The scheme has the following main features:-

i) The flats are being offered at the discounted cost. The cost construc on of 20 m wide road of about 10 km, water
of the flats is likely to increase w.e.f 1st April, 2022. supply lines, storm water drains, sewage treatment,
ii) 40% concession in construc on cost for EWS flats at boundary wall construc on, augmen ng electric supply
Pkt.1A, 1B & 1C Sector A1-A4 Narela by establishing Electric Grid Sub-sta on and street light
maintenance.
iii) 10% concession in construc on cost for EWS flat at Pkt. V
Sector G7/ G8 Narela viii) Alloca on were made in DDA’s Annual Budget 2021-22 for
transport infrastructure projects such as grant to DMRC
iv) The flats at Narela sub-city are being offered a er taking
towards construc on of phase IV Metro line for Rithala-
several remedial measures in terms of improvement of
Bawana-Narela corridor and construc on of UER-II
infrastructure, security and connec vity on the basis of
stretch in Delhi through NHAI.
sugges ons/feedback of the earlier allo ees/ residents
of the area. ix) Flyover cum ROB is recently inaugurated in Narela.

v) The allo ees will be eligible for subsidy under PMAY


scheme of the central govt. if they avail home loan from
the Bank/Financial Ins tu on.
vi) The en re process from applica on to allotment and
possession is being done through online mode. The
allo ee need to visit DDA office only for execu on of CD.
vii) Es mate Approval Commi ee (EAC) of DDA, under
Chairmanship of Vice-Chairman, DDA on 28.10.2021
approved schemes at sector G2 & G6, Narela for