Unit Price Schedule: Code Description Type/Size Unit Unit Price'10 Activity Wise EPSILON Rate
Unit Price Schedule: Code Description Type/Size Unit Unit Price'10 Activity Wise EPSILON Rate
Unit Price Schedule: Code Description Type/Size Unit Unit Price'10 Activity Wise EPSILON Rate
569162297.xls 01/08/2022
RATE FOR SUB-CONTRACTORS ITEMS
(Boundary wall and Building works)
Approved Rate
Sl. No. Description of Item of works Unit Remarks
in Taka
1 Earth work in Excavation :
a) Up to 5 feet Depth Cft. 1.20
b) Above 5 feet Depth Cft. 1.50
2 Back filling with Compaction Cft. 0.30
3 Sand filling with Compaction Cft. 0.25
4 Polythene Laying Sft. 0.10
5 C.C work (M-10) Sft. 0.300
6 Mass Concrete work in Floor (M-20) Cft. 0.300
7 Brick Flat Soling (with levelling & Dressing) Sft. 0.70
8 Shuttering Works :
i) Wooden shuttering, fixing in/c making Sft. 5.50
ii) Steel shuttering, fixing only Sft. 5.00
9 M.S Rod Fabrication & Placing GI wire (40/60Grade) including kg. 1.80
10 R.C.C works (M-25) :
i) Bottom Raft Cft. 4.50
ii) Wall Cft. 5.75
iii) Slab Cft. 5.50
11 R.C.C works (M-15/20) :
i) Column Footing Cft. 5.00
ii) Foundation / Grade Beam Cft. 5.50
iii) Column Cft. 6.00
iv) Copping Rft. 4.00
12 R.C.C works in Building (M-20) :
i) Footing & Pedestal Cft. 5.00
ii) Grade Beam Cft. 5.50
iii) Column Cft. 6.00
iv) Lintel & Tic-Beam Cft. 6.00
v) Floor Beam Cft. 5.75
vi) Floor Slab Cft. 5.50
vii) Sunshade,Drop Wall, Cornice & Railing Sft. 3.00
13 75 mm Damp Proof Coarse Sft. 2.50
14 1st. Class Brick work - 10" Cft. 3.50
15 1st. Class Brick work - 5" Cft. 2.50
16 Chipping of RCC surface Sft. 0.50
17 12 mm Plastering work Sft. 2.50
18 6 mm Plastering work Sft. 2.00
19 Neat Cement Finishing work Sft. 0.50
20 Drip Course Rft. 2.00
E/Pintu/Sub-contractor bill formet
21 Wooden Door Frame making Cft. 120.00
22 Wooden Door shutter Sft. 75.00
23 Wooden Grill fitting Sft. 2.50
24 Wooden Stair Railing making & fixing Rft. 75.00
Collapsible Gate supplying , Fitting complete in/c.
25 Fabrication by 1" x 1" Angle Sft. 150.00
Approved Rate
Sl. No. Description of Item of works Unit Remarks
in Taka
Plumbing
P01 Commode nos. 5,700.00
P02 Pan nos. 2,000.00
P03 Hand Wash Basin nos. 2,600.00
P04 Standing Urinal: nos. 2,250.00
P05 Towel Rail nos. 450.00
P06 Mirror nos. 500.00
P07 Glass Shelf nos. 350.00
P08 Soap Tray nos. 150.00
P09 Toilet Paper Holder nos. 175.00
P10 G.I. Pipes 20mm dia Rm. 465.00
P11 G.I. Pipes 25mm dia Rm. 475.00
P12 U.P.V.C. Soil Pipe 100mm dia Rm. 150.00
Electrical
W01 PVC Pipe ¾" (20mm) dia Rm. 45.00
W02 Cable Rm. 45.00
W03 Earth cable Rm. 85.00
W04 Switches and Switch/Regulator Boards Sets 2,000.00
W05 56" Ceiling Fan nos. 1,500.00
W06 300mm dia Exhaust Fan nos. 1,200.00
W07 1 x 4' x 40 watt. fluorescent tube light Sets 350.00
W08 2 x 4' x 40 watt fluorescent tube light Sets 450.00
W09 Distribution Board Sets 1,500.00
W10 Circuit breakers nos. 2,500.00
W11 Water Pump nos. 7,500.00
W12 Fire Extinguisher nos. 2,500.00
Manpower:
L01 Supervisor Hr. 25
L02 Mason Hr. 10
L03 Skilled labour Hr. 17.5
L04 Ordinary labour Hr. 9.25
Disel Lubricant
96.2 19
126.16 25
14195 0
189.24 53
199.55 88
59.93 26
47 1
37.6 1
31 8
0
375.33 101
332.75 146
414.93 166
279.13 70
37.85 15
222.36 89
199.55 88
2200.7 440
1649.5 330
208.16 42
310.67 62
242.86 310
199.5 88
64.66 47
70.97 6
23.5 5
250
145.08 12
184.51 37
406.87 155
184.51 83
21.15 4
354.83 156
384.79 281
257.05 188
250 Brick Work 125 Brick Work
100cft =2.83cum 100 sft=10.76sqf
Foundation Super str. Super str. Expo. Str. Super str.
(1:6) (1:6) (1:4) (1:4) (1:6)
Equipment
E09 Mixture m/c no.
E10 Vibrator m/c no.
E05 Rig in/c bentonite no.
E12 Cutting & shaping m/c
E34 Polishing m/c
E15 Drill m/c, rowel bolts, G.I. wire, in/c m/c % of aluminum cost
C. Form Work
shuttering tk
scaffolding sft 25 25 25 25
Laying cost tk
125 Brick Work BFS HBB Edging RCC
100 sft=10.76sqf 100sft 100 rft 100 cft
Super str. Footing Col G.Beam Lintel Slab Stair
(1:4) (1:2:4) (1:2:4 (1:2:4) (1:2:4)(1:2:4) (1:2:4)
90 90 90 90 90 90
480 300 550 250 850 850 850 850 850 850
16 5 10 2 22.5 22.5 22.5 22.5 22.5 22.5
22.5 22.5 22.5 22.5 22.5 22.5
2.6 18 18 18 18 18 18
0.2 0.125 0.25 0.125 0.2 0.2 0.2 0.2 0.2 0.2
0.75 0.25 0.5 0.25 1 1 1 1 1 1
1 1 2 1 1 1 1 1 1 1
4 6 6 6 6 6 6
1050
4.2
4.2
3.7
4
540
1
20
100
1 1.25
1
3
21.75
Floor fitting Plastering NCF Painting
100 sft 100 sft 100 sft 100sft 100 sft 100 sft
Tiles 12mm (1:4)12mm (1:6)12mm (1:4) Synthetic distemperi Plastic
(2:1) dado 2coat 2coat 2coat
door/windo wall wall/ceiling
6.25 5 6 7.5
2.5 1 0.75 2
3.6
1
1
1
1 1 1
1
21.75
False Ceiling
100 sft
gypsum
100
120
5
5
5
40%
100