Federal Register / Vol. 83, No.

83 / Monday, April 30, 2018 / Notices 18863

from current operations, and changes station or gate during their reserved Dated: March 13, 2018.
that did occur would be on an as- entry window, all parking lots on Park Deborah L. Conway,
needed basis. Management of park Loop Road would be available on a first- Acting Regional Director, Northeast Region,
visitors would continue to vary come, first-served basis. National Park Service.
seasonally as visitor demand and needs Under all of the action alternatives [FR Doc. 2018–08998 Filed 4–27–18; 8:45 am]
change with many management (alternatives B, C, and D), vehicle size BILLING CODE 4312–52–P
strategies focusing on the peak season limits would be phased in for all
between mid-May and mid-October. commercial and noncommercial
Parking would remain available to all vehicles on the Park Loop Road to
users on a first-come, first-served basis DEPARTMENT OF JUSTICE
improve safety and maintain the historic
and right lane parking on the Park Loop character of the road. Also common to Bureau of Prisons
Road would continue to occur. these alternatives, the number of
Temporary or permanent closures of oversize commercial vehicles (vehicles Annual Determination of Average Cost
roads and parking areas may occur if that do not fit within a standard parking of Incarceration
necessary to address safety and security space such as a bus) allowed at key
concerns or to ensure the financial AGENCY: Bureau of Prisons, Justice.
locations at one time would be managed
sustainability of the overall ACTION: Notice.
to ensure desired conditions are
transportation system.
maintained and visitor capacities at the SUMMARY: This Notice publishes the
Alternative B—would establish a
reservation system for parking at five of parks primary attractions are not annual determination of average cost of
the primary attractions and trailheads exceeded. incarceration for the Fiscal Years (FY)
along Park Loop Road during peak times The NPS will accept comments on the 2016 and 2017. The fee to cover the
and seasons, and eliminate right lane Draft Plan/EIS for a period of 60 days average cost of incarceration for Federal
parking to improve traffic flows. Gates following publication of the inmates was $34,704.12 ($94.82 per day)
and queuing lanes would be constructed Environmental Protection Agency’s in FY 2016 and $36,299.25 ($99.45 per
where needed to validate reservations (EPA) Notice of Availability of the Draft day) in FY 2017. The average annual
and to control access on some first- Plan/EIS in the Federal Register. After cost to confine an inmate in a
come, first-served lots. the EPA Notice of Availability is Residential Re-entry Center was
Alternative C: Proposed action and published, the NPS will schedule public $29,166.54 ($79.69 per day) for FY 2016
preferred alternative—would address meetings to be held during the comment and $32,309.80 ($88.52 per day) for FY
transportation and congestion issues by period. The comment period and dates, 2017.
establishing a reservation system for the times, and locations of these public DATES: Applicable Date: April 30, 2018.
Ocean Drive corridor, Cadillac meetings will be announced through ADDRESSES: Office of General Counsel,
Mountain Road, and the Jordan Pond social media and local media outlets; Federal Bureau of Prisons, 320 First St.
North Lot during peak use season and on the NPS Planning, Environment, NW, Washington, DC 20534.
(approximately mid-May to mid- and Public Comment website at http://
October). During initial implementation FOR FURTHER INFORMATION CONTACT:
parkplanning.nps.gov/
of this alternative, all other parking lots ACADTransportationPlan, and Acadia Sarah Qureshi, (202) 353–8248.
in the park would continue to be National Park’s website at https:// SUPPLEMENTARY INFORMATION:
managed on a first-come, first-served www.nps.gov/acad/index.htm. Title 28 of the Code of Federal
basis; but the alternative includes an Regulations, part 505, allows for
If you wish to comment, you may
adaptive management strategy that assessment and collection of a fee to
submit your comments by any one of
directs park managers to monitor traffic cover the average cost of incarceration
several methods. The preferred method
and resource conditions elsewhere in for Federal inmates. Under § 505.2, this
of commenting is to enter comments
the park. If monitoring indicates traffic fee is calculated by dividing the number
electronically through the PEPC website
or resource conditions worsening representing Bureau of Prisons (Bureau)
at http://parkplanning.nps.gov/
beyond established thresholds, access to facilities’ monetary obligation
ACADTransportationPlan. Comments
Island Explorer routes entering the park, (excluding activation costs) by the
will also be accepted in hardcopy by
vehicle access to other parking lots, or number of inmate-days incurred for the
mail to: Acadia National Park, Attn:
vehicle access to the entire Park Loop preceding fiscal year, and then by
Transportation Plan, P.O. Box 177, Bar
Road may be added to the reservation multiplying the quotient by the number
Harbor, ME 04609, or you may hand-
systems. Expanded opportunities for of days in the fiscal year.
parking and associated visitor access to deliver hardcopy comments to the park
Based on FY 2016 and FY 2017 data,
the park (without private vehicles) at 20 McFarland Hill Drive, Bar Harbor,
the fee to cover the average cost of
would be provided via expanded public ME. Comments will not be accepted in
incarceration for Federal inmates was
transit service and improvements at any other format beyond those specified
$34,704.12 ($94.82 per day) in FY 2016
Hulls Cove and the Acadia Gateway above.
and $36,299.25 ($99.45 per day) in FY
Center. Before including your address, phone 2017. The average annual cost to
Alternative D—would establish a number, email address, or other confine an inmate in a Residential Re-
systemwide approach to manage volume personal identifying information in any entry Center was $29,166.54 ($79.69 per
of vehicles on Park Loop Road during comment, you should be aware that day) for FY 2016 and $32,309.80 ($88.52
the peak use season. Gates and your entire comment—including your per day) for FY 2017. (Note: There were
nshattuck on DSK9F9SC42PROD with NOTICES

additional entrance stations would be personal identifying information—may 366 days in FY 2016 and 365 days in FY
installed at all access points to Park be made publicly available at any time. 2017.)
Loop Road and a timed-entry While you can ask us in your comment
reservation system would be established to withhold your personal identifying Ken Hyle,
for vehicle access to Park Loop Road information from public review, we General Counsel, Federal Bureau of Prisons.
during the peak use season. Once a cannot guarantee that we will be able to [FR Doc. 2018–09062 Filed 4–27–18; 8:45 am]
visitor passes through an entrance do so. BILLING CODE 4410–05–P