Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

10th January, 2021

To,
The Head of Department,
Procurement, Logistics & Administration,
Group Ltd.

Dear Sir,

RE: APPEAL FOR TECHNICAL & FINANCIAL /COMMERCIAL RE- EVALUATION OF


THE PROVISION OF GPON / HFC/TRUNKING & TRUCK ROLL, MAINTENANCE
SUPPORT SERVICES 2022-2023.

We value and appreciate the opportunity to be working with Group Ltd during this contract
period.
To serve you better, we have continuously invested in human resource, warehousing (including
materials worth more than USD 20 million currently in our warehouse) and machinery
ranging from vehicles, tools and specialized equipment to satisfactorily handle all scopes not
limited to GPON & HFC.

In 2021, we were able to do more than 400,930 work orders with minimal quality issues as
demonstrated by data below:

We have EHS policies in place to ensure quality work and safety of teams. We enforce Q&EHS
standards through mandatory TBT photos shared by teams daily before work. We conduct
weekly safety meetings to ensure EHS policies in place are adhered to as well as address any
arising Q&EHS issues.

We have a fully-fledged warehouse that is secure and can safely holds materials you provide to
us. We believe that we have unique skills and resources that will increase Wananchi Group Limited
market share, which we know is of utmost importance to the company.
1.0 PERFORMANCE FOR YEAR 2021 (1/1/2021 - 31/12/2021)

Below is a summary of jobs we have done in the last year as well as the quality issues raised that were
successfully rectified.

SUMMARY OF WORK DONE IN 2021 CORRECTION ISSUES RAISED IN 2021


Drop Disconnections (DDW) 2,433 QC QUALITY CONTROL AUDIT 5
A 9
Equipment pick up 567 QCS QUALITY CONTROL SERVICE CALL 1
7
Equipment Upgrade 767 SDI Deduction Installation 9
Subscriber Maintenance 3,422 SDS Deduction Support 1
GPON Installations 590 8
6
HFC Installations 7,346
AddTap/Cleanup relocations(TRCs) 805
15,930

1.1 HUMAN RESOURCE (Technical Teams & Dispatch Team)

We have trained our technical and dispatch team and they are all fully equipped to ensure efficiency in
delivery of work as below:

TECHNICAL TEAMS
TEAM EXPERTISE VEHICLE

INHOUSE INHOUSE 101 HFC Installation/Support /Clean up 1

  INHOUSE 102 HFC Installation/Support 1

  INHOUSE 103 HFC Installation/Support 1

       

SUB1 TEAM 1 HFC Installation/Support /Clean up 1

  TEAM 2 HFC & GPON Installation/Support 1

  TEAM 3 HFC Installation/Support 1

  TEAM 4 HFC & GPON Installation/Support 1

       

Sub2 TEAM 1 HFC & GPON Installation/Support 1

  TEAM 2 HFC & GPON Installation/Support 1

  TEAM 3 HFC Installation/Support 1


  TEAM 4 HFC & GPON Installation/Support 1

       

Sub3 TEAM 1 HFC Installation/Support 1

  TEAM 2 HFC Installation/Support 1

  TEAM 3 HFC Installation/Support 1

       

Sub4 TEAM 1 HFC Installation/Support 1

  TEAM 2 HFC Installation/Support 1

1.2 TOOLS AND EQUIPMENT

We have an internal system that ensures verification of materials and tools required by both QC and
GROUP QC before enrolment to work. We have also acquired an additional 4 vehicles to enhance in-
house capacity this year.

Below is a list of tools we have bought for each team depending on the scope:

UO Qt UO Qt
GPON - Installation tools M y HFC - Installation tools M y
Description     Description    
Protective Helmet & Safety gloves leather pcs 2 Protective Helmet & Safety gloves leather pcs 2
Safety shoes and overalls pcs 2 Safety shoes and overalls pcs 2
Hammer, Claw Hammer pcs 1 Hammer, Claw Hammer pcs 1
Side-Cutting Pliers, Hi-Leverage NE pcs 1 Side-Cutting Pliers, Hi-Leverage NE pcs 1
Set of Flat Star Screw Drivers set 1 Set of Flat Star Screw Drivers set 1
Standard-Plus Full-Floating Line Belt (Size: Standard-Plus Full-Floating Line Belt (Size: 22-
pcs 1 pcs 1
22-26) 26)
Adjustable linebelt strap, 1-3/4" wide, 7' pcs 1 Adjustable linebelt strap, 1-3/4" wide, 7' pcs 1
Tool pouch 5202 w/ Belt pcs 1 Tool pouch 5202 w/ Belt pcs 1
2000 Series Diag.-Cutting Pliers, Hi-
pcs 1 2000 Series Diag.-Cutting Pliers, Hi-Leverage pcs 1
Leverage
Magnetic Dual Steel Tape, Pwr-Retrn, 30' x Drop Connector Torque Wrench, 7/16", 25 or Set
pcs 1 pcs 1
1" of sparnners
Heavy Duty Flat-Steel Fish Tape w/ Reel,
pcs 1 Magnetic Dual Steel Tape, Pwr-Retrn, 30' x 1" pcs 1
120' Qty. 1-24
Heavy Duty Flat-Steel Fish Tape w/ Reel, 120'
1 pcs 1
24FT Fiber Glass ladder pcs Qty. 1-24
(DDT59611) Tool Univ Drop Trimmer Cable
1 pcs 1
Splicing Kit with Power Meter pcs Preparation
Splicing Machine set 1 24FT Fiber Glass ladder pcs 1
Tool Bag/bucket pcs 1 Signal Level Meter pcs 1
Drill power + drill bits pcs 1 Compression tools for series 6-11 set 1
First aid kit & Fire extinguisher pcs 1 Drill power + drill bits pcs 1
Safety cones & Barricading tape set 1 First aid kit & Fire extinguisher pcs 1
Safety cones & Barricading tape pcs 1
1.3 EHS &TRAINING

Wconducts safety meetings every Wednesday morning with all Technicians (both in house &
subcontractors) for Quality & EHS refresher trainings and any arising issues with QC. Group
QC is also occasionally invited to handle team queries, especially when new equipment
models are rolled out.

Training of team with QC below:

Sample of TBT Photos shared by teams every morning before reporting


to site, to showcase EHS Compliance.

1.4 WAREHOUSE

Warehouse is secure. Materials reception and stock issuance is controlled by the warehouse
manager.
We look forward to your consideration and positive response.

Yours Sincerely,

For and on Behalf Of Engineering Ltd.

CHIEF EXECUTIVE OFFICER

You might also like