Professional Documents
Culture Documents
PSEW - Clean - Energy - Web - 1 - WIND GENERAL DATA
PSEW - Clean - Energy - Web - 1 - WIND GENERAL DATA
PSEW - Clean - Energy - Web - 1 - WIND GENERAL DATA
ENERGY
FOR
POLAND
CLEAN ENERGY CLEAN ENERGY FOR POLAND
12-14 GW
CO₂ emissions
in the Polish electricity sector
would drop by 47 million tonnes
million tonnes
5.8 GW Wind power
(from 125m to 78m tonnes of CO₂ per year capacity in Poland
in 2040) (end of 2018)
2/3
plants in Poland
Italy 9.5
France 13.8
of Poles,
would choose a wind
UK 18.9
FROM WIND
A WIND FARM IN YOUR
NEIGHBOURHOOD
Farmers receive rent New jobs created Revenues for local governments
from farmland leased in Poland from property tax
for wind turbines
Development and construction
of a 10 MW wind farm:
173 jobs
(61 directly with the project) Funding of sports infrastructure,
e.g. sports fields
Development of local
REVENUES FOR MUNICIPALITIES infrastructure, e.g. construction
of access roads
WITH WIND FARMS
INCLUDING PIT
2,500 PLN
/1 MW
92.8% 7.2% 97.8% 2.2% 92.5% 7.5%
CIT
4,500 PLN 9.06m PLN 29.18m PLN 8.73m PLN
Average income from Average revenues Average revenues
/1 MW property tax in municipality of municipality of poorest municipalities
Source: PwC report “Gap in implementation of the RES 2020 target”; Ernst & Young, 2012
THE ECONOMY
Are there any regulations for
Supply chain Wind turbine
wind turbine construction?
of Polish manufacturers
Of course, Grandpa, there are many
wind farms 01 regulations and requirements
that the investors have to meet.
03
Remember:
Wind turbines
improve energy security
and independence 05
2 MW
Power generated by one wind turbine
can power 2,200 homes
2,200 homes
Wind turbines came to the rescue,
helping restore power to Wolin Island and
the port in Świnoujście, and allowing
for electricity to be later restored in Szczecin
and the industrial plant in Police.
Our conversation is
louder than a turbine!
I saw it on TV that
wind power is unstable!
Is that true?
volume of electricity
Precise forecasts are available
12 hours ahead, and 1 hour before
we know the exact energy
to be generated production with 99% certainty.
12 hours
Precise forecast
1 hour
99% certainty
55 dB
vacuum
cleaner
35 dB
ticking
40-45 dB
clock
Wind
turbine fridge
40 dB 60 dB
conversation
400 m
Source of data:
Handbook of Environmental Acoustics, James P. Cowan, New York, 1994
GLOBAL
radar systems that stop
the turbines after detecting Power
birds. There are already lines
projects in Poland where such
systems are required by 131m 14% CAUSES OF
BIRD DEATHS
the environmental decision.
PER YEAR*
Wind farms are
never built Buildings,
windows
in birds' migratory 550m 59%
routes — they are
always located
outside of migration
corridors!
OF A WIND FARM
Planning 3-5 years
INVESTOR
selects the site and
-
secures the title
to land for the project
10-12
months
Orally at
In writing Digitally a consultation
meeting
OF A WIND FARM
Construction 1-2 years
REGULATIONS
APPLICABLE
TO INVESTORS
3 European
directives BUILDING PROCEDURE
After the adoption of LZP and environmental decision
16
national
legislative
acts
Geological
survey
17 regulations Building
design
Building
permit
APPROVED BY
Environmental Governor previously Head of County
and grid guidelines (Wojewoda) (Starosta)
Operating Operating
permit permit
ISSUED BY ISSUED BY
Regional County
Inspectorate for Inspectorate for
Building Supervision Building Supervision
OF A WIND FARM
Operation 15-25 years
Acoustic monitoring
may be performed periodically,
in various conditions
and seasons
Measurements are carried out at night,
at various times, to ensure that the noise level Environmental
does not exceed applicable norms
monitoring
If the farm does not exceed After building the wind farm,
admissible noise level at night, the investor carries out
there is no risk of exceeding detailed monitoring
them during daytime of birds and bats.
All accidents
involving animals
are recorded.
Investors
are required to keep the wind
Investors usually cooperate with local farm in proper technical condition,
communities; they can also establish a to ensure its maintenance,
Social Benefits Fund, repairs and safety of operation.
acting as a participatory budget (according
to the residents' decisions).
90%
Modern turbines are taller, New technologies allow for Smaller number of turbines 90% of materials used in a wind
so the source of noise is increased wind farm capacity has a positive impact on the turbine can be recycled. On average,
located further away from while reducing the number environment in the vicinity it takes half a year for the wind
the ears of residents of turbines by more than a half of the wind farm and turbines to pay back its "carbon
living nearby — 4 turbines instead of 11 significantly reduces risks debt" related to CO2 emissions
for birds and bats for manufacturing, transportation,
construction and maintenance
11 4
over a 20-year operating period.
TURBINES TURBINES
225 m r=75 m
r=45 m 150 m
125 m
80 m
2 MW 0m 5.5 MW
each each
22 MW 22 MW
wind farm capacity wind farm capacity
Do I have to pay
anything extra for all this?
+2 GW
by the government in 2018
in wind farms
COMPARED TO
+4.5 GW
300 –12 PLN/MWh in wind farms
(-5%)
–27 PLN/MWh
(-10%)
200
WIND POWER
IS THE CHEAPEST
Wholesale the energy price we would pay
energy price for would be 5% lower 10% less for OF ALL
2019 in early with additional energy with ENERGY SOURCES
December 2018 2 GW capacity additional 4.5 GW
in wind farms wind capacity
psew.pl