RFQ For Waste Water Treatment Package (Internal) R.0
RFQ For Waste Water Treatment Package (Internal) R.0
RFQ For Waste Water Treatment Package (Internal) R.0
TENDER NO. :
LEMBAR REVISI
DAFTAR ISI
1 GENERAL .................................................................................................................................................... 4
3 DOCUMENTATION ...................................................................................................................................... 6
1 GENERAL
1.1 INTRODUCTION
PT. Medco Power Indonesia (hereinafter referred as Company) is entitled to provide
power in Sumbawa, Nusa Tenggara Barat. In order to provide power as intended,
Company will develop Combined Cycled Power Plant (CCPP) with natural gas used as
its feed. Natural gas feed to CCPP will be supplied by LNG Regasification Terminal.
This study covers Sumbawa LNG Regasification Terminal project which builds the LNG
regasification facility consists of LNG storage hub terminal with associated
regasification facility that will produce natural gas export to CCPP.
The terminal will operate continuously in receiving and store LNG that is uploaded from
LNG Carrier. The LNG terminal will consist of Jetty, LNG Storage Tank, and
Regasification plant with boil-off gas (BOG) recovery to prevent gas venting or flaring
during normal operation complete with its auxiliary utility system as required.
1.2 GENERAL
This requisition covers the minimum requirements for the Request for Quotation or
Purchase Order for the design, materials, fabrication, inspection and
testing/commissioning of the Equipment/Materials to be used in SUMBAWA LNG
STORAGE & REGASIFICATION TERMINAL .
1.3 DEFINITIONS
The following definition and abbreviations shall be applied within this document.
EMPLOYER/OWNER : PT. MEDCO ENERGI
PROJECT : SUMBAWA LNG STORAGE & REGASIFICATION
TERMINAL.
PURCHASER/CONTRACTOR : Konsorsium PT. Inti Karya Persada Teknik - PT.
Wijaya Karya (Persero) Tbk
VENDOR /SUBCONTRACTOR : The Supplier, Manufacturer material and
equipment, and or included services, chosen
and approved by the CONTRACTOR and
OWNER
2.1.2 Two (2) years Operation Spare Parts ( [ ] not required, [ x ] required )
Recommended two (2) years operating spare parts list shall be submitted included price and
delivery time.
c) VENDOR shall supply operational consumables for initial charge and commissioning
operation together with the equipment. Lube oil and grease shall be included.
d) The cost of operational consumable shall be included in the proposal.
3 DOCUMENTATION
a) Submission
VENDOR shall submit documents to PURCHASER the documents in accordance as
listed on "VENDOR Data Requirement (VDR)" (Attachment-3). All documents to be
submitted to PURCHASER shall bear this requisition number.
b) Manufacturing schedule and status report
VENDOR shall submit a time schedule for the submission of documents including the
following:
Fabrication (including order and material delivery from sub VENDOR),
Tests and inspections
REQUEST FOR QUOTATION FOR
WASTE WATER TREATMENT
PACKAGE
DOCUMENT NO: Rev. A
SUMBAWA LNG STORAGE &
No. of Page
XXX-XXX-XXX-XXX-XXX REGASIFICATION TERMINAL
7 of 18
6 FIELD PRESERVATION
VENDOR recommended field preservation procedures including rust prevention (for 6
months storage after delivery to the site) shall be submitted.
8 ORDER OF PRECEDENCE
If any inconsistency or conflict exists between documents and/or drawings, the order of
precedence shall be as follows:
a) Purchase Order
b) This Requisition including technical clarification notes.
c) PURCHASER’s data sheet or drawings
d) Project specifications, e.g. Technical and General Specification
e) Industrial Standard, i.e. ASME, ASTM, etc.
If the conflict is still not resolved, VENDOR shall request PURCHASER to give a final
judgment.
REQUEST FOR QUOTATION FOR
WASTE WATER TREATMENT
PACKAGE
DOCUMENT NO: Rev. A
SUMBAWA LNG STORAGE &
No. of Page
XXX-XXX-XXX-XXX-XXX REGASIFICATION TERMINAL
9 of 18
9 SUB-VENDOR LIST
VENDOR shall submit the sub-VENDOR list with his proposal for the Equipment and
Materials.
12 SHE REQUIREMENTS
VENDOR manufacture and facility shall follow OWNER & PURCHASER HSE
requirement
REQUEST FOR QUOTATION FOR
WASTE WATER TREATMENT
PACKAGE
DOCUMENT NO: Rev. A
SUMBAWA LNG STORAGE &
No. of Page
XXX-XXX-XXX-XXX-XXX REGASIFICATION TERMINAL
10 of 18
SPECIFICATION
Specification for Waste Water
XXX-XX-XXXX A
Treatment Package
REQUEST FOR QUOTATION FOR
WASTE WATER TREATMENT
PACKAGE
DOCUMENT NO: Rev. A
SUMBAWA LNG STORAGE &
No. of Page
XXX-XXX-XXX-XXX-XXX REGASIFICATION TERMINAL
13 of 18
transportation procedure
3. Packing list Before shipping 2E 5E
each equipments
11. Dimensional/Sectional drawing 1M 2E 5E
12. Wiring Diagram 2M 2E 5E
13. Foundation Design and Base 3C+1\E 2W 2E 5E
Anchoring
14. Equipment Data sheet with 3C+1E 1W 2E 5E
Loading Data
15. Calculation Sheet 2W 2E 5E
16. Local Control Panel with 2M 2E 5E
Detail Outline Terminal
Drawing
17. Mechanical Instrumentation 2M 2E 5E
Diagram
REQUEST FOR QUOTATION FOR
WASTE WATER TREATMENT
PACKAGE
DOCUMENT NO: Rev. A
SUMBAWA LNG STORAGE &
No. of Page
XXX-XXX-XXX-XXX-XXX REGASIFICATION TERMINAL
14 of 18
NOTES:
b. Definitions:
c. Electronic Files shall be submitted in PDF format, drawing in PDF and AutoCAD.
Electronic file preferably provided in Flash Disk.
d. Certification for Area Hazardous Classification shall be submitted as a supplier
document before equipment shipment.
e. Certification and report include in MDR.
REQUEST FOR QUOTATION FOR
WASTE WATER TREATMENT
PACKAGE
DOCUMENT NO: Rev. A
SUMBAWA LNG STORAGE &
No. of Page
XXX-XXX-XXX-XXX-XXX REGASIFICATION TERMINAL
16 of 18
INSPECTED BY
TEST AND MFR’S
NO REMARK
INSPECTION PURCHASER OW NER VENDOR RECORD
1. Material Inspection
Non Destructive
1.2. R R I OR
Examination
2.
3. Final Inspection
4 Painting inspection R R I OR
5 MDR R R I R
Abbreviation
a. Hold Point (H)-VENDOR is not allowed to proceed with the test/inspection unless a written
release is issued by the PURCHASER. VENDOR shall submit Inspection Notification to
PURCHASER.
b. Witness Point (W) – PURCHASER intends to witness the test/inspection, however
VENDOR can proceed with the test/inspection when the PURCHASER inspector is not
present at the notified time. VENDOR shall submit Inspection Notification to
PURCHASER.
c. Spot Witness (SW) – Spot Witness specified the operation test/examination where the
REQUEST FOR QUOTATION FOR
WASTE WATER TREATMENT
PACKAGE
DOCUMENT NO: Rev. A
SUMBAWA LNG STORAGE &
No. of Page
XXX-XXX-XXX-XXX-XXX REGASIFICATION TERMINAL
17 of 18
Contractor inspector shall be notified in advance and may be present during the specified
activity. VENDOR shall submit inspection notification to contractor.
d. Surveillance (S) – VENDOR is not requested to notify PURCHASER. The PURCHASER
inspector will monitor work in progress, tests and inspections during his visit or periodical
inspection.
e. Official Record (OR) - VENDOR is requested to provide the official record to be
submitted as Material Data Report.
f. Internal record (IR)- VENDOR is requested to provide internal records for PURCHASER
inspector to verify the quality, such as welding consumable control record, etc.
g. Documents review (R) – VENDOR is requested to submit the documents or records to
PURCHASER for review and approval.
h. Implementation (I) – Preparation for execution of measurement, observation
examination, and or testing and reporting.
REQUEST FOR QUOTATION
FOR WASTE WATER TREATMENT PACKAGE
XXXXXXXXXXXXXX
SUMBAWA LNG STORAGE & REGASIFICATION TERMINAL No. of Page
18 of 18