Professional Documents
Culture Documents
Tutorial 3
Tutorial 3
Tutorial 3
29 Jan 2021
Agenda
Clarification on Traffic Studies
pedestrian flow
vehicular flow
loading/unloading/services
Pick-up/Drop-off Points
Advantages:
1)Increase holding area for cars / buses
Shift the
ramp by
about 16m
Shift the
southern wall
by about
12m
Clarification on Mini Project
Overview
Individual Project
Point: 25%
Submission Time: 8 March 2021
Submission Requirement
All calculation steps shall be provided in Word Format
Travel Pattern
12000
10000 9890
8000
7489 7210
6458
Trips
PCU factor
Task for Student
5. Please estimate how may bus services are required to meet the
traffic demand generated by the town based on its peak hour trips.
Assumptions shall be made based on the bus capacity when reached
the town and their frequencies.
6. Please estimate how many MRT stations shall be provided around the
town based on the MRT trips and assuming the MRT capacity when
reach the respective station and their headway.