Contract SH.QCB.01
Dyarb Negm Ww TP
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 2 of 22
b. Flow Distribution
1- BIOBLOCK A: The average flow to the BB was 2200 m3/d ( from 1/12 to 6 /12)
2- BIOBLOCK B : The average Flow to the BB was 1500 m3/d ( from 1/12 to 13 /12)
3- BIOBLOCK C: The average flow to the BB was 1054 m3/d ( from 29/12 to 31 /12)
4- BIOBLOCK D: The average flow to the BB was 1620 m3/d ( from 8/12 to 31 /12)
c . Sludge Management
D. Cholorine system
- injected amount of chlorine During NOV was 496 kg
E. Lap Result
- Average COD was 72. 9 ml/l
- average PH was 7.4
- average MLss was 4232.5 mg/l
-average MLVss was 2602.1 mg/l
-average Tss was 206. 1 mg/l
-average Vss was 164.6 mg/l
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 3 of 22
ISSUES
NO SUBUNITS NO EQUIPMENTS RESULT
FAULTS CAUSES PROCEDURES
1 MECH SCREEN
2 ELEC PENSTOCK
3 GRIT REMOVAL BRIDGE
1 HEADWORK
4 AIR LIFT PUMP
5 VALVES
6 AIR BLOWERS
1 AIR BLOWERS
2 PUMPS
2 BIOBLOCK 3 VALVES
4 AIR LIFT PUMP
5 PIPING
1 SCREW PUMP
THICKNER 2 VALVES
3 3 THICKNER
1 S.N PUMPS
2 SLDGE PUMPS
4 PUMP STATION SLUDGE
ACTUATOR ELEC NOT
3 VALVES SUPPLIER MAINTENANCE
NOT ISSUE FINISHED
WORKING
NOT NOT
5 CHOLOR
1 CHOLOR FLOW CTRL
READING
SUPPLIER CALIBRATION
FINISHED
6 GENERATOR 1
ELECTRICAL
7 EQUIPMENT
1
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 4 of 22
Charts
- Chart For BB A
- Chart For BB B
- Chart For BB C
- Chart For BB D
- Chart For BB A
- Chart For BB B
- Chart For BB C
- Chart For BB D
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 5 of 22
Sludge Outgoing
NO OF FILLING DRY SLUDGE
DATE
BEDS REMOVED TON
2021-12-01 1
2021-12-02 1
2021-12-03 1
2021-12-04 1
2021-12-05 1
2021-12-06 1
2021-12-07 1
2021-12-08 1
2021-12-09 1
2021-12-10 1
2021-12-11 2
2021-12-12 2
2021-12-13 2
2021-12-14 2
2021-12-15 2
2021-12-16 2
2021-12-17 2
2021-12-18 2
2021-12-19 2
2021-12-20 2
2021-12-21 3
2021-12-22 3
2021-12-23 3
2021-12-24 3
2021-12-25 3
2021-12-26 3
2021-12-27 3
2021-12-28 3
3
2021-12-29
2021-12-30 3
2021-12-31 3
AVERAGE .09
TOTAL 4
Dyarb Negm Ww TP 10.000 m3/d Date:
(SHARKIA Potable Water and Sanitation Co.) Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DyarbNegm- Monthly Report – Page: 10 of 22
Nos. Quantity
Sl. No. Items Removed Remarks
Skips M3
1. Grits 2 4
2. Screened materials 1 2
Total 3 6
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 11 of 22
Lab Results for Aeration Tank BB (A,B) for the Month of DECEMBER
BB A BB B
Settled Settled
*Total *Total
Date DO Sludge DO Sludge
Suspended Suspended
mg/l Volume mg/l Volume
Solids (mg/l) Solids (mg/l)
SVI (ml/g) SVI(ml/g)
2021-12-01 21.75 3 22.2 3.5
2021-12-02 18.5 3 38.5 3
2021-12-03 13.8 3.3 28.7 3
2021-12-04 26.75 3 25.5 3
2021-12-05 15.75 3.3 16.2 3
2021-12-06 18.25 2.9 17.5 2.8
2021-12-07 20.2 3
2021-12-08 15.2 3.2
2021-12-09 16 3
2021-12-10 21.4 3.1
2021-12-11 23.7 3
2021-12-12 20 3.2
2021-12-13 60.2 3
2021-12-14
2021-12-15
2021-12-16
2021-12-17
2021-12-18
2021-12-19
2021-12-20
2021-12-21
2021-12-22
2021-12-23
2021-12-24
2021-12-25
2021-12-26
2021-12-27
2021-12-28
2021-12-29
2021-12-30
2021-12-31
AVERAGE 11.9 3 11 2.9
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 12 of 22
Lab Results for Aeration Tank BB (C,D) for the Month of DECEMBER
BB C BB D
Settled Settled
*Total *Total
Date DO Sludge DO Sludge
Suspended Suspended
mg/l Volume mg/l Volume
Solids (mg/l) Solids (mg/l)
SVI (ml/g) SVI(ml/g)
2021-12-01
2021-12-02
2021-12-03
2021-12-04
2021-12-05
2021-12-06
2021-12-07
2021-12-08 23 3.6
2021-12-09 38.3 3.7
2021-12-10 25.6 3.4
2021-12-11 20 3
2021-12-12 22.7 3.5
2021-12-13 24.8 3
2021-12-14 20.3 3
2021-12-15 23.8 3
2021-12-16 15.3 3
2021-12-17 15.7 3.2
2021-12-18 16 3.5
2021-12-19 17.3 3.6
2021-12-20 20.7 3.3
2021-12-21 54.3 3
2021-12-22 30.3 3.7
2021-12-23 44.8 3
2021-12-24 56.9 3
2021-12-25 67.5 3
2021-12-26 20.3 2.8
2021-12-27 23.7 2.9
2021-12-28 63 3
2021-12-29 39.3 4 20.8 2.6
2021-12-30 31.5 3.5 20 3
2021-12-31 30.1 3 17.6 3.1
AVERAGE 33.6 3.5 29.3 2.9
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 13 of 22
TOTAL KG
December 31 600
Chlorine Stock
Drums Received : 2
Drums Returned : 0
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 14 of 22
Bioblock cleaning
2-DEC Chlorine tank cleaning Completed
Headwork cleaning
Bioblock cleaning
Headwork cleaning
Bioblock cleaning
Headwork cleaning
Bioblock cleaning
Headwork cleaning
Bioblock cleaning
Headwork cleaning
Headwork cleaning
Bioblock cleaning
Headwork cleaning
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 15 of 22
Bioblock cleaning
18- DEC Chlorine tank cleaning Completed
Headwork cleaning
Bioblock cleaning
Headwork cleaning
Bioblock cleaning
Headwork cleaning
Headwork cleaning
Bioblock cleaning
Headwork cleaning
Bioblock cleaning
Headwork cleaning
Headwork cleaning
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 16 of 22
BIOBLOCK MAINENANCE&CLEANING
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 17 of 22
Greece Technical
1- Dimitrios Reppas
2- Savvas Fytopoulos
3- Konstantinos paroussis
4- Thomas siampaliotis
5- kostantinos marinos
ﺃﺣـــــﻤــــﺪ ﻋــــــﺎﺩﻝ/ﻡ
ﻌﻡ 1 ﻭﻟﻳﺩ ﻣﺣﻣﺩ ﻋﺑﺩﺍﻟﻣﻧ- ﺩ ﻣﺣﻣﺩ ﺍﻟﺳﻳ/1 ﻛﻣﻳﺎﺋﻲ- ﺏ ﺳﻳﺩ ﻏﺭﻳ-1
ﻝ 2 ﺍﺣﻣﺩ ﻛﺎﻣ- ﻰ ﺍﺣﻣﺩ ﺫﻛ2 / ﻣﺳﺎﻋﺩ- ﻰ ﻋﺑﺩﺍﻟﺭﺣﻣﻥ ﻟﻁﻔ-2
ﺭ ﺭﺿﺎ ﺍﺣﻣﺩ ﺍﻟﻧﺟﺎ-3
ﻋﺑﺩﺍﻟﻣﻧﻌﻡ-4
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
DYN Monthly Report – October 2021 Page: 20 of 22
5. Outsourcing Services
SUPPLIERS ON SITE
.
Dyarb Negm Ww TP 10.000 m3/d Date: 07 October 2021
(SHARKIA Potable Water and Sanitation Co.)
Revision: 00
Contract No. SRSSP.(SH.QCB.01)
Mafraq Monthly Report – October 2021 Page: 22 of 22
6. HSE Report
2- HSE Inspection