Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 10

Maintain

Training
Facilities
Template #1
OPERATIONAL PROCEDURE
Equipment Type
Equipment Code
Location
Operation Procedure:
Template #2
HOUSEKEEPING SCHEDULE
Qualification Station/Bldg.

Area/Section

In-Charge

Schedule for the 2nd Semester, 2011


Responsible
ACTIVITIES Every
Weekl
Every
Person Daily other 15th Monthly Remarks
y
Day Day
1. Clean and check welding
equipment/ accessories
from dust and oil; dry and
properly laid-out/
secured/stable
2. Clean and free welding
booths and welding
positioners from
dust/rust /gums, used
Mig wire stubs and metal
scraps
3. Clean and arrange
working tables according
to floor plan/lay-out;
check stability
4. Clean and check floor,
walls, windows, ceilings
• graffiti/dust/rust
• cobwebs and
outdated/unnecessary
objects/items
• obstructions
• any used
materials/scraps (slugs,
stubs) spilled liquid
• open cracks (floor)
5. Clean and check work
shop ventilation and
illumination by dusting
lamps/bulbs, replacing
non-functional lamps and
keeping exhaust clean
6. Clean and check computer
set -monitor, CPU,
keyboards, mouse – free,
unnecessary markings,
dust; cables and plugs are
in order; well-arranged; all
items functional
7. Clean, inspect air
conditioning equipment:
• keep screen and filter
free from dust/rust
• Check selector knobs if
in normal positions and
are functional
• Check if drainage is OK
8. Clean, check and maintain
Tool Room
• Free of dust, not damp
• Tools in appropriate
positions/locations
• With visible
labels/signage
• Logbook and forms are
complete, in order and
updated
• Lights, ventilation – OK
9. Clean and check Rest
Room
• Urinals, bowls, wash
basins, walls and
partitions are free from
stains, dirt, oils, graffiti
and unnecessary
objects;
• Ceilings free from
cobwebs and dangling
items
• Floor is kept dry; no
broken tiles or
protruding objects
• Equipped with dipper
and pails; properly
located after use
• Water systems is
functional: no
dripping/damaged
faucets or pipes
• Drainage system is
working, no water-
clogged areas
• No offensive odor
• Lights /Ventilation – OK
10. Clean and check wash
area:
• Walls/Floors- –free from
oils, molds, broken tiles,
gums, stains or graffiti
• Drainage system is
functional
• Water system
functional; no dripping
faucets or leaking pipes
• Free from unnecessary
objects (mops, rags)

11. Clean and maintain work


shop surroundings by
sweeping/ removing fallen
leaves, branches, debris
and other refuse,
impounded water, clearing
pathways of obstructions
12. Disposal of waste
materials
(Follow waste segregation
system)

Template #3
GMAW WORKSHOP HOUSEKEEPING SCHEDULE
DAILY TASK YES NO
Dispose segregated waste; clean garbage cans

Sweep floors; if wet, wipe dry

Wipe and clean whiteboards

Clean and arrange working tables

Clean and check mounting of machines/equipment

Before leaving, collect stubs and other welding wastes.

WEEKLY TASK YES NO


Clean posters, visual aids and update accomplishment/Progress Charts

Clean bulbs/lamps/ceilings/walls

Clean/Wash of windows/glasses/mirrors

Clean and check tools, machines, supplies, materials

Sanitize garbage receptacles

Empty water collector; clean body of Water Dispenser

MONTHLY TASK YES NO


Conduct inventory

Clean and arrange tool room

Inspect electrical system; clean cables, wires

Clean instructional materials & modules; arrange and put in order

Inspect and clean air-conditioning equipment filter; clean body

Template #4
WELDING EQUIPMENT MAINTENANCE SCHEDULE*
8 HOURS 50 Hours 100 HOURS
•  •

Template #5
EQUIPMENT MAINTENANCE SCHEDULE
EQUIPMENT TYPE
EQUIPMENT CODE
LOCATION
Schedule for the Month of March
MANPOWER Daily Every Weekly Every Monthly Remarks
ACTIVITIES Other 15th
Day Day

1. Check panel board,


and circuit breakers’
electrical connections,
cables and outlets
 Clean and kept dry
 Parts are well-
secured/attached
 Properly labeled
2. Check Mig gun (nozzle,
contact tip, diffuser)
and ground cable:
 Clean and kept dry
 Parts are well-
secured/ attached
 Inspect for damages
and replace parts if
necessary
3. Check adjustment
lever’s if functional
(amperages/speed); if
not, calibrate

4. Check Gas cylinder


outfit for any
abnormality
 Gate valve
 Co2 regulator
 Gas hose Fittings
 Fittings
5. Check/Clean wire
feeder (rollers, wire
speed/spool
adjustment); remove
used oil, dust; keep
dry.

6. Run the equipment for


5 minutes and observe
for unusual noise or
abnormal operation; if
repair is necessary,
send to technician.
Template #6

WORKSHOP INSPECTION CHECKLIST

Qualification
Area/Sectio
In-Charge
n
YES NO INSPECTION ITEMS

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

Remarks:

Inspected by: Date:

Template #7
EQUIPMENT MAINTENANCE INSPECTION CHECKLIST
Equipment Type :
Property Code/Number :
Location :
YES NO INSPECTION ITEMS

Remarks:

Inspected by: Date:

Template # 8
WASTE SEGREGATION LIST
Qualification:
Area/Section :
In-charge:
WASTE SEGREGATION METHOD
GENERAL/ACCUMULATED WASTE
Recycle Compose Dispose

You might also like