Item Description Qty Unit Rate Amount

01 MISCELLAENOUS

1 Site mobilization
2 Level and setting out of the work
3 Foreman In - charge
4 Insurance
5 Plants and equipment
6 Scaffolding
7 Screening (if needed)
8 Welfare & safety
9 Programme, Progress & record
10 Site meetings

sum
Temporary site hoarding and removal (As per
11 client approved supplier) and "No Parking" notices
12 Temporary building & shed
13 Removal of temporary building, shed/fence
14 Water for works
15 Protection of work
16 Lighting & security
17 Temporary storm water drainage
18 Samples & testing
19 Clearing of rubbish and always move to spoil
20 Proping of the existing suspended slab
21 Lifting

Miscellaenous To General Summary 10,000,000


BEME FOR SCRUBBER STORAGE TANK FOUNDATION
Item Description Qty Unit Rate Amount

The contractor is referred to the


specifications and drawings for all details
related to this BEME

02 SITE PRELIMINARIES

Clear site of all bushes, uproot and


dispose offsite 378.0 m2 300.00 113,400.00
Excavation Trenches for foundation not
exceeding 2m depth 50.8 m3 900.00 45,684.00

Preliminaries To General Summary 159,084.00

CONCRETE WORK
Reinforced insitu concrete (1:2:4 - 20mm
aggregate) in stone dust in

Concrete Blinding 10.0 m3 35,000.00 350,000.00


3
Concrete Plinth 10.0 m 40,000.00 400,000.00
Mat Foundations 10.0 m3 45,000.00 450,000.00
3
Isolated footings 10.0 m 45,000.00 450,000.00

Concrete work to Summary 1,650,000.00

REINFORCEMENT/STEELWORK

High yield bar reinforcement to BS 4461 in


straight and bent bars in 10mm - 25mm
diameter in lintel, beam concrete works 20000.0 kg 500.00 10,000,000.00

reinforcement to Summary 10,000,000.00

SAWN FORMWORK
Sides and soffit of ground beams & oversite
concrete & columns 345.0 m2 3,000.00 1,035,000.00

Sawn formwork to summary 1,035,000.00


BEME FOR SCRUBBER STORAGE TANK FOUNDATION
GENERAL SUMMARY
Item Description Amount

1 01 MISCELLAENOUS 10,000,000.00

2 02 SITE PRELIMINARIES 159,084.00

3 03 CONCRETE WORKS 1,650,000.00

4 04 REINFORCEMENT 10,000,000.00

5 05 SAWN FORMWORK 1,035,000.00

TOTAL 22,844,084.00