ACESCO Std.

No 10031-9-VGS-G000-00857-01

1 FOR APPROVAL Z.Y. M.C M.C E.C. 10.04.2009


0 FOR APPROVAL Z.Y. M.C M.C E.C. 03.03.2009
REVISION DESCRIPTION BY CHECK APPROVED APPROVED DATE
OWNER :

GENERAL ELECTRIC COMPANY OF LIBYA


ZWITINA 2X285 MW GAS TURBINE PROJECT

CONSULTANT :

Arabian Consulting & Engineering Services Co.

TITLE :

STANDARD INSPECTION AND TEST PLAN


ITP No: 935
MV SWITCHGEARS
SUB-CONTRACTOR : MAIN CONTRACTOR :

PROJECT DOC. NO:

SIZE JOB NO. AREA DEPT. CODE DESIGN REV


SCALE
This Drawing/Document is the property of
ENKA TEKNIK and it cannot be used,
reproduced or loaned to third parties without
the written permission of ENKA TEKNIK 4 7 4 0 0 3 2 0 T - 9 7 5 08 1 NTS
FORMS INDEX

LIST OF ATTACHED FORMS

No. Form No. Rev. Description


1. ITP - 935 1 STANDART ITP:935 – MV SWITCHGEARS
2. 0 AREVA MV SWITCHGEARS FAT PROCEDURE

LIST OF REFERENCE DOCUMENTS

0 740032 0E-061 01 MV MAIN DISTRIBUTION SINGLE LINE DIAGRAM


4 740032 0E-054 05 MV SWITCHGEAR TECHNICAL SPECIFICATION
4 740032 0E-063 01 MV SWITCHGEAR INCOMING and BUS COUPLER OPERATION
DESCRIPTION
4 740032 0E-056 01 MV DISTRIBUTION PANEL MANUFACTURER DRAWINGS
STANDARD INSPECTION AND TEST PLAN Document No:
47400320T97508
ITP No: 935 Date:10.04.2009
MV SWITCHGEARS Rev.No:1
Page: 2
PROJECT NAME: ZWITINA POWER PLANT PROJECT NO:740032 DRAWING NO/ISO NO: OTHER REFERENCES:

MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:

Activity Activity Inspection/Test Reference Document Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements ENKA TEKNİK Rep. Client GECOL/ACES Co. Rep. Reference No.:
935-1 Visual and Dimensional Inspection Refer to AREVA FAT • Outline Drawings W W
1-Physical Inspection, Cubicle Dimensions Procedure • IEC 62271-100& IEC 60694
2-Painting and color
3-Name Plate and Labelling
4-Accessories and quantities

935-2 Mechanical Operation Tests Refer to AREVA FAT • IEC 62271-100 W W


Procedure

935-3 Electrical Operating Tests Refer to AREVA FAT • IEC 62271-100 W W


Procedure

935- 4 Dielectric Tests / Measurement of Circuit Resistance Refer to AREVA FAT • IEC 62271-100 W W
Procedure • IEC 60694

935- 5 TYPE TESTS • IEC 62271 R R


1-75 kV impulse and 42 kV 50 Hz/ 1 min tests • IEC 60298
2-Electrical continuity of earthed metallic cover of • IEC 60694
Cable compartment • IEC 60068
3-Internal Fault Test
4-Magnetic Field Emission
5-Seismic Tests
6-Short Circuit Performance
7-Temperature rise tests of the main circuit
8-Vibration Tests
9-Test under conditions of arcing due to internal fault
10-Short-time withstand current and peak withstand
Current test

Note : Above mentioned tests shall be carried out by manufacturer.


Legend : S - Surveillance Inspection W - Witness Inspection Point H - Mandatory Hold Point For Inspection R - Record Review
* Report or Certificate to be provided.

Sub -contractor QC Date & Signature /Stamp No. Enka Teknik QC Date & Signature /Stamp No. Client GECOL/ACES Co. Rep. Date & Signature / Stamp No.
12 KV Switchboards PIX 12 type
FACTORY ACCEPTANCE TESTS Page 1/3

METAL-CLAD SWITCHGEAR TYPE : PIX 12

CUSTOMER : ENKA TEKNIK A.S.


SUBSTATION : ZWITINA POWER PLANT

Customer's reference :
AREVA order Nbr : ATM-08-E-110
Customer's specification : 4 740032 0E-05405
Standards : Tests and verifications as per
IEC 62271-100/62271- 200/60694/60044-1/60044-2

CHARACTERISTICS :

Rated voltage : 12 kV
Rated lightning impulse withstand voltage (peak value) : 75 kV
Rated normal current (for busbar) : 2500 A
Rated short time withstand current (r.m.s. value) : 40 kA
Rated frequency : 50 Hz
Service voltage : 6.6 kV

AREVA T&D Enerji Endüstrisi A.Ş. Barış Mah., 1801 Sok. No:104, 41410 Gebze – Kocaeli / TÜRKİYE

Tel.: +90 (262) 648 3300 Faks: +90 (262) 641 2036
FACTORY ACCEPTANCE TESTS Page 2/3

1) BUILDING CONFORMITY (IEC 62271-100 & 60694 ,sub-clause 7.5)

1-1 Physical inspection of cubicles/ Cubicles dimensions

1-2 Labelling of switchgear in accordance with drawings

1-3 HV Main Components


Circuit-breakers : verification of their ratings and characteristics
Number of current or voltage transformers
Verification of their characteristics

1-4 Verification of painting.

2) MECHANICAL OPERATING TESTS (IEC 62271-100 sub-clause 7.102)

2-1 Working of switchgear


Verification of plugging in, operation of protective shutters
Mechanical operation tests on circuit-breakers.
Mechanical tests of earthing switch interlocking with circuit breaker movable part.

2-2 Verification of interchangeability and no interchangeability devices

2-3 Verification of working of mechanical interlocks

2-4 Verification of working of key locks (only for cables side V.T's)

3) ELECTRICAL OPERATING TESTS

3-1 Verification of wiring marking


3-2 Auxiliary and control switchgear
Number of auxiliary/protective relays/metering devices
Verification of their characteristics
Verification of Protective Relays good operation by Secondary injection
Verification of Energy Meters good operation by Secondary injection
3-3 Verification of ratio, winding direction of current and voltage transformers
3-4 Functional Tests/Verification of working of HV switchgear and auxiliary and control circuits
FACTORY ACCEPTANCE TESTS Page 3/3

4) DIELECTRIC TESTS/MEASURE OF CIRCUIT RESISTANCE

4-1 Power frequency withstand voltage tests on the main circuit


(including Circuit-Breakers in closed position)

Checking of the live line indication lamps operation during this test.

4-2.Main Circuit (with circuit-breaker) resistance measurement

4-3 Voltage withstand tests on auxiliary and control circuits


(IEC 62271-100 & 60694 sub-clause 7.2.4 Amendment N°2)

5) VERIFICATION OF ROUTINE TESTS REPORTS