Dyarb Negm Ww TP 10.

000 m3/d Date:


(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 1 of 22

SHARKIA Potable Water and


Sanitation Co.
SRSSP.(SH.QCB.01)

Operation and Maintenance Contract for


Dyarb Negm WwTP 10.000 m3/d Treatment Works

Contract SH.QCB.01

Dyarb Negm Ww TP
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 2 of 22

Monthly Report November


2021
1. Executive Summary
1.1. General Report
a. incoming flow To the plant during December Was 75910 m3/d

b. Flow Distribution

1- BIOBLOCK A: The average flow to the BB was 2200 m3/d ( from 1/12 to 6 /12)

2- BIOBLOCK B : The average Flow to the BB was 1500 m3/d ( from 1/12 to 13 /12)

3- BIOBLOCK C: The average flow to the BB was 1054 m3/d ( from 29/12 to 31 /12)

4- BIOBLOCK D: The average flow to the BB was 1620 m3/d ( from 8/12 to 31 /12)

c . Sludge Management

- Average sludge amount Was 108 m3/d

- No of Working Drying beds Was 3

- Amount of Extracted Sludge From Drying beds was 0 kg

D. Cholorine system
- injected amount of chlorine During NOV was 496 kg

E. Lap Result
- Average COD was 72. 9 ml/l
- average PH was 7.4
- average MLss was 4232.5 mg/l
-average MLVss was 2602.1 mg/l
-average Tss was 206. 1 mg/l
-average Vss was 164.6 mg/l
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 3 of 22

1.2. Equipment Healthy

ISSUES
NO SUBUNITS NO EQUIPMENTS RESULT
FAULTS CAUSES PROCEDURES
1 MECH SCREEN
2 ELEC PENSTOCK
3 GRIT REMOVAL BRIDGE
1 HEADWORK
4 AIR LIFT PUMP
5 VALVES
6 AIR BLOWERS
1 AIR BLOWERS
2 PUMPS
2 BIOBLOCK 3 VALVES
4 AIR LIFT PUMP
5 PIPING
1 SCREW PUMP
THICKNER 2 VALVES
3 3 THICKNER
1 S.N PUMPS
2 SLDGE PUMPS
4 PUMP STATION SLUDGE
ACTUATOR ELEC NOT
3 VALVES SUPPLIER MAINTENANCE
NOT ISSUE FINISHED
WORKING
NOT NOT
5 CHOLOR
1 CHOLOR FLOW CTRL
READING
SUPPLIER CALIBRATION
FINISHED
6 GENERATOR 1
ELECTRICAL
7 EQUIPMENT
1
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 4 of 22

Charts

1- CHARTS FOR DAILY FLOWS TO THE BIOBLOCK

- Chart For BB A

- Chart For BB B

- Chart For BB C

- Chart For BB D

2- CHARTS FOR DAILY Sludge From THE BIOBLOCKS

- Chart For BB A

- Chart For BB B

- Chart For BB C

- Chart For BB D
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 5 of 22

Effluent Statistical Summary

RAW SEWAGE FINALLY EFFLUENT SLUDGE


Date
BOD COD PH VSS TSS BOD COD PH DO SV30 SVI MLSS MLVSS
01/12/2021 320 487 7.61 234 264 45 70 7.39 3.5 340 75.7 4486 2660
02/12/2021 502 761 7.42 488 812 50 77 7.45 3 400 113 3518 2051
03/12/2021 470 645 7.47 320 456 39 56 7.4 3 390 110 3718 2230
04/12/2021 432 459 7.53 150 176 32 64 7.3 3 380 94.9 4004 2568
05/12/2021 330 566 7.29 132 212 30 67 7.47 3 370 100 3700 2150
06/12/2021 210 350 7.67 213 240 43 80 7.52 3.2 400 162.5 3900 2550
07/12/2021 180 274 7.6 172 180 32 58 6.87 3.1 420 152.4 4100 2980
08/12/2021 190 298 7.64 210 233 40 80 7.05 3 410 153.7 3950 2500
09/12/2021 188 376 7.57 190 213 45 82 6.99 3 390 98.3 3970 2610
10/12/2021 203 510 7.58 189 160 41 73 7.23 2.9 415 133 4105 2815
11/12/2021 230 857 7.61 192 102 30 70 7.78 3 430 165.1 4210 3100
12/12/2021 210 323 7.66 188 145 32 75 7.33 3.2 410 102 3990 2650
13/12/2021 230 409 7.82 122 140 45 81 7.34 3 350 99.7 3510 2250
14/12/2021 233 410 8.91 131 210 31 70 7.76 3 370 90.2 4100 2660
15/12/2021 240 445 7.27 190 215 37 77 7.22 3.2 415 92.6 4480 2760
16/12/2021 250 520 7.89 121 130 38 82 7.75 2.9 420 109.9 3820 2640
17/12/2021 245 470 7.6 175 186 28 76 7.63 3 405 100 3670 2330
18/12/2021 240 440 7.1 215 233 26 70 7.54 3 390 125.8 3100 2120
19/12/2021 510 764 7.81 130 140 31 70 7.42 3.2 420 120 3500 2100
20/12/2021 360 645 7.9 128 176 36 74 7.55 3.5 490 115 4200 2630
21/12/2021 240 592 7.81 124 204 45 89 7.56 3.7 516 113.3 4500 2910
22/12/2021 260 510 7.79 204 318 29 63 7.4 3.2 770 137.25 5588 2866
23/12/2021 220 540 7.84 129 210 20 33 7.07 3 610 119.6 5100 3200
24/12/2021 215 445 7.63 110 170 33 80 7.06 2.9 760 180.7 4320 2880
25/12/2021 210 386 7.88 88 100 52 79 7.1 3 840 234.1 3584 2228
26/12/2021 260 400 7.7 70 180 40 89 7.22 3.2 800 140.6 5688 3154
27/12/2021 260 510 7.72 98 145 37 70 7.12 3 850 164.2 5142 2800
28/12/2021 220 379 7.88 110 116 37 55 7.12 3.2 670 123.3 5132 3190
29/12/2021 210 378 7.89 68 100 62 90 7.68 2.9 650 125.6 5172 2812
30/12/2021 232 342 7.91 112 114 55 78 7.57 3 660 150.3 4390 2140
31/12/2021 220 357 7.92 101 109 60 83 7.47 3 630 134 4560 2130
AVERAGE 268.4 479.0 7.7 164.6 206.1 38.7 72.9 7.4 3.1 508.7 127.0 4232.5 2602.1
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 6 of 22

WWTW NET Chlorine Consumption (Measured)


` Weight [Kg] Flow Rate Avg.rate
DATE Chl-start Chl-end consu M3/d {mg/l} {mg/l}

2021-12-01 600 584 16 3541 4.5 0.19


2021-12-02 584 568 16 3402 4.7 0.20
2021-12-03 568 552 16 3590 4.5 0.19
2021-12-04 552 536 16 3706 4.3 0.18
2021-12-05 536 520 16 3470 4.6 0.19
2021-12-06 520 504 16 3655 4.4 0.18
2021-12-07 504 488 16 1855 8.6 0.36
2021-12-08 488 472 16 1665 9.6 0.40
2021-12-09 472 456 16 3035 5.3 0.22
2021-12-10 456 440 16 3400 4.7 0.20
2021-12-11 440 424 16 3490 4.6 0.19
2021-12-12 424 408 16 3361 4.8 0.20
2021-12-13 408 392 16 3340 4.8 0.20
2021-12-14 392 376 16 2500 6.4 0.27
2021-12-15 376 360 16 2300 7.0 0.29
2021-12-16 360 344 16 1850 8.6 0.36
2021-12-17 344 328 16 1960 8.2 0.34
2021-12-18 328 312 16 1930 8.3 0.35
2021-12-19 312 296 16 1416 11.3 0.47
2021-12-20 296 280 16 1300 12.3 0.51
2021-12-21 280 264 16 2500 6.4 0.27
2021-12-22 264 248 16 2060 7.8 0.32
2021-12-23 248 232 16 1119 14.3 0.60
2021-12-24 232 216 16 808 19.8 0.83
2021-12-25 216 200 16 880 18.2 0.76
2021-12-26 200 184 16 1460 11.0 0.46
2021-12-27 184 168 16 2053 7.8 0.32
2021-12-28 168 152 16 1832 8.7 0.36
2021-12-29 152 136 16 2880 5.6 0.23
2021-12-30 136 120 16 2700 5.9 0.25
2021-12-31 120 104 16 2855 5.6 0.23
Total 496 75910 242.4 10.10
Daily Average 16 2448 7.8 0.33
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 7 of 22

Raw Sludge Production


BB A BB B RAW SLUDGE VOL.
DATE FLOW FLOW BB A BB B
M3 M3 M3/D M3/D
2021-12-01 68 78 2.2 2.5
2021-12-02 64 104 2.1 3.4
2021-12-03 57 95 1.8 3.1
2021-12-04 54 86 1.7 2.8
2021-12-05 53 78 1.7 2.5
2021-12-06 60 101 1.9 3.3
2021-12-07 0 106 0 3.4
2021-12-08 0 79 0 2.5
2021-12-09 0 75 0 2.4
2021-12-10 0 70 0 2.3
2021-12-11 0 35 0 1.1
2021-12-12 0 254 0 8.2
2021-12-13 0 106 0 3.4
2021-12-14 0 0 0 0
2021-12-15 0 0 0 0
2021-12-16 0 0 0 0
2021-12-17 0 0 0 0
2021-12-18 0 0 0 0
2021-12-19 0 0 0 0
2021-12-20 0 0 0 0
2021-12-21 0 0 0 0
2021-12-22 0 0 0 0
2021-12-23 0 0 0 0
2021-12-24 0 0 0 0
2021-12-25 0 0 0 0
2021-12-26 0 0 0 0
2021-12-27 0 0 0 0
2021-12-28 0 0 0 0
2021-12-29 0 0 0 0
2021-12-30 0 0 0 0
2021-12-31 0 0 0 0
TOTAL 11.5 41
AVG 2 3
TOTAL 52.5

TOTAL DAILY AVG. 5


Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 8 of 22

Raw Sludge Production


BB C BB D RAW SLUDGE VOL.
DATE FLOW FLOW BB C BB D
M3/D M3/D M3/D M3/D
2021-12-01 68 78 0 0
2021-12-02 64 104 0 0
2021-12-03 57 95 0 0
2021-12-04 54 86 0 0
2021-12-05 53 78 0 0
2021-12-06 60 101 0 0
2021-12-07 0 106 0 0
2021-12-08 0 79 0 0
2021-12-09 0 75 0 0
2021-12-10 0 70 0 0
2021-12-11 0 35 0 0
2021-12-12 0 254 0 0
2021-12-13 0 106 0 0
2021-12-14 0 0 0 2.1
2021-12-15 0 0 0 3.6
2021-12-16 0 0 0 3.4
2021-12-17 0 0 0 2.7
2021-12-18 0 0 0 2.1
2021-12-19 0 0 0 0.6
2021-12-20 0 0 0 1.0
2021-12-21 0 0 0 2.3
2021-12-22 0 0 0 2.7
2021-12-23 0 0 0 6.6
2021-12-24 0 0 0 4.6
2021-12-25 0 0 0 0.0
2021-12-26 0 0 0 5.0
2021-12-27 0 0 0 4.9
2021-12-28 0 0 0 1.2
2021-12-29 0 0 0 4.3
2021-12-30 0 0 0 4.0
2021-12-31 0 0 0 4.3
TOTAL 0 55
AVG 0 3
TOTAL 55

TOTAL DAILY AVG. 3


Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 9 of 22

Sludge Outgoing
NO OF FILLING DRY SLUDGE
DATE
BEDS REMOVED TON

2021-12-01 1
2021-12-02 1
2021-12-03 1
2021-12-04 1
2021-12-05 1
2021-12-06 1
2021-12-07 1
2021-12-08 1
2021-12-09 1

2021-12-10 1
2021-12-11 2
2021-12-12 2
2021-12-13 2
2021-12-14 2
2021-12-15 2
2021-12-16 2
2021-12-17 2
2021-12-18 2
2021-12-19 2
2021-12-20 2
2021-12-21 3
2021-12-22 3
2021-12-23 3
2021-12-24 3
2021-12-25 3
2021-12-26 3

2021-12-27 3
2021-12-28 3
3
2021-12-29
2021-12-30 3
2021-12-31 3

AVERAGE .09

TOTAL 4
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 10 of 22

Waste Disposal (Skips Removal )

Nos. Quantity
Sl. No. Items Removed Remarks
Skips M3

1. Grits 2 4

2. Screened materials 1 2

Total 3 6
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 11 of 22

Lab Results for Aeration Tank BB (A,B) for the Month of DECEMBER

BB A BB B
Settled Settled
*Total *Total
Date DO Sludge DO Sludge
Suspended Suspended
mg/l Volume mg/l Volume
Solids (mg/l) Solids (mg/l)
SVI (ml/g) SVI(ml/g)
2021-12-01 21.75 3 22.2 3.5
2021-12-02 18.5 3 38.5 3
2021-12-03 13.8 3.3 28.7 3
2021-12-04 26.75 3 25.5 3
2021-12-05 15.75 3.3 16.2 3
2021-12-06 18.25 2.9 17.5 2.8
2021-12-07 20.2 3
2021-12-08 15.2 3.2
2021-12-09 16 3
2021-12-10 21.4 3.1
2021-12-11 23.7 3
2021-12-12 20 3.2
2021-12-13 60.2 3
2021-12-14
2021-12-15
2021-12-16
2021-12-17
2021-12-18
2021-12-19
2021-12-20
2021-12-21
2021-12-22
2021-12-23
2021-12-24
2021-12-25
2021-12-26
2021-12-27
2021-12-28
2021-12-29
2021-12-30
2021-12-31
AVERAGE 11.9 3 11 2.9
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 12 of 22

Lab Results for Aeration Tank BB (C,D) for the Month of DECEMBER

BB C BB D
Settled Settled
*Total *Total
Date DO Sludge DO Sludge
Suspended Suspended
mg/l Volume mg/l Volume
Solids (mg/l) Solids (mg/l)
SVI (ml/g) SVI(ml/g)
2021-12-01
2021-12-02
2021-12-03
2021-12-04
2021-12-05
2021-12-06
2021-12-07
2021-12-08 23 3.6
2021-12-09 38.3 3.7
2021-12-10 25.6 3.4
2021-12-11 20 3
2021-12-12 22.7 3.5
2021-12-13 24.8 3
2021-12-14 20.3 3
2021-12-15 23.8 3
2021-12-16 15.3 3
2021-12-17 15.7 3.2
2021-12-18 16 3.5
2021-12-19 17.3 3.6
2021-12-20 20.7 3.3
2021-12-21 54.3 3
2021-12-22 30.3 3.7
2021-12-23 44.8 3
2021-12-24 56.9 3
2021-12-25 67.5 3
2021-12-26 20.3 2.8
2021-12-27 23.7 2.9
2021-12-28 63 3
2021-12-29 39.3 4 20.8 2.6
2021-12-30 31.5 3.5 20 3
2021-12-31 30.1 3 17.6 3.1
AVERAGE 33.6 3.5 29.3 2.9
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 13 of 22

Process Disinfection Chemicals

Net Chlorine Consumption - Monthly Summary

TOTAL KG

MONTH DAYS Chlorine Tank

December 31 600

DAILY AVERAGE [Kg] 16

AVERAGE [mg/l] 0.33

Chlorine Stock

Chlorine Drumset Full Chlorine Drumset Online


Location No of
Amount -Kgs No of Drums Amount -Kgs
Drums
Chlorination Drum Set
2 1200 1 600
Room

Total 2 1200 1 600

Drums Received : 2

Drums Returned : 0
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 14 of 22

Peripheral Maintenance Report

S. No. Date Description Status

NOV sludge pump Valve actuator Maintenance

Bioblock cleaning
2-DEC Chlorine tank cleaning Completed

Headwork cleaning
Bioblock cleaning

4- DEC Chlorine tank cleaning Completed

Headwork cleaning

Bioblock cleaning

6- DEC Chlorine tank cleaning Completed

Headwork cleaning

Bioblock cleaning

8- DEC Chlorine tank cleaning Completed

Headwork cleaning

28- Grits Removal From Sand silos


DEC Completed

Bioblock cleaning

10- DEC Chlorine tank cleaning Completed

Headwork cleaning

11- Trashes Removal From Screening Skips Completed


DEC
Bioblock cleaning

12- DEC Chlorine tank cleaning Completed

Headwork cleaning

Bioblock cleaning

14- DEC Chlorine tank cleaning Completed

Headwork cleaning
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 15 of 22

S. No. Date Description Status

Bioblock cleaning
18- DEC Chlorine tank cleaning Completed

Headwork cleaning
Bioblock cleaning

20- DEC Chlorine tank cleaning Completed

Headwork cleaning

Bioblock cleaning

22- DEC Chlorine tank cleaning Completed

Headwork cleaning

23- Grits Removal Completed


DEC
Bioblock cleaning

24- DEC Chlorine tank cleaning Completed

Headwork cleaning

NOV Cholorine Gas Flow control valve calibration Maintenance

Bioblock cleaning

` 26- DEC Chlorine tank cleaning Completed

Headwork cleaning

Bioblock cleaning

28- DEC Chlorine tank cleaning Completed

Headwork cleaning

29- Trashes Removal Completed


DEC
Bioblock cleaning

30- DEC Chlorine tank cleaning Completed

Headwork cleaning
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 16 of 22

BIOBLOCK MAINENANCE&CLEANING
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 17 of 22

Cholorine Tank cleaning


Headwork cleaning
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 19 of 22

Organization Chart & Manpower List attached

Greece Technical

1- Dimitrios Reppas
2- Savvas Fytopoulos
3- Konstantinos paroussis
4- Thomas siampaliotis
5- kostantinos marinos

‫ ﺃﺣـــــﻤــــﺪ ﻋــــــﺎﺩﻝ‬/‫ﻡ‬

‫ﻭﺭﺩﻳﻪ ﻟﻴﻠﻰ‬ ‫ﻣﻌﻤﻞ‬ ‫ﻭﺭﺩﻳﻪ ﻧﻬﺎﺭﻯ‬

‫ﻌﻡ‬ 1 ‫ ﻭﻟﻳﺩ ﻣﺣﻣﺩ ﻋﺑﺩﺍﻟﻣﻧ‬- ‫ﺩ‬ ‫ ﻣﺣﻣﺩ ﺍﻟﺳﻳ‬/1‫ ﻛﻣﻳﺎﺋﻲ‬- ‫ﺏ‬ ‫ ﺳﻳﺩ ﻏﺭﻳ‬-1
‫ﻝ‬ 2 ‫ ﺍﺣﻣﺩ ﻛﺎﻣ‬- ‫ﻰ‬ ‫ﺍﺣﻣﺩ ﺫﻛ‬2 / ‫ ﻣﺳﺎﻋﺩ‬- ‫ﻰ‬ ‫ ﻋﺑﺩﺍﻟﺭﺣﻣﻥ ﻟﻁﻔ‬-2
‫ﺭ‬ ‫ ﺭﺿﺎ ﺍﺣﻣﺩ ﺍﻟﻧﺟﺎ‬-3
‫ ﻋﺑﺩﺍﻟﻣﻧﻌﻡ‬-4
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 20 of 22

Emergency Equipment list


Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 21 of 22

5. Outsourcing Services

SUPPLIERS ON SITE

OTHER CONTRACTING ACTIVITIES IMPACTING ON OPERATIONS

.
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
Mafraq Monthly Report – October 2021 Page: 22 of 22

6. HSE Report

1- Key Performance Indicator

Sr. No. Performance Indicators Data

HS.1 Lost Time Injuries Nil

HS.2 Fatalities Nil

HS.3 Injuries Nil

HS.4 Ill - Health Nil

HS.5 Injury Severity Rate Nil

2- HSE Inspection

No. Activities Frequency

1 Walk Down Inspection Daily

2 Work Permit issued Daily

3 Inspection of Equipment and Tools As per schedule

4 Replacement or cleaning of Safety Signage’s Weekly

5 Inspection and cleaning of all SCBA container boxes. Weekly

6 Inspection of Fire Extinguishers Monthly

You might also like