Request for Non-Destructive Testing

Project Name Andres LNG Terminal Expansion Project, Dom Republic

IN-APN-0004
Discipline LNG Tank Construction Notification No/ Date
02.Nov.2021

Subcontractor APN Co LTD Request Date / Time 02.Nov.2021 /

ITP No. ELT-05-CT-PC-0004 ITP Step N/A

Reference DWG. ELT-05-ET-DWG-0021

Inspection Items Outer Tank Annula Plate Non-Destructive Testing

Detail Description (If Required)


1. Base material PT inspection(7 Point only)
OAI-6 (5 POINT) ACCEPT
OAI-14 (2 POINT) ACCEPT
Report No : APN-POSCO-PT-001

Attachment: No ( O ), Yes ( )
Subcontractor
NDE Inspector POSCO E&C
(S-Tank Engineering)

Name JONGJIN LEE

Position SITE MANAGER

Signature

Date 02.Nov.2021

Results of Inspection: Accepts ( O ), Rejects( ), Accepts with Comments ( )