TENDER SCHEDULE OF DEVELOPMENT WORKS (ANNEXURE-B)

Name of work :Design and construction of UG & PG Hostel (G+3 floors) and dining hall building for 500 capacity of Boys and 500 capacity of Girls for
Central University of Karnataka at Kalaburagi, Karnataka. SH: Building portion including internal water supply, sanitary installations, drainage, overhead
terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, fire fighting system, lifts, solar water heating system, LT panel, street
lighting, in EPC mode (Design & Build basis) and Development of site, bulk services including internal roads, paths, storm water drains, UG sump, etc.
( BOQ based).
BILL OF QUANTITIES
Development works and services (BoQ based)
Rate i/c
Item No. Description of Item Qty Unit AMOUNT
C.I.
EARTH WORK
1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and
disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge.
1.1 All kinds of soil 1735 cum 212.67 368989
2 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and
disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-
Charge.
2.1 Ordinary rock 86 cum 412.19 35448

3 Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and
dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil,
and then returning the soil as required, in layers not exceeding 20 cm in depth, including
consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated
soil as directed, within a lead of 50 m :
3.1 All kinds of soil
3.1.1 Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia 513 metre 425.93 218503
4 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in
layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, 100 cum 256.88 25688
lead up to 50 m and lift up to 1.5 m.
5 Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked
materials.
5.1 All kinds of soil. 20 cum 105.72 2114

5.2 Ordinary or hard rock. 80 cum 189.58 15166


Rate i/c
Item No. Description of Item Qty Unit AMOUNT
C.I.
CONCRETE WORK
6 Providing and laying in position cement concrete of specified grade excluding the cost of centering
and shuttering - All work up to plinth level :
6.1 1:5:10 (1 cement : 5 coarse sand(zone-III) : 10 graded stone aggregate 40 mm nominal size) 495 cum 6455.99 3195715

7 Extra for providing and mixing water proofing material in cement concrete work in doses by weight per kg
of cement as per manufacturer’s specification. 338 66.14 22354
cement
REINFORCED CEMENT CONCRETE
8 Centering and shuttering including strutting, propping etc. and removal of form for :
8.1 Foundations, footings, bases of columns, etc. for mass concrete 17.44 sqm 333.13 5810
8.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. 208.32 sqm 712.58 148444

8.3 Suspended floors, roofs, landings, balconies and access platform 48 sqm 810.52 38905
9 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position
and binding all complete upto plinth level.
9.1 Thermo-Mechanically Treated bars of grade Fe-500D or more. 7800 kg 97.65 761695
10 Providing and laying in position machine batched and machine mixed design mix M-25 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as per
IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength
and durability as per direction of Engineer-in-charge.
(Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as
per design mix is payable/recoverable separately).
10.1 All works upto plinth level 52.12 cum 9352.84 487470
FINISHING
11 12 mm cement plaster finished with a floating coat of neat cement of mix :
11.1 1:4 (1 cement: 4 fine sand) 148 sqm 383.89 56815
12 6 mm cement plaster of mix :
12.1 1:3 (1 cement: 3 fine sand) 80 sqm 265.89 21271
Rate i/c
Item No. Description of Item Qty Unit AMOUNT
C.I.
ROAD WORK
13 Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after
excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road
roller including making good the undulations etc. and re-rolling the sub grade and disposal of 3183 sqm 183.32 583505
surplus earth with lead upto 50 metres.
14 Providing and laying C.C. pavement of mix M-30 with ready mixed concrete from batching plant.
The ready mixed concrete shall be laid and finished with screed board vibrator, vacuum
dewatering process, providing dowel bars with sleeve/ tie bars wherever required, laying at site,
spreading and compacting mechanically by using needle and surface vibrators, levelling to
required slope/ camber, finishing with required texture, including steel form work with sturdy M.S.
channel sections, curing, making provision for contraction / expansion, construction & longitudinal
joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with
approved joint filler and sealants, complete all as per direction of Engineer-in-charge (The panel
shuttering work and items of joint fillers, sealant, dowel bars with sleeve /tie bars to be paid
separately).

Note:- Cement content considered in M-30 is @ 380 kg/cum. Excess/ less cement used as per 319 cum 10235.87 3265244
design mix is payable/ recoverable separately.
14.1 Add for using extra cement in the items of design mix over and above the specified cement content 127.38 Qntl 787.42 100302
therein.
15 Providing and laying at or near ground level factory made kerb stone of M-25 grade cement
concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1
cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except
at sharp curve shall not to more than 5mm), including making drainage opening wherever required
40 Cum 9795.91 391836
complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be
measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).

WATER SUPPLY

16 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot &
cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes
& fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as
per direction of Engineer in Charge : External work

16.1 75 mm nominal inner dia. Pipes. 502 metre 2299.06 1154129


Rate i/c
Item No. Description of Item Qty Unit AMOUNT
C.I.
DRAINAGE
17 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff
mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints
etc. complete :
17.1 150 mm dia. R.C.C. pipe 395 metre 541.01 213699

17.2 250 mm dia. R.C.C. pipe 118 metre 882.33 104115


18 Constructing brick masonry circular type manhole 0.91 m internal dia at bottom and 0.56 m dia at
top in cement mortar 1:4 (1 cement :4 coarse sand), in side cement plaster 12 mm thick with
cement mortar 1:3 (1cement : 3 coarse sand) finished with a floating coat of neat cement,
foundation concrete 1:3:6 mix (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm
nominal size), and making necessary channel in cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement,
all complete as per standard design :

18.1 0.91 m deep with S.F.R.C. cover and frame (heavy duty, HD-20 grade designation) 560 mm
internal diameter conforming to I.S. 12592, total weight of cover and frame to be not less than 182
kg., fixed in cement concrete 1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size) including centering, shuttering all complete.(Excavation, foot rests and 12 mm thick
cement plaster at the external surface shall be paid for separately) :

18.1.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 18 each 12909.06 232363
19 Extra depth for circular type manhole 0.91 m internal dia (at bottom) beyond 0.91 m to 1.67 m
19.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 4 metre 7541.40 30166
20 Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS :
10910, on 12 mm dia steel bar conforming to IS: 1786, having minimum cross section as 23 mm x
25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space
between protruded legs having 2 mm tread on top surface by ribbing or chequering besides
necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing
16 each 541.54 8665
and suitable to with stand the bend test and chemical resistance test as per specifications and
having manufacture's permanent identification mark to be visible even after fixing, including fixing
in manholes with 30x20x15 cm cement concrete block 1:3:6 (1 cement : 3 coarse sand :6 graded
stone aggregate 20 mm nominal size) complete as per design.

20.1 Supplying and fixing C.I. cover without frame for manholes :
20.1.1 455x610 mm rectangular C.I. cover (light duty) the weight of the cover to be not less than 23 kg. 3 each 1551.05 4653

Total 11493065
TENDER SCHEDULE OF PLINTH AREA (PART D) (Annexure -A)
FOR QUOTING COMBINED RATE FOR CIVIL & ELECTRICL WORKS.
Name of Work: Design and construction of UG & PG Hostel (G+3 floors) and dining hall building for 500 capacity of Boys and 500 capacity of Girls for Central
University of Karnataka at Kalaburagi, Karnataka. SH: Building portion including internal water supply, sanitary installations, drainage, overhead terrace tanks, rain
water harvesting, internal electrical installations, lightning conductor, fire fighting system, lifts, solar water heating system, LT panel, street lighting, in EPC mode
(Design & Build basis) and Development of site, bulk services including internal roads, paths, storm water drains, UG sump, etc. ( BOQ based).

The bidder must quote his/their rate in the following format (to be quoted only in the Financial bid only and nowhere else):-

Percentage
Estimated cost above or below % in
Sl.No. Name of component Total Cost
in Rs. the estimated Figures
cost
1 Design and construction of UG & PG Hostel (G+3 floors) and dining hall
building for 500 capacity of Boys and 500 capacity of Girls for Central University
of Karnataka at Kalaburagi, Karnataka. SH: Building portion including internal
water supply, sanitary installations, drainage, overhead terrace tanks, Internal
electrical installations, lighting conductor, fire fighting system, lifts, solar water
heating system, LT panel, street lighting, Development of site and bulk services
including internal roads, paths, storm water drains, rain water harvesting, etc.
509500638 0
in EPC mode. (Design & Build basis). (Plinth area 18764 sqm). (Except Sl.No.2
below)

Development works and services (BoQ Based)


2 Design and construction of UG & PG Hostel (G+3 floors) and dining hall building
for 500 capacity of Boys and 500 capacity of Girls for Central University of
Karnataka at Kalaburagi, Karnataka. SH: Development of site, bulk services
11493065
including internal roads, paths, storm water drains, UG sump, etc. ( BOQ based).

-
Total 520993703
Note:Development work and services BOQ as per Annexure-B enclosed for Sl.No.2.
Notes:-
1 The rate quoted in the bid will cover all provisions of bid documents such as scope of work, relevant specifications and all other terms & conditions of the
contract, etc.
2 Payment shall be made for the actual area built.

3 The quoted rate shall be inclusive of all types of foundation that may be required to be provided as per structural considerations.

4 Ramp with stainless steel railing for physically challenged persons shall be provided at Ground floor which shall not be considered for plinth area
calculation and for measurement.
5 The plinth area shall be measured as per IS: 3861.
(i) Plinth area shall not include shafts open to sky, however shaft cover at top shall be counted at one floor level only

(ii) Balcony area shall be measured and paid @50% of the Plinth area rate irrespective of top being protected or not protected above.
6 The work will be awarded as a whole and no splitting of work shall be considered. The lowest bidder shall be decided on the basis of overall
bid amount.

Signature Of Contractors / Bidders


Name and address of Contractors /Bidders Executive Engineer
HCD, CPWD, Hubli