Request For Inspection(RFI)

NORINCO INTERNATIONALCO.,LTD.
Development Production Service Project for East
Baghdad oil Field/Southern

Provision of EPCC Service For


Project Name: Contract No. 049SC18
Pipeline Corridor From FPF to CPF

RFI Ref No. NORINCO-ZLBY- RFI Inspection Date 26/12/2021

Inspection Location S2,Pump Station Inspection Time 12:30 PM

Civil £ Structural Steel R Equipment □ Piping-Pipeline □

Electrical £ Instrumentation □ MC/Commissioning □ Any Others □

Description of Inspection:
As per ITP 049SC18-0000-QA-PRO-0005 D02
RFI for bolt torquing inspection for Pumps Shelter & Pipe Rack ,at : (Pump Station).

CONTRACROT : A1, NORINCO : W, PMC/OWNER:W


Attached Document(s)& Drawing(s) :
EBS1-FPFA24-SAST-DWSS-1001-D03
EBS1-FPFA24-SACV-DWCI-1001-D01

Inspection Result: □ Accepted □ Accepted with comments □ Rejected □ Canceled

Comments:

Sub-Constructor NORINCO QA/QC TPI PMC

Name : Name : Name : Name :

Signature : Signature : Signature : Signature :

Date: Date: Date: Date:


EBS MDOC

Name :

Signature :

Date: