KERTAS TUGASAN

KOD DAN NAMA PROGRAM /


MC-050-2:2012: EDM DIE SINKING OPERATION
PROGRAM CODE AND NAME

TAHAP / LEVEL L2

NO. DAN TAJUK KOMPETENSI/ /


COMPETENCY UNIT NO. AND C05: EDM DIE SINKING OPERATION
TITLE

1. Interpret detail drawing


2. Prepare EDM electrode
3. Select material to be machined
4. Select EDM Die Sinking machines and
accessories requirement
NO. DAN PERNYATAAN AKTIVITI
5. Set up workpiece.
KERJA / WORK ACTIVITIES NO.
6. Set up EDM electrode.
AND STATEMENT
7. Carry out EDM Die Sinking operation
8. Inspect finished product
9. Submit finished product with recording
data to superior

MC-050-2:2012-C05/KT(4/4) Muka Surat / Page : 1


NO. KOD / CODE NO.: Drp/ of 2
ARAHAN/INSTRUCTION :
 Jawab semua soalan. Jawapan perlulah jelas dan menjurus kepada topik.
 Pelatih boleh merujuk Kertas Penerangan MC-050-2:2012-C05/P(4/4)

SOALAN/QUESTION :

1. Dengan bantuan gambarajah, lakarkan level gauge cecair dieelektrik dalam tangki.

(12 markah)

2. Senaraikan LAPAN (8) daily inspection pada mesin EDM DIE SINKING.

.......................................................................................................................................
.......................................................................................................................................
......................................................................................................................................
......................................................................................................................................
(8 markah)
3. Lengkapkan jadual hasil pemeriksaan produk untuk projek edm die sinking di bawah

KOLEJ VOKASIONAL KERIAN

INSPECTION SHEET

Program Name Date

Drawing No Inspect Duration


Material Quantity of Inspect
Finishing

DIMENSIONS TOLERENCES INSTRUMENT RESULT


IN OUT

∓ 0.05
∓ 0.05
∓ 0.05

∓ 0.05
∓ 0.05

∓ 0.05

∓ 0.05

∓ 0.05

∓ 0.05

∓ 0.05

Inspect By Approved By

(10 markah)