Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Diversion-01, Catchment Area 33.70 Sq.

Km, MFD 7535 Cs, Length of C

Sl.No. Tank Name Village Mandal


1 Gurramvani Kunta Dharmaram Konaraopet
2 Pedda Cheruvu Dharmaram Konaraopet
3 Girramvani Kunta Dharmaram Konaraopet
4 Saniga Kunta Marthanpet Konaraopet
5 Erra Kunta Dharmaram Konaraopet
6 Parrela Kunta Kolanur Konaraopet
7 Boggula gandi Marthanpet Konaraopet
8 Bhavani Kunta Kolanur Konaraopet
9 Large Tank Kolanur Konaraopet
10 Kotha Cheruvu Chinna Bonala Sircilla
11 Pedda Cheruvu Pedda Bonala Sircilla
12 Jangamvani kunta Pedda Bonala Sircilla
13 Maisamma Cheruvu Peddur Sircilla

Diversion-02, Catchment Area 11.000 Sq.km, MFD 3253 Cs, Length of

1 KummariKunta Kolanur Konaraopet


2 Borranikadakunta Kolanur Konaraopet
3 Salvanikunta Kolanur Konaraopet
4 Kuntanamakunta Kolanur Konaraopet
5 Oora Cheruvu Mushtipalli Sircilla
6 Maisamma Kunta Kolanur Konaraopet
7 Chinna Cheruvu Ragudu Sircilla

Diversion-03 , Catchment Area 24.168 Sq.km, MFD 5872 Cs, Length of

1 Peddha Cheruvu Nagaram Konaraopet


2 Oota Cheruvu Nagaram Konaraopet
3 Peddha Cheruvu Rammanna Peta Konaraopet
4 Ravi Kunta Rammanna Peta Konaraopet
5 Mallareddy Kunta Rammanna Peta Konaraopet
6 Peddha Cheruvu Ragudu Sircilla
7 Kummari Kunta Marupaka Vemulawada
8 ChinthalaKunta Marupaka Vemulawada
9 Amma kunta Chandragiri Vemulawada
10 Thette Kunta Chandragiri Vemulawada
11 Pallavani Kunta Chandragiri Vemulawada

Diversion-04 , Catchment Area 6.422 Sq.Km, MFD 2172 Cs,Length of C


1 Thumma Kunta Sircilla Sircilla
2 Eedula Cheruvu Chandrampeta Sircilla
3 Kotha Cheruvu Sircilla Sircilla
Tanks in Submergence Area
1 Thummala Kunta Sircilla Sircilla
2 Damera Kunta Sircilla Sircilla

Diversion-04A , Town Catchment Area 1.336 Sq.Km, MFD 670 Cs,Length o


1 Shanthi nagar Sircilla Sircilla
2 Vidya Nagar Sircilla Sircilla
3 Below ZP Office Sircilla Sircilla

PUMPING before Bypass Road, Catchment Area 1.620 Sq.Km, MFD 773 Cs

PUMPING after Bypass Road, in between Karakatta and Approach Channel, Catchment Area 2.71

Natural flow to Vagu Catchment Area 4.90 Sq.Km, MFD 1774 Cs

Total Catchment Area 80.965 Sq.Km, Diversions 1,2,3,4, 4A Catchment Area 76.632 Sq.Km, Total
MFD 7535 Cs, Length of Canal 6.70 Km

Capacity (Mcft) FTL


6.85 400.800
24.17 387.78
5.00
5.31 363.833

2.18 366.55
7.50 377.56
3.10
56.50 357.35
7.76 377.78
17.50 354.41
5.40 348.28
7.74 328.98

MFD 3253 Cs, Length of Canal 4.40 Km

5.01 351.7
3.48 344.21
1.87 341.32
5.56
8.00 336.2
0.32

MFD 5872 Cs, Length of Canal 1.15 Km

20.38
3.74 377.02
19.13 352.32
0.31
4.42 344.148
29 332.41
4.1
2.47 340.37
1.51
0.01
2.53 330.353

MFD 2172 Cs,Length of Canal 3.425 Km


1.67 339.16
26.67 330.85
44.33 326.56
gence Area
5.72 316.48
5.45 321.3

Km, MFD 670 Cs,Length of Canal 2.275 Km

322.904

Cs

nel, Catchment Area 2.713 Sq.Km, MFD 1138 Cs

rea 76.632 Sq.Km, Total Pumping Catchment Area 4.33 Sq.Km 76.632
4.33
80.962
IMPLEMENTATION OF EFFECTIVE FLOOD MANAGEMENT PROPOSAL IN SIRICILLA TOWN

Amount Total Expected


Amount Amount
No of Max Flood Catchmen Catchmen Length of Channel LA Area Amount of Earth of of Period of
Sl.No Estimated in Covered Villages Proposed Diversion Channel From-to t Area in t Area in needed of LA in StructersR Completion Estimate Status
Tanks in Km Work Rs Estimate
Cusecs Sq Km Sq Miles in Acres Crores s in from LA
in Crores Rs in
Crores Crores handed over

1 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Pedda Bonala-2 tanks, Chinna


1 13 7535 Cs bonala- 1, Kolanooru-4, From Large Tank, Kolanooru(v), Konaraopeta(m) TO Mysammakunta, Pedduru(v), Siricill(m) 33.70 13.01 5.8 117 17.48 13.83 14.5 45.81 6 months under preparation
Marthannapeta-2, Dharmaram-4

Kolanuru-4 tanks, Mustipally-1, Along the Outer Ring Road Side drain TO Ragadu Junction TO Telangana Bavan before TO Mid Maneru
2 7 3253 Cs 11.00 4.25 4.4 16 2.4 2.81 15.86 21.07 6 months Under preparation
Ragudu-2 Reservoir

Nagaram-2 tanks, Ramannapeta-


Proposed from Ragudu Road Bridge nala TO Collectorate TO Chandragiri tank Surplus TO Mid Maneru Permanent Under
3 11 5872 3, Marupaka-2, Ragudu-1, Reservoir 24.17 9.33 0.95 19 2.92 1.61 3.54 8.07 6 months preparation.
Chandragiri-2 Tanks

Tentative Completed
Kotha Cheruvu TO above the approach channel to existing Chandragiri Cheruvu Surplus Course to Mid and sent to P Secretary,
4 3 2172 Siricilla Town-3 tanks. 6.42 2.48 3.425 67 10 1.1 17.7 28.8 6 months Municipal
maneru reservoir.(6x3 m size Box Culvert and Open Channel all along the Sircilla Town Internal Roads)
Administration by the
Dist Collector.

Temporary
4A nil 670 Sircilla Town Sewerage , Weaving From Kotha Cheruvu Siricilla(v&m) to Manair vagu (via Shanthi nagar) U/s of Thangallapally Road 1.34 0.52 2.275 2 0.3 0.35 11.54 12.19 Work in under preparation
Machine , colour dyes water Bridge
progtress

Total flood
19502 76.62 29.58 16.85
Discharge in Cs

Note: Expecting final DPRs by 10-10-2021

You might also like