A MICRO- PROJECT REPORTON

"TYPES OF FORMWORK USE


FOR
RCC STRUCTURES AT SITE "

2021-2022

This Micro-project ssubmitted in partial fulfillment of the


Requirement for the award of diploma in
CIVIL ENGINEERING

Under the guidance of


Mr.JAYANT SAHARE SIR
(Lecturer in Cvil Engineering Department)

SUBMITTED BY
Vishal.R.Shende

DEPARTMENT OF CIVIL ENGINEERING


GOVERNMENT POLYTECHINC BRAMHAPURI,
2021- 2022
CERTIFICATE

This is to certify that Mr. Vishal . R. Shende of


Fifth semester of " DIPLOMAIN CIVIL ENGINEERING " has satisfactorily
completed this project entitled"TYPES OF FORMWORK USE FOR RCC
STRUCTURES A SITE " During this year 2021- 2022 in requirement of the
partial fulfillment of Diploma courses civil Engineering.

Mr.JAYANT SAHARE SIR

(MICRO-PROJECTGUIDE)

GOVERNMENT POLYTECHINC BRAMHAPURI,


GOVERNMENT POLYTECHNIC,BRAMHAPURI

SUBMISSION
I amMr.Vishal R.Shende Roll No. 03 a student of
Third year of Department of Civil Engineering , humbly
completed this microproject in Subject Design of steel and RCC structure
(DSR) work from the time to time as described in this report by
ourown skill and study between the period from 2021- 2022.
As per instructions and Guidance of Mr.JAYANT
SAHARE and that, Ihave not copedi the report
or it's any apprecabe part from any other iterative contravention
of thrilling academcethcs.ii

Date:-
Sign

Name:-................................
..............
Part–A
Micro-ProjectProposal

Title of Micro-Project
TYPES OF FORM WORK USE FOR RCC STRUCTURE SATSITES
• Aims of the Micro-Project:
Prepare a report on types of form work use for RCC structure satsites.

• Course Outcomes Addressed:


1) To acquire knowledge about types of formwork use for RCC structure satsites.
2) To study the suitability of types of formwork use for RCC structure satsites.

3.0ProposedMethodology:
At the first step we got our topic of design of steel and RCC structures to
Preparereport on types of formwork use for RCC structures at sites. Then we discussed with our
subjectteacher about the collection of data required for project, source of data, preparation
ofreport etc.
For our micro-project thenwe will discuss about topic inour group and
distributeourworkamongallgroupmembers.Wewillsearchfortypesofformwork usefor
RCCstructures at sites and then we will show our collected data to subject teacher after that
wewillprepareareport.
4.0 Action Plan

Sr. Detailsofactivity PlannedStartdate Planned Roll no.


No. Finishdat ofResponsibleTea
e m
Members
-
1. Microprojectgiven 20/11/2021 -

2. Collectingtheinformation 26/11/2021 11/12/2021


-
3. Distributionofwork 30/11/2021 -

4. PreparationofReport 05/12/2021 12/12/2021 -


-
5. Submission 08/12/2021 -
6.0 ResourcesRequired

Sr.No. NameofResource/material Specifications Quality Remarks


1. Internet - -
2. Computer HPCompany,Windows10 01Nos. -
3. Buildingconstruction Niralipublication 01Nos. -

Names of Team Members with Roll No.

Sr.No. Student Name Roll No.

01 Vishal Ratan Shende 03

Part– B
Micro-ProjectReport
TitleofMicro-Project
TYPESOFFORMWORK USEFORRCC STRUCTURESATSITES

• Rationale:-
The use of formwork is very important in the process of construction.
Therearemany types offormworkand thisisnecessarywhenconstructingabuild.Becauseof
formwork,it is easy tomake the different designof building parts suchas stairs,
walls,andfloor.Thereare3typesofformworkdesignsuchastimberformwork,plywoodformwork,
andsteelformwork.

2.0 AimoftheMicro-Project :
PrepareareportontypesofformworkuseforRCCstructuresatsites.

• CourseOutcomesAddressed:-

1) ToacquireknowledgeabouttypesofformworkuseforRCCstructuresatsites.
2) TostudythesuitabilityoftypesofformworkuseforRCCstructuresatsites.

4.0 LiteratureReview
Sr. TitleofBook Author Publication
no.

01. BuildingConstruction Vithoba K. Kumawat Niralipublication


,Sheetal S. Karale
,Vaibhao K.Sonarkar

02. Design of steel and R. R. Gadpal, Niralipublication


R.C.CStructure D.J.Khamkar,
R.B.Narahari

5.0ActualMethodology Followed:-
AtthefirststepwegotourtopicofdesignofsteelandRCCstructurestoPreparereportontypesoff
ormworkuseforRCCstructuresatsites.Thenwediscussedwithour
subject teacher about the collection of data required for project, source of data,
preparationofreportetc.
For our micro-project thenwe will discuss about topic inour group and distributeour
work among all group members. We will search for types of formwork use for RCCstructures
at sites and then we will show our collected data to subject teacher after that
wewillprepareareport.

INTRODUCTION

FORMWORK
Formwork (shuttering) in concrete construction is used as a mould for
astructure in which fresh concrete is poured only to harden subsequently.
Typesof concrete formwork construction depends on formwork material and
type ofstructuralelement.

Theconstructionofformworktakestimeandinvolvesexpenditureupto20 to
25% of the cost of the structure or even more. Design of these
temporarystructures are made to economic expenditure. The operation of
removing theformworkis knownas stripping.Strippedformworkcanbereused.

Agoodformworkshouldsatisfythefollowingrequirements:

• Itshouldbestrongenoughtowithstandalltypesofdeadandliveloads.

• It should be rigidly constructed and efficiently propped and braced


bothhorizontallyandvertically,so as toretainitsshape.
• The joints in the formwork should be tight against leakage of
cementgrout.

• Construction of formwork should permit removal of various parts


indesiredsequenceswithoutdamageto the concrete.

• The material of the formwork should be cheap, easily available


andshouldbesuitablefor reuse.

• The formwork should be set accurately to the desired line and


levelsshouldhaveplanesurface.

• Itshouldbeaslightaspossible.

• The material of the formwork should not warp or get distorted


whenexposedto theelements.

• Itshouldrestonfirmbase.

EconomyinFormwork

The following points are to be kept in view to effect economy in the cost
offormwork:

• Theplanofthebuildingshouldimplyminimumnumberofvariations in
thesize of rooms, floor area etc. so as topermitreuse
oftheformworkrepeatedly.
• Design should be perfect to use slender sections only in a
mosteconomicalway.

• Minimum sawing and cutting of wooden pieces should be made


toenable reuse of the material a number of times. The quantity of
surfacefinishdepends onthequalityof theformwork.

Formwork can be made out of timber, plywood, steel, precast concrete


orfiberglass used separately or in combination. Steel forms are used in
situationwhere large numbers of re-use of the same forms are necessary. For
smallworks, timber formwork proves useful. Fibre glass made of precast
concreteand aluminium are used in cast-in-situ construction such as slabs or
membersinvolvingcurvedsurfaces.

Types of Formwork (Shuttering) for Concrete

Construction:TimberFormwork:

Timber for formwork should satisfy the following

requirement:Itshouldbe

• Well-seasoned

• lightinweight

• easilyworkablewithnailswithoutsplitting

• freefromlooseknots
Timberusedforshutteringforexposedconcreteworkshouldhavesmoothandeven
surfaceon allfaceswhichcomeincontactwithconcrete.

TimberFormwork

PlywoodFormwork

Resin bonded plywood sheets are attached to timber frames to make


uppanels of required sizes. The cost of plywood formwork compares
favourablywith that of timber shuttering and it mayeven prove cheaper in
certain casesinview ofthefollowingconsiderations:

• It is possible to have smooth finish in which case on cost in


surfacefinishingis there.

• Byuseoflargesizepanelsitispossibletoeffectsavinginthelabourcostof
fixinganddismantling.

• Numberofreusesaremoreascomparedwithtimbershuttering.Foresti
mationpurpose,numberofreuses canbe takenas20to 25.
PlywoodFormwork

SteelFormwork

This consist of panels fabricated out of thin steel plates stiffened along

theedges by small steel angles. The panel units can be held together through

theuse of suitable clamps or bolts and nuts. The panels can be fabricated in

largenumber in any desired modular shape or size. Steel forms are largely used

inlarge projects or in situation where large number reuses of the shuttering

ispossible. This type of shuttering is considered most suitable for circular

orcurvedstructures.
SteelFormwork

Steelformscomparedwithtimberformwork:

• Steelformsarestronger,durableandhavelongerlifethantimberform
workandtheirreuses aremoreinnumber.

• Steelformscanbeinstalledanddismantledwithgreatereaseandspeed
.

• Thequalityofexposedconcretesurfacebyusingsteelformsisgoodands
uchsurfacesneednofurthertreatment.

• Steelformworkdoesnotabsorbmoisturefromconcrete.

• Steelformworkdoesnotshrinkorwarp.

ConstructionofConcreteformwork:

Thisnormallyinvolvesthefollowingoperations:

• Proppingandcentring
• Shuttering

• Provisionofcamber

• Cleaning and surface

treatmentOrderandMethodofRemovingFor

mwork:

Thesequenceofordersandmethodofremovalofformworkareasfollows:

• Shuttering forming the vertical faces of walls, beams and


columnsides should be removed first as they bear no load but only retain
theconcrete.

• Shutteringformingsoffitofslabsshouldberemovednext.

• Shuttering forming soffit of beams, girders or other heavily


loadedshutteringshouldbe removedintheend.

Rapid hardening cement, warm weather and light loading conditions

allowearly removal of formwork. The formwork should under no circumstances

beallowed to be removed until all the concrete reaches strength of at least

twicethe stresses to which the concrete may be subjected at the time of

removal offormwork. All formworks should be eased gradually and carefully in

order topreventtheload beingsuddenlytransferredto concrete.

Figure shows formwork for different types of members in civil

engineeringconstruction.
FORMWORKFORBEAMSANDSLABS

Periodofremovalofformwork

S.No. Descriptionofstructuralmember TimePeriod


1 Walls,columnsandverticalsidesofbeams 1to 2days
2 Slabs(propsleftunder) 3days
3 Beamsoffits(propsleftunder) 7days
Removalofpropstoslabs
4 (a)Forslabsspanningupto4.5m 7days
(b)Forslabs spanningover4.5m 14days
Removalofpropstobeamsandarches
5 (a)Spanningupto 6m 14days
(b)spanningover6m 21days
• ActualResourcesUsed

Sr. Nameof Specifications Quality Remarks


No. Resource/material
1. Internet - -
2. Computer HPCompany, Windows 01Nos. -
10

• OutputsoftheMicro-Projects
• WegottheinformationaboutvarioustypesofformworksuseforR.C.C.structures.
• Westudiedthesuitabilityofaboutvarioustypesofformworks.

• SkillDeveloped/LearningoutcomeofthisMicro-Project;-
• Learningskill
• Workingina Team.
• Preparationofreport.

9.0 ApplicationsofthisMicro-Project:-
 It is used as a mould for a structure in which fresh concrete is poured
onlytohardensubsequently.

**************
Micro Project Evaluations Sheet
Name of Student :-Vishal. Ratan Shende ENROLLMENT
NO:- 1815970011

Name of programme:-Civil Engineering Semester:-5th


CourseTitle:- Design Of steel and RCC
structures Code:-22502
Title of the Micro-project :-Types of formwork use for RCC structures a site.
Course work ones achieved:-1.To acquire knowledge about types of fromwork
use for RCC structures at site.
2.To study the suitability of types of from work use for RCC structuresat site
Sr Characteristicstobe Poor Average Good Excellent Sub
no. assessed (Marks9 Total
(Marks (Marks (Marks -10)
-3) 4-5) 6-8)

1. Relevancetothe
course

2. LiteratureReview/
information collection

3. Completionofthe
targetasperproject
proposal

4. AnalysisofDataand
representation

5. Qualityofprototype/
Model

6. ReportPreparation
(B) Individual presentation/Viva(Coverts overtaken armour of4marks)
7. Presentation

8. Viva

(A) (B)
Process and product Individual Presentation/ Total marks 10th
Assessment(6 marks) Viva(4 marks)

Name and designation of the teacher:-Mr.JAYANTSAHARE


SIR
Dated Signature:-

You might also like