The applicant and his/her service provider are ful responsible for ensuring the operation is carried out sofely by competent persons and workplace 's safe for anyone that may be affected by the operation. The grontng of permit by EFM shall not be considered as EFM being responsible in anyway, for any occdent that may arse rectly or indirectly from their work activities.

You might also like